HomeMy WebLinkAbout6.i. Payment #2, 1997 Street & Utility Reconstruction, City Project #277CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 19, 1997 AGENDA ITEM: Payment #2, 1997 Street & Utility AGENDA SECTION: Reconstruction Project, City Project #277 Consent PREPARED BY: Bud Osmundson , AGENQA City Engineer/Public Works Director _°- 9 a° _ ATTACHMENTS: Payment Voucher #2 APPROVED BY: This item requests the second payment to Kober Excavating, Inc. in the amount of $204,588.20 for City Project #277, the 1997 Street & Utility Reconstruction Improvements. Work completed and represented in this amount as of July 31, 1997 is 43% of contracted work. This work has been inspected and is in compliance with Contract Documents. Utility work on the project is nearly complete. The Contractor plans on completing curb & gutter work on 143rd and 144th Streets and sidewalk on Cameo the week of the 11th. Bituminous paving is scheduled for 143rd and 144th Streets the week of the 18th. Attached is a copy of the construction Pay Voucher #2 for your information. Staff recommends approval of this second payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #2 TO KOBER EXCAVATING, INC. IN THE AMOUNT OF $204,588.20. COUNCIL ACTION: 1 CONSTRUCTION PAY VOUCHER ESTIMATE VOUCHER NUMBER: 2 DATE August 7, 1997 WSB PROJECT NUMBER: 1050.01 PERIOD ENDING: July 31, 1997 PROJECT: 1997 STREET AND UTILITY RECONSTRUCTION PROJECT CITY OF ROSEMOUNT PROJECT NO. 277 CONTRACTOR: KOBER EXCAVATING, INC. 16112 JARVIS ST NW ELK RIVER, MN 55330 CONTRACT DATE: MARCH 19, 1997 WORK STARTED: JUNE 15, 1997 COMPLETION DATE: SEPTEMBER 1, 1997 WORK COMPLETED: ORIGINAL CONTRACT AMOUNT $764,211.50 TOTAL ADDITIONS $0.00 TOTAL DEDUCTIONS $0.00 TOTAL FUNDS ENCUMBERED $764,211.50 TOTAL WORK CERTIFIED TO DATE $328,923.45 LESS RETAINED PERCENTAGE 5.00% $16,446.17 LESS PREVIOUS PAYMENTS $107,889.08 TOTAL PAYMENTS INCL. THIS VOUCHER $312,477.28 BALANCE CARRIED FORWARD $451,734.22 APPROVED FOR PAYMENT THIS VOUCHER 5204.588.20 APPROVALS WSB & ASSOCIATES, INC. In accordance with field observation, as performed in accordance with industry standards, and based on our professional opinion, the materials installed ated to be 3 % completed are satisfactory and the work properly performed in accordance with the plans and specifi=Manage as of July 31, 1997. We hereby recommend payment of this voucher. Signed: Signed. -- Construction Observer KOBER CONSTRUCTION COMPANY, INC. This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: Signed: Date: Title: CITY OF ROSEMOUNT Checked by: Date: _ -- -- - — -- - - —------- — Approved for payment: Authorized Representative Date: