Loading...
HomeMy WebLinkAbout6.i. Payment #1, Geronime Pond Street & Utility Improvements, City Project #280 l ' CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 4, 1997 AGENDA ITEM: Payment #1, Geronime Pond Street & AGENDA SECTION: Utility Improvements, City Project #280 Consent PREPARED BY: Bud Osmundson AGENDA NO�AA � � City Engineer/Public Works Director � 6 � ATTACHMENTS: Payment Voucher #1 APPROVED BY: �Tj"�_ ��— _ This item requests the first payment to Bonine Excavating, Inc. in the amount of 5321,200.94 for City Project #280, the Geronime Pond Addition Street & Utility Improvements. Work completed and represented in this amount as of October 24, 1997 is 51 % of contracted work. This work has been inspected and is in compliance with Contract Documents. Chippendale Avenue should be open to traffic this week. The installation of sewer and water services and storm sewer is nearing completion. Preparation of the streets for concrete curb & gutter should begin late this week. Attached is a copy of the Construction Pay Voucher #1 for your information. Staff recommends approval of this first payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #1 TO BONINE EXCAVATING, INC. IN THE AMOUNT OF S321,200.94. COUNCIL ACTION: 2 , . CONSTRUC'iION PAY VOUCiiER ESTIMATE VOUCHER NUMBER: 1 DATE October 29, 1997 WSB PROJECT NUMBER: 1061.01 PERIOD ENDING: October 24,1997 PROJECT: GERONIME POND STREET R UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT PROJECTNO.280 CONTRACTOR: BONINE FJCCAVATING,INC. 12669 MEADOWVALE ROAD ELK RIVER,MN 55330 CONTRACT DATE: JU�Y 15,1997 WORK STARTED: SEPTEMBER 3,1997 COMPLETION DATE: NOVEMBER 15,1997 WORK COMPLETED: ORIGINAL CONTRACT AMOUNT $668,382.70 TOTAL ADDITIONS $0.00 TOTAL DEDUCTIONS $0.00 TOTAL FUNOS ENCUMBERED $668,382.70 TOTAL WORK CERTIFIED TO DATE $338,106.25 LESS RETAINED PERCENTAGE 5.00% $16,905.31 LESS PREVIOUS PAYMENTS $0.00 TOTAL PAYMEN7S INCL.THIS VOUCHER $321,200.94 BALANCE CARRIED FORWARD $347,181J6 APPROVED FOR PAYMENT THIS VOUCHER 5321,200.94 APPROYALS WSB 8 ASSOCIATES,INC. In accordance with field observation,as performed in accordance with industry standards,and based on our professionai opinion,the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work is estimated to be 51 %completed as of October 24, 1997. We hereby recommend payment of this voucher. �� �� � Signed: Signed: i Construction Observer Project ManagerlEngineer ', BONINE EXCAVATING,INC. This is to certify that to the best of my knowledge,information,and belief,the quan6ties and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: Signed: Date: Title: CITY OF ROSEMOUNT Checked by: Approved for payment: Aut or�zed Representative Date: Date: