HomeMy WebLinkAbout6.n. Receive Feasibility Report/Order Plans and Specifications for Biscayne Point, City Project #285 i � CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CtTY COUNCIL MEETING DATE: September 16, 1997
AGENDA ITEM: Receive Feasibility Report/Order Pians & AGENDA SECTION:
Spec's - Biscayne Pointe Addition Street & Utility Consent
Improvements, City Project #285
� PREPARED BY: Bud Osmundson AGEND��
City Engineer/Public Works Director �� � 6 �
ATTACHMENTS: Resolution, Executive Summary, APPROVED BY:
Schedule and Drawin
The Cit received a etition and ordered a Feasibilit Re ort for the ubli im r v
Y p y p p c p o ements
that are necessary to serve the proposed Biscayne Pointe Addition on August 19, 1997.
Attached is the Executive Summary from the Feasibility Report, a map and proposed
schedule for the project. This project will provide for the site grading and the
construction of sanitary sewer, watermain, storm drain, streets and sidewalks for the
first phase of the Biscayne Pointe development. The total estimated project cost is
5702,000, 5642,000 of which will be spread against the first phase of the
development. The cost of the extension of the sanitary sewer (560,000) which extends
easterly and will connect to the Brockway Draw Trunk Sanitary Sewer will be assessed
against the outlot area. There are no trunk costs in this project.
The proposed schedule is attached. As previously stated, it is hoped that the utilities
can be constructed this fall with most of the street work completed in 1998. Depending
on timing issues, this project may be combined with the Brockway Draw Trunk Sanitary
Sewer project and bid the projects together.
Staff recommends that Council take the action as described.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE
FEASIBILITY REPORT, APPROVING THE PROJECT AND ORDERING THE PREPARATION OF
PLANS AND SPECIFICATIONS FOR THE BISCAYNE POINTE ADDITION STREET & UTILITY
IMPROVEMENTS, CITY PROJECT #285. '�,
COUNCIL ACTION:
5
�
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1997 -
A RESOWTION RECEIVING THE FEASIBILITY REPORT, APPROVING
THE PROJECT AND ORDERING THE PREPARATION OF
PLANS AND SPECIFICATIONS FOR THE
BISCAYNE POINTE ADDITION STREET & UTILITY IMPROVEMENTS
CITY PROJECT #285
WHEREAS, pursuant to the resolutions of the Council adopted on August 19, 1997, a report
has been prepared by the City Engineer with reference to the improvement of Biscayne
Pointe Addition Street & Utility Improvements, City Project #285, and this report was
received by the Council on September 16, 1997, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost-effective, and feasible.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF ROSEMOUNT, MINNESOTA:
1 . The Council will consider the improvements in accordance with the report and the
assessment of abutting property for all or a portion of the cost of the improvements
pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the
improvements of 5702,000.
2. Such improvements are hereby ordered as proposed pursuant to a petition of affected
property owners.
3. The City Engineer is hereby ordered to prepare lans and specification for the makin
P 9
of such improvements.
ADOPTED this 16th day of September, 1997. II
Cathy Busho, Mayor '
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
.
5.0 Project Schedule
The proposed schedule for this improvement is listed below. This
schedule is based on the provisions of Chapter 429 of the Minnesota State
Statues. The schedule assumes that all elements of the improvement,
includina developer obligations and easement acquisitions,are completed
in a timely manner.
• Order Feasibility Report August I9, 1997
• Receive Feasibility Report September 16, 1997
• Order Plans & Specs September 16, 1997
• Receive Plans & Specs/Order Ad for Bid October 7, 1997
• Open Bids October 31, 1997
• Award Contract November 4, 1997
• Begin Construction November 17, 1997 :
• Substantial Completion of Utilities December 31, 1997
• Substantial Completion of Streets/Grading June 30, 1998
• Final Completion (wear course} June 30, 1999
September 16, 1997
Preliminary Report
Biscayne Pointe
Street and Utility Improvements
Rosemount, Minnesota
Executive Summary
City Project No. 28� provides for the construction of sanitary sewer,
water main, storm drain, street and site grading improvements for Phase I
of the proposed Biscayne Pointe development. Phase I of the Biscayne
Pointe development consists of approximately 14 acres which will be
platted into 34 sin�le-family residential lots. The remaining 48 acres of
the Biscayne Pointe parcel will be platted as Outlot A until future phases
are constructed.
The project is located in the NW'/a of Section 28, Township 115N,
Range 19W. The proposed development is located to the north of the
Union Pacific (U.P.) Railroad and east of Biscayne Avenue. The project
includes approximately 2,9001inear feet of sanitary sewer, 1,6001inear
feet of w�ater main, 1,000 linear feet of storm drain, 80,000 cubic yards of
excavation, and 1,6001inear feet of street construction.
The total estimated project cost is �702,000, all of which is assessable to
the Biscayne Pointe development. The estimated cost for improvements
within the limits of Phase I is$642,000. Spreadinb the $642,OOQ over the
34 assessable lots in Phase I yields an approximate assessment rate of
$18,882.35 per lot. In addition, Outlot A is subject to assessments for
installin� a sanitary sewer across the outlot. The estimated cost for this
is $60>000.
This improvement is necessary to provide the subject property with
municipal utilities and street access. In addition, the improvement is cost-
effective and fe�ible from an engineering standpoint. The improvement
could be constructed as an individua] project or as a part of the Brockway
Draw Trunk Sanitary Sewer Project, City Project No. ?86.
Project construction is scheduled to begin in November 1997, with
substantial completion scheduled for spring of 1998. Final completion
(bituminous wear course) is scheduled for spring of 1999.
A-ROSEM9803:00
Page 1
��...ti.--,_., ..... .
. ___
..... . � :�A.
� � � �� � :� � �
.
. _ � ,� ,� r� i� �
,
, � t'. u..w ` _ ,
� ,, , �; '=J� ` ' _ �� ]��
f ` �/�J
�Q . .Ot]-75 � .� .. 011-31 j �_\..�-� ( 1' "
. ; � '� `; :�, �;6,�, � � � `i' . �t +�S 1` �
� Ot0-77 N � �'� 'I� , . .{ �' . �'�. =_-' .__.. � .
�C:i . .r . ' \ \' Y;'�.� eQ' �• ���� p15�Jt � . . . � .. � � I
. U'rV� �t .',� • ..I �otJ-59 .. ' � .
� � Q � 0
��. �� CJ � .1� : � �Oli 50 � . � . .
O '�I �
ota-75M
. O � .�D10- nvl.�];.o � . � .
012-.BB � ' . �975 . .
0 s0
�. ti , NML�9aiY �� .3�; � rJ� O . �0
� ., 010-55 �_� ���
�' CQNNEPIAfaA TRAIL, u�G�
',., . _ ` .._ ...... . . .... ::. � 1 . ; � .
, ozo-eo �,� 250
. � . . � � �] W�; . OYO-31 010-75
� 010-604 . � � ���' � �"�S�y��� � , S�ALE IN FEET
, , ��j � 'I BR�NK SEWER �
, i �� � ..' . � ,i� f .
. . . � 1,. �. . . .
. . � . � ���/ . -
i.
. . . �. � � . . :,���
o,o-eo
� � �Xl-DO . � . . . �I�� � 061-60 � � . � � . .
� OIJ-55 . �� � . � . H :9]2.
� � � O50-BD � . � _, f � . ��' ..
. � �ty9B � - y
Ot0-BO : . . � M- 1 D . . .
022-60 . . � .� f� . . � i � , c% .
� ao-eo . . '� . . .. , 0-�8 � l
D�}_60 � . II ' ,_.,. '� � � / �
03I-60 . . . . �__ ____.... �.: / ..
010-Ot �
�,��
�
PRQJECT i o,o_z5
ior � 81SCAYNE P
LOCATION '�i Powr a��'�Q� � HWl�91iJ GAP
�T
i � j ���r�
,
� � �Ot 5 �e � �ARMY NAiIONAL W ��r . .
� � CUARD� � �
` arr � � ORGANIZATIONAI w � 5���� �F�G a�
, �n' • Q Q" MAIN1fNANCE � : �J�' pPG .
c,� Q sr+oP Q Q�`P �N�o�
. L U
` Dt:N� SCH DIST 196 �oT � N � ��o-i5
e z10_pg lC( 78 m:; o�o-s2
143RD ST. W. �
, oNc.counrr , CM� PARCEL
mo-y�
. . . � � � . . OZ+-o0 � 1AAINTENANCE �, . .
. .s� : SF�P . . .
• . . . � � � � � . . . . ..
�'i' . a„ � ~ � . OI6-00 . . .
! ' 11 • .� l0i 2 .......sc�.w . � . . . . .
� � � . 028-00 . � . � .
� . � � . . . � ru«a
' ~ CITY PROJECT NO. 285 ROSEMOUtJT, NBNNESOTA PROJECT LOCATION MAP "'°�9°° � '
Y M ~ BISCAYNE POINTE UTILITY 8� STREET IMPROVEMENTS �� '}97 8 t
�