Loading...
HomeMy WebLinkAbout8.b. STAC Charge Change � CITY OF ROSEMOUNT � � EXECUTIVE SUMMARY FOR ACTION CITY COUNCit MEETING DATE: November 21, 1995 AGENDA ITEM: STAC Charge Change AGENDA SECTtON: NEW BUSINESS PREPARED BY: Bud Osmundson AGENDA �tQ�s � � � � City Engineer/Public Works Director � � �V� ATTACHMENTS: Summary Sheets APPROVED BY: The Storm Sewer Access Charges (STAC) that the City presently collects with Building Permits are shown in the attached literature. They range from S 1,071 per Single Family house to 57,130 per acre for Industrial property. As the attached, comparison with 4 adjacent cities shows Rosemount is the only City that collects its Storm Water Trunk Costs at the Building Permit stage. AU of the area cities have an Area Charge which is collected from the developer through the final plat process. By collecting all of our costs with the Building Permit it makes the permit costs seem high in relation to other area cities. However, in the area cities that portion is collected from the developer prior to the builder taking out a permit. For 1996 we have numerous options available as outlined. Staff is recommending that we modify our present system to include Trunk Area Charges similar to adjacent communities and to lower the Commercial and Industrial Zoned Property Trunk Fees. Staff is also recommending that we raise the Single Family fee to match the average of the other communities in the area. What this would do is actually lower the Building Permit cost by approximately 5500 for a Single Family Building Permit. It also lowers considerably the Building Permit charges for the Commercial and Industrial zoning districts. However, the amount collected will be approximately the same due to the fact that we are collecting it from the developer at final plat. One major advantage to collecting the fees up-front from the developer is that the City will have in-hand, front end funding for the trunk costs for Storm Water Facilities in a project area. When the Surface Water Management Plan is complete, these Trunk Area Charges may be requested to be modified. However, that may take up to six months prior to approvaf by all involved agencies. RECOMMENDED ACTION: Discussion item only with direction to Staff. COUNCIL ACTION: 4 � SUMMARY OF AREA CITIES 1995 STORM WATER TRUNK COSTS COLLECTED FROM DEVELOPERS AND BUILDERS AS OF 10-25-95 ITEM APPLE BURNSVILLE EAGAN LAKEVILLE ROSEMOUNT VALLEY Truck Area Charge Collected from Developer (Prices are per acre>: • Single Family 2,350 5,227.20 3,310.56 4,704.48 0 • Muitiple Family 2,940 6,969.60 4,181 .76 5,227.20 0 • Public/Institutional 3,530 6,969.60 5,052.96 4,704.48 0 • Commercial 3,530 7,405.20 5,052.96 6,577.56 0 � tndustrial 3,530 7,405.20 5,052.96 6,577.56 0 Connection/Access Charges �STAC) Collected with Building Permit (Prices are per acre): � Single Fami(y 0 0 0 0 3,213 * � Multiple Family 0 0 0 0 5,110 � Public/Institutional 0 0 0 0 5,110 • Commercial 0 0 0 0 6,640 � Industrial 0 0 0 0 7,130 * S 1,071 per unit The average Trunk Area Charges are as follows: Single Family S3,898 per acre Multiple Family $4,830 " " Public/Institutional $5,064 " " Commercial $5,641 " " Industrial $5,641 " " , , ` PROPOSED 1996 STORM SEWER ACCESS CHARGES Options Available: 1. Leave present system as is (coilect with Buiiding Permit) and leave fees as is 2. Same system as is but lower fees (i.e., Commercial and Industrial) 3. Modify system to include Trunk Area Charges and Lower fees to average of area communities 4. Raise fees 5. Wait until SWMP is complete and enact changes then Staff recommends No. 3 ; � .,�w____- . , . _;.: __ - - _ _---___ . PROPOSED 1996 STORM WATER TRUNK COSTS COLLECTED FROM DfVELOPERS AND BUILDERS A. Trunk Area Charges Collected from Developers Single Family 52,000 per acre (50.046/sf)* Multiple Family S2,530 " " ° Public/lnstitutionai 52,550 " " u Commercial �2��2� u n u Industrial 52,820 " " " * Gross acres of developable property minus acreage of ponding (at high water level) plus wetlands at delineation line. B. Connection Charges (STAC) Collected with the Building Permit Single Family S 650 per lot Multiple Family S 430 per housing unit (4plex=4units) Public/Institutional 52,550 per acre of impervious acreage '� Commercial $2,820 u �. ,� �, « ' $2,820 � �, �� „ ,� � Industrial ; ' These new rates shall be charged to all property other than those currently platted and also in the planning stages incfuding Shannon Pond East, Shannon Meadows, Wensmann 7, 8 and 9, Eastbridge PUD Single Family and Multiple Family. These fees shall not be charged to all areas on which the property owner provides treatment of surface water through an MPCA approved treatment plan or plant and which an NPDES Permit is in place. '�';