HomeMy WebLinkAbout6.b. Order Feasibility Report CSAH 42 & Canada Avenue Turn Lanes. City Project #258 CITY OF ROSEMOUNT
EXECUTIVE SUb�lARY FOR ACTION
CITY COUNCIL MEETING DATE: May 3 , 1994
AGENDA ITEM: Order Feasibility Report, CSAH AGENDA SECTION:
42, Canada Avenue Turn Lanes; New Business
City Project No. 258
PREPARED BY: Bud Osmundson AGENDA N���� � � �
City Engineer/Assistant Public Works Director
ATTAC�TTS: Dakota County Highway Department APPROVED BY:
Letter, Estimate, Ma.p.
As previously discussed at numerous City Council meetings, right turn
lanes on CSAH 42 at Chippendale and Canada Avenues, and on Canada
Avenue at CSAH 42 , are necessitated by the predicted increased traffic
due to the proposed development in the South Rose Park Replat area.
The County has agreed to put the CSAH 42 projects in their CIP funding
schedule this year as described in their letter.
Staff is recommending that a feasibility report be completed which
will investigate and detail these proposed improvements, the
associated costs and the method(s) available for financing. OSM has
been involved with the traffic analysis in the area and would be the
recommended firm to use for this project. It is anticipated that the
feasibility report could be completed and brought back to the Council
on June 7.
Staff recommends ordering the feasibility study as stated.
RECONIl�sNDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING THE
PREPAR.ATION OF A FEASIBZLITY REPORT FOR TURN LANES ON CSAH 42 AND CANADA
AVENUE, CITY PROJECT NO. 258 .
COIINCIL ACTION:
2
CITY OF ROSEMODNT
DAROTA COtINTY, MINNESOTA
RESOLIITION 1994 -
A RESOLIITION ORDERING THE PREP�TION
OF A FEASIBILITY REPORT FOR THE
CONSTRIICTION OF RIGHT TIIRN LANES ON CSAH 42
AT CHIPPFsNDALE AND CANADA AVENUES,
1�1I�TD ON CANADA AVENIIE AT CSAS 42
CITY PROJSCT N0. 258
�'SEREAS, the City of Rosemount is concerned for the safety of its
residents usirlg the streets and highways in the community; and
�TTHEREAS, the City Engineer has investigated the traffic data on the
aforementioned streets; and
�IHEREAS, the predicted increase in traffic on CSAH 42, Chippendale
Avenue and Canada Avenue warrants the investigation of the
construction of turn lanes as described.
NOW THEREFORE BE IT RESOLVED, BY THE CITY COIINCIL, the City Engineer
is directed to prepare a feasibility report to investigate the
construction details, the estimated aosts, and the available methods
of financing for the proposed turn lane construction on CSAH 42,
Chippendale Avenue, and Canada Avenue.
ADOPTED this 3rd day of May, 1994 .
E. B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk
MOTION BY: SECONDED BY:
VOTED IN FAVOR:
VOTED AGAINST:
DA KOTA CO UNT Y DACOUNTY ENGINEER E�
(612)891-7100
HIGHWAY DEPARTMENT Fax(6t 2)89t-703�
� 14955 GALAXIE AVENUE.3RD FLOOR APPLE VALLEY,MINNESOTA 55124-8579
,�
M�'� April 18, 1994
_',��:,; --
�:
'�.
Bud Osmundson, P.E.
City Engineer/Assistant Public Works Director
City of Rosemount
2875 145th Street W.
P.O. Box 510
Rosemount, MN 55068-0510
Re: Request for turn lanes on CSAH 42
Dear Mr. Osmundson:
This is in response to your letter dated April 7, 1994 requesting
inclusion of turn lanes on CSAH 42 in the 1994 CIP. We support the
request for adding east bound right turn lanes at Chippendale Ave. and
at Canada Ave. and would make a request to the County Board to include
these projects in this years program. According to our policy, the
City would be required to participate in 45% of the turn lane
construction and 50% of the signal revision. The work at Chippendale
would require reconstruction of the inplace traffic signal system to
accommodate the turn lane.
At the Canada Ave. intersection, the existing right of way is not
adequate to construct the right turn lane. If this project is
approved, additional right of way will need to be acquired from the
property owners to a point 500' west of Canada Ave.
The preliminary estimated cost would be $60, 000 for the turn lane and
signal revision at Chippendale Ave. and $25, 000 for the turn lane at
Canada Ave. The City's share would be $40, 000 plus 45� of right of
way costs. The right of way costs are unknown and will be in addition
to construction costs. Engineering costs are not included either.
The turn lanes at the proposed Business Parkway are required due to
new city street construction and are not eligible for County funding.
The turn lanes to the proposed Rosemount Village Square are also in
conjunction with a new access onto CSAH 42 and are not eligible for
County funding.
If the city agrees to participate in the costs for the turn lanes on
42 at Chippendale and at Canada Ave. , please forward that information
to me and I will request that the County Board add this item to this
years program.
Very truly yours,
'a�����
David L. Everds, P.E.
Dakota County Engineer
Printed on Rec cled P er ' A l OPPORTUNITY EMPLOYER
TO: Jeff May
FROM: Bud Osmundson
DATE: April 19, 1994
RE: Turn Lane Costs
Estimated costs for turn lane construction on CSAH 42 are as
follows:
1. Right turn lane and signal revisions
at Chippendale $107, 000
2 . Right and left turn lanes directly
into Rosemount Village Square $ 85, 000
3 . Right turn lane at Canada $ 36, 000
Total $22$, 000
These are preliminary ball park figures and need to be revised
with a feasibility study. They do include engineering and
administration at 300.
cc: Tom Burt
l71;N� I,V , , ', /' ; ' tl =I+w'�11 Ii� 17 '� . � .: � IR 'C � � I �I� �""' '"'... . ��� ' IINMI�1 � I'.IM�11 ._".. ...w
���
S • _if�li. ^"'i�'—i �" . ; R ! ! � Y = 10� � A 1 A i
\ . _ . . . 0 I ' t�I .
i 7 7a bm
� ` �u� •
, � �.�ym u t� •
s ' / � �_urrte_i�q�x s�r �� _ � �� �+�� , l - ---ione _�soty_..si�E�_ .�. :eo
. 5 �` I
_ - -- � - -- - -- � ': ` : �� /
� �� �,..�- 6 8 � . �, ,l. ;, u � � ' / ..
�� a��b�.a�ss•e7�� i
. 6 � '� Q��r t':�` n e �:, y; :i i� j: � ini �s
� [IN;0 � , IIr��1 T ���Q� Ib i IS � t1 U . q �U ! i ! ' . /
i • � ro w u- �r n !�� � - r _ � _ , _ ,$s i _._._
.' NO. 42--�– – -- � ——
- – `�'"�" '�" –— DAKOTA C UNTY
�_ ,,�►--
" 41'O`� -�
�,O ��
,
1 t � ��
p =O..
1 ' � � oao� ' .
oie�is i : CuIY.�YIM.ItlI ox� i o:i a
�....�................ �
, � J� I i.
---._' @A aro� (V� � ,� �
�s�sr�515;51 � �
, ., g
,..
sT� � �' r'
. � -
; � , % �
nn.�s � R y° ua-ci , _
o�,o, ; FT , I,.
, .
, i r o��w / �� w ....._..I....._..•--•_....., � .
; �( _ --- - ,,,._ _ . EST— ��,;t►. �:
I � �.
,.�..� o��o, ' .on e, � . "ar-"'� � . .,
o1a o�i-0�
W � �.� W .��
� .��; _ ----- � 0 1 , .:;
. Z J � . �� .? � �� ( � � ���. .
. . � � W O70 07 ' 0/f•�q i � ' , / '
� a ,,,. � � ' �, �� V .Q,-t
.',� ,- �
W ` ' ���t� '�"-_ o»o� ;•'''�•� Y r
�,
J �
Q � � num � • .. . �� - . _ . __ . .
W ���� U ` -- •- --- - •`,�� - - w r�` - °
a oy�.o� �
p. a ' �` i
� _ '" /\ .I � r�.a
i� U — 3 o�s o� ;.� ou rs
�s � � I oio���
e n � I
N S
..�[!i I . . . . . . . . .
011•17
6 �
f I_ � � � � � � � � �
�� ..I . � . � . � ... . h . . . � .
' . . . . . . � � �0�0•]t i .
� _ , . , - ' ; � i 1 ,.
t
31IIff1 � I� � . . � I ' : � . � . � .. . � � .
� -------�a---:---t, � �
�► � � ( tt 3
i ,J S 1 S � { 7 � • 10 11� It 1�. � ' ���c� � . � .
-� t -d1 - - $ - I � n.a � �U• � � .
� 4 on n aua ,
����_ _ _ _ ��-- sst _ - --j �
_ ` '
I; j „
r ��.u � � - � - � - s • -��- • � ie- �� �t n a- �s �e o �� —---'�."—. . — —�__au�.__. _
� � � • w . . .s a v • • a a u w n w u ' . . . ( . .
� . E � t1 Rt " . \ '.�
, * » . • i '"
�y M L i M N O ry M� If � . .
7 t �f �� . 11 ' . . . ��' . . �`
N � � _ �Pofll IRAII_ M �.��• . � .. Z �
. ) � � a �� /�� . . � ' �..
�. a / , ' H a w�s� � � . �R..�. .
� « /{/. p �n:.' �f ' s w '� A i '• y � �� I . . I ,t•� . . .
� . • � . � �N,.je n ��r"��;.��. ..,y�.w enr er �n � $ d� . � � � .