Loading...
HomeMy WebLinkAbout6.i. Payment #2, Wensmann 12th Addition Street & Utility Improvements, City Project #287 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: July 6, 1999 AGENDA ITEM: Payment #2, Wensmann 12th Addition AGENDA SECTION: Street & Utility Improvements, City Project #287 Consent 0 PREPARED BY: Bud Osmundson AGEND��.��D�! �� � City Engineer/Public Works Director � ATTACHMENTS: Payment Voucher #2 APPROVED BY: This item requests the second payment to Ryan Contracting, Inc., in the amount of 5103,663.65 for City Project #287, the Wensmann 12th Addition Street & Utility Improvements. Work completed and represented in this amount as of May 31 , 1999 is 88% of contracted work. This work has been inspected and is in compliance with Contract Documents. This payment is mostly for street and sidewalk construction in the Addition. The sidewalk from the future park to 153rd Street has been completed. Attached is a copy of the Construction Pay Voucher #2 for your information. Staff and WSB & Associates recommend approval of this second payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #2 TO RYAN CONTRi4CTING, INC., IN THE AMOUNT OF $103,663.65. COUNCIL ACTION: 2 - B.A.Mittelsceadc,P.E. 350 Westwood Lake Office BretA Weiss,P.E. I����� 8441 Wayzata Boulevard Peter R Willenbring,P.E. Minneapolis, MN 55426 Donatd W.Scema,P.E. Ronald B.Bray,P.E. 612-541-4800 �Associates,Inc. FAX 541-1700 June 24, 1999 Honorable Mayor and City Council City of Rosemount 2875 145�' Street West Rosemount, NIN 55068 Re: Construction Pay Voucher No. 2 Wensmann 12�' Addition Street&Utility Construction City Project No. 287 WSB Project No. 1067.51 Dear Mayor and Council Members: Please find enclosed Construction Pay Voucher No.2 in the amount of$103,663.65 for the referenced proj ect. Would you please process pay�rnent and forward to Ryan Contracting Co. at your earliest convenience. Thank you. Sincerely, WSB &Associates, Inc. ���c� �� Bret A. Weiss, P.E. Vice President Enclosures c: Bud Osmundson/Doug Litterer, City of Rosemount Ryan Contracting Co. nrri F:�WPWIM/067.S1;wJ-lv.rpd Infrastructure Engineers Planners EQUAL OPPORN\TIY EhiPLOYER �. , �� , :� Construcfion Pay`�Voucher� Voucher No. 2 Date: June 21, 1999 WSB Project No: 1067.51 Period Ending: May 31, 1999 Project: Wensmann 12th Addition Street&Utility Construction Project Location: City of Rosemount Project No.287 Contractor: Ryan Contracting Co. 870013th Ave East Shakopee,MN 55379 Contract Date: July 30,1999 Work Started: Completion Date: Work Completed: Original Contract Amount $379,349.67 Total Additions $3,960.00 Total Deductions $0.00 Totai Funds Encumbered $383,309.67 Total Work Certified to Date $335,639.83 Less Retained Percentage 5.00% $16,781.99 Less Previous Payments $215,194.19 Total Payments Incl. This Voucher $318,857.84 Balance Carried Forward $64,451.83 Approved for Payment This Voucher $103,663.65 Approvals WSB�Associates, Inc. In accordance with field observation, as performed in accordance with industry standards, and based on our professional opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work estimated to be completed as of May 31, 1999 is as indicated herein and we hereby r commend ' ' sa°ia ; payment of this voucher. I . � Signed: Signed: Construction Observer Project Manager/Engineer Ryan Contracting Co. This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: Signed: Date: Title: City of Rosemount Checked by: Approved for Payment: Authorized Representative Date: Date: