Loading...
HomeMy WebLinkAbout4.j. Award Contract for Reconditioning of Connemara Water TowerCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 6, 1996 AGENDA ITEM: Award Contract for Reconditioning of Connemara Water Tower AGENDA SECTION: Consent PREPARED BY: Bud Osmundson City Engineer/Public Works Director AGENDA ITEM # 4 -J_ ATTACHMENTS: KLM Recommendation Letter and Bid APPROVED BY: Tabulation I This item is for Council consideration of awarding a contract for reconditioning and repair to the Connemara Water Tower. The repairs include minor welding and repair of coating (painting) failures on the interior and exterior of the Connemara Water Tower. This item was budgeted in the Water Operating Budget for 1996. In 1995 we had both the Connemara Water Tower (1 million gallon) and the Chippendale Water Tower (.5 million gallon) inspected by KLM Engineering personnel for evaluation of maintenance needs. In 1995 we completed the repairs to the Chippendale Avenue Water Tower and budgeted money in the 1996 Water Operating Budget for the Connemara Water Tower repairs. This project must be done in late fall after the greatest demand for water is complete and we can take this Tower out of service. The bids were received on July 25, 1996 and the low bidder was V. E. Gray & Sons Contracting, Inc. at $61,490. The Engineers Estimate was $75,300. Both KLM Engineering and Staff recommend that V.E. Gray & Son Contracting, Inc. be awarded the project. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR CONNEMARA TOWER REPAIR AND PAINTING. I COUNCIL ACTION: K CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1996 - A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR CONNEMARA TOWER REPAIR AND PAINTING BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1 All bids for the construction of Connemara Tower Repair and Painting are hereby received and tabulated. 2. The bid of V.E. Gray & Sons Contracting, Inc. in the amount of $61,490 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for an on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 6th day of August, 1996. ATTEST: Susan M. Walsh, City Clerk Motion by: Voted in favor: Voted against: Cathy Busho, Mayor Seconded by: KLY ENGINEERING, INC. P.O. Box 897 - 3394 Lake Elmo Ave. N. * Lake Elmo. MN 55042 (612) 773-5 111 - Fax (612) 773-5222 July 29, 1996 Bud Osmundson, P. E., City Engineer 89, FAX agly. S. City of Rosemount Afe 2875 145th Street west Rosemount, Minnesota 55068 RE., Bid Evaluation for Reconditfaning the 1.0 MAfG Elevated Water rower Repair Connemara Tower, City of Rosemount, Minnesota, KLM Project No. MN 1020 Dear Mr. Osmundson: The bid opening was held on July 25,1996 at 10:00 AM at the City Hall. Thesix (6) bids received were as follows: 1.0 Propezal Bidde[I Total Base Bid V, E. Gray-& Son �Qontrac_fing, Inc. 1,490.00 Kangas Tank & M2intenance, Inc. $75,050.00 Abhe & Svoboda, Inc. $88.3Z5.00 TIVII Qggatings, Inc. $91,955.00 Odl212d Protedive _Qoatings, Inc. $93,000.00 Tenver-coatingl. Inc, $112,480.00 The Engineers estiMgte was ;75,300.00, In reviewing the qualifications of the bidders, we find V. E. Gray & Son Contracting, Inc. meets the requirements of the specifications and are qualifled to do the work. 2 We recommend you accept the lowest bidder, V. E. Gray & Son Contracting, Inc. fbr Proposal No. 1.0, for the Cleaning, Repairing and Painting Repair, 1,000,00o Gallon Elevated Water Storage Tank Repair, Connemara Tower. Project MN 1020. Their bid was $61,490.00. - Enclosed, lbr your reference are bid tabulation sheets on the projects. Sincerely, KLM ENGINEERING, INC. t Jack R. Kollmer Principal Associate Cc: Shawn A. Mulhern/office files Enclosures: Bid Tabulation Sheets G:%VMWOrd*MzV2Mbk*v*1.doc DID TABULATION SHEET Bid Date: July 25, 1996 OpeningTime: 10:00 A.M. Chvw: City of RosCmount. MN Proposal Numben 1.0 Description: Connemara Tower Repair Owner ProJect No.: MN 10 2 0 KIM Project No.:—MN1020 Contractor. Bid l3ondl Afildavit of Ihid Item Unit P3id Item Ua id Item Unit Itent Unit Bid Itaul Total 1 5% Attendance I NO. I Price lNo. 2 Price Fo. 3 Price IBid No. 4 Price No. 5 I 1 Base Bid V.E. N/A $16,080.00 $3,150.00 $10,620.00 $20tOOO.00 11,640. $61,490.00 Gray Lump Sum $90.00 per/h $12.00 sq.ft.$5.00 sq.ft.6. sq.ft. Tenyer N/A $34,000 ' 00 $3,150.00 $15,930.00 $40,000.00 19,400. $112,480.0 Coatings Lump Sum $90.00 per/h $18.00 sq.ft. $10.00 sq.ftlO. sq.Et.* TMI N/A $19,850. 00 $3#150..00 $13,275.00 $32t4OO.00 23,280. $91,955.00 'Coatings I Lump Sum $90.00 per/h $15.00 sq.ft. $8.10 sq.ft.12. sq.ft. Odland N/A $25,600.00 $3,150.00 $8,850.00 $36,000.00 19,400. $93,000.00 Protecti a Lump Sum $90.00 per/h $10.00 sq.ft. $9.00 sq.ft.10. sq ft. Coatinq s Kangas N/A $13,000.00 $3,500.00 $8,850.00 $40,000.00 91700. $75,050.00 Tank & Lump Sum $100.00 per/li$10.00 sq.ft. $10.00 sq.fl.5. sq.ft. 'Maint. Abhe & N/A $120310.00 $2,975.00 $13,275.00 $36,000.00 1 23f765 $88,325.00 Svoboda Lump Sum $85.00 per/h 1 $15.00 sq.ft. $9.00 sq.ft.112.25 ft.