CITY OF ROSEMOUNT
EXECUTIVE StTMMARY FOR ACTION
CITY COUNCIL MEETTNG DATE; July 20, 1993
AGENDA ITEM: Change Order #3, Shannon Hills AGENDA SECTION:
3rd Addition Str & Utl, Project #225 Consen:t
PREPAR.ED BY: Bud Osmundson AGENDA��T�� �� � �,(
City Engineer/Assistant Public Works Director /�
ATTAC�NTS: Change Order #3 APF D
Attached is Change Order #3 to the referenced project which is a
deduction in the amount of $9, 636 from the original contract amount.
The Change Order consist of three items;
1. ) The additional street cleaning required due to the excessive
rains and subsequ�nt erosion of dirt onto the streets which
required cleaning and sweeping prior to the bituminous wear
course installation. This amounted to $433 .50 .
2 . } An additional excavation and sub-grade correction required prior
to the pavement installation. The cost of this item was an
addition of $588.
3 . ) The third item is a procedural item which should have been done
with the previaus change order approving tihe sidewalk
construetion, Change Order #2 . This item amounts to just the
deletion of a previous bid item for sidewalk con:struction which
- amounts to � total deduction from the contract of $1Q, 657.50 . -
The total of the three items amounts to a deduction af $9, 636 from the
original contract amount. The pricing of the additions and
corrections to the contract are within acceptable limits .
Staff recommends approval of this Change Order.
RECONIl�tENDED ACTION: MQTZQN TO APPROVE CHANGE �RDER #3 , SHANNON HILLS
3RD ADDITI�N STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #225 .
_ . ... COUNCIL ACTION:
9
c .
Change Order No. 3 City P%ject No. 22S
Project: Shannon Hills 3rd Addition OSM Project No. 4869.fl4
Owners: City of Rosemount Date af Issuance: June 4, 1993
2875 145th Street West
Rosemount, MN 55068
Contractor. Erickson Construction, Inc. Engineer. Orr-Schelen-Mayeron
13616 Pleasant I.ane & Associates, inc.
Burnsvilie, MN 55337
You are directed to make the follawing changes in the Contract Documents:
Description: See Attachment Na l
Purpose o€Change Order. See Attachment No. 1
Attachments (list documents supporting change}: See Attachment No. 1
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
Original Contract Price $199,859.20 Original Contract Tirne
NfA
Previous Change Orders No. 1 to No. 2 Net Change from Previous Change Orders
$5,407.29 N/A
Contract Price Prior to this Change Order Contract Time Prior to this Change Order
$205,266.49 N/A
Net Deduct of this Change Order Net Increase (decrease) of Change Order
$9,636.00 N/A
Contract Price with all Approved Change Orders Contract 7�me with Approved Change Orders
$195,630.49 N/A
Recommended Apprnved r ' '
By: _ By: -- u
E 'neer Contractor
Appro�ed � Apprnved Date of Council Action
By: v�� By: �'u�y 2A ���9.�
,
City Engineer City Manager
( � •
Date: June 4, 1993
CHANGE ORDER N0. 3
SF[ANNON HILLS 3RD ADDITION
CITY OF ROSEMOUNT �
CITY PROJEGT NO. 225
OSM PROJECT NO. 4869.00
The purpose of this change Order is to allow for the payment of the following items.
1. Addirional street cleaning required to remove an excessive amount of dirt from
the roadway (relating to new home canstruction) prior to sweeping for the
bituminous wear course installation.
Total Cost = $433.50
2. Additional excavation and subgrade correction required to construct the future
stub roads at Cobbler Avenue and Cranberry Way.
Totai Cost = $588.40
3. Delete Bid Item 45 - 4" Concrete Walk (replaced with Change Order No. 2j.
Total Deduct = $10,657.5Q
Total Cost Change Order No. 3 = $9,636.40 (Deduct)