Loading...
HomeMy WebLinkAbout4.f. Final Acceptance of Street and Utilities for Shannon Pond 2nd Addition, City Project #255 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: March 19, 1996 AGENDA ITEM: Final Acceptance of Street and Utilities AGENDA SECTION: Shannon Pond 2nd Addition, City Project #255 Consent PREPARED BY: Doug Utterer, Civil Engineer AGENDA I'?EM # 4 F ATTACHMENTS: Letter from Valley Eng. Co., Inc. APPROVED BY: The Shannon Pond 2nd Addition construction was completed in August, 1995. All public utilities and streets were inspected and accepted by the City as of September 1, 1995. This item is a request to Council to accept the streets and utilities for perpetual maintenance in the Shannon Pond 2nd Addition. Per the Development Contract and this acceptance, a two year warranty period begins (until September 1, 1997) on the streets, watermain, sanitary sewer and storm sewer. Staff recommends that the City accept the street and utilities. RECOMMENDED ACTION: MOTION TO ACCEPT THE STREETS AND UTILITIES FOR PERPETUAL MAINTENANCE IN THE SHANNON POND 2ND ADDITION, CITY PROJECT #255. COUNCIL ACTION: 1 • Civil Engineering for Public Works i k VALLEY ENGINEERING CO., INC. and Private Industry February 28, 1996 Mr. Bud Osmundson, P.E Public Works Director/City Engineer City of Rosemount 2875 145th Street West Rosemount, MN 55068-0510 Re: Shannon Pond Second Addition Dear John: All of the public works systems in the subject plat have been constructed and tested in accordance with the approved plans and specifications. Accordingly, we request final acceptance of the work by the City of Rosemount. Please return a memorandum of acceptance so that the developers may release the final retainage to the general contractor. Thank you, for your attention to this matter. • Sincerely, 1 Steven D. Harvey, P.E. copies to: Hampton Development Corporation 7301 Ohms Lane, Suite 500 Minneapolis, Minnesota 55439 (612) 832-9475•Fax 832-9542