Loading...
HomeMy WebLinkAbout6.f. Approve Change Order #1, Hawkins Pond Street & Utility Improvements, City Project #275CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 2, 1997 AGENDA ITEM: Approve Change Order #1, Hawkins Pond Street & Utility Improvements, City Project #275 AGENDA SECTION: CONSENT PREPARED BY: Bud Osmundson AGENDA d O "je -IT6 F City Engineer/Public Works Director ATTACHMENTS: Change Order #1 APPROVED BY: ►i This Change Order addresses water service connections to the existing homes at 4275 and 4255 145th Street West and to extend the contract time to account for a delay in the start of the project. Originally this project was just going to hook the homes at 4275 and 4255 145th Street up to sanitary sewer constructed with improvements in the Hawkins Pond Addition. Water services were already in place on 145th Street for these two homes, but during the course of the Hawkins Pond project the homeowners requested that they be hooked up to City water at the same time as they were being hooked up to the sewer. Also by having the City Contractor complete their water service connection to their home they could apply the costs to their assessments, as was approved by the City Attorney. Delays beyond the control of the contractor prevented them from starting the project for 15 days. This Change Order will extend the final completion date (except wear course) to September 15, 1997. RECOMMENDED ACTION: MOTION TO AUTHORIZE APPROVAL AND NECESSARY SIGNATURES FOR CHANGE ORDER #1 TO THE HAWKINS POND STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #275. COUNCIL ACTION: 0 s City of Rosemount OWNER 275 OWNER'S PROJECT NO. Hawkins Pond Street and Utilities PROJECT DESCRIPTION CHANGE ORDER 3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST. PAUL. MN 55110 612490-2000 800325-2055 ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION The following changes shall be made to the contract documents: August 19, 1997 DATE 1 CHANGE ORDER NO. A-ROSEM9604.01 SEH NO. Description: Add water service home connections to the contract, and extend the contract time described in Item 9 of Division 1 - Supplementary General Requirements. Purpose of Change Order. To install water services connecting to the homes at 4275 and 4255 145th Street West, and to extend the contract time to account for a delay in the start of the project. Basis of Cost: ■ Actual ❑ Estimated: Attachments (list supporting documents) May 29, 1997, letter from S.M. Hentges with Notice to Proceed attached. July 25, 1997, Change Order Request from S.M. Hentges. CONTRACT STATUS Time Cost Original Contract Substantial Completion Substantial Completion Final Completion Phase l Phase 11 (except wear course) July 15. 1997 July 31, 1997 Au_ciust 31. 1997 $793,737.65 Net Change Prior C. O.'s _ to _ N/A N/A N/A N/A Change this C. O. 15 days 15 days 15 days $5.732.05 Revised Contract July 30, 1997 Recommended for Approval: Short Elliott Hendrickson Inc. Agreedo by Contractor. ZW BY Pnajccfi %yf,�w"et, TITLE Distribution Contractor 2 SNORT ELLIOTT HENDRICKSON INC. MINNEAPOLIS, MN Owner 1 August 15, 1997 September 15. 1997 $799,469.70 By p. E, Project Manager App rov for5-'wner: BY 11�N6 . I-OdAj 4 TITLE Project Representative 1 SEH Office 1 ST CLOUD, MN CHIPPEWA FALLS, WI MADISON, WI LAKE COUNTY, IN EQUAL OPPORTUNITY EMPLOYER