HomeMy WebLinkAbout6.g. Payment #1, Shannon Pond South Street & Utility Improvements, City Project #288 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 1 , 1999 AGENDA ITEM: Payment #1-Shannon Pond South Addition AGENDA SECTION: Street & Utility Improvements, City Project #288 Consent PREPARED BY: Bud Osmundson AGENDA�� � � � City Engineer/Public Works Director � ATTACHMENTS: Payment Voucher #1 APPROVED BY: This item requests the first payment to Erickson Construction, Inc., in the amount of 584,991 .37 for City Project #288, the Shannon Pond South Addition Street and Utility Improvements. Work completed and represented in this amount as of August 30, 1999 is 22% of contracted work. This work has been inspected and is in compliance with Contract Documents. This payment is for Utility Construction mainly on 156th Court West and 157th Street West. The aggregate base should be installed on these two streets within the week. Attached is a copy of the Construction Pay Voucher #1 for your information. Staff and WSB & Associates recommend approval of this first payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #1 TO ERICKSON CONSTRUCTION, INC., IN THE AMOUNT OF 584,991 .37. COUNCIL ACTION: 3 - B.A.Mittelsteadt,P.E. 350 Westwood Lake Office Brec A.Weiss,P.E. I��� � 8441 Wayzata Boulevard Peter R Willenbring,P.E. S Minneapolis, MN 55426 Donald W.Scerna,P.E. Ronald B.Bray,P.E. 612-541-4800 �'1�ssociates,Inc. FAX 541-1700 May 17, 1999 Honorable Mayor and City Council City of Rosemount 2875 145`� Street West Rosemount, MN 55068 Re: Construction Pay Voucher No. 1 Shannon Pond South City Project No. 288 WSB Project No. 1147.01 Dear Mayor and Council Members: Enclosed are three(3) copies of Construction Pay Voucher No. 1 for the above-referenced project in the amount of$84,991.37. Would you please process payment in this amount to Erickson Construction, Inc. at your earliest convenience. Thank you. Sincerely, WSB & Associates, Inc. �� Bret A. Weiss, P.E. Vice President Enclosures c: Bud Osmundson/Doug Litterer, City of Rosemount Erickson Construction, Inc. nrn F•iwpwiMr�a�on,�r-ra.w� Infrastructure Engineers Planners EQUAL OPPORTUNTIY EMPLOYER .�" - � � ' Cor�sfruct�an Pa Voucher ., Vaucher Nv. 1 Date: May 17,1999 WSB P�pject No: 1'(47.00 peri�d Ending: Apti13Q,1999 P�oject: Shannon Pond South Project Location: City af Rosemount Project No.288 Con#ra�tot: �rlckson Construction, lnc. � 136�i6 Pteasanti..ane . Bumsville, MN 55337 . Contract Date: Ocfpber 28�i998 Work 5tarted: • • ' • � Completian Date: Work Completed: Original ContractAmount 5414,139.15 7otal Adtlitions Total Oeductions 1"o�at�unds Encumbered �414,�35.15 Totat Work Certified to Date 589,464.60 Less Retained Percentage 5.00°le 54,473.23 �ess Previous Payments Tatal Payments Inc!_This Voucher S84�991.37 Bslance Carried Forward $329,147.7a ApprQved for Payment This Voucher S84,991.37 Aaprovals —���" - - - '.."—.� � WSB&Associates� Inc. In accordance with field observ�tion, as pe�ormed in accordanCe with industry standards,and based on au�professional opinion�the materials installed are satisfactory�nd the work properly performed in 2Ccordance with the plans 8nd specificatians. The total work estimated to be compiet�d as of April 30, 1999 is as indicated herQin and we hereby recommend ' � payment af this voucher. ��`�° , � , Signed: i �� l.��tQ�` 1. — S'gnea, � ConstruGtian Observer Project ManagerlEngineer Eriakson Consfructi4�, tnc. This is to certify that to the best of my icnowledge, information, 2nd belief,the quantities and values of wark certified herein is a Yir appro 'rnate estimate for the period cavered by this voucher. Contractor. �C�i , Signed: . Date: �,�S— � � Title: ��..� _�,. - ...,T—� � .. City of Rosemount Cheoked by: Appcoved for Payment Authorized Representative Date: Date: , TOTAL P.���