HomeMy WebLinkAbout10.c. Receive Feasibility/Set Public Hearing 1996 Street & Utility Reconstruction Improvements, City Project #266 . CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCII MEETING DATE: December 19, 1995
AGENDA ITEM: Receive Feasibility/Set Public Hearing AGENDA SECTION:
1996 Street & Utility Reconstruction Improvements, City Consent
Project #266
PREPARED BY: Bud Osmundson AGENDA NO.
City Engineer/Public Works Director � � ��� # �, � �j
ATTACHMENTS: Resolution, Feasibility Report APPROVED BY: `i���l�—
�"
At the October 17, 1996 meeting, City Council authorized Staff to prepare a Feasibility Report on the
1996 Street & Utility Reconstruction Project, City Project #266. The attached report addresses the
project which would include total street reconstruction of Cameo Avenue from 145th Street to Lower
147th Street, Lower 147th from Canada Avenue to Burma Avenue, Burma Avenue from Lower 147th
Street to 146th Street, plus storm drain construction from 146th Street to Erickson Pond.
The report identifies the total praject cost to be $2,650,000. Detailed estimates are found in the report.
Funding for the project will come from Storm Water Core and Utility, Sanitary Sewer Core, Watermain
Core, Assessments, 1996 C.I.P. items and encumbered funds: They are itemized on Table B in the report.
The assessments for single family homes are proposed to be 52,500. The reason for the increase from
52,000 to 52,500 is that the project area currently does not have concrete curb and gutter, but has
bituminous curb in very poor condition. The value added from the concrete curb & gutter is approximately
5500 per lot. In addition, the City had set the $2,000 per parcel assessments for reconstruction projects
in 1993 and this amount should increase with inflation. We are having appraisals completed on a handful
of houses and all of the businesses in the project area which we will have prior to the Public Hearing. For
the purposes of this report we estimated the assessments for Commercial properties using the previous
appraisals completed.
The burial of overhead lines is addressed in the report. NSP has estimated the cost for the bulk of the
project to be approximately 5647,000. Since this funding is not going to be available, the buria{ of lines in
the residential area is not being proposed at this time until a funding source is available. NSP estimated
the cost of burying the line from 145th Street through Erickson Park and up to Trunk Highway 3 to be
approximately $50,000. We do have funding in the 1996 C.I.P. for that portion.
� We have mailed out notices for an informational meeting for next Thursday night (December 21 st) at City
Hall. We hope to answer many of the questions for the residents along the project prior to the Public
Hearing on January 16, 1996.
Staff will provide an overview of the project and answer any questions you may have.
If Council wishes to proceed with the project, the attached resolution should bs adopted.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE
FEASIBILITY REPORT/SET PUBLIC HEARING, 1996 STREET AND UTILITY RECONSTRUCTION
IMPROVEMENT PROJECT, CITY PROJECT #266.
COUNCIL ACTION:
2
{ � CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1995 -
A RESOLUTION RECEIVING THE FEASIBILITY REPORT/SET PUBLIC HEARING
1996 STREET AND UTILITY RECONSTRUCTION IMPROVEMENT PROJECT
CITY PROJECT #266
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount,
Minnesota, construct certain improvements, to-wit: City Project #266, 1996 Street & Utility
Reconstruction Improvements, in the City as described in and in accordance with the
feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and
street improvements, City Project #266 is feasible, and should best be made as proposed,
and the City Engineer's report to this effect has heretofore been received by Council, and
filed with the City Clerk on December 19, 1995; and
WHEREAS, the statute provided that no such improvements shall be made until the Council
has held a public hearing on such improvements following mailed notice and two
publications thereof in the official newspaper stating time and place of the hearing, the
general nature of the improvement, the estimated costs thereof, and the area proposed to
be assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the
feasibility report for City Project #266 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemount
that the public hearing be scheduled to consider City Project #266, 1996 Street & Utility
Reconstruction Improvements to be held on Tuesday. January 16, 1996 at 8:00 o`clock
p.m. or as soon thereafter as possible, in the Council Chambers of the City Hall.
ADOPTED this 19th day of December, 1995.
E. B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
FEASIBILITY REPORT
CITY OF ROSEMOUNT
1996 STREET & UTILITY RECONSTRUCTION
IMPROVEMENT PROJECT
PROJECT NO. 266
�� � CITY OF ROSEMOUNT .
�
ENGINEERING DEPARTMENT
��
WSB & ASSOCIATES, INC.
;
_ �
:.: . . i
r , . . «?`�., .. .. . � . . � � � . � . . . . �:. �