CITY OF ROSEMOUNT
- EXECUTE'�`E SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: February 15, 1994
AGENDA ITEM: 145th Street, City Project #245 AGENDA SECTiON:
Discussion/Clarification Oid Business
PREPARED BY: Bud Osmundson AGENDA��� � � �
City Engineer/Assistant Public Works Director
ATTACHMENTS: Letter to Residents for Informational AP V D Y:
Meeting and Funding Chart ' 2�
There are three items which need ta be provided to the Council either for informational purpases
or far clarification.
1 . Attached is a letter mailed to residents on Friday, February 11 , 1994 setting an
informational meeting for this projec# for Wednesday, February 23, 1994 at .7:00 p.m. at
City Hall. Council Members, as long as there are not more than two, are invited to
attend.
2. After further discussion with NSP regarding decorative lighting, we were informed that
the bases of the decoratiue {ighting poles are 20" in width. State Aid rules require a 18"
clear zone from the face of curb to any obstruction, such as a sign post or light post. !f
the 6' sidewalk_is the option chosen there would only be a 34" walking sidewalk around
each pole for actual waiking. Staff will investigate two options, either widening the entire
sidewalk to 8' for tkre entire length on both sides or widen in a circular manner around the
pole area to provide a wider walking surface. Staff is under the assumption that the City
Public Works Department will eventually or immediately be responsible for snow removal
of these sidewalks. If that is the case, Staff recommends an 8' wide sidewalk be
instaUsd.
3. The Finance Director asked me to clarify the funding sources for the proposed project.
The attached general funding overview itemizes the breakdown between what was
previously referred to as "Street Core Fund", into two columns entitled MSA Funds and
Other Funds. I tried to explain that this funding for the decorative lighting and overhead
burial would have to come from other sources. The total amount is estimated at
5220,000. Other Funds available to use are as follows
A. C.I.P. Reserves - This fund is reserve funds from underspending ofprevious years
Capital Improvements. This fund has undesignated funds in it which Council has the
option of using. At this time however, this account has considerable amounts designated
for use if necessary for the Community Center.
B. We have in the Capital Improvements Program for 1994, approximately 572,000
identified for improvements to Cameo Avenue and 143rd Street. An option is to utilize
these funds for the proposed improvements to 145th Street and not complete the Cameo
and 143rd Street Improvements this year. However, other funds would also have to be
uti(ized with this option.
C. This third option would be to continue negotiations with NSP and ask that the
billing for these improvements not be completed until 1995. The NSP portion of the
5220,000 is approximateiy 5190,000.
1 apologize if these funding sources were not clear after the last meeting and will totally
itemize MSA eligible funds in a separate column in the future. Gouncil will not have to
make a decision on the funding sources at this time, but should provide direction to Staff.
RECOMMENDED ACTION:
NONE
GOUNCIL ACTION:
�
. i . �� � � . . � � �
. ....�cv,.^,.•-.,.._. . . . .
, C1TY HALL
`� � �' �,T�/ O(� RO 5 E 1 V 1�u , V T 2875—145th Street West
� P.O.Box 510
_ � Rosemount,MN
Everything's Coming Up Rosemount!! 55oba-osio
Phone:61?-�23-�411
Fax:612-423-5203
TO: RESIDENTS ALONG 145TH STREET
FRDM: BUD OSMUNDSON, CiTY ENGINEER
RE: 145TH STREET RECONSTRUCT{ON FROM CHILI AVENUf TO CAMEO AVENUE
CiTY PROJECT NO. 245
You are invited to attend an informal informational meeting at 7:00 p.m. on Wednesday, February
23, 1994 at the City Hall to discuss the propased irnprovements for this segment of 145th Street.
The returns from the survey were provided to City Council and showed almost a 50-50 split on al1
of the questions. At the February 1, 1994 Council meeting, it was determined that the following
improvements would be considered:
• The existing 40 ft. wide strest would be replaced with a 44 ft. wide street, thereby allowing
the use of MSA Funds and aflow parking on both sides of the street.
• A 6 ft. wide sidewalk be placed on both sides af 145th Street.
• Decorative and improved intersection lighting be instalfed.
• Burying and/or realignment of overhead electrical, phone and cable line.
The City Cauncil has preliminarily set the assessments for single-family homes to be S 1 ,500 for this
Collector street. The policy is to assess only those properties with driveways to 14�tM Street.
P.E. Project Manager from OSM
At the informational meeting, Staff and Brian Bourassa, ,
Engineering will give an overview of the project, explain the proposed improvements, explain the
assessments and try to answer any guestions you may have. We want your input and appreciate
your concerns for your neighborhood. The concerns and questions you raise that evening will be
passed along to the City Council for their consideration.
The Public Hearing is scheduled #or 8:00 p.m. on March 2, 1994. Many of yau that are invited to
this informational meeting may not be notified of a Public Hearing because of your driveway
location and related lack of assessments. This will be explained in more detail at the informational
meeting.
Thank you in advance for taking the time to participate in this process and attending the meeting.
Please feel free to call me anytime at 322-2022.
cc: Ron Wasmund, lnterim City Administrator
City Council
� P,;���.�-����-
m tamrr.e>
�osr arta
ESTIMATED GENERAL FUNDING OVERVIEW February 9, 1994 H'i.0
CITY PROJECT NO. 245 �
145TH STREET RECONSTRUCTIQN FROM CHIPPENDALE/CHILI AVENUE TO CAMEO AVENUE
REVENUES
ITEM ESTIMATED ASSESSMENT STORM WATERMAIN SANITARY MSA FUND OTHER FUNDS TOTAL
COST SEWER CORE FUND SEWER CORE REVENUES
CORE FUND FUND
Sanitary 76,800.00 -0- -0- -0- 76,800.00 -0- -0- 76,800.00
Sewer
°3anitary 36,800.00 -0- -0- -0- 36,800.00 -0- -0- 36,800.00
�ewer
�ervices
Natermain 107,800.00 -0- -0- 107,800.00 -0- -0- -0- 107,800.00
Nater 55,200.00 -0- -0- 55,200.00 -0- -0- -0- 55,200.00
�ervice
�torm Drain 24,100.00 -0- -0- -0- -0- 24,100.00 -0- 24,100.00
�treet 689,100.00 55,500.00 -0- -0- -0- 633,600.00 -0- 633,600.00
itreet/ 10,000.00 -0- -0- -0- -0- 10,000.00 120,000.00 130,000.00
_ighting
�idewalks/ 92,200.00 -0- -0- -0- -0- 77,000.00 15,200.00 92,200.00
�rails
)verhead 85,000.00 -0- -0- -0- -0- -0- 85,000.00 85,000.00
Jtilities
I"OTALS 7,177,000.00 55,500.00 -0- 163,000.00 113,600.00 844,900.00 220,200.00 1,241,500.00