Loading...
HomeMy WebLinkAbout5.a. County Highway Systems Project Updates _ CITY OF ROSEMOUNT E�ECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: July 1, 1997 AGENDA ITEM: County Highway Systems Project Updates AGENDA SECTtON: Department Heads Report PREPARED BY: Bud Osmundson AGENDA NO. City Engineer/Public Works Director �V� �t 9 ATTACHMENTS: APPROVED BY: Staff would like to take this opportunity to update the City Council on three projects eing undertaken by the County which have a major impact on the City of Rosemount. Staff will provide more details verbally at the meeting. The first project is the CSAH 42 Corridor Study. This project +s well underway and the County is hosting an open house on July 24, 1997 at the Apple Valley Western Service Center Atrium. The open house is an effort to obtain as much public input as possible for this study. Staff met this week with Fred Hoisington, who is a subcontractor to BRW, the consultant for the project, and reviewed Rosemount's development patterns and issues with CSAH 42. The second project to discuss is the CSAH 46 project. Last week many of you attended the open houses held in Apple Valley and Coates. The open houses were well attended by Rosemount residents. The consultant had a drawing showing the entire length of the 8'l2 mile project which was very informative. From the Apple Valley border to Biscayne Avenue the design team is proposing a 3 lane urban design. The City will have some watermain looping and storm sewer which will be part of the project and will be identified in the future design of the project. It appears that the City will be discussing with the County a turn back of a portion of CSAH 48 east of Coates. The last project that I would like to discuss is the Dakota County Transportation Plan. Planning Staff and myself inet with Dakota County Staff this past week and reviewed their work to-date. As part of the plan, the County is proposing to share more heavily in the cost of storm sewer for projects. Other parts of the plan show that the County is requesting principal arterial status on Trunk Highway 3 north of CSAH 42. The Plan also shows that there are future 6 lane needs on CSAH 42 west of Trunk Highway 3 and future 4 lane needs on County Road 38 (McAndrews Road) west of Shannon Parkway. The County has identified potential new County Road alignments including Blaine Avenue south of CSAH 42, Emery Avenue in the eastem portion of Rosmeount which would connect CSAH 42 to County Road 48, and an extension of Diamond Path south of 160th Street to 170th Street. My recommendation is to have a work session meeting with a member of the Dakota County Staff to discuss these Transportation Plan issues in the near future. No action is necessary on any of these items tonight, but please call me if you have any further questions. RECOMMENDED ACTION: Discussion only. COUNCIL ACTION: