Loading...
HomeMy WebLinkAbout4.h. Payment #1 and Final, 1996 Bituminous Overlay and Appurtenant Work, City Project #274CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 3, 1996 AGENDA ITEM: Payment #1 and Final, 1996 Bituminous AGENDA SECTION: Overlay and Appurtenant Work, City Project #274 Consent PREPARED BY: Doug Litterer, Civil Engineer AGENDA 1 1 LIV1 #4-H_ ATTACHMENTS: Payment #1 & Final Voucher APPROVED BY: This item requests the first and final payment to Bituminous Roadways, Inc. in the amount of $48,764.90 for construction on City Project #274, 1996 Bituminous Overlay and Appurtenant Work Improvements. The original Contract amount was $45,800. The final payment is 6.5% over the Contract amount. The major reason for the over -run is due to the fact that extra curb & gutter on Connemara Trail and Cormorant Way was removed and replaced. The curb and gutter was in poor condition. Attached is a copy of the Payment Voucher for your information. Staff recommends approval of this first and final payment request and acceptance of the street overlay for perpetual maintenance. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #1 AND FINAL TO BITUMINOUS ROADWAYS, INC. IN THE AMOUNT OF $48,764.90 FOR THE 1996 BITUMINOUS OVERLAY AND APPURTENANT WORK, CITY PROJECT #274 AND TO ACCEPT THE STREET OVERLAY FOR PERPETUAL MAINTENANCE. COUNCIL ACTION: 1 BITUMINOUS ROADWAYS, INC. P.O. BOX 64228 ST. PAUL, MINNESOTA 55164 PHONE (612) 686-7001 Cityof Rosemount B 2875 - 145th St W II. PO Box 510 L Rosemount, MN 55068 d'i_ # 13550 J L O O BC A T I O N w w, #65460 .. Crty Project #274 olltog Addition Overlay and Final Estimate move existing curb & gutter 345 if @ $5.00/1f $ 1,725.00 â–ºsoil borrow (LN) , 3 cy @ $20.00/cy 60.00 legate base class 5 No% crushed rock 13.95 tons @ $10.00/ton 139.50 [bituminous surfaces 5,866 sy @ $.65/sy , 3,812.90 ><mmous overlay 1,633 tons- @ $20.00/ton 32,660.00 k oat material - 525, gallons @. $1.50/gal 787.50 >icrete curb &gutter .; 345 If@ $15.00/if 5,175.00 djacking of concrete curb & gutter 901 @ $8.00/lf 720.00 an & seal concrete, curb & gutter cracks 601f @ $3.50/1f 210.00 ust frame and ring casting 21 ea @ $150.0%a' - _ 3,150.00 [ding 50 sy @ $5.00/sy 250.00 ust gate valve 1 ea @ $75.00 75.00 thank-yo, u! INVOICE DUE UPON RECEIPT. A FINANCE CHARGE OF 1 %96 PER MONTH (Ift. PER YEAR) WILL BE CHARGED ON ANY BALANCE OVER 30 DAYS PAST DUE.