� EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: November 7, 1.995
AGENDA ITEM: NSP Peak saving Agreement AGENDA SECTION:
Consent
PREPARED BY: Bud Osmundson AGENDA �Q.�� � �
� �
ATTACHMENTS: Agreement APPROVED BY•
t
For the last several years the City has had a similar agreement to the attached with
Northern States Power Company whereby the City will cut power to Well #7 in times of
high demand for NSP. In return NSP charges the City a very low rate all other times.
Well #7 is the only source that qualifies for this agreement other than the Cornmunity
Center. This saves the City considerable electrieal charges and its use of Well #7.
City Attorney has reviewed the agreement. Staff recommends action as stated below.
RECOMMENDED ACTION: MOTION TO AUTHORIZE THE PUBLIC WORKS DIRECTOR TO
SIGN THE ELECTRIC SERVICE AGREEMENT PEAK-CONTROLLED TIERED SERVICES WITH
NORTHERN STATES POWER COMPANY.
COUNCIL ACTION:
4
Account Na P$KZjT1�tg5�666119
Electric Service Agreement
Peak-Controlled Tiered Services
'I'HIS AG�P�sF.11��,Made this 1'7th da
of y, 1995 b
a M'innesota Co Y JW y and between NOR
rporation,hereinafter called the Co '�HERN STATES POWER COMP,e�y
�II�abed in the business of m�ci �w�ter sem��Y,"and ROSEMOUNT ,
CI1"Y OF hereinafter called the"Cns'tomer,"
WTTNESSETH:That the parties hereto,each in consideration of the a
1.�D�F greements of the other,agree as follows:
�RVICE:Co
Wue,Alternatin �y a�to supplY and Customer agrees to accept electric service in the form of T'hree Pi�ase �
for the o g C�IIt at a nominai fi�u��,of 6p g�
Peration of electric equipm�t now' �at a nomfn�y voltage of=180_y/277 gor Customer's use solely
�UF located at 1445p �nstalled or to be installed by Customer on the prnPer��'known as ROSEMOUNT
�pE��E��W ROSEMOUNT iKN 55068,
facilii'�es o serv�D��C�GE:In consideration of fhe
�',C�stomer agrees that if the net demand �acity commitment by ComPanY and its inv
accondance with the rate selected charge payments durin � �ent in
this rate schedule,the SPecified in Par�graph 4 below,amount to less than the g Y contract year hereunder,in
difference beiween such minimum d�mand c �um demand chazge Spe�ed iu
in the bill following the contract anniversary month and Cvstomer�e and said net demand char
grees to a ge PaYmes►t sha11 be included
3. TERM. Th�A P Y same as a chazge for service rendered.
greement shatl commence at 12:01 A.M. on
ending at 12:01 A.M Aug�22 Z�0 August 22,lgyg and��n�ue for a eriod
PaTtY,shall continue ' and if not then terminated by at least six months prior written no ce by either
fiirther until so terminated,
4-RATE: Customer agrees to
(Two�, q��3'for and elects the rate schedvie for Peak-Controlled Tiered Second
Customer a , Tier 2
grees to pay CompanY�s established rate schedule in
established rate schedule now in effect being the one attached hereto. Effective wi�e�this locatity for such Service,the
code is:GI004. However,the term commencement date,the rate
Factor based on �e�c�e��te code is suvject to change followin
cvstomer�s previous I2 months usa e. g an annual evaluation of Performance
g This rate and rate code change does not require cu�flm�.authorization
5. TERMS AND CONDITTONS:The service hereunder
Regulations of Company on file with the state �be snpplied forCustomer's use subject to the Gen
such niles and regulations is re�atory commission as they now exist or ma h �Rules and
avaiiable from the ComPanY• This a Y ereafter be chan py of
head'u►g"Additional Terms and Conditions"which �ement is also subject to Sections(s)15 ged. A co
only as herein stated and will not assi �attached to this Agreement. Customer a ��g under the
i
gn this Agreement exc t �to use elec�ical service
eP upon written consent of Company. ec i
6.���1MUM pEM�ND CHARGE D
; average annual demand charge differendal will be the 1 Company agcees that dcuing the term of this a
a. the avera e esser of the following: S�ement,the minim�
g differential between the firm demand and controllable demand rates as ecified
effective rate schedule listed in Par� h 4
b. the avera e �P above(cunrenfly �3.40 per gW�,or SP on the currenfly
the variable int g annual differentiat between the
er�uption credit detenmination of the currenu demand and controllable demand rates
Y effective rate schedule listed in 4.abov�e.��g from appiication of
will not�0 hours �er����ON: Company agrees that the tatal intentional int
for Tier 1 En p calendar year for Tier 2 customers, 150 hoors er �P�ons of controlled demand
�'gy-Controlled Seivice Rider customers. P Y�'for.Tier 1 customers,and 300 houis per yea�.
8. CONTROL PERIOD NOTTCE:Company will endeavor to give customer
period.
one hour notice of commencement of control
9.E3CPECTED MqJ�ytTM D
demand is 101.00 kW.The E�DS:For the term of this a eeme�e
�Pected maximum annval @emand less the �customer's expected maximum annual adjusted
controlled demand. The customer's e ected Predetermined demand level is the e.Ypected maximu�
� �m���e�'season adjusted demand is 87.00 kW.
__-
� -'._...___.._..___._.. _-.-.
..._..Y _ '_ -_'
-- - -._ _ — CO �y•
CllStOiriel'TI1S}r
__
- be revised subject to approval by �►P
DEMAND LEVEL(I'DL):The PDL may
10.PREDETERNIINED or optional arrangement as sgecified below. control P�O�• be the
elect either the staa.dard to limit adjusted demand to 0 N/A kW during control periods. Custome�s PDL will
Standard:Customer agre��to reduce adjusted demand bY.____ eriod will not be less than
Optional:Customer agrees ed to load reduction. The PDL in months without a control p
monttily adjusted demand less the agre �od dwin►g tb.e Preceding eleven months. 1 �,vith all
erated in parallel with CompanY must comP Y
th;e gre�atest PDL of all months with a con�lment which is aP Rules and Regulations of CompanY•
�ny customer with generating e�t P ���the General
el �n��� �to approval by CompanY• ��e�'ision of the PDL
reqnirements associated with Parall i�or after the trial periad snbj for the co�n�g months of the contract in
The PDL may be re�� S the demand ct�ar�e��� es for the failwre to control to
o�s�vithin the trial Pen°d,the customeT Pay the customer increases the PDL. C� �the revision of
hed by the number of kilowatts(k� aid penalties against the recalculated amount) 18. In this
�e�t period multip� m��be cc�t�any p to but not to exceed.
their PDL are forgiven. (The� �e same calculation is made for the most recent montbs uF multiplYing�'e
ter of the following: (a)the amount determin�ties paid/owed for
the PDL occurs aft�eT the m�p�Od'�ble for the grea the total amou�t of any p
pse,however,the customer is resP° �described above,or(b?
demand cl�arge diffezential by the PDL increase, ement wil1
failure to control load to the previous PDL. es that the fust twelve months of this agre
Con►PanY agre the trial period. If customer
11.TRIAL PERIOD AND CANCELLATION CHARGE= to terminate this agreement during lled T'iered Time of
eriod. Customer must notifY ComP�y in writing
be a trial P eriod,Customer's Peak-Conmolled Tiered Service or PeakT�ontro Day Service)•
termimates this agreement during the trial p nding firm rate(General Service or General nding
culated using the con'esPo ed under the���� ��
Day Service bills will be recal ce between the recalculated amount and the amount c1�az'g
Customer will be charged the differen d for any additional charges which were a�
customer will receive a refun
peak-Controlled rate. Also, ntrol load. A trial period for Peak-Controlled�T�ered c�ved e ther service,�oll�closed
period due to customer failure to co mer accaunt that has Pre�� y
gervice wil1 not be available to.any c�° �ment or
T'une of Day -Controlled Services. �ad,if Customer tern►inates this agre
peak-Controlled or Energy e���e�velve month trial P e will be the difference between the
Customer will paY a cancellation charg m�.. .�e�cellation charg
ed as axesult of any default of Custo ��,vhich
this agreement is terminat eive a re£und for any additianal charg
r the most recent 18 months for Tier 2 or 3 c months for Tier 1 of Peak-Controlled Ti
billing amo�nts described abo�e,f Time of Day Service. Customer will not re
Service or Peak-Controlled Tiered ���e to customer failure to�ve describ manner>Customer will be charged a11
were assessed during tlus 18 or 36 manth P ment is ternunated in an}' ce or
AddidonallY,if at any time this agre� �vided by ComPa�►Y for Peak-Controlled T'iered Setvi
ecial equiPmem and facilities p
instaiiation and removal costs for sp S�ce. ement and upon notice from the
Peak-Controlled Tiered Time of Day
L SYSTEM:Custumer agrees to control loads to the timits contained in this agre
12.CONI'R� �by this agreemen� ested by
an to reduce load to levels p�etermin ed demand level when requ
CO� y month customer fails to control load to predetermu►
13.FAILURE TO CONTROL:If m�Y in the Rutes for ApPlicat�on of Peak-Controlled Tiered Senri���ntro peri dlled
the additional charge SPec�'� um adjusted demand during Y
ComPanY, ed sball be aPPlied to the amount by which customer's maxin► ed demand level when requested
gervices(clos ) ��omer incucs three failures to control load to predetermin mer from Peak-
exceeds predetermined demand. otiate the predetermined demand level or remove custo
t to reneg ermi
b ComganY>t�►e Comgany�s�'�the n� Time of Day Service. In a case where customer is removed��1e�'m customer's
y mer will be sublect to a cancellation charg SP
Controlled Tiered or Peak-Controll�e o D y Service,custo
T i e r e d o r Peak-Controlled Tiered e d D e m a n d L e v e l a�to pa y
Electric Service Agreement. the uonal Predetermin
G E:C u s t o n►e r c hoosin g OP� erated generating
14. GENERATING CUSTOMER CHA� and billing eXPe�ses related to the use o f c u s to�m�on of Peak-Controlled
Compa�►Y$0.00 per month for additional met��1 p��,�d�-b��the Rules for ApP
equipment to reduce adjusted demand during
Tiered Seivices and Peak-Contmlled Services(Closed). ROSEMOIINT CTTY�F
NORTHEKN STATES POWER COMPANY By
By JOE BRUIVIlVIEL
Tifle
lviarketing RePrese°tab°e
Mazketing?vfanager
Secvice Policy