EXECUTIVE SUMMARY FOR ACTION
UTILITY COMMISSION MEETING DATE: October 3, 1995
AGENDA ITEM: Payment #1, Diamond Path Trunk AGENDA SECTION:
Watermain Improvements, City Project #267 Consent
PREPARED BY: Bud Osmundson AGENDA ���A/� � ), �
City Engineer/Public Works Director �y� y'
A1"TACHMENTS: Payment Voucher #1 APPROVED BY:
This item requests the first payment to Schield Construction Company in the amount of
564,519.00 for City Project No. 267, Diamond Path Trunk Watermain Improvements.
Work completed and represented in this amount as of September 26, 1995 is 63°l0 of '
contracted work. This payment includes Change Order No. 1 for extra work that was
required to place 12" watermain in the CSAH 42 right-of-way. This work has been
inspected and is in compliance with contract documents.
Watermain work is nearing completion. Bituminous trail, street restoration and landscape
� restoration work remains to be completed.
Attached is a copy of the pay voucher for your information. Staff recommends approval
of this first payment. •
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #1 TO SCHIELD
CONSTRUCTION COMPANY IN THE AMOUNT OF 564,619.00 FOR DIAMOND PATH TRUNK
WATERMAIN IMPROVEMENTS, CITY PROJECT NO. 267.
COMMISSION ACTION:
3
MEMO
TO: BUD OSMUNDSON, PUBUC WORKS DIRECTOR/CITY EN6INEER
FROM: DOUG LITTERER, CiVIL ENGINEER
DATE: SEPTEMBER 26, 1995
RE: DIAMOND PATH TRUCK WATERMAIN IMPROVEMENTS
CITY PROJECT NO. 267
Estimate Voucher No. 1, Estimate Voucher Detail No. 1 and Change Order Na 1 are
attached for your review and signatures. It is estimated that the project is 63% compiete
as of September 22, 1995.
cc: Rich Lonnquist, Project Inspector
. Mark Fremder, Engineering Technician
267cor13.wpd
.,,
CONSTRUCTION PAY VOUCHER
CITY OF ROSEMOUNT
Estimate Voucher Number: 1
Project: Diamond Path Trunk Watermain Improvements
City Project No.: 267
Date: September 26, 1995
Period Ending: September 22, 1995
Contractor: Schield Construction Company
1360A� Ferris Avenue
Apple Valley, MN 55124
Contract Date: August 28, 1995 Work Started: August 29, 1995
Completion Date: October 13, 1995 Work Completed:
Original Contract Amount 100,229.14
Total Additions 5,000.00
Total Deductions 0.00
Total Funds Encumbered 105,229.14
Total Work Certified to Date 67,914.74
Less Retained Percentage 5.00% 3,395.74 �
Less Previous Payments 0.00
Total Payments Including This Voucher 64,519.00
Balance Carried Forvvard 40,710.14
APPROVED FOR PAYMENT,THIS VOUCHER $64,519.00
SHIELD CONSTRUCTION COMPANY
This is to certify that to the best of my knowledge,information, and belief,the quantities and values of work certified
herein is a fair approximate estimate for the period covered by this voucher.
Contractor: Signed By
Date: Title
CITY OF ROSEMOUNT
Ch d By: Approved for payment:
Authorized Representative
Date: ����!�S� Date:
VOUCHER DETAIL
DIAMOND PATH TRUNK WATERMAIN 9/26/96 ' s
ESTIMATE VOUCHER: +� 1 PROJECT# 267
CONTRACTOR: 3ohleld Const. Co.
PROJECT COORDINATOR: Rlch Lonqulat . :... . .. .:;;;;,.;;;;
:;;;;::;;�p�'�p���`Eyjjjjp��`�g;#;�.:;::; TOTAL TO DATE THIS PAYMENT
<::>:;;::>::>:<;;:. '�$�'AI. ltNi't' ��k�A�.
ITEM �p�G ,. ::::.............. :•.. RICE QTYS. TOTAL PRICE
_:..:. . . . ....:....,...:::r>:;:>:;::;:>::>;:......:.... .....:>;:»>;:.;:<.::...... :.... :z.»;:. 3 TOTAL P
.. __............ . ....:,,,.::,,...............................::::.::.. ...................::::,;,:::::,::.:,:::, ::::.:..:.. �;.<.»>.::?::>:: . �:::<;>;::::;;<a;<::;::>:::.. � »;;:.rt:>:;:.>: nTY .
n�o. . >r�o ... » ;:I'r�M ::: ::�.: ;;�uNlir�:.:. 4�rY�.:. P�I�� pRl �
:...:... ..
1 2021.601 Mobilization L.S. 1 �`'1,t��J4��3 $�,�Qf��Q , . 0 $ - 1 S 1,000.0�
2 2021.601 Cleanu LS. 1 �1 QC�O QO :4'� QD�f)�f3 ; 0 S - 0 S -
3 2104.601 Remove Metal Culvert L.F. . 68 : $�:t'�:7 :< &1:�9 �ff>: 0 S - 0 S -
.... _ 0 S -
4 2104.601 Remove 8" Watermain
L.F. 60 ;;;;:::"�:?�;41::<�>i<:::><;;::;::<::::::::::�:�7�?::60>; 0 $
- 36 $ 123.20
6 2104.b01 Remove Permanent Barricades L.F. 36 :.:;;:!��<��>::>::::::.:;:`.:::::>�'1:��.2!�:�: � $ _
::'#»$!8�>58::>: 0 8 � $
Remove Bituminous Walk S.F. 144 ">:':'�`.�:�`:<:��:i:`<»: �...
6 2104.603 -
7 2104.606 Remove Bituminous Pavement S.Y. 216 �:aaS,9� : $�4'1.,9� :: � $ - � $ "
' uminous Pavement LF. 226 �;:<:`;'$;t3;:Es$<`:';:%::;::;;;;:�';i`;:;�:1'��#60`:: 0 $
- 0 $ -
8 2104.613 Sawin Bit
9 2104.623 Salva e lar e Arrow Si n Each 2 S16?9 $31 S8, 0 $ - 2 S 31.58
10 2105.601 Common Excavation (LV) C.Y. 60 �� 16 , ')�A f3� : 0 $ - 0 $ -
11 2106.622 Select Granular Borrow fLV) C.Y. 26 <... $7.�5� $1:��f�#�(�.: 0 $ - 0 $ -
12 210b.626 To soil Borrow lLVI C.Y. 100 $�i��'�::::i::::�:>:<: �8���� 0 $ - 0 S -
13 221 1.601 A . Base Class V 100°•fo CrushedRock Ton 76 ���2 ��'���� � S ' � $
14 2331.621 Irra ular Width Pavin S.Y. 216 : $1 9 7& ����8 �4:< 0 $ - 0 S -
367 602 Bituminous Material For Tack Coat Gal. 11 i;`::;z��;�.6:� ::>::>:::::::>::>::::>;>���:;t:�i : � 9 - � $ '
16 2 �
ve t L.F. 68 `�"z<:�1G:�$»;:<:<:>;'«::;;::>`�:�4:�`;:�f!`>:' 0 S - 0 $ -
16 2601.61 1 18" CS Pi e Cul r
17 2601.616 18" CS Pi e A ron Each 2 �tA$Bs ? $2g728' : 0 $ - � $ '
18 2621.602 4" Concrete Walk L.F. b 'IQ��3 S8� ��i 0 $ - 0 S -
19 2621.611 2" Bituminous Walk Re lacement L.F. 18 :: �'1�<#�1 < $������ : 0 � - 0 $ -
20 2621.611 2" Bituminous Walk New LF. 400 �1��L�::'':`:::>::>::: $6�fi�4�� 0 S - 0 $ -
21 2631.601 Concrete Curb & Gutter Desi n B618 L.F. b0 � ���7:1 ¢'i 936 60 ; 0 S - 0 $ -
22 2631.502 Concrete C�rb& Gutter Desi n S Modified L.F. 20 ' �2.+4 7S 8��£ �C� : 0 S - 0 5 -
23 2636.601 Bituminous Curb L.F. 26 :: $9.4..��� ..; $��4�Q 0 S - � $ -
24 2684.631 F & I Si n Panels T e C S.F. 8 $�(�,0!Q. . ¢��}�EN3.: 0 $ - 0 $ -
0 $
26 2673.602 Silt Fence Neav Dut L.F. 100 , $�72 $27�f�Q 0 $ ' "
26 2676.601 Seedin Acre 1.4 ;:$A71 2$ <: �.t,21`��.�.7� : 0 S - 0 S -
27 2676.606 Soddin S.Y. 1 700 >::::s:::�2:�2::::;»>`:i:>:<s;z'��`�'�4:#�4::::: 0 $ - 0 S -
:.::..:
....:..
28 0683.601 Traffic ControF LS. 1 '':`:'$�Q��� $��Q�!� � S - 0.5 $ 250.00
....... ....
29 0604.602 Connect to Existin Watermain Each b $7A�£�&ft`:::':?::`:::: �3;7£)� BD < 0 $ - 3 S 2 221.68
30 Ob04.602 H drant Each 3 S'l,2��;'1'8 �5;8��4�, . 0 $ - 2 $ 2 59B.32
.,..
31 0604.802 8" Gate Valve and Box Each 6 •.: $4�3:�t8`:"�'.'i;�:`�� ��.�"E:$,4�1: � $ - 2 S 887.36
32 0604.802 12" Gate Valve and Box Each 3 �1,��2�� ...; ��.�Q�41 . 0 $ - 3 $ 3 607.41
. ... .
33 0504.602 Ad'ust Valve Box Each 8 ,.;: $23>2.±�3 . :; $i, $99�� � 0 $ - 0 $ -
34 0604.802 1" Cor oration Sto Each 4 ��1`�1 $3..6'�,��T..' 0 S - � $ -
36 0604.603 1" Co er Pi e L.F. 60 <' �'1'7 7� �� 4��,�p< O $ - 0 $ -
36 0604.603 Bore 24" Steel Casin L.F. 127 :;': �11'(;;��.';'.;:`:;;`s"`.'�3���;3.84;: 0 $ 127 $ 14,213.84
::.;:
,,,,,,;, .
37 0604.603 12" DIP Watermain CI 62 IJacked Carrier) L.F. 127 ::.... 1;�.2&,.;. ,.., ;¢2<Q63:7b' ' 0 $ - 127 5 2,063.75
38 0504.603 8" DIP Watermain CI 62 L.F. 110 ` $'I�i.,1� . @� �f3� 2Q:> 0 $ - 30 S 463.60
39 0604.603 12" DIP Watermain CI b2 L.F. 1 414 ..; ���,1� :.::$�F�94�,$�<: 0 $ - 1200 5 31 3b6.00
QO 0604.820 Ductile Iron Fittin s Pound 4,600 $'[,.�'� .. < .��,:1<���#�0> 0 $ - 3000 $ 4,110.00
`
:. ... ... .
�'1itQ��`�� 94:'; 50.00 ��2„31'4.7'�:<
49 Chan e Order #t S 6,000.00 $ 5,000.00
TOTAL $105,229.14 TOTAL $67,914J4
LESS 6%RETAINAGE S 3 396.74
TOTAL THIS PAYMENT 864,619.00
. �
CHANGE ORDER
CITY.OF ROSEMOUNT
Change Order Number: 1
Project: Diamond Path Trunk Watermain Improvements
City Project No.: 267
Date: September 25, 1995
The following changes shali be made to fhe contract documents:
Descripfion:
Add $S,OOOAO to the contract amount.
Purpose of Change Order:
To compensate the contractor for extra work that was required to place 1�"watermain in the CSAH 42 right-of-
way.
Basis of Cost: �Actual ■ Estimated:
. Attachments(list supporfing documents)
CONTRACT STATUS Time Cost
Original Contract �o-�3-ss; Completion $100,229.14
Net Change Prior C.O.'s - to - ' N/A N/A
Change this C.O. N/A $5,000.00
Revised Contract �a�s-ss;Completion $105,229.14
Recommended for ApprovaL
�
NAME
�p�EZ."r l"i�i11 A'�f9�
TITLE
. Agreed fo by Confractor. Approved by:
CONTRACTOR CITY ENGINEER
B.� DATE
DATE