HomeMy WebLinkAbout4.k. Change Order #3, Shannon Hills 3rd Addition Street & Utility Improvements, City Project #225r { f CITY OF ROSEMOUNT EXECUTIVE StTMMARY FOR ACTION CITY COUNCIL MEETTNG DATE; July 20, 1993 AGENDA ITEM: Change Order #3, Shannon Hills AGENDA SECTION: 3rd Addition Str & Utl, Project #225 Consen:t PREPAR.ED BY: Bud Osmundson AGENDA��T�� �� � �,( City Engineer/Assistant Public Works Director /� ATTAC�NTS: Change Order #3 APF D Attached is Change Order #3 to the referenced project which is a deduction in the amount of $9, 636 from the original contract amount. The Change Order consist of three items; 1. ) The additional street cleaning required due to the excessive rains and subsequ�nt erosion of dirt onto the streets which required cleaning and sweeping prior to the bituminous wear course installation. This amounted to $433 .50 . 2 . } An additional excavation and sub-grade correction required prior to the pavement installation. The cost of this item was an addition of $588. 3 . ) The third item is a procedural item which should have been done with the previaus change order approving tihe sidewalk construetion, Change Order #2 . This item amounts to just the deletion of a previous bid item for sidewalk con:struction which - amounts to � total deduction from the contract of $1Q, 657.50 . - The total of the three items amounts to a deduction af $9, 636 from the original contract amount. The pricing of the additions and corrections to the contract are within acceptable limits . Staff recommends approval of this Change Order. RECONIl�tENDED ACTION: MQTZQN TO APPROVE CHANGE �RDER #3 , SHANNON HILLS 3RD ADDITI�N STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #225 . _ . ... COUNCIL ACTION: 9 c . Change Order No. 3 City P%ject No. 22S Project: Shannon Hills 3rd Addition OSM Project No. 4869.fl4 Owners: City of Rosemount Date af Issuance: June 4, 1993 2875 145th Street West Rosemount, MN 55068 Contractor. Erickson Construction, Inc. Engineer. Orr-Schelen-Mayeron 13616 Pleasant I.ane & Associates, inc. Burnsvilie, MN 55337 You are directed to make the follawing changes in the Contract Documents: Description: See Attachment Na l Purpose o€Change Order. See Attachment No. 1 Attachments (list documents supporting change}: See Attachment No. 1 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price $199,859.20 Original Contract Tirne NfA Previous Change Orders No. 1 to No. 2 Net Change from Previous Change Orders $5,407.29 N/A Contract Price Prior to this Change Order Contract Time Prior to this Change Order $205,266.49 N/A Net Deduct of this Change Order Net Increase (decrease) of Change Order $9,636.00 N/A Contract Price with all Approved Change Orders Contract 7�me with Approved Change Orders $195,630.49 N/A Recommended Apprnved r ' ' By: _ By: -- u E 'neer Contractor Appro�ed � Apprnved Date of Council Action By: v�� By: �'u�y 2A ���9.� , City Engineer City Manager ( � • Date: June 4, 1993 CHANGE ORDER N0. 3 SF[ANNON HILLS 3RD ADDITION CITY OF ROSEMOUNT � CITY PROJEGT NO. 225 OSM PROJECT NO. 4869.00 The purpose of this change Order is to allow for the payment of the following items. 1. Addirional street cleaning required to remove an excessive amount of dirt from the roadway (relating to new home canstruction) prior to sweeping for the bituminous wear course installation. Total Cost = $433.50 2. Additional excavation and subgrade correction required to construct the future stub roads at Cobbler Avenue and Cranberry Way. Totai Cost = $588.40 3. Delete Bid Item 45 - 4" Concrete Walk (replaced with Change Order No. 2j. Total Deduct = $10,657.5Q Total Cost Change Order No. 3 = $9,636.40 (Deduct)