HomeMy WebLinkAbout6.j. Payment #2, Shannon Pond South Street & Utility Improvements, City Project #288 CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: July 6, 1999
AGENDA ITEM: Payment #2, Shannon Pond South Street & AGENDA SECTION:
Utility Improvements, City Project #288 Consent
PREPARED BY: Bud Osmundson AGENDA N� .
City Engineer/Public Works Director �
ATTACHMENTS: Payment Voucher #2 APPROVED BY:
This item requests the second payment to Erickson Construction, Inc., in the amount of
5201 ,511 .45 for City Project #288, the Shannon Pond South Addition Street and Utility
Improvements.
Work completed and represented in this amount as of June 15, 1999 is 73% of
contracted work. This work has been inspected and is in compliance with Contract
Documents.
This payment covers utility construction and some aggregation base placement in
preparation for street construction. The first lift of bituminous pavement could be
completed by this Council meeting.
Attached is a copy of the Construction Pay Voucher #2 for your information. Staff and
WSB & Associates recommend approval of this second payment.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #2 TO ERICKSON
CONSTRUCTION, INC., IN THE AMOUNT OF $201 ,51 1 .45.
COUNCIL ACTION:
3
- BA.Mittelsteadc,P.E.
350 Westwood Lake Office Bret A Weiss,P.E.
II��� � 8441 Wayzata Boulevard Peter R Willenbring,P.E.
S Minneapolis, MN 55426 Donald W.Stema,P.E.
Ronald B.Bray,P.E.
612-541-4800
�'Assoriates,Inc. FAX 541-1700
June 24, 1999
Honorable Mayor and City Council
City of Rosemount
2875 145`� Street West
Rosemount, MN 55068
Re: Construction Pay Voucher No. 2
Shannon Pond South
City Project No. 288
WSB Project No. 1147.01
Dear Mayor and Council Members:
Please find enclosed Construction Pay Voucher No. 2 for the above-referenced project in
the amount of$201,511.45. Would you please process payment in this amount to Erickson
Construction, Inc. at your earliest convenience. Thank you.
Sincerely,
WSB &Associates,Inc.
� �����
�
Bret A. Weiss, P.E.
Vice President
Enclosures
c: Bud Osmundson/Doug Litterer, City of Rosemount
Erickson Construction, Inc.
nrri
F.•'WPWlM!/a7.0/�vo-2-lv.wpd
Infrastructc�re Engineers Planners
EQUAL OPPORTUNITY EMPLOYER
`� y" � � d��'�ys�"�. 3°,'3' �C�'. � ,m,^'��..��R�� ;, ' r.a� s „., ,"'_:
� � � �� �� cf�er
� ��� ¢ �� ,�� ��������, . �;�r� ����Canstruc,t�on Pay��ll,ou 5.
Voucher No. 2 Date: June 21, 1999
WSB Project No: 1147.00 Period Ending: June 15, 1999
Project: Shannon Pond South
Project Location: City of Rosemount Project No.288
Contractor: Erickson Construction, Inc.
13616 Pleasant Lane
Burnsville, MN 55337
Contract Date: October 28, 1998 Work Started:
Completion Date: Work Compieted:
Original ContractAmount $414,139.15
Totai Additions
Total Deductions
Total Funds Encumbered $414,139.15
Total Work Certified to Date $301,581.92
Less Retained Percentage 5.00% �15,079.10
Less Previous Payments $84,991.37
Total Payments Inci. This Voucher $286,502.82
Balance Carried Forward $127,636.32
Approved for Payment This Voucher $201.511.45
Approvals
WSB�Associates, lnc.
In accordance with field observation, as performed in accordance with industry standards, and based on our professional
opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and
specifications.
The total work estimated to be completed as of June 15, 1999 is as indicated herein and we hereb recommend �
73/c ;
payment of this voucher. �
�
Signed: Signed:
Construction Observer Project Manager/Engineer
Erickson Construction, Inc.
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified
herein is a fair approximate estimate for the period covered by this voucher.
Contractor: Signed:
Date: Title:
City of Rosemount
Checked by: Approved for Payment:
Authorized Representative
Date: Date: