Loading...
HomeMy WebLinkAbout4.h. Receive Petition/Order Feasibility Report, Basic Builders/Hawkins City Project #275 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: May 7, 1996 AGENDA ITEM: Receive Petition/Order Feasibility Report, AGENDA SECTION: Basic Builders/Hawkins, City Project #275 Consent . PREPARED BY: Bud Osmundson AGENDA City Engineer/Public Works Director EM H ATTACHMENTS: Resolution, Petition APPROVED BY: The City has received a petition for public improvements in the proposed Basic Builders/Hawkins Addition from Jeff Nivala of Basic Builders. They recently received concept approval for subdividing the John Hawkins property. At this time, Staff is requesting Council to order the Feasibility Report for this Addition. The major issues will be the design of the sanitary sewer. SEH will be the consulting engineer used on the project. This project has been designated City Project #275. • RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING PETITION AND ORDERING A FEASIBILITY REPORT FOR BASIC BUILDERS/HAWKINS STREET & UTILITY IMPROVEMENTS, CITY PROJECT #275. COUNCIL ACTION: 4 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1996 - A RESOLUTION RECEIVING PETITION AND ORDERING FEASIBILITY REPORT FOR BASIC BUILDERS/HAWKINS ADDITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT # 275 WHEREAS, the City Council of the City of Rosemount has received a petition from the developer and property owners of the proposed Basic Builders/Hawkins Addition Street and Utility Improvements, City Project #275. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Rosemount as follows: (1) the aforesaid petition represents 100% of the owners of the affected property; (2) the property owner requests in the petition that the improvements be constructed and that the entire cost for their share less the City's share of the cost of the improvement be assessed against the property; (3) the aforesaid petition is approved and placed on file. (4) the City's Consulting Engineer is directed to prepare the necessary Feasibility Report for the Basic Builders/Hawkins Addition Street and Utility Improvements, City Project #275. ADOPTED this 7th day of May, 1996. Cathy Busho, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: Proj Z7� CITY OF ROSEMOUNT PETITION FOR LOCAL IMPROVEMENTS 0100% Petition) To the City Council of Rosemount, Minnesota: • We, the undersigned, being the owners of all the real property Legally described as follows: aePttiodhe hereby petition the city council to undertake without a public hearing under Minnesota Statutes, Section 429. 031, the following improvements to such property and agree to pay for all costa for the preparation of the feasibility report for these improvements in the event the improvements are not ordered in: X Sanitary Sewer X Walkways X Watermain X Streets X Storm Sewer X Curb & Gutter X Streetlights Other and to pay the entire assessable costs thereof against our property encompassing or abutting said improvements based on benefits received without regard to cash valuation. 447 - e of PA,A (s)+ Address Date / /// 0/111111r 14450 So. Robert Trail, Rosemount, MN 4-19-9 B -/i,J/ui der y: Jeff W. Nivala, President 2. 3. 4. We also agree to guaranty payment for the preparation of plans and specifications for the above petitioned improvements in order that the plans and specifications may be prepared simultaneously with the feasibility report. For City Use On y 'd: . �����' H : 449-% To Council : O/ / ! ` 7(0 Date Rec y � � • Property owned in joint tenancy should be signed by each owner. 10/88 el. .e • y.' Vi • .}.. :!j•iA. . .Jib•• �• :,(:• • • Property Legal Descriptions s - • Parcel No. 1 PID #34-03010-010-41, "The West 164.80 feet of th East 692.17 feet of the South one-half (1/2) of the Northwest quarter (1/4) , Section 30, Township 115, Range 19 . " Parcel No. 2 PID #34-03010-010-39, "The West 164. 81 feet of the East 856.95 feet of the South one-half ( 1/2) of the Northwest quarter ( 1/4) , Section 30, Township 115, Range 20. " Parcel No. 3 PID #34-03010-010-42, "The West 299 feet of the East 1155.95 feet of the South one-half (1/2) of the Northwest quarter (1/4) , except the-South 370; feet thereof, Section 30, Township 115, Range 19. " Gross Property Acreage 16.28 Acres +- Comprehensive Land Us Designation is Urban Residential - The subject property s currently-_in the MUSA. ti. - `'T.i F!•`7 JS• w .'...-.0 T, y,dam'"%•. ti .7.:::'‘ -:.:.•, !. 1: \'`1 �•J . y J y :iM �� .,„+^t 1.. ". : *3 g� i X hh.i N 1}Y e;07.7' f7h fJ is rt 4i ',` =(nK Yr tin 4,h 1, 1i ;7,....�'Y yY4 } >7 J 1 ti . ii 4 - Yy . t tY ;rt -.ti J • •