HomeMy WebLinkAbout6.p. Order Feasibility Report for 145th Street West Street & Utility Improvement, City Project #291 .�
< ' CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: October 7, 1997
AGENDA ITEM: Order Feasibility Report - 145th Street and AGENDA SECTION:
Utility Improvements, City Project #291 Consent
PREPARED BY: Bud Osmundson AGEND���� � �
City Engineer/Public Works Director �
ATTACHMENTS: Resolution, Map APPROVED BY:
The 1998 Budget includes funding for street and utility reconstruction of 145th Street
from CSAH 42 to the railroad tracks adjacent to City Hall. This segment of roadway is
currently in very poor condition. The proposed project would include mainly street
reconstruction which would convert the existing rural roadway to an urban section
including widening of the pavement and construction of concrete curb & gutter. The
project will also include storm drainage improvements, plus sanitary sewer and
watermain construction. It is not anticipated that major reconstruction of the sanitary
sewer and watermain will be necessary.
The funding for the proposed project will include assessments, Municipal State Aid,
Capital Improvement Plan Funds (which will come from 1998 general taxes), the sanitary
sewer, watermain and storm drain utility operating funds plus possibly the Core facilities
for the same.
Staff is recommending that Short-Elliott-Hendrickson be used for this project due to their
familiarity with the area. This project is a Municipal State Aid project which are required
to be completed utilizing metric units of dimension. We are requesting the initiation of
this project at this time so that the necessary survey work can be completed prior to the
change of seasons.
Staff recommends adoption of the resolution to direct Staff to begin work on the 145th
Street and Utility Reconstruction Improvements.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING A FEASIBILITY '
REPORT FOR 145TH STREET AND UTfLITY RECONSTRUCTION IMPROVEMENTS FROM
CSAH 42 TO THE RAILROAD TRACKS ADJACENT TO CITY HALL, CITY PROJECT #291 .
COUNCIL ACTION:
10
.
:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1997 -
A RESOLUTION ORDERING A FEASIBILITY REPORT FOR
145TH STREET AND UTILITY RECONSTRUCTION FMPROVEMENTS
FROM CSAH 42 TO RAILROAD TRACKS ADJACENT TO CITY HALL
CITY PROJECT #291
WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the
feasibility of the 145th Street and Utility Reconstruction Improvements, City Project #291 .
NOW THEREFORE BE IT RESOLVED, the City Engineer is directed to have the necessary
feasibility report prepared for the 145th Street and Utility Improvements from CSAH 42 to
railroad tracks adjacent to City Hall, City Project #291 .
ADOPTED this 7th day of October, 1997.
Cathy Busho, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Second by:
Voted in favor:
Voted against:
I �/� i' /
_�'�� '�
l�i i' � °
;;`� � ��
� ,;,; �
, �
,, ,,
�
� �� ��
�i/ � �,
' � -
; i
� � -� 145TH STREET
��� . �� o & UTILITY
� �>` ' � � � � IMPROVEMENT PROJECT
_ �,� j � �� 0
- Q /�
u � ' � � % � � � � �
`�' �—,� � � � -- � � � � �
�
� i I � o — --- -------
- . i �i� � ., o — —
' _ o � o
� j; `��,., L;-�� �' 9 — - � �� �� Cl � , C=�
I . G� � 1�d� TH ST.
, ,_�r: � � � � 1���l�-�Z - - - -_ -__ _ ,. =-
� -- - -�_- — ._ ° -
__., ' - - -` -- - -- -- - _ _ _ -- - ;
� — ---- �
-� _. _ - --
-- _ __ _ -- -
- --- -- — --- -
-- --
- -- -- _
- -� �_ _t _ _
-- -� � � �_ 1, j� , � :
�
_ - J,- - � � �
- - �-- � �
-� _. �_� __ _� �
— — _� , �__, � ���
,
� � o
'�-�}-� � �
"-" - : �� � , � - , � , `�� j � � ,�,�
, ��
, � , , �_
I _ I L�� ���L - �� // �
��
� ��
=--r-
-- m__' C� �/�5
_ ,
. f , ,�
_ -j , �_ �; T >��I�� ���
_ '� � �-� . . �\C '�\./T�y\\��\' / .
� � � � Sly, _.� �/,
--f I�--- �l _-�t��;�� , ` ;O,
,,�,�j y j .Z '
� `. ', � ,�,; ��
� � � '��� � � � �
V`,
� � � � i���,� '�%
%
_
. --1 _ ___ - _ ----- --------------
_ _._ ___ __; ;
�• - -- -
, i , ii,
_- � i'
,
� �;;
��' � �