Loading...
HomeMy WebLinkAbout4.i. Receive Bids/Award Contract, 1996 Bituminoud Overlay and Appurtenant Work, City Project #274 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: July 2, 1996 AGENDA ITEM: Receive Bids/Award Contract, 1996 AGENDA SECTION: Bituminous Overlay and Appurtenant Work, City Project Consent #274 PREPARED BY: Bud Osmundson AGENDA rrEm _City Engineer/Public Works Director ATTACHMENTS: Bid Tabulation, Resolution, Financing APPROVED B . Table The City received and opened five bids on June 21, 1996 for the 1996 Bituminous Overlay and Appurtenant Work, City Project #274. City Staff has reviewed the bids and the low bidder is Bituminous Roadways, Inc., 9050 Jefferson Trail West, Inver Grove Heights, MN 55077, with a total bid of $45,800. This bid is $9,882.50 below the Engineer's Estimate. Staff recommends that Council adopt a resolution receiving the bids and awarding the contract to Bituminous Roadways, Inc. in the amount of $45,800. Also attached is a breakdown of the revised estimated cost and the new pending assessment amount. With the actual bid prices plus other expenses and a contingency, the pending assessment is now $230.00 per lot compared to the original estimate of $261 .40 per lot. The project should start and be completed within a few weeks. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK, CITY PROJECT #274. COUNCIL ACTION: 3 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1996 - A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK IMPROVEMENTS CITY PROJECT 274 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of 1996 Bituminous Overlay and Appurtenant Work Improvements are hereby received and tabulated. 2. The bid of Bituminous Roadways, Inc. in the amount of $45,800.00 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 2nd day of July, 1996. Cathy Busho, Mayor ATTEST: Susan M. Walsh, City Clerk Mot i on b Y• Seconded by: Voted in favor: Voted against: CITY OF ROSEMOUNT BID TABULATIONS 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK IMPROVEMENTS CITY PROJECT#274 BID OPENING: JUNE 21, 1996 @ 10:00 A.M. II BIDDER I BID BOND TOTAL BID Ace Blacktop, Inc. $48,201.00 Ashbach Construction Co. Bituminous Roadways, Inc. $45,800.00 McNamara Contracting $49,540.00 Northwest Asphalt, Inc. $50,655.00 Valley Paving VI-CON, Inc. ,/ $48,172.50 ENGINEER'S ESTIMATE $55,682.50 or CITY OF ROSEMOUNT 1996 Bituminous Overlay and Appurtenant Work Improvements Project No. 274 FINANCING Construction Cost (per Bid): $45,800.00 Plus Legal, Advertising and Contingency: $ 3.317.50 Total Project Cost $49,117.50 Assessment Costs (35%) $17,195.00 Total Lots 75 Pending Assessment $ 230.00