HomeMy WebLinkAbout4.h. Order Feasibility Report - 1996 Street Reconstruction Project (Cameo Ave. and Lower 147th St) � � � CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: October 17, 1995 AGENDA ITEM: Order Feasibility Report-1996 Street AGENDA SECTION: Reconstruction Project (Cameo and Burma Avenues and Consent Lower 147th Street) PREPARED BY: Bud Osmundson � AGENDA ���A � J, � City Engineer/Public Works Director � �d� ��' ATTACHMENTS: Resolution APPROVED BY: , Since the 1996 Budget has been certified to the County and it included Ca ital Improvement Project money for the reconstruction of Cameo Avenue and Lower 147th Street, Staff feels that it is time to begin the Feasibility Report process so that construction can begin as earty as possible next spring. I am recommending that Staff prepare the Feasibitity Report for the project. We will however hire a consultant to prepare the plans and provide both preliminary and construction surveying for the project. � .,_,,,�; Previously, Staff had completed a Feasibility Report for a proposed Storm Drain Facitity Improvement Project from Lower 147th Street and Cameo draining all the way to Erickson Pond adjacent�to City Hall. This was the Erickson 190 Drainage District Improvements, City Project #266. I'm recommending that the entire project include that pceviously studied project, but also include the street improvements to Cameo, Burma and Lower '147th' Street. This will be a very large project due to project cost and the number of residents effiected. We again will have the downtown area torn up for construction for another construction season. We will be crossing Trunk Highway 3 with a large pipe and may have to open cut tha.t roadway. However, I believe this closure of Trunk Highway 3 will be minimaL The tentative schedule for fihe project woul:d be as follows: ' m, Order Feasibility Report October 17,;�'f 995 Receive Feasibility Report December 5, 1995 Informational Meeting December:1.3, 1995 Public Hearing January 16,, 1�996 Order Plans & Spec's January 16, 1996 Receive Plans & Spec`s/Order Ad for Bid March 5, 1996 Receive Bids/Award Contrac�t April 2, 1996 Begin Construction May 1, 19�; '_; Complete Construction August, 1�.9f;, .;{ With this schedule Staff believes it is early enough to get good.;-b�,ds for the project. Staff recommends the action as stated below. � ;;R��� RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTI�N��ORDERING A FEASIBILITY REPORT FOR 1996 STREET RECONSTRUCTION PROJECT (C�'MEO AND BURMA AVENUES AND LOWER 147TH STREET) ` `�� ' UN IL A TION: I CO C C 6 • . CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1995 - A RESOWTION ORDERING A FEASIBILITY REPORT FOR 1996 STREET AND UTILITY RECONSTRUCTION 1MPROVEMENT PROJECT CAMEO AVENUE, LOWER 147TH STREET AND BURMA AVENUE CITY PROJECT #266 WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the feasibility of the 1996 Street and Utility Reconstruction Improvement Project on Cameo Avenue, Lower 147th Street and Burma Avenue, City Project #266. NOW THEREFORE BE IT RESOLVED, the City Engineer is directed to have the necessary feasibility report prepared for the 1996 Street and Utility Reconstruction Improvement Project on Cameo Avenue, Lower 147th Street and Burma Avenue, City Project #266. ADOPTED this 17th day of October, 1995. E. B. McMenomy, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: