HomeMy WebLinkAbout5.a. New Fire StationCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: NOVEMBER 19,1996
AGENDA ITEM: New Fire Station Overview
AGENDA SECTION:
Dept. Heads Report
PREPARED BY: Thomas D. Burt, City Administrator
AGENITBM #5 A_
ATTACHMENTS: Change Orders
APPROVED BY.
y
Todd Christopherson from AMCON Construction Managers will be present to update the City Council on its
progress. Christopherson will review the change orders that have occurred. Staff recommends approval of the
Change Orders.
RECOMAIIENDED ACTION: MOTION to approve the Change Orders as presented for the
Dodd/Shannon. Fire Station.
*9 612-882-6002 11/15196 08:38 AM D 112
AMCON CM FAX
TODD CHPISTOPHERSON, R E
612-890-1217 VOICE
612-882-6002 FAY
612-650-6963 D/GIT4L PAGER
FAX: 612 423-5203
NO. OF PAGES: 2
DATE: Friday, November 15, 1996
Tom
Attached is the list of changes we have had to the project to date and the status.
Please note that there are some items that are listed as both adds to one contractor and deducts to
another contractor.
Of the approximately $30,000 in added cost, rou hly \20,000 is attributed to an increase in the
paving design, additional concrete apron, and /im rting nd when the City stock pile ran out.
0 ' ).
The original budget included a contingency of 65,000. Af r the bids were received, the contingency
5
) mo
was reduced to $30,000 due to bids that w re $35,000 mor than the cost estimate. With the change
r
attached, we are just under the remaining ontingency.
I am looking forward to presenting this
Thanks
CC Greg Stotko, Amcon
Mark Vetter, Vetter Johnson
tion and an update'�o the Council at Tuesday's meeting.
Professlonal Construction Management
I
Co
q
00
C-)
00
0
0-
Q
Z
0
Rosemount Fire Station
Project Changes
11/15/96
NO.
Issule Signed
Description
Contractor
Amount
Status
Upgrade Sprinkler system
Anderson Mechanical
600
Delete Check valve at sprinkler
Anderson Mechanical
(700)
Change sink faucet at 3 compartment
Anderson Mechanical
35
2.1
10/4/96
Additional driveway, thicker paving through out
Bituminous Roadways
9,275
quantity verified by Amcon
2.1
10/4/96
Delete paving at East side for concrete Apron
Bituminous Roadways
(700)
Accepted
30.1
10/4/96
Relocate existing light pole
Burnsville Electric
1,410
Authorized, need to write, neg. pricing
30.1
10/4/96
Electrical Changes on E-1
Burnsville Electric
625
Authorized, need to write
30.1
10/4/96
Revised site layout per modified alternate bid
Burnsville Electric
(4,125)
BE to review modifications and re -quote
30.1
10/4/96
Electrical Changes per E-2
Burnsville Electric
should be a credit, BE says no, TC to review
30.1
10/4/96
Pour concrete base for street light
Burnsville Electric
350
negotiate with Burnsville Elect., too high
30.1
10/4/96
Change hoist wiring from single phase to 3 phas( Burnsville Electric
118
NA
Wire monitor to flow switch
Burnsville Electric
-
not needed, no add
Add pipe sleeves at data room
Burnsville Electric
325
Wire light in cabinet at corridor
Burnsville Electric
150
Credit for MC cable used
Burnsville Electric
(150)
Waiting on quote, then negotiate - offered to trade
Add Phone Shelf
Classic Craft
250
quoted
28.1
10/4/96
Delete 4 extinguishers, add recessed cabinet
Construction Supply
(75)
NA
Add I angle framed mirror
Construction Supply
-
No charge per Greg S
Bell tower steel material
DG Welding
1,200
quoted
1.1
10/4/96
Haul in fill, approx. 1268 cy
Friedges Excavating
8,242
verify quantity upon comletion
1.1
10/4/96
West Entrance and import sand
Friedges Excavating
2,500
approved
Temporary Fence
Friedges Excavating
495
Authorized, need to write
Cost to box in light fixtures at soffit
Friedges, Inc.
1,500
quoted
NA
Additional services for re -bid mech.
Gausman and Moore
-
T & M request, no extra
Changes per Arch review of shops
Glewwe Doors, Inc.
100
Greg Stotko to review with Glewwe
26.1
10/4/96
Add three lockers due to additional wall space
JF Equipment
623
Authorized by City, need to write
12.1
10/4/96 yes
Add scuppers and delete flashing @ windows
Kato Roofing
(47)
12.1
10/4/96 yes
Protective walkway at training area
Kato Roofing
1,270
Run by SA and TB prior to proceeding
4.1
10/4/96
Add Apron at East Entrance
Spraungel
4,700
Accepted
NA
Two curb cuts - concrete apons
Spraungel
-
Revised plan - no added cost
Additional Driveway
Spraungel
verify add or deduct, small if at all
Back charge forjoist bearing angle
Spraungel
(2,233)
Greg review and advise
Bell tower concrete credit
Spraungel
(400)
est., needs to be negotiated
Masonry Pier at room 114
Spraungel
150
authorized.
3.1
10/4/96
Add 6' of 15" rcp storm sewer
St. Paul Utities
150
requested for more, need to write
3.1
10/4/96
Add PIV
St.Paul Utilities
1,500
Authorized, need to write
Box out lights - EIFS detail
Sterling Contractors
700
due to fire rating required on lights
7.1
10/4/96
Credit for wrong color joists
Superlo ' r Iron
(2,000)
Accepted by SA
ADdition handrail required and protective frame
Thurnbeck
385
Cut 19 pockets in plank on mezz. for hand rails
Western
-
Not an extra, part of their contract
Cut landing grtg to fit, weld additional angles
Western
222
Greg review and advise - requested to stiffen stairs
install angle forjoist bearing
Western
2,233
Greg review and advise - extra from western to be pd by Spraungel
Bell tower steel erection
Western
860
quoted
Total $
29,537.75
AWCON CM
Project Changes