Loading...
HomeMy WebLinkAbout4.o. Receive Feasibility Report/Set Public Hearing, 1996 Bituminous Overlay and Appurtenant Work, City Project # 274 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCILMEETING DATE: May 7, 1996 AGENDA ITEM: Receive Feasibility Report/Set Public AGENDA SECTION: Hearing, 1996 Bituminous Overlay and Appurtenant Work, Consent City Project #274 PREPARED BY: Bud Osmundson AGENDA NITEm # ),y- City Engineer/Public Works Director ��YY!! ATTACHMENTS: Feasibility Report, Resolution APPROVED BY: Attached is the Feasibility Report for the 1996 Bituminous Overlay and Appurtenant Work Project, City Project #274. The area that was chosen for this year's project, due to the condition of the existing streets, is the Carrollton Addition area which includes the streets as follows: 144th Street, Upper 143rd Street and 143rd Street between Chili and Cimarron Avenues plus Cimarron Avenue between 144th and 143rd. This year's project includes some reconstruction and repair of the concrete curb and gutter in the project area. The total estimated cost of the project is $59,000.00. Per the Assessment Policy, which was revised last year, 35% of the total project cost is proposed to be assessed against the benefitting properties. That amount is approximately $275.00 per lot. There are 75 single family homes in the project area which will be assessed. Staff recommends that the cap of $500.00 per R-1 residential lot be set for 1996. Last year's original estimate was $159.00 per lot and ended up being levied at $136.00 per lot, but did not include any concrete curb and gutter work. The proposed schedule is as shown in the Feasibility Report. The action this evening is to receive the feasibility report and set the public hearing for the project on June 4, 1996. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING FEASIBILITY REPORT AND SET PUBLIC HEARING FOR THE 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK, CITY PROJECT #274. COUNCIL ACTION: 1 CITY OF ROSEMOUNT _ DAKOTA COUNTY, MINNESOTA RESOLUTION 1996 - A RESOLUTION RECEIVING THE FEASIBILITY REPORT/SET PUBLIC HEARING 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK IMPROVEMENTS CITY PROJECT #274 WHEREAS, the City Council deemed it necessary and expedient that the City construct certain improvements, to-wit: City Project #274, 1996 Bituminous Overlay and Appurtenant Work Improvements, in the City as described in and in accordance with the feasibility report prepared by the Public Works Department; and WHEREAS, the City Council has been advised by the City Engineer that said improvements described in City Project #274 are feasible, and should best be made as proposed, and WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public hearing on such improvements following mailed notice and two publications thereof in the official newspaper stating time and place of the hearing, the general nature of the improvement, the estimated costs thereof, and the area proposed to be assessed, in accordance with the law. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility report for City Project #274 and places it on file. NOW THEREFORE BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount that the public hearing be scheduled to consider City Project #274, 1996 Bituminous Overlay and Appurtenant Work Improvements to be held on Tuesday, June 4, 1996 at 8:00 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of City Hall. ADOPTED this 7th day of May, 1996. Cathy Busho, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: FEASIBILITY REPORT FOR BITUMINOUS OVERLAY & APPURTENANT IMPROVEMENTS CITY PROJECT #274 Prepared by /ged Henry C. Osmundson, P.E. City Engineer/Public Works Director Date: April 15, 1996 Reg. No. 19156 EXECUTIVE SUMMARY City Project #274 provides for the milling and installation of a structural bituminous overlay and concrete curb & gutter repairs on the streets within the Carrollton Addition areas in central Rosemount. The Project is feasible from an engineering standpoint and can best be accomplished under one contract. The estimated cost of the project is approximately $59,000.00. The funding for the project will come from assessments to benefited properties and the 1996 Operating Budget. The project can be initiated in July and completed within two weeks. INTRODUCTION The City's Pavement Management System has identified that 144th Street, Upper 143rd Street and 143rd Street between Chili Avenue and Cimarron Avenue, plus Cimarron Avenue requires a structural bituminous overlay at this time. These streets were constructed in 1978 and sealcoated in 1982 and 1990. The concrete curb and gutter will be repaired as needed. PROPOSED IMPROVEMENTS The proposed improvements will include the removal and replacement of sections of concrete curb & gutter, raising other curb & gutter that has settled, and the milling of the outside six feet (6') adjacent to the existing concrete curb & gutter. Also required is the raising of the manholes and gate valves in the project area. After this work is complete, a 2" bituminous overlay will be installed and compacted. FINANCING The estimated cost of the project is approximately $59,000.00. The project will be financed by a combination of the 1996 Operating Budget which will cover 65% of the cost or $38,350.00. The remaining 35% will be covered by assessments to the benefiting properties or $20,650.00. It has been determined that there are 75 residential units in the project area, all single family homes. Using the "Unit Method" (or per lot method), the total estimated cost for assessments would be $275.00 per lot. SCHEDULE The schedule for the project is as follows: Receive Feasibility Report May 7, 1996 Public Hearing June 4, 1996 Approve Project June 4, 1996 Approve Plans & Spec's June 4, 1996 Order Ad for Bids June 4, 1996 Bid Opening June 28, 1996 Bid Award July 2, 1996 Complete Construction August 1, 1996 Assessment Hearing September 17, 1996 ITEM SPEC. ITEM TOTAL UNITS UNIT TOTAL NO. NO. QUANTITIES PRICE 1 2104.501 Remove Existing 200 L.F. 5 3.00 $ 600.00 Curb and Gutter 2 2105.525 Topsoil Borrow (LV) 6 C.Y. $ 15.00 $ 90.00 3 2211.501 Aggregate Base CI.5, 25 Tons $ 12.00 $ 300.00 100% Crushed Rock 4 2232.501 Mill Bituminous 5,900 S.Y. $ 1 .40 $ 8,260.00 Surface 5 2331.518 Bituminous Overlay 1,530 Tons $ 25.00 538,250.00 (Type 41 , Modified) 6 2357.502 Bituminous Material 640 Gallon $ 1 .50 $ 960.00 for Tack Coat s Concrete Curb and 7 2351 .501 Gutter, Design 200 L..F. $ 14.00 $ 2,800.00 "Modified S" Mudjacking of 8 0520 Concrete Curb and 60 L.F. $ 6.00 $ 360.00 Concrete Clean and Seal 9 0531 Concrete Curb and 60 L.F. $ 5.00 $ 300.00 Gutter Cracks 10 2506.522 Adjust Frame and 21 Each $150.00 $ 3,150.00 Ring Casting 11 2575.505 Sodding 50 S.Y. $ 3.25 $ 162.50 12 0504.602 Adjust Gate Valve _ 3 Each $150.00 $ 450.00 TOTAL BID _ $ 55,682.50 Construction Cost Estimate: $55,682.50 Plus Legal, Advertising and Contingency: $ 3.317.50 Total Project Cost: $59.000.00 1996 BITUMINOUS OVERLAY Carrollton„„e v r re r /1 r r 1 re r/ Addition / / / / 1 /I/ / 4 ,,,,,k .e/11 4,, ° A A r A , At,fiv.2,44.1. -:.A.4.fA:,:azi A A A A Ar Ar r r_ ,,,, r -/', 4'"4 A, 1i d nir A .0 A t A A a r r/, /,,,r/c /r/r7/.* , ., r ,A',u,5i‘A24AtEii4/!A31!;1A-1 1 4 P::4- r •■I , w r ri , 4 '� City Project V NO2]4 , ' 0 r r r r r , 4 4r/ 4 I An r/./ 4 W =J�- E fr s I A A A A A A A A 145th Street West