HomeMy WebLinkAbout4.l. Declare Cost/Set Assessment Hearing for Shannon Hills 6th, City Project #251 CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE. March 19, 1996
AGENDA ITEM: Declare Cost/Set Assessment Hearing AGENDA SECTION:
Shannon Hills 6th Addition, City Project #251 Consent
PREPARED BY: Doug Utterer, Civil Engineer AGENDA ITEM # 4 L
ATTACHMENTS: Resolution, Project Cost & Funding APPROVED BY: s/
Summary, Map .i
Attached are copies of a Project Cost Summary, a Project Funding Summary and a
Resolution declaring all costs for the referenced project. The Feasibility Report project
cost estimate was $474,300. The Project was completed on July 7, 1995. The final
project costs totaled $369,345 and a summary of these costs are attached. Most of the
cost is assessable to the benefitting property which is the Shannon Hills 6th Addition.
The final assessable cost to the project was $337,672, which is $11,256 per lot. The
remaining $31,673 will come from the Storm Core Fund.
City Project #251 was initiated through a petition from Ground Development Corporation
for the construction of public streets and utilities for the Shannon Hills 6th Addition. The
Public Hearing was held on March 2, 1994.
Staff recommended action is as stated below and to set a Public Hearing to consider
these assessments on April 16, 1996 at 8:00 p.m. or as soon as possible thereafter.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION DECLARING COST TO BE
ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT, AND
CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT FOR SHANNON HILLS 6TH ADDITION
STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #251.
COUNCIL ACTION:
4
,._..., CITY OF ROSEMOUNT
'`� DAKOTA COUNTY, MINNESOTA
_.
����
�•�w`;` RESOLUTION 1996 - 19
A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING
PREPARATION OF PROPOSED ASSESSMENT, AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT
SHANNON HILLS 6TH ADDITION STREET & UTILITY IMPROVEMENTS
CITY PROJECT #251
WHEREAS, a contract has been let for Shannon Hiils 6th Addition Street & Utility
Improvements and the contract price for such improvement is S295,765, and the expenses
incurred or to be incurred in the making of such improvement amount to 573,580 so that
the total cost of the improvement will be 5369,345.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Rosemount, Minnesota:
1 . The portion of the cost of such improvement to be paid by the City is hereby declared
to be 531,673 and the portion of the cost to be assessed against benefited property
owners is declared to be S337,672.
� ,,.
'-.- '` 2. Assessments shall be payable in equal annual installments extending over a period of
10 years, the first of the installments to be payable with general taxes for the year
1996, and shall bear interest at the rate of 2% points per annum above the interest
rate paid by the City for its bonds from date of the adoption of the assessment
resolution.
3._ The City Clerk, with the assistance of the Public Works Director shall forthwith
calculate the proper amount to be specially assessed for such improvement against
every assessable lot, piece or parcel of land within the district affected, without
regard to cash valuation, as provided by law, and he shall file a copy of such
proposed assessment in his office for public inspection; and
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
1 . A hearing shall be held on the 16th day of April, 1996 in the City Hall at 8:00 p.m.
or as soon thereafter as possible, to pass upon such proposed assessment and at
such time and place all persons owning property affected by such improvement will
y:`
be given an opportunity to be heard with reference to such assessment.
2. The City Clerk is hereby directed to cause a notice of the hearing on the proposed
assessment to be published once in the official newspaper at least two weeks prior
to the hearing, and she shall state in the notice the total cost of the improvement.
.--� Resolution 1996 - 19
- ,
�,..;
`�
She shall also cause mailed notice to be given to the owner of each parcel described
in the assessment roll not less than two weeks prior to the hearings.
BE IT FURTHER RESOIVED by the City Council of Rosemount, Minnesota:
The owner of any property so assessed may, at any time prior to certification of the
assessment to the County Auditor, pay the whole of the assessment on such
property, with interest accrued to the date of payment, to the City, except that no
interest shall be charged if the entire assessment is paid within 30 days from the
adoption of the assessment. The owner may at any time thereafter, pay to the
County Auditor the entire amount of the assessment remaining unpaid, with interest
accrued to December 31 of the year in which such payment is made. Such payment
must be made before November 15 or interest will be charged through December 31
of the succeeding year.
ADOPTED this 19th day of March, 1996.
� -
� ��"
t,.;�
Cathy Bu o, Mayor
ATTEST:
S san M. W sh, City Clerk
Motion by: W i p p e r m a n n Seconded by: A n d e r s o n
Votedinfavor: Busho, Carroll , Edwards, Anddrson, Wippermann .
Voted against: N o n e.
2
PROJECT COST SUMMARY
CITY PROJECT NO. 251
ITEM AMOUNT
CONSTRUCTION COST:
Watermain
41,283
Sanitary Sewer 45,300
Storm Drain Lateral 56,039
Storm Drain Core 54,620
Street (including trails & sidewalks) 98,523
Subtotal 295,765
ENGINEERING:
Design Engineering 24,132
Construction Engineering 25,265
Soil Borings/Testing 373
Subtotal 49,770
ADMINISTRATION, LEGAL, FINANCE:
Easements -0-
Legal Notices 359
Administration Fees 14,788
Recording Fees 120
Appraisals -0-
Bond Issuance Costs 8,153
Other Professional Services 390
Subtotal 23,810
TOTAL PROJECT COST 369,345
PROJECT FUNDING SUMMARY
CITY PROJECT #251
'TOTAL PROJECT COST I $369,345
FUNDING SOURCES AMOUNT
Assessments to Shannon Hills 6th Addition 337,672
Subtotal 337,672
Storm Sewer Core Fund 31,673
Subtotal 31,673
TOTAL FUNDING 369,345
$337,672 _ 30 lots = $11,256/lot
/\/111A IL)T\/ 11111 ^ TI 11L-)n A I rIT1/�AJ
L /VI rl\1 1 f 111.1... 1(U/\L/ !'1L/L/I I IVI r
n
I -
14iL-M .'� AAIA IfA1 `)A�JI'IlIA\/
MI •101•40k: ----kr— mnesrg --i•
` .±f ln/lllrvn • nfll\nn 1
` I
1 I
Nst
2 I ^rr 1 `7 . 1 . . O I .
7•= - t
s ,
1
to I I I (V I
. ----ma---I ``i Bari toga--- C•
Ir---�iJI6--; BM-I
11 . o
`} . I - , SSA 1. 3 ,
; t i (p ii _ r-----•s -_;r--~
r - —,.. �:)
ItIrli I t { [ rti'1 f� 1 +1 I, I Z 7![1T1 —i
C7 t II A__XWI__J A�___�razt/
a tali .. \1�s�� y o I, a tfr o alai c� tnek
y-.--%VW x wi Lit --...7_irL "\ cod
I5 . 0 " , . , ' 1
r T , r r' 'A v�A' l�■.04
ii{. ‘,..,.....;.„-....---,.* -1 . -- ■-•-:-__---11**1 oll •
1 J !Iri$
r ' A y
K . it `
y`' =Q Arm.` � �1
\ i /� ;
• •• �' ` 1 ,L,4,t PO C7 btu r 1a•
ev,,,------.Z----- `,. ...., 41...// gilt -........:::s.s / i 1
s e ,, c.J1707\ ..
t (t ,:,, r--L$ G
\•
I
f i 14050 ,\ i \�!s i' s F
1 �, +�, ___ - ,_-•
T a i / I
•
big + ii -
( ri. ' ■
/1/4: a-. . ---I'7.:� 2YM
III ill 0 I/ 1 s
g �,,' (F L,'' p'
4 l_10__Jo*
1 : 1 .
•