HomeMy WebLinkAbout6.d. Receive Petition/Order Feasibility Report-Shannon Pond East 1st Addition, City Project #283 � CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: April 15, 1997
AGENDA ITEM: Receive Petition/Order Feasibility Report- AGENDA SECTION:
Shannon Pond East 1 st Addition, City Project #283 Consent
PREPARED BY: Bud Osmundson /Q � AGENDA�i�$.�.8 � � �
City Engineer/Public Works Director d��• � � CIY!
ATTACHMENTS: Resolution, Petition APPROVED BY:
The City has received a petition for Public Improvements in the proposed Shannon Pond
East 1 st Addition from Jim Allen of Hampton Development. This Addition received
preliminary plat approval by the City Council on June 6, 1995 as part of the Shannon
Pond East Addition.
At this time, Staff is requesting Council to order the Feasibility Report for this Addition.
WSB & Associates will be the Consulting Engineer used on this pro}ect. This project has
been designated City Project #283.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING PETITION AND
ORDERING A FEASIBILITY REPORT FOR SHANNON POND EAST 1 ST ADDITION STREET
AND UTILITY IMPROVEMENTS, CITY PROJECT #283.
GOUNCIL ACTION:
3
�. � ,
CITY OF ROSEMOUNT
�
DAKOTA COUNTY, MINMESOTA !
RESOLUTION 1997 -
A RESOtUTION RECEIVING PETITION AND ORDERING FEASIBILITY REPORT FOR
SHANNON POND EAST 1ST ADDITION STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #283
WHEREAS, the City Council of the City of Rosemount has received a petition from the
developer and property owners of the proposed Shannon Pond East 1 st Addition Street and
Utility improvements, City Project #283.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Rosemount as
follows:
(1) the aforesaid petition represents 100% of the owners of the affected property;
(2) the property owner requests in the petition that the improvements be
constructed and that the entire cost for their share less the City's share of the cost
of the improvement be assessed against the property;
(3) the aforesaid petition is approved and placed on file.
(4) the City's Consulting Engineer is directed to prepare the necessary Feasibility
Report for the Shannon Pond East 1 st Addition Street and Utility Improvements, City
Project #283.
ADOPTED this 15th day of April, 1997. ,
Cathy Busho, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
04i08i97 1�:25 ALLEN HOMES_CORP � 1 612 423 5203 N�.682 D� l
Proj # ���
CITY OF RDSEHqUNT
PETITION �OR LOCAL IMPRQVE ENTS
ilOOx Pe�itien)
To the City Cdun�il of Raae�punt, M��ne�ots
M�, the under��g�ed, be�ng �he ov�ere of al� khe reai
legal�y d�ear�b�d e� �o��ows: • P�a�acty
First Addition ta Shannon Pond East. rev'sed 8
B1oCk I lots 1 - 6, Block 2 lots 1 - i0 �nd Bloc 3 1ot� 1 - 12
hereby petiti�n thQ citp taunci� to under �ke xi��out a
h�e�3ng under ninn���te Stn�ut�B. 5��ti�ri �g� p31, the following
impravemerite to au�h g�vperty 8nq agrge ta ey tor �11 �aste �ar
thn preparat�on ot the faaeibillty repert �r thmsa imprcvemant�
in the eveat th� imprvv�m�nte ere nvt order d in:
�.,�,. �enit�ry 5ever � Waika�ye
.�,� Viate�ra�1�1 � 5treeti�
. � 5t4rm ��xQr � Curb b Gutt,eri
-,�_ Street�,ight� Oth r
end to p8Y tbe e�tire aese��ebl� oe�ks th+xreot �qoinnt evr
prape�rty en�ompag�3ng or abutting seid mpravement�r besed on
berie,�it� ���e3v�d rithout r�agard !a cssf� val e��tin.
5�, natur� of Ovnerts! � Add�T� Do p
c ' i /
i. �'�,r�� --7
� � � ��
��
4.
w� �►�.Wa agtre� to guaranty peyment #er the prepar9tit�n of plane
and speaittcation� �ar th�► abvve p�fiittnned mprovem��tte ln o�rder
that th� p].�ne artd epecitiaatilo�te �ney b� pr psr�d sin�ulta��eouelr
w�.th th� �eaeibi��ty report.
Fnri City Uee Only
Date Rec•ei t � ���� 7 BY= ' Tv nur��i 1: �_��-Q' �
� F'rope�r�y avned in �oint tenencyr ehould h� igned bp c�ach o�+ner.
.i o,r ee
� ;
;