HomeMy WebLinkAbout6.k. Payment #6, Wensmann 11th Addtion Street & Utility Improvements, City Project #298 CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: September 7, 1999
AGENDA ITEM: Payment#6-Wensmann l l�h Addition Street& AGENDA SECTION:
Utility Improvements, City Project#298 Consent
PREPARED BY: Bud Osmundson AGENDA NO.
City Engineer/Public Works Director �1���,Yi_ � � ��
ATTACHMENTS: Payment Voucher#6 APPROVED BY: �
This item requests the sixth payment to Ryan Contracting Company, in the amount of
$17,241.26 for City Project#298,the Wensmann 11�'Addition Street&Utility Improvements.
Work completed and represented in this payment as of August 15, 1999 is 91%of contracted
work. The work has been inspected and is in compliance with Contract Documents.
This payment is mainly for the first lift of bituminous paving. The installation of the final lift
of paving and punch list work remain to be completed on this project.
Attached is a copy of the Construction Pay Voucher#6 for your information. Staff and WSB
&Associates, Inc. recommend approval of this sixth payment.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT#6 TO RYAN
CONTRACTING COMPANY, INC. IN THE AMOUNT OF $17,241.26 FOR THE
WENSMANN 11TH ADDITION STREET &UTILITY IlVIPROVEMENTS, CITY PROJECT
#298.
CITY COUNCIL ACTION:
- BA.Mittelsteadt,P.E.
350 Westwood Lake Office Bret A Weiss,P.E.
I���SB 8441 Wayzata Boulevard Peter R.Willenbring,P.E.
Minneapolis, MN 55426 Donald W.Scerna,P.E.
Ronald B.Bray,P.E.
612-541-4800
�'flssociates,Inc. FAX 541-1700
August 18, 1999 �
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068-4997
Re: Construction Pay Voucher No. 6
Wensmann 11�' Addition Street & Utility Construction
City of Rosemount Project No. 298
WSB Project No. 1067.31
Dear Mayor and Council Members:
Please find enclosed Construction Pay Voucher No. 6 for the above-referenced project in
the amount of$17,241.26.
Please process payment for this amount and forward to Ryan Contracting Co.at your earliest
convenience. Thank you.
Sincerely,
WSB & Associates, Inc.
�� �U...��
Bret A. Weiss, P.E. ����
Vice President
Enclosures
c: Bud Osmundson/Doug Litterer, City of Rosemount
Ryan Contracting Co.
nrri
F.•�WPWIM!067.3!'w-61tr.wpd
, Infrastructure Engineers Planners
EQUAL OPPORNNITY EMPLOYER
>CONSTRUCTION PAY VOUCHER
ESTIMATE VOUCHER NUMBER: 6 DATE August 18, 1999
WSB PROJECT NUMBER: 1067.31 PERIOD ENDING: August 15, 1999
� ;_. . ����... „�, .R>,,,_ .. ..��, . ._ :_-:.... =. .�.•�. :�:�: � ro��=:__..�. . � .r �•, r,. . ... �
PROJECT: WENSMANN 11T"ADDITION STREET 8 UTILITY CONSTRUCTION
- CITY PROJECT NO.298
ROSEMOUNT,MN
CONTRACTOR: RYAN CONTRACTING CO.
870013TH AVE EAST
SHAKOPEE MN 55379
CONTRACT DATE: September 16,1998 WORK STARTED:
COMPLETION DATE: WORK COMPLETED:
_ _ _
_ _
_.
ORIGINAL CONTRACT AMOUNT $644,811.46
TOTAL ADDITIONS $32,032.68
TOTAL DEDUCTIONS ($28,003.52)
TOTAL FUNDS ENCUMBERED $648,840.62
TOTAL WORK CERTIFIED TO DATE $592,900.02
LESS RETAINED PERCENTAGE 5.00% $29,645.00
LESS PREVIOUS PAYMENTS $546,013.76
TOTAL PAYMENTS INCL.THIS VOUCHER $563,255.02
BALANCE CARRIED FORWARD $85,585.60
APPROVED FOR PAYMENT THIS VOUCHER 17 241.26
APPROVALS
WSB&ASSOCIATES,INC.
In accordance with field observation,as performed in accordance with industry standards,and based on our professional opinion,the materiais installed
are satisfactory and the work properly performed in accordance with the plans and specifications. The total work is estimated to be 91%completed as
of August 15, 1999. We hereby recommend payment of this voucher.
Signed: Signed:
onstruction bserver ro�ect Managed ngineer
RYAN CONTRACTING CO.
This is to certify that to the best of my knowledge,information,and belief,the quantities and values of work certified herein is a fair approximate estimate
for the period covered by this voucher.
Contractoe Signed:
Date: Title:
CITY OF ROSEMOUNT
Checked by: Approved for payment:
Authorized Representati e
Date: Date: / ��� ` �
F:�wPwn�ni oa�.s i�vo-s.�a