Loading...
HomeMy WebLinkAbout8.a. Comprehensive Guide Plan Amendment - MUSA Expansion V CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL iVIEETING DATE: February 4, 1997 � AGENDA ITEM: Comprehensive Guide Plan Amendment --- MLJSA AGENDA 5ECTION: Expansion New PREPARED BY: Dan Rogness, Community Development Director AGEN���:� �� , � I � ATTACHMENTS: Resolution and Background Information APPROVED BY: �' Applicant: City of Rosemount Location: Within the corporate limits of Rosemount Owner: Various Owners Guide Plan: Phase 1, 2 and 3 MLTSA in the Land Use Plan Section Amendment: Add Phase 2 MUSA to Phase 1 as the new 2005 (Current) MCJSA, and change the existing Phase 3 to the new Phase 2 MLTSA PC Hearing: Janaury 28, 1997 PC Vote: Unanimous Recommendation of Approval (5-0) SUMMARY The latest Comprehensive Guide Plan amendment was approved by the Rosemount City Council on 11/09/93 (Res. No. 1993-116). The Met Council subsequently approved it on 12/02/93. Because of limitations to the Rosemount wastewater treatment plant, the Met Council restricted the city's initial 2000 MLTSA request by shifting it to 2000+. The Met Council's plans for the Rosemount treatment plant have now been completed, which include the phase-out of this facility by 2000 with a replacement of a lift station. In addition, the latest 2040 Regional Growth Strategy information from the Met Council contains population/household projections. Based upon this new information, staff is now ready to submit an amendment to the planning commission, city council and metropolitan council for review and approval. The amendment request is actually quite simple in concept ... add the Phase 2 (2000-2005)MITSA area to the Current Phase 1 MCTSA(2000), which will become the new Current MUSA. The e�sting Phase 3 (2005-2013) MLJSA will then become the new Phase 2 (2005-2010)MUSA. By doing so, the city will be able to approve development projects and provide necessary public services now rather than wait unti12000. RECOMMENDED ACTION: MOTION to Adopt A Resolution Approving an Amendment to the Land Use Plan of the Roesmount Comprehensive Guide Plan Update 2000. COUNCIL ACTION: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1997- A RESULUTION APPROVING AN AMI+,NDMENT TO LAND USE PLAN OF THE ROSEMOUNT COMPREHENSIVE GUIDE PLAN UPDATE 2000 VVHFR�AS, the Rosemount City Council approved Resolution No. 1993-116 on November 9, 1993 that adopted Update 2000 as the Comprehensive Guide Plan for the city; and WHEREAS, the Metropolitan Council approved Rosemount's Guide Plan Update 2000 on December 2, 1993 with stipulations related to wastewater treatment capacity and on-site septic system inspections; and WHEREAS, the City of Rosemount adopted a biennial septic system inspection ordinance on May 7, 1996; and WHEREAS, the City of Rosemount has projected the useful life of the Rosemount Wastewater Treatment Facility prior to its planned phase-out by 2001, as identified in Exhibit A (to be replaced by a lift station); and WHEREAS, the City of Rosemount is proposing to amend the Comprehensive Guide Plan's I', Land Use Plan as identified in Exhibits B, C and D; and I,, WHEREAS, a public hearing was held by the Rosemount Planning Commission on January ' 28, 1997 to consider and recommend the proposed amendment with a unanimous vote in , support of it; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rosemount hereby authorizes staff to submit an application to the Metropolitan Council to amend the city's Comprehensive Guide Plan Update 2000 by adding the Phase 1 (2000) and Phase 2 (2000-2005) MUSA's into a new current Phase 1 (2005) MUSA, and changing the Phase 3 (2005-2013) MUSA to a new Phase 2 (2005-2010) MUSA. ADOPTED this 4th of February, 1997. Cathy Busho, Mayor ATTEST: Susan M. Wa1sh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: EXHIBIT�__ ROSEMOUNT, MINNESOTA C'i1N1ULATIVE IMPACT on WASTEWASTE FLOWS-MGD u ing THREE GROWTH SCENAR (� Rosemount WWTP Empire Annual MGD Z90 Household MGD Ind./ MGD MGD --- Year Growth Households Comm. Balance Househoids 1997 200 (.025) (.015) .250 (.025) 250 (.038) (.015) .237 (.025) 300 (.050) (.015) .225 (.025) 1998 200 (.050) (.030) .210 (.050) 250 (.076) (.030) .184 (.050) 300 (.100) (.030) .160 (.050) 1999 200 (.075) (.045) .170 (.075) 250 (.114) (.045) .131 (.075) 300 (.150) (.045) .095 (.075) Z000 Zoo �.loo� (.060) .130 (100) 250 (.152) (.060) .078 (.100) 300 (.200) (.060) .030 (.100) 2001 200 (.125) (.075) .065 (.125) 250 (.190) (.075) .025 (.125) 300 (.250) (.075) (.035) (.125) NOTE: • Assume 100 units to Empire per year; balance to Rosemount • Assume 1 household=250 gpd • Assume 10 acres/year for indJcomm. (1500gpolacre) � Balance=remaining capacity at Rosemount WWTP of.29 MGD minus household and ind./comm. units based on .96 MGD capacity and .67 MGD flow on 12/31/96. � EXHIBIT B I SUMMARY OF A PROPOSED COMPREHENSIVE GUIDE PLAN AMENDMENT I�', CITY OF ROSEMOUNT, MINNESOTA �I Janua 1997 'I rY A. Request: Amend the Land Use Plan of the Rosemount Comprehensive Guide Plan Update 2000, as revised, dated October 1993, to identify the Phase 2 MUSA (Metropolitan Urban Service Area) as part of a revised Phase 1 MUSA to the � year 2005, and to designate a new 2005-2010 MUSA. I B. Current MUSA Categories Phase I 2000 MUSA Phase II 2000-2005 MUSA Phase III 2005-2013 MUSA C. Proposed MUSA Categories: Phase I 2005 MUSA (identical to current Phase I and II MUSA) Phase II 2005-2010 MUSA (identical to current Phase III MUSA) D. Future MUSA Categories: (to be determined during the required 1998 update) Phase III 2010-2015 MUSA Phase IV 2015-2020 MUSA E. Rationale: �'I The Metropolitan Council approved a major amendment to Rosemount's II Comprehensive Guide Plan on September 16, 1993 (Res. #93-57). At that time, j the Council stated that, "Once the Commission's Implementation Plan [for the '', Rosemount WINTPJ is approved by the Council, the city may resubmit its year ', 2000 MUSA request." This amendment will allow the City to provide additional ' areas of development opportunities three years ahead of the existing plan , designation since: (a) the Rosemount Wastewater Treatment Plant has capacity prior to the planned phase-out; (b) nearly 65% of the residential land within MUSA is controlled by two owners without current development activity; and (c) the expansion will allow for cost effective extension of municipal services. EXHIBIT C SUMMARY OF M.U.S.A. AMENDMENT ROSEMOUNT COMPREHENSIVE GUIDE PLAN ---January 1997 Land Su�piv: • 705 acres are currently available for residential development within the (current) Phase 1 MUSA. • Approximately 65% of the total acreage within the current MUSA is owned by CMC Heartland Partners (165 acres) or Kelley Trust (290 acres). • 670 acres for residential and 700 acres for commercial/industrial are shown within the Phase 2 MUSA (2000-2005). Housing Su�plv: ', • Nearly 1,735 housing units can be constructed within the (current) Phase 1 ', MUSA at an overall gross density of 2.5 dwelling units per acre. I • The number of housing units that can be constructed within the current MUSA I should ailow a 5.5 to 8.5-year supply from 1997 (200-300 units/year range). Sewer Capacity: • Approximately 30% of the housing units to be constructed within the current MUSA will be treated by the Empire WWTP. The remaining 1,200 units will be treated at the Rosemount WWTP, including all Phase 2 MUSA property. • The Rosemount WWTP will be phased out by the year 2002 and replaced with a new lift station with significant capacity improvements. • Based on three different growth options (200, 250 or 300 housing units/year), the existing Rosemount WWTP should easily have capacity through 2Q01. An�sis • At a high projection of 315 new housing units per year, 2,520 units will be constructed from 1997-2005 (8 years). • However, Phase 1 plus Phase 2 MUSA together will provide space for nearly 3,410 housing units at an assumed gross density of 2.5 dwelling units per acre. • Therefore, an estimated 890 housing units (or 355 acres) is an "overage° amount shown within the Phase 2 (2000-2005) MUSA. However, the city is requesting all Phase 2 MUSA to be added to Phase 1 MUSA (2005) in order to allow efficient and controlled utility/street phasing. �c,E+tF lT D . CITY OF ROSEMOUNT � , yZ M;. � �p 3 � , .. - ,�r � ,� �� i• ; . , � i. � i i c.i � �� ; � c-i '.�. � � � � � � ; '" � -�¢-wos • '• , �-'� L.��i� � ;�' z rn L� � _ e.��.�� ;� RRI � 'I�' • r--;�� � 1 ' � . , .��, , , � • � _ �� � ' ��'�� 'PIOSs� p I � I � �I —� �' • AG � ! ; � CONS � ) � �i�'', i � � 0 S �� � '�---� � �' ��Gd � _�� ��,� G•I �r- , N � � �� ��i � � :� � � � - � ✓--.� � ' '�°� �_�./ `� � !e���� �� � � � � � � , � i � � � , PD•R • .:�. ;: .;' . • ;: � Im_. . .... . .. . ,... GI ^--y- PIOS . •' • r10 _ . _ �� � —T — . • � �. P� � i i � a. - o �o t�R...:... .. Q y _ �. . t .:. : . . ' --- .... :• . ..:.,::: : . - s� i `'� , �� M s I # L >:�;::.:: .;: .:::...: 1 � :::::: . 1 1 �- . � J = ` � WM I . AG t�1k � pD•R k f ( � � ' �� —i . -- : ;( � I � � � I :::::: . _ <>:: • ,� .. . : . : �s � � ; 8 E` , Ue � : q, ;,, ,.�€ AG � r > ; PII Sr - -- __-i , �` i . � _ �� f Y i , , i SS I <•: ' ` � : : • t: I �pG TiJ "PIOS UR PIOS PII ,�:�:` : n �t.. �� ! ' -_ � � - , � • �S = �8 i rro`SE �F �s a. ! � - i 1��° _ � ��- �� -PII ' �� t; ` � �: � i -cs.rta�. az 1 .. ------ r,. -_ -- �S------- •;_ , 4 � ' Me n * PI03 ' � PII I CONS �'� - . _ PIOS �n � . � —',. , ., � • �� i .. . : � �;•--�-� � F _.... . � . AG _ � ; V � F � -.___ j . , ..:_ UR � � . 1 -" --------- ;. 1 _-,.:�--- - ------- ' ac'. �....� ------ �r AG - - � — T— � ' I ��— I . ... t, < C BP PII , � , __._ _ . - .. .:'� �POMN� _�;. � � . � P , . :�. .._ � ._ i . II . . _� I 1� UR k �-�'S� � � �� - PI� � ___ - �� - �-- -- -�� . . _._ ---e�e� - - ; � � ,__..���,� .. � �v � � � � COATES �� '� � , , �: , � _ �� p - � .. � 1 --- _ � R � - _� gP`' .. ��_� j' i = I � _ -_ � -- ,' --- � = wos - �.� .-�`r. i i — - .LEGEND w - - �,,�E ;---�.�-_�--��oRTH A�,��,� LAND UsE PLAN A6 Agriculmre PO�MU Pianned Oevelopment Mixed Use j x�se i October 1993 � � �7noo Musa CONS Cunservancy C Commercial RR Rural Readem�al BP Business Park � Comprehensive Guide Plan �— � x�se 11 UR Urban Hesidential 6�1 General Industnal "" U�te 2�� � � IZ000�1005 MUSN � � � PO fl Planned Oevelopment Nesidential WM Waste Manaqement ` . HH High OensitY Aes�dential PIOS Exlstmg Parks or Open Space � x�sE IU p�l Pu61ic 1 Institutional �1. fuwre Park lacations . l7005-IDl7 MUSA! � � m (es ineiceted u+the Comprehensive . Park Plrn and Developmenr Guidel p� � C�� p+� tt C2no5-zo�o, CURRENT M.U.S.A. --- ROSEMOUNT, MN ACRES TO DEVELOP WITHIN CURRENT PHASES PHASE f = 705 acres residential 375 acres commercial/industriai 50 acres other 1,100 acres total PHASE II = 670 acres residential 700 acres commercial/industrial 1,370 acres total PHASE III = 520 acres total (all residential) ALL PHASES . . . . 2,990 acres to develop 9 i EXHIBIT '� VACANT LAND SUMMARY --- ROSEMOUNT, MN Using 2.5 Dweiling Units per Acre Density 1/01/97 MUSA Designation Acres Housing Units Phase I, final platted lots/units 60 155 Phase I, prelim. platted lots 210 595 Phase I, concept approval 0 � Phase I, vacant with no plans 435 985 705 1735 Phase II, vacant with no plans 670 1675 Phase III, vacant with no plans 485 1210 TOTAL 1860 4620 Note: 1. Phase I MUSA = year 2000 designation 2. Phase II MUSA = year 2000-2005 designation 3. Phase III MUSA = year 2005-2013 designation 4. Platted IoUunit count based on actual inventory; assumed 2.5 units/acre for non-planned property. ------------------------------------------------- 1995-2010: Therefore, based on a projected increase of 4,715 housing units in Rosemount from 1995-2010 (or 315 units/year), the current Comprehensive Guide Plan MUSA designation will be adequate through 2010. 1995-2020: However, using the 2020 growth estimates, Rosemount will need another 1 ,400 acres in MUSA between 1995-2020 for housing in order to accomodate the expected increase of 8,715 units during that 25-year period ... (8715-4620-600) = 3500/2.5 = 1400 i i EXHIBIT ! VACANT LAND SUMMARY --- ROSEM4UNT, MN Using 10.0 Employees per Acre Density 1/01/97 _ MUSA Designation Acres Empioyment ------------------------------------------- -------- ------------------ Phasel 120 1200 Phase II 700 7000 Phase III 0 0 TOTAL 820 8200 Note: 1. Phase I MUSA = year 2000 designation 2. Phase II MUSA = year 2000-2005 designation 3. Phase III MUSA = year 2005-2013 designation ------------------------------------------------- 1995-2010: Therefore, based on a projected increase of 3,955 empioyees in Rosemount from 1995-2010 (or 265 emp./year), the current Comprehensive Guide Plan MUSA designation will be adequate through 2010 (an overage of 425 acres). 1995-2020: Using the 2020 estimate that shows an increase of 4,555 employees between 1995-2020, Rosemount still has enough projected MUSA area to accomodate that increase (an overage of 365 acres). � � E�zoVNT F Ro s CITY O . _ _ _. ,`M , - _ � ��.;,�=', ` ' �� . . ,- �:,,�„ , ; � � � , � /- 1 � ' � � � • -JL' T � ' i � — j ; � RR ``�-��-��as i } � �1 - - • �' � �_' • '.��� � � /-'� RR y �� � �-�'� � � � � � . �t. � :..� Lti t � � ' ,�� , " . �,'� ,-� ;�. �..,� . � _o-, ,.;�'�,� `� �� � l�' � �_._-.,,_._, _ `�G • PIOS� ;� -� �� � I � � _ ' �-�,,; . , ���G-- �- !�`-�.-� =-�r- —. � • AG � � , +—. _ ,� � �r- , v , -;�--��,- f,� ��T.� � � �--� -==��./ • -=,r`' -�.- ; , I . I . !g� _ RR�;��-.t--�I, �'- " " � ' ; ;� � �� �� � � PU-R ' • �i �' `!_.: Plo ,P�os I, e • ` ' . . ` � e ' � �� � � i � PI •.;_:•::•:::.:.:.:.::::::::.: ! ' j i n ° .�., .�o `�:' gp. . ! m_,. `, :�- � �:>w:.: I :;Y-� I >..;;�;:: �>;:-; � I --�.,.r.s .,,.::;>` ;;:r��:� r:>;N:<., 5 :=::;�`:><:.. .. . :�: .�. . , . ... . ....� . � - .>:::.>:- - - �:._.-..::..:...:.:.:•....:. . 't i - — �::�:�>.�Y».<:;V - �,p !:<::�: ��`-' :�>.v:`:">;;'. _ a <>.;::»>::>,:� :s;:»:.:< � VJ1 .�Y:� :}i,+.::.:s;x.;�4: ,::Y:Y:v::::::,:.�vi:. � �:'.`� _ ..r:::::,: •:;ii: .... ..... � ;::•;';•;•;::_.. ' ::.�.....�. ...... .'.'•'•'•'.••. ...{{`::�.k:i •i,!�'�".•. � PD-R `S:G: :?:�'S4�::'�:;:a�i / '•i:::c:•�ap^'�+�. �`-s'r.'+' . L:• � _ . � �%:%:°�r:w. :..;r. .f p �'�_:`: o�;:•:�•.':.....;...�.y:. e � ..w....,Srv:{:f;:,:. .,.r;. :...;:.�... -�;x,�;�^;;;+ ``•'.v:i:::`�`:;�r?.. �..• ...r,•:a:::� ::.c:::. • ( UR ..�y��:�� •n.�.�.�:..;;::;:.:,.::. >:>;::<�:::<;=�: �l ...,.�.>:::::... ?>::<:::•:<;,; ;.... ._.. . �o..o� � �. � .�.�.�:::. �:{:w;:�t,<::':`>:;.;��`�`+�' . ';ti).::..:.y.r.�. �� • � :$t4':::2•'`•:ti w•��.�i�i:C2 : .:.�� • ,:{i,:s:�x'�<..:�''::Q:.. / ':•. ::;:::;�.. nSi�:`...:,;:� � � U R P I O S .�:��� ::`::::� � : ::�::::�:�>:...:., P Il -prOS ..�: �:::�-.:�.:.. :����4::1. � �;�:>��:::;: I I �:.�:.::. >�:,>:::>;.:::r ::::,:sw,.:��t:z;<r:is�`�s: � a PI >:.�:>�;:.::$:xt»;�::<...,...:.:: I ', . •--::• �:;.�:::;:::r:::;. � . - `� �::£>�;.;�h.sti,.` .;<. A .—E :���•: w:,>:::::<r . �;: I p�� ,a, E���:�=, ::;:�.>:::::.a.::�<:.::<::.:.��.:::�:: ,— ..� _ , - -� - i1A . � PIOS � p�� I i �, � PI�S ( � � ��� �� % � I , - - �. � UR o \t!I � I � b ��„'-=�� C%•:' C �..,.� , i �� t � � ! � :::::::.:;�..:. � � � BP P�� � i � � .Pn Mui�- �= li P11 � ' � E� UR '� y ; �i � � � � � � � � ; io � - P , � i r � q � :..: � R = a � '. BP �' � �,' � �%� ..j.�.. � I I� I . , ' Pios — :I i G-1 � , _.....,. . s �,y,'�.f�.� LEGEND lr�7 o a�rt �rw�, r ��d, , IVIUSA PswSrnG �� �� AG Agriculture Ptl•MU Pianned Deveiopment • Mixed Use �� PHASE I C Commercial � � �2�oa Musa1 CONS Conservancy RR Rural Residential BP Business Park � � PHnsE It G-I Generai lndustrial :::::::;:::: UR Urhan Residential �:::::::::::.:`.>: (ZOQO 1005 MUS:71 PD�R Planned Development � Residentiaf WM Waste Managemen HR High Oensity Res�dential PtOS Existing Parks or Open Space '-"—� Future Park Locations , ';' PHASE�111 .^ I p;� Puolic insntutional � as indicated in the Comprehensive ', r2ee� a ., �us.v va.F P1an and Deve/aament Guidel - ---- ----- -- ---I� i YH ''' E� I UNDEVELOPED RESIDENTIAL PROPERTY WITHIN �''� ROSEMOUNT'S CURRENT M.U.S.A. '�, DEVELOPMENT UNITS ACRES DENSITY STATUS WWTP , CMC-1(single farnily) 192 80 2.4 P R ' CMC-1(townhouse) 70 14 5.0 P R ' Hawkins Pond-1 16 16 1.0 P R Hawkins Pond-2 SQ 22 2.3 P R Geronime Pond 100 38 2.6 P E CMG2 175 70 2.5 N R Shannon Meadows 29 13 2.2 F R ' Shannon Pond East 77 39 2.0 P-F E ', HRA Senior 44 3 17.5 F R ' McNamara 132 22 6.0 P 65-R/67-E Englert 150 25 6.0 N E Gergen 45 45 1.0 N E Broback Ind. 8 11 .7 F R Kelly Trust 580 290 2.0 N R O'Leary's 25 10 2.5 F E Canollton Sth 8 4 2.2 F R McMenomy 36 5 6 N E TOTALS- 1737 707 2.5 �TATUE CODE: C= Concept Plan Approval P=Preliminary Plat Approval F=Final Plat Approval N=No Status R=Rasemount WWTP E= Empire WWTP Updated: l2/31/96 ���_ ` . EXHIBIT (continued) DISTRIBUTION OF RESIDENTIAL HOUSING UNITS WITHIN ROSEMOUNT'S CURRENT M.U.S.A. TYPE # % Single Family 1,230 71% Twin Homes 50 3% Townhomes 413 24% Apartments 44 2% TOTAL 1,737 100% i � � Population, Household & Employment Forecasts by the Metropolitan Council Rosemount, Minnesota __ ', A. POPULATION: increase Increase 1995 2000 2010 2020 1995-2010 1995-2020 11,720 14,500 23,700 34,000 11,900 22,290 102% 190% B. HOUSEHOLDS: Increase Increase 1995 2000 2010 2020 1995-2010 1995-2020 ---------- ---------- ---------- ---------- ------------- ------------- 3,785 5,000 8,500 12,500 4,715 8,715 125% 230% C. EMPLOYMENT: Increase increase 1995 2000 2010 2020 1995-2010 1995-2020 5,345 6,330 8,300 9,900 2,955 4,555 55% 85% EYHIBIT ROSENIOUNT, MINNESOTA C'[IMULATIVE IMPACT on WASTEWASTE FLOWS-MGD � in�THREE GROWTH SCENARIOS Rosemount WWTP Empire Annual MGD .290 Household MGD Ind./ MGD MGD Year Growth Households �omm. Balance Households 1997 200 (.025) (.015) .250 (.025) 250 (.038) (.015) .237 (.025) 300 (.050) (.015) .225 (.025) 1998 200 (.050) (.030) .210 (.050) 250 (.076) (.030) .184 (.050) 300 (.100) (.030) .160 (.050) 1999 200 (.075) (.045) .170 (.0�5) 250 (.114) (.045) .131 (.075) 300 (.150) (.045) .095 (.075) Z000 aoo (.loo� (.060) .130 (.100) 250 (.152) (.060) .078 (.100) 300 (.200) (.060) .030 (.100) 2001 200 (.125) (.075) .065 (.125) Zso (.190) (.075) .025 (.IZs� 300 (.250) (.075) (.035) (.125) NOTE: • Assume 100 units to Empire per year; balance to Rosemount • Assume 1 household= 250 gpd • Assume 10 acres/year for ind./comm. (1504gpd/acre) • Balance= remaining capacity at Rosemount WWTP of.29 MGD minus household and ind./comm. units based on .96 MGD capacity and .67 MGD flow on 12/31/96. ' _ _ ._ ' ;,pro Title:Rosemounf WWTP Phaseflut ' � Project #9208 �escriDtI01t: '�P�B�Pmvida for the phaseout of the Rr�semount WWTP w the Metro Plant via a ncw lift station and em in Imra Grove �Ia . 'Ihe e�dsting aerated pond system. forceatain connecting to the iaterceptor syst wit� the CeatralizationJDecentralization projected to reach capacitY bY 2000, w�l be eiiminated in agreemeat Study aad facility plannin8 results h Sis( � • . I .: ' � �MYWiM�r��p�O x� � O�M '^C+J �" " / • J�IyH F , `+M'• �. wtv�••�+°,.;�r.i . .. ^ � ..�v,;;::a:%: 'A::wYawr..:,.:•::�..::.... . .. :::,;,....;�•:..:i::..6.?'a .. .......�� -� � _.:.::.. .:�'�'��''��.�::.� nzatron� k. .:::>:. ... _ .-...:�yj•:..... ..:.::n:i-;nc Prior Autharization �Z,000,000 ssep I-Pla�s �"Pp`°"°� 0 �°�°°�d �� 1996 Author�iraxion e $1,000,000 s�II�ai�a 0'�`°"°d 0 � OF"� �}�� ���>""' /�` � ���{A.}���}��}< step III camstcvcsioa Q'''pp`91Od Q � Q Faoa� ' �� }..�YLai..�+J�+�+v"�_a�'"�Y��'. � Q Fssoae Future Authorizations a 10,116,6zz oma �"�`°"°d � � . - Total Project SI1,I16,622 .. ......... - 4 .•:....:n.:::::: ..::..:.::.:t m:tin��v.:.x:w;{J.4�� . ... . . . � :.�...... vrxw::::.vq•' , F. <0.5'.9M��'�i:i'?• � . ••:::..:v:?9Y::i..•.::\v:.ev..;;.; .ty.:. . —` �:n.:.........v.:.x:r::.:�i•::: �. .v - .. ..:�{� � t. :.......�:::ny::�.}..:......: y d...Y.�*�:;xx.,$.:.�Yr:v;i::k:i:4::.�{:._v:i'v}.... •� �'y . :�:na,•::.. ... :...�......-:v ��::'::v:�•::., ...... nv.:�':rv'm:r:. 'i . :.: w�+ :•:.v .5 :::. '. LLL— ..' ..l.r . . .vnv:•.v�•y:A:::..'m•.•;::�......... ViIM•�' { ..�. h ^ . ...�.,.. .......... .,. .... ... .. . ,.:..... ,:.:.::..�.�;: ..>..;.:.:::;.:.:::..;::;.;.:.:.flb :<::>;::t>.<;:::«.:.;;:.::,>z;:;:..,; �.::�,. :;k,. k;:<:.�:..�:. �<:. n�,, 1. : ...............::...,......:. ....�....,:::::.,.. . }b„�F:w ..:w:...r......... . �:.v:m;... -.��u�. �A.i ........:.::. ...; •.v .: •:.:x:................ . ': ..u. ..... .:::•:•�:�:. ::�:• . •. ::% xl.. ..i :W:: `:�:' v,rTi.t.�}.A.`S.. .vh:` ::\v�. .{v �. �v .vx ...ri.n.i.vn::hl�i:::<•::� ��. ....v .� ::::..4.n.ti. v ..fi. .................... .. .. �� .. ::.::n......ihJ v.v:'.....�v::;:.::;�.y'}.'p,` P .:::.. :.. .. An . ................ .r . n...:•nw•.v i.........,A; .r.... i4�:. :::..:.. ....YH�:.•:,• ...M. ynh`-J:::•... .... ..... �v::.. . .:....:::::..<::::::.:.:...:::::.J.:.�:::::.:::.::�...:;:.;::.-...�.�><:::.:::.::..:...::.::::.::..:.:.:...... ......,..;.::.. ,r.�,wcr.<J:r;�;z:a`.",,•.:•.::.::•.:........ ........... . ,.,............. .fi..... ,�.+:..::�3.::»'<,a�.�an.:'2?..... ::. .:.. h T: .. . ....�_: .. .:!. .:y, '+L vtn\:?�:Sl:...�� ��:::i4:�i2:.::.i::- - �. •::..: ri v.. .. ... ~ L�aC�$%?`;+�'..hvn 'i:4:i•iiii:.iri4' .:. ... _ ... .. . .:::...::::.::... n . �.:. Project Type: Irnerccptor 1996 Objectives. Coati�ue desiga and the tatus Bud et right-of-way acquisition Step 1 - In pmgress 5251,000 1997- Complete desiga Sttp 2- In pro� 5749,000 1998- Not applicable Step 3 - Nat authorized N/A 1999- Not applicable Total Capitai Budget: $1,OOQ000 . .... 2Q00- Not appticable . . .. , .......iii:oiii:.::i.�::::.:.i>r;•i:itJ:i:}:•xii:.:qyS:i-..::v:-. ...�:.v .._............................... ... ....:::. ..... .._ _...._... _.::::• :....:.::.,.:..::�:::�:::::::>:+::.::::.:. ...:................:::.:.::::• .....x:.:•v :2t�;+::;'.,•.:;':::^y::?. ... ...... . ..w......::..•,,;•, .wc:r•>::::::�... .:.am ..............._.....:.::..::......._:...............:.,....... .:::::::::.......... :.�..........,;..... .... u!;:.::;,:.' �x.�::.�..::::..... . ........: .........__.............. .............. ..............................:... ..�:::::.x�:•:o::::::•. ..�:,...:.:n::::x;.::::.:::.::•:..:.:...... ....M{. .._._.. .... _..... ...... ............................................,. ...............................,. -::�:.:�..•.-..:.... r:,.•:•-:::: ........ .:.�.........:........ .......... .................... ................... • . ............... .. .......... ........... ...................... ....X .:....�:...;..: . -.;:..:..;:,.;.::.;•...:';">�»;::;� ..iU..:...::�-::.;.,;-...:.::::::.;y,,.; .......:. .:..........................................._........,..._.... .....:.:::. ::.:>::...;...... nn.....i.......................................................... ...:::.•:::n..... ..{v.nv:�:.::................;.:............ v.•�.i:::\{},;.�Y:� .:nw. v...; ...�. ..�.. .............. ................n................... .. l.r t.................. ...... .,v,..... � ..........., n ...::::::::....�.:::�... v+t v..+.:�:.ii:iv:?v..........:v:� v,.;:{:vT:ti:+`' :tL�vT:ti�iT'� ...v.�:::::.::::.........:::::......:�::::::::�-:::::L•n..v..:�:::•::::..{�i{........ :�:m:�vii...:-:::x:n.......:......:..!y:.C:��:::i: :. .......:..�...v....... .....����::n�. n :,- .::'. .... ....:..-:nv:vn�:'::• ...:.•..... .:v:�::�::v.•::x� ....,.,-..,.t:n: ::: ......y.... �..................:....... {..} : t......v.......si.....<..... . .............. �. . ':.�:--........................i.�-.�. :•`::::•.:::.r...tv::.:v.}..,.5 i: .. �{{H.t.:i::`:.� .S.\1N............T.:..::::::::::::. .. ,. ..::>::+ai'4i'::vn?Y,-,,:,.;:'.... .::,,..::•::w:<•:.:.•:::::`::.. .:.. ,.,. .,: . O . '.;< �._..._.� �e�-.�.'�:�:;;;:;,�: �:. .: .......... p ......:.:..... �}�� ..........:...:.:::.::..::::...,..:> .:::.:,.....:::::,...,,..0 eCI...::........�Y:::::.... ...x..r.vni.....::::::.:::v:::::::. .. ':. ........... ............�i �v}�N.... ' '...��. .. .... ... .................... . ..........r .... .....Y....: :::'::::y�:'•i:{.•i: ... .�{'u,`:=' ..[ ,..... .....<...................... ..... ....:........., . . ,.v.-`.C�':'•: ... _ ��:::..::::::::::::�.............,:�:.,. .....:::...... ....::... :::.:........:...::::,.•:.... .^. t�^�'io-�,:"_,::�,+h�; .....u+... .................. . Tw46Y+ ................... ......... � ....:�::::::-:::.�.:� . ..r.. . .... . � ...............::. ....v.;.Rp:<.x�:.:::::v:::::::::�. �:�:...y,.;:i�.:4::i{�:::............ ,... ,.. v.............. diliire..S . ... .. en .................... ............... ....::..... . ......... .:.. ::��- ..,>;��>;:::< ...,. ....,>.......... ...... ....... >.......... ........::>:::::.:::..... ,.,:::.:::..:,.. .. .. ....................... _.........__............_..... ......... ...,...:. ..::,:..;;;��.:..... -� ...:.,..;::.......N..,.:...W;.:Y:..:� :..:. . ::.:...:........ :�::.:. ...:.... ...........::::::,:::................ :....:.,..._....::.:.... .. .v.��::...:.:....... .. .., ,... .............::........ .:,... ... ......:: ... . ...... .::. ;:.... ..,.,:....... ... ...... '.4.�:.vi:::�v.:::... :w::•v::..:... .. .....u.� :.ri{+n;.); ^�+C � :::..:'. :: ' •ti' f�Y :i.0 :i-... ... .��.. . .'.Y'.{. .... � . -.�::i:. ' :n . .... . ... . .... . .. ....... .:..• .... -......::.'............ ... �. . .:..... .... . . _quth_ _ Future Category: Expansion 'Thru 12131/94 5198,989 a� � 1995 5200,800 SO � Risk of Deiay: 5 � W.... �... � eratin Effici 0 .,��:;:::,::::.:;:.::k.,:<:..:,..,.�;;:,�:;>,.,....:�.:.:�;: �0 � g ��' . .,, Q�,��9G � .< :;:�;:: � #��<: �:. 2 I.. h r.....�. �ff➢/ N ? T� vH{rix�;"A.y:'a. • ., ::2a�(�tr��9C �.��fl� , eratin Effectivmess' so � g `:�,'��:: '� � 4 ;(�� sp Governmernal Coord'ination: Q .>:<::,�:�::,,.,� s (�/� :r.+N`:��riJr������ s�t a���25/V��1i/��: . . :..• . +i::i�1N� • . • �:"�, ti�4.Otr. r99� �.,..<:�:�.:'�,� � Subto „�;;.;', :::..�.::..: �:��,.Y:�:.�;:::i�:.. w�: .� �;, � � ao a,�:,�����6��ta� '��IOs#� i/b�a/�b�C ��bY+: OA . . .�"`.�"'`.�'"'":. . ...."�°"...�"'.."",.'�".,""" Priori Poiat Total: 7 1997 SZO1,011 5398,989 I 19 98 • SO 55,000,000 �—�-� . 000. 1999 �0 54,000,000 $�o�p��ec'ry pco�`cred w b`ree�ched by tb,e Year 2 prtated p�d plaat is not mmeaabk to iataim� 2000+ SO 5717,633 Contingency �0 �0 Fttecti.�cnas:Pbaseout im�roves floa�n7it}+ro mxc lmeataia fi�a+e , ������guintosy requi�ts aad avoids fuua+e odo� II'�, Totals 51,000,000 510,116,622 p�blcros. :TotaTPro ect Cosr. ':511,1:16,622"< +�AP�naix w.l l � � � e � • ' � - � � - . � �• � �in.i�� ��`�- � • .. ��■�_ III{L*�Z • .�. � � t� �,�_ �""�`T ; j'�� - . ' ti1111t1 1�• � \l:i las� .�i7/ 111�� � - r���C�, i• �fn� . � t�� 1��f�-'� '� ; .0 ,�•_ �..�.�� ��• tta 1' �:�, ��- �:-:�. :' t��» � �`G �.--�- .� ��t- i. - _-.�� �{������ t �: ` �1\� , � ,� , � ..� �, ��, _ . � � - ._-. � > ` !r: ` •.-. ~� 'I � �• �.�i ; � � ! ..,� �'l� - .. r•� 1.� �- �. _ ��- , } e� �t .--. . � ���, � � � ... .,� ' r�A�l�� `�:-� r�. , � ;. ~, � `. ��`� -� _ , , � ���.. i o � �,.- �'" I� . . � . ,_��— �,�;� ��i� � �• � � � IV. � 1 111 r� , �------ --�---� -- �- - ..___..__.._____�_.._._. .___..�._..__.._._ . ' ---...... _..._ .Y.__-� -----__. .. . _ - 1 METROPOLITAN C � UNCIL �� Mears Park Centre, 250 E. Sth Strees, S� Paul, Mianesota 55101 � 612-291-6359 RESOLUTION NO. 93-57 R�SOLUTION REQUIRING MODIFICATION OF A PROPOSED AMENDNIENT TO T�IE ' CITY OF R�SEMOUNT CONYPREHENSIVE PLAN i WHEREAS, the city of Rosemount, by letter submitted March 22, 1993, transmitted a proposed amendment to its adopted comprehensive plan regazding revision of the entire plan, in accordance with the NietroQolitan Land Plannin;Act and the Council Guidelines for Re�riewing Local Comprehensive Plan Amendments; and �,�'nLP.EAS, at its meeting on September 16, 1993, the Metropolitan Cauncil reviewed the Rosemount plan amendment and adopted a plan review report, in accordance with the Metropolitan Land Planning Act and the Council Guidelines for Reviewing L.acal Comprehensive Plan Amendments; and WHEREAS, the proposed amendment has been re•�iewed for impacts on metropolitan systems, apparent consistency with other adopted Metropolitan Development Guide chapten and compatibility with plans of ad;acent iccal ur.its of govemment; and WHEREAS, the Council has conctuded that the amendment as proposed constitutes a substantial �� impact on or substantial departure From the Council's Wastewater Treatment and __ Handiin� Poiicv Ptan, and that a plan modification is required prior to Councii apprvvaL NOW, THEREFORE, BE IT RESOLVED, that: .. 1. The Metropolitan Council fnds that: a. The forecasts contained the Rosemount comprehensive pIan, Update 2400 are consistent with the Council's forecasts. b. The city's policies for rural area development are consistent with the Council's rural policy, except for the existing developed areas shown on its zoning map as Rural ResidentiaL c. The hietropolitan Waste Controi Commission has completed interim improvements to the Rosemount Wastewater Treatment Plant that has increased its design capacity to approximately 0.9 mgd. The city's plan and flow projections must be consistent wich the plant's capacity. . d. The long term faciIity plan for the Rosemount plant wiIl not be approved until 1994_ e. The city's program for inEiltratio�nflow is acceptable, and the provisions for private wastewater treatment plants comply with Council requirements. c� � The city needs to modify its on-site sysiem regulations to require biennia! inspection of on-site systems by certiFed and licensed inspector�. � g. The ciry's surface water management policies comply with the Council's ', Interim Nonpoint Management Strategy. , h. The plan's funciional ciassiFcation system complies with the current I' Transportation Poliry Plan, but not the ciassification revisions adopted by the TAB in 1992 and 1993. i. The ciry does not specify when che results of the TH 55 Corridor Study will be available, nor how it will be incorporated into the Comprehensive Plan. " j. The plan amendment indicates the city is studying the provision of municipal services to the eastern portion oF the ci_ry, but ^o: a�d:ess t,e volumes and types of traffc expected to be generated by expansion of the proposed industrial uses and densities. . k The transit section of the plan is realistic in scope given the level oE service available. The city is committed to work with develogers to remove barriers and encourage transit use in the desi;n of development projects in transit corridors. 1. A decision to relocate the Minneapolis/St. Paul airport to the Rosemount search area woutd require a major revision to the transportation element oF the ciry's Comprehensive Ptan. � m. Approximately 2�0 acres of Spring Lake Regional Park is located on the ' eastern end of Roseinount. Adjacent development appears to be � consistent with regional parks. n. There are no other regional recreation facilities within the city. Proposed development in Rosemount, adjacent to Lebanon Hills Regional Park � located in Eagan and Apple Valley, is compatble and cansistent with metropolitan plans for regional recreation open space. o. The plan provides compiete inEormation on its housing goals and policies, as weil as implementation measures necessary to achieve them. 2. The Metropolitan Council conciudes that it will: a. Adopt the above findings and the staff report as part of these recommendations. b. Inform the city of Rosemount thar pursuant to the Metropolitan Land Planning Act (Minnesota Statutes Sec. 473.175, Subd. 1), before it can put the plan amendment into eEfeci it must: �} ........� ._...,`........".�.___. _.�. _. _._._.. _-----_.... _.....---.. _..... _.. . ._ .. . ._ . ._. --------- - — _ I t � L madify its pian by removing the area wichin che proposed year 2000 � MUSA (including the area identified as removed from the MUSA until after 1996) until such time as the Council has approved the � Commission's Implementation Plan for expanding the capacity of the Rosemount wastewater treatment ptant. 2. modify its Comprehensive Plan to reflect the Rosemount wastewater �ieatment pIant capacity oE 0.9 million gallons per day. 3. modiFy its plan to specify that all on-site systems are to be inspected • at least biennially by an inspector licensed by the city or County, - and certiFied by the NiPCA. • c. Recvmmend that the city revise its plan to respond to the changes to the region's roadway classiFcatior_ s;nte^: adoptc� by t:e Tr"� in i992 and 1993. d. Recommend that the city revise its plan to specify how the ciry will incorporate the recommendations oF the TH 52/55 Study. e. Commend the ciry for its support of strategies to work with deveiopers to remove barriers and encourage design that promotes transit usage in specified corridors. �� Adopted this 16th day of September, 1993. . - ti�. � � -- � Kevin owe, Vice Chair andra L. Lindstrom, ecre ' i� , ,� ��' CRAIG J. MINEA 611 QUINCE CIRCLE - BOULDER, CO. 80304-1030 TELEPHONE (303)440-9497 - FAX (303) 442-3491 Faxed - (612) 423-5203 January 24, 1997 Mr. Dan Rogness Community Development Director City of Rosemount P. O. Box 510 Rosemount, MN. 55068-0510 Dear Dan: I received the proposed January 1997 Rosemount Comprehensive Guide Plan that will be presented to the Rosemount Planning Commission and City CounciL My only criticism of the plan is that it treats all MUSA sewered acreage as fungible, i.e. all R-1 land is equal in quality. In my opinion, several hundred acres of the expanded Phase I MUSA area, designated for single family residential, are unsuitable for Class "A" residential development. Much of this ground lies immediately east of the north-south Canadian Pacific Railroad. This land is too close to the Wintz Warehouse (formerly Brockway ' Glass), Griggs Bros, the Dakota County Highway Department, the National Guard maintenance garage, and Knutson Rubbish. These adjacent industrial uses are totally incompatible with better quality residential development. The 230 acre Kelly Trust parcel is the only current and expanded Phase I acreage suitable for medium to high-end housing. If the Kelly Trust representatives continue to demand $30,t�00-$40,000 per acre, the larger residential developers, such as Centex and U.S. Homes, will build elsewhere. Rosemount will be unable to achieve their development projections of 315 homes per year. I recommend that you invite several large residential developers to review and comment on the proposed Comprehensive Plan revisions before adopting the plan as currently drawn. Inquire whether any of the expanded Phase 1 MUSA acreage would meet their development criteria. I have 155 acres within the revised MUSA Phase II area. I am asking you to recommend the inclusion of this 155 acre parcel in the revised 1997 Phase I MUSA service area. This gently rolling property is the only remaining parcel of sufficient size for better quality, single family residential development, east . of State Highway #3. This parcel is the only serious competition to the Kelly Trust property. As the future sewer interceptor will be located on the property's west boundary, the inclusion of this property in the Phase I MUSA will not require any additional infrastructure investment. � i rely, g a cc: Ms. Cathy Busho, Mayor