HomeMy WebLinkAbout6. CSAH 42 Turn Lanes, City Project #258 , �' CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: July 19, 1994
AGENDA ITEM: CSAH 42 Turn Lanes, City Project #258 AGENDA SECTION:
Public Hearing
PREPARED BY: Bud Osmundson AGENDA ��� �
City Engineer/Public Works Director
ATTACHMENTS: Resolution, Executive Summary, APPROVED BY:
Preliminary Assessment Roll & Map
On July 2, 1994, the City Council received the feasibility report for City Project #258.
This project includes the construction of turn lanes on CSAH 42 at Chippendale and
Canada Avenues plus a turn lane on Canada Avenue onto CSAH 42.
The total estimated project cost is approximately 5119,600. The City is responsibte for
approximately 565,800 and the remaining 553,800 is Dakota County's responsibility.
Approximately .2 acres of right-of-way acquisition will be required as part of this project.
Staff is recommending that the City of Rosemount cost be assessed to the area as shown
on the attached map. The assessment rate based on preliminary cost estimates is
approximately 2� per square foot or $871 .00 per acre for the improvements.
The purpose of the public hearing is to provide an opportunity for public input for the
project. If the project is to be completed in 1994 the proposed funding mechanism is the
only one that the City has at this time. If the Council is not comfortable in assessing
these costs and would like to pay for the project through the Capital Improvements
Program, the project would have to be delayed until 1995 and Council would have to
approve the amount in the Capital Improvement and General Levy Budget.
Staff recommends approval of the project and could return in late August or early
September with plans and specifications and proceed through the bid process at that
pant. One barrier which may be overcome is the acquisition of the right-of-way or
easement which could delay the project. Staff wiN provide an overview of the project and
then open it up to any questions from the Council or the audience.
Staff recommends adoption of the resolution as stated.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION TO APPROVE THf PROJECT
AND ORDERING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE PROJECT,
CSAH 42 AND CANADA AVENUE TURN LANES, CITY PROJECT #258.
CQUNCIL ACTION:
4
e
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1994 -
A RESOLUTION FOR THE APPROVAL AND ORDERING THE PREPARATION
OF PLQNS AND SPECIFICATIONS FOR:
CSAH 42 AND CANADA AVENUE TURN LANE IMPROVEMENTS
CITY PROJECT #258
WHEREAS, the City Council ofi the City of Rosemount ordered a feasibility report for
CSAH 42 and Canada Avenue Turn Lane improvements, City Project #258; and
WHEREAS, the City Council has received and accepted the Feasibility Report on July 5,
1994 for City Project #258; and
WHEREAS, the City Council ordered and hetd a public hearing on July 19, 1994 to
receive input of this project.
NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount
hereby orders the improvements of CSAH 42 and Canada Avenue Turn Lane
Improvements, City Project #258. �
BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the
preparation of plans and specifications for said improvements.
ADOPTED this 19th day of July, 1994.
E. B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by Seconded by
Voted in favor
Voted against
a
. �
E�CUTIVE SII�VIMARy
City Project Na 258 provides for the construction of right turn lanes on County Staxe
Aid Highway No. 42 (CSAH 42) at Chippendale and Canada Avenues, and on Ca.nada
Avenue at CSAH 42 and a traffic signal revision at the intersection of CSAH 42 and
Chippendale Avenue. The proposed improvement recommendatians were made based
on the traffic analysis completed in the Traffic Impact Study for Rosemount Market
Square Retail Center a.nd on discussions with state, county and local representatives.
The project is feasible from an en�ineering standpoin� This Feasibility Report proposes
the construction of approximately 1504 feet of turn lane construction, roadwav signage
and striping and a traffic sianal revision. The total estimated project cost is $1I9,600,
of which $65,800 is the City of Rosemount's portion and $53,800 is Dakota County's
portion. Approximately 0.20 acres of right-of-way acquisition will be required as part of
this project. The fundin' for this project will come from assessments to the benefitting
properties and from Dakota Countv.
The project construction can be initiated in September, 1994 and completed in
November, 1994 provided that the required easements can be obtained.
OSM Project No. 5128.20 -
L
♦
City of Rosemount
CSAH 42, Canada Ave. Turn Lanes
City Project No. 258
OSM Project No. 5128.20
Preliminary Assessment Roll
Parcei Estimated Parcei Assessment Total Assessment
Area (sq. ff.) Amount Amount
A 554400 S 11,186 $65,800
B 217800 54,395
C 15998 S323
D 39898 $805
; E 47138 $951
F 290408 $5,860
G 40600 $819
; H 62800 $1,267
I 18925 5382
� J 39838 S804
K 26800 $541
� L 7500 $151
M 85600 $1,727
N 280000 $5,650
O 47100 $950
P 28800 S581
Q 30000 $605
R 39000 $787
S 44400 $896
T 39000 $787
U 38900 $785
V 164000 S3,309
W 91500 S1,846
X 64500 S 1,309
Y 43400 $876 �
Z 44700 5902
AA 329200 S6,642
BB 380900 S7,686
DD 44600 5900
EE 3375 Sb8
FF 46000 $928
GG 54000 $1,090
Totais 3261080 S65.800
Assessment rate=S65800 /3261080 s .ff. _ $.020/s . ff.
j:5128.20\civil�misc\prelas2PRElAS2.XLS Pag 2 1 6/30/94
'� ---i _�..,.n—� �! _._ � � � � . � _ ■ � _ -■ � __ ■ i r i � i � i _ � i _ � � __ ■ i ■ r r r .
�/.. " I.".I.�_�._�._t �� �._� � ' �� �__�__�_.�- � ../_1 %//.
----s--T i� •_ • tg. S'�� A:c_ -'.v. .o,_<L�=----' - - I
a _ -
,� � �.�#4�'��-Lw�l:_�'n_ara'-s__�_� .. .. a .. „L
- �.�.��.....�. �.- :.Fl_�,,..�., ;.� .�o. i , � , �, , I
i �.,-...�{±..;::.:,. , . � 4
' � 1�0��.• ip:7C`t D.` ,...`'+;�i� s'� .G �c�`� i ^.
� .�.f.�" ;: . .. �� a �� i •!
// ,
� � r-�' , �` � _ �. �� _
g • _. - �,:'.�'.`:. �/.•/ (� � _�.� , M �
_:E, � ,•�,.` , .� .,, �
A , .� . 4 :� �..: ..;,., ; .:., : ;
----
, � ,� . ,, ti�... �:t:, � ��,.. ���
: �
> �� �
. ; . h� _.E '�� ..... ...--
� : o....: .:. ,,..__.; � �, '.,:�:��-
;.
' y-� I �j
i ._. �_.....;.� � ' •' �_.:, : � s �x.
I_ ' ...,,..... 0 , p �. �..\�, ���.. 4,c1 � � /::; '
�:,.« Q � �,.,�/� . N i ' �
a.,.,� j � , � �:,.�t '���.:�:L�. .. I , ..... .,.� /
,
I � ' - ,. �.o`�`�' '�., J -
.: �.---�-- � � —
... ._...._...
� C�r� �� �
( •ti�'
�i_.._ R 5 '� �p� , �ia .'~,y � .
�— �:�<�—i� cr�•cr / � � , .. � � .
W �
Y :I ` U : ' = X �'� � :'
r w,`•�
::f•:7 ' c7fit � � 1 t� i
. . IM �, ~�`1 .`1 ` ' ,f � � .. �
1 I
S (. . .
� •�� •c•2�CI � �/•. 4 ..
<<�� v �,°.,;��s� � � �Y ��'::_/ . .._..—..—.._.
--�---�-———— .— ��� -�.' -- ��. ��- .; �.`��'
:,�, —�� ��.-� ���,� � ;�o . �.� .
_ ;�j ,..
I � . �- - ��� Y. �jp �� � ..
.� s• ,�.u
� �O\ *F � I �p' 411.73
. ' • vua: - •aL•��`%{'1�]' '�D�J q F ; J PARCEL.
� ;i; ����1 .a,�� ,� • _ •
� i .�o•��
• � �,; �\ ..�w � �� .
; � �,� � SESSMEN7 AREA
,; AA Ei,, .��£ N
j, �;��-_ F r-_a:r•i�M , r � i
' ' S.''«z�o. i.. !�� .��.�:: .
� � 1 • ���';�.� �i�'t, . (
� N
.
, .
--•-'---•--�---•---.�:
i �
� ' . . �-�-��:+��.�M-�-�-b���'�_':'� ( � � � . .
. . �. ' \ , N0 SCALE ,
. � , ����,•f'��"��•� ,< <, . � .
. .. � O:�•U �A:�� , \
C�. .. iEST . . � �� � � �
� . .�•I•��,!�c�.�� �.�t;'.•�l.l�.i:�fi.r�fFn=i � . • � j I .
� •I • ( . i . I... .1._ . ... f � � .
. �� � .��..�..�..�..�..�.. •..�... n.� .� � � � � . . � � �
. . . . . �. . I'iC.:'2 t:�..
��r��c ?y: Ccte Ccmm.Pi�. Dron�inq Title -
scneien CSAH 42,CANADA AVE TURN LANES ASSESSMENT MAP 4
PLJ 6/15/94 5128.20
�j��nssoc�aees tnc. CITY PROJECT NO.258
� En�loeen•AreAitat�.P��nne�3.suneyort ROSEMOUNT,MINNESOTA � �
� � . � . �oo e..y�►i.�.tmar.�r�s r.r,.i.ee��...ra � . . . � . . � .
� . � Y�oor�OoUi.YV.SStt{�1220�112•l933;t3 . � � . .. . � � .
� ...��.'.._-...M.._.__...�,..�.�...�,.-� �..._._ .._........ ..._ .. ___. --"'---'.._ __.. .__.. .._ " -- ."-.. _.-.-_'-------"'_. r�. __._.-.__._...�_._.._..�._.�.__...��_—_....�.�.... -
._._- -__ _� � :�^"'".....� �• . .. .. . . . _ w�,�:. y r.
._. _ « �-"�''v:s�y� -:�., � '^ • t� '
•