Loading...
HomeMy WebLinkAbout6.g. Paymetn #4, Wensmann 12th Addition Street & Utility Improvements, City Project #287 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 7, 1999 AGENDA ITEM: Payment#4-Wensmann 12th Street&Utility AGENDA SECTION: � Improvements, City Project#287 Consent PREPARED BY: Bud Osmundson AGENDA NO. City Engineer/Public Works Director �� '� � . � ATTACHMENTS: Payment Voucher#4 APPROVED BY:�� This item requests the fourth payment to Ryan Contracting Company, in the amount of $6,040.57 for City Project#287, the Wensmann 12th Street&Utility Improvements. Work completed and represented in this payment as of August 15, 1999 is 92% of contracted work. The work has been inspected and is in compliance with Contract Documents. The contractor has completed utility construction and the installation of the first lift of paving. All that remains to be completed is the installation of the final lift of paving and punch list items. Attached is a copy of the Constnzction Pay Voucher#4 for your information. Staff and WSB & Associates, Inc. recommend approval of this fourth payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT#4 TO RYAN CONTRACTING CO., INC. IN THE AMOUNT OF $6,040.57 FOR WENSMANN 12Tx STREET &UTILITY IlVIPROVEMENTS, CITY PROJECT#287. CITY COUNCIL ACTION: - B.A.Mittelsceadt,P.E. 350 Westwood Lake Office Bret A.Weiss,P.E. II����� 8441 Wayzata Boulevard Peter R.Willenbring,P.E. Minneapolis, MN 55426 Donald W.Scerna,P.E. Ronald B.Bray,P.E. 612-541-4800 �Assoriates,Inc. FAX 541-1700 August 23, 1999 Honorable Mayor and City Council City of Rosemount 2875 145�' Street West Rosemount, MN SSOb8 Re: Construction Pay Voucher No. 4 Wensmann 12�'Addition Street &Utility Construction , City Project No. 287 WSB Project No. 1067.51 Dear Mayor and Council Members: Please find enclosed Construction Pay Voucher No. 4 in the amount of$6,040.57 for the above-referenced project. Would you please process payment and forward to Ryan Contracting Co. at your earliest convenience. Thank you. Sincerely, WSB & Associates, Inc. `�L��� Bret A. Weiss, P.E. � Vice President Enclosures c: Bud Osmundson/Doug Litterer, City of Rosemount Ryan Contracting Co. nm F.'��RPWlMI06L3I1vo-J-frr.wpd Infrastructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER _ _ . _.__ ,�. , � _ �., . _ �: , ; �Constructron Pay.11oucher. .. , ; Voucher No. 4 Date: August 18, 1999 WSB Project No: 1067.51 Period Ending: August 15, 1999 Project: Wensmann 12th Addition Street 8�Utility Construction Project Location: � City of Rosemount Project No.287 Contractor: Ryan Contracting Ca 870013th Ave East Shakopee, MN 55379 � Contract Date: July 30, 1999 Work Started: Completion Date: Work Completed: Originai Contract Amount $379,349.67 Total Additions $3,960.00 Total Deductions $0.00 Total Funds Encumbered $383,309.67 Total Work Certified to Date $351,661.32 Less Retained Percentage 5.00% $17,583.07 Less Previous Payments $328,037.69 Total Payments Incl. This Voucher $334,078.26 Balance Carried Forward $49,231.41 � Approved for Payment This Voucher 6 040.57 Approvals WSB&Associates, Inc. In accordance with field observation, as perFormed in accordance with industry standards, and based on our professional opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work estimated to be completed as of August 15, 1999 is as indicated herein and we hereby recommend� ' payment of this voucher. s2°io Signed: Signed: IU�^ Y � Construction Observer P o�ect Manager/Engineer Ryan Contracting Ca This is to certify that to the best of my knowledge, information,and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: Signed: Date: Title: City of Rosemount � Checked by: Approved for Payment: Aut�rized Representative Date: Date: ���� �