Loading...
HomeMy WebLinkAbout4.i. Payment #4 & Final, Change Order #2, Shannnon Hills 6th Addition, City Project #251CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: January 16, 1996 AGENDA ITEM: Payment #4, C.O. #2 & Final- Shannon Hills 6th Addition, City Project #251 AGENDA SECTION: Consent PREPARED BY: Doug Litterer, Civil Engineer AGENDAME `t ATTACHMENTS: Payment Voucher 4 & Final APPROVED BY: Change Order #2 This item request the fourth and final payment to Hennen Construction Company in the amount of $58,201.53 for construction of City Project No. 251, Shannon Hills 6th Addition Street and Utilities Improvements. The original contract amount was $302,816.80. Total construction cost, not including Change Orders No. 1 and 2, is $256,492.30. The major reason for the 15% under -run is due to the fact the soils encountered were suitable for use and the resulting common excavation and granular borrow backfill were not required on Cobbler Avenue. The total construction cost, including Change Orders No. 1 and No. 2 is $283,217.30. Change Order No. 1 was paid for with Payment No. 3. Change Order No. 2 is for pond excavation as detailed. Upon final payment, a two year warranty period begins (until January 16, 1998) on the street and utilities. The City should also accept these facilities for perpetual maintenance. Attached is a copy of the Payment Voucher and Change Order No. 2 for your information. Staff recommends approval of this fourth and final payment and requests the acceptance of the streets and utilities for perpetual maintenance. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT NO. 4 AND FINAL, PLUS CHANGE ORDER NO. 2 TO HENNEN CONSTRUCTION COMPANY IN THE AMOUNT OF $58,201.53 FOR SHANNON HILLS 6TH ADDITION STREET AND UTILITIES IMPROVEMENTS, CITY PROJECT #251 AND TO ACCEPT THE STREET AND UTILITIES FOR PERPETUAL MAINTENANCE. COUNCIL ACTION: 2 JAN 08 196 10:35 OSM MPLS, MN CONSTRUCTION PAY VOUCHER Estimate Voucher Number: 4 Date: OSM Project Number: 5408.00 Period Ending: Project: SHANNON HILLS 6TH ADDITION -- FINAL UTILITIES AND STREET IMPROVEMENTS CITY OF.ROSEMOUNT 251 Contractor: HENNEN CONSTRUCTION CO. 24520 MAIN STREET ROGERS MN 55374 Contract Date: Completion Date: P.2 November 22, 1995 November 22, 1995 Work Started: Work Completed: Original Contract Amount 302,816..80 Total Additions 26,725.00 Total Deductions 0.00 Total Funds.Encumbered 329,541.80 Total Work Certified to Date 283,217.30 Less Retained Percentage 0.00* 0.00 Less previous Payments 225,015.77 Total Payments Incl This Voucher 283,217.30 Balance Carried Forward 46,324.50 APPROVED FOR PAYMENT, TRYS VCTJCHER 58,241.53 APPROVALS ORR- SCHELEN- MAYERON & ASSOCIATES, INC. Pursuant to our field observation, as performed in accordance with our contract, and based on our professional opinion, materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is: l00% completed as of November 22, 1995. We herby recommend payment of this voucher.' Signed: Signed: Construction Observer Project Manager/Engin4ffer nENNkW CONSTRUCTION CO. This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein'is a fair approximate estimate for the period covered by this voucher. Contractor: 'e sa54- a, Signed By D c-- -- Date : g -off � S� Title ,'- CITY OF ROSEXOUNT Checked By: Appr ve for pa ent: Authorized Representative Date: Date: PAGE 1 JAN 08 '96 1036 OSM MPLS. MN CHANGE ORDER I Change. Order No: 2 City Project No. 251 Project: Shannon Hills 8th Addition Utilities & Street Improvements OSM Project No. 5408.00 Owner. City of Rosemount Date of Issuance: November 2o, 1995 Contractor: Hannan Construction Engineer: Orr-Schelen- Mayeron 4530 Main Street and Associates, Inc. Rogers, MN SW74 You are directed to make the following changes In the Contract documents: Description: Excavation of pond In northwest comer of Shannon Hills Sth Addition: Pond Excavation: 2,280 C.Y. 0 $7.50 = $17,100.00 Rip -Rap: 17.5 Ton @ $50.00 - $875.00 Silt Fence: 1,000 LF. @ $2.50 = $2,500.00 Wood Fiber Blanket Type Regular 400 S.Y. @ $2.00 = $800.130 Seeding 2.9 AC @ $800.00 = $2,320.00 TOTAL = $23,595.00 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: $302,816.80 Original Contract Time: NIA Previous Change Orders No. 1 to No:: Net Change from Previous Change Orders: $3,130.00 N/A Contract Price Prior to this Change Order. Contract Time Prior to this Change Order. $305,94580 N/A ' Net Increase (Decrease) of this - Change Order: Net Increase (decrease) of Change Order: -- $23,:595.00 N/A Contract Price with all Approved Change Orders: Contract Time with Approved Change Orders: • $329.541.80 . ' . N/A _ Recommended By: Ap ved By - C�7i7�i/T G d q.S.7 /BYO R Appr S Approved By: Date of Council Action: (City Engineer) (City Manager) kWoaao�a�htlooAR�S�t�