Loading...
HomeMy WebLinkAbout5.a. Receive Bids/Award Contract - Schwarz Pond Outlet, City Project #259 `� CITY OF ROSEMOUNT - EXECUTIVE SUMMARY FOR aCTION CITY COUNCIL MEETING DATE: October 4, 1994 AGENDA ITEM: Receive BidlAward Contracts AGENDA SECTION: Schwarz Pond Storm Drain Outlet Improvements, City Oid Business Project #259 ;;,;-� eP PREPARED BY: Bud Osmundson AGENDA ��M � City Engineer/Public Works Director � � ATTACHMENTS: Bid Tabulation, Resolution APPROVED BY: On Friday, September 3Q, 1994, bids for the referenced project were received and read aloud publicly. Five (5) bids were received and are listed for your review on the attached bid tabulation. Bids ranged from 5289,750.14 to 5383,039.11 . . The apparent low bid received is from Richard Knutson, Inc. (RKI), 125$5 Rhode Island Ave. So, Savage, MN, in the amount of $289,750.14. The engineers estimate was 5360,000 based on 1994 construction costs. Staff added two small projects to the Schwarz Project for bidding purposes. One was the improvements required to construct the south parking lot at Jaycee`Park adjacent to the Shannon Pond Additions. This was to be funded by Park Dedication. Prior to any work on this parking lot, the Park and Recreation Committee will approve the cost. The second° addition was the repair of the watermain cross connection to Apple Valley which broke last winter. Apple Valley will split this cost with Rosemount. The engineers estimate for the Sehwarz Project was 5286,000, while the low bid from RKI was 5213,465. The Jaycee Park Proje,�t estimate was 559,200, RKI bid was 553,725. The Diamond Path Interconnect estimate was 515,200, RKI bid was 522,560. Staff recommends all of these projects be awarded. This is based on the information Staff has available at this time. If there is a mistake on the bids which changes the recommendation, Staff will provide the correct documents at the Council meeting. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT, SCHWARZ POND STORM DRAIN OUTLET AND MISCELLANEOUS IMPROVEMENTS, CITY PROJECT #259. COUNCIL ACTION: 8 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1994 - - A RESOLUTION RECEIVING BIDS AND AWARDING CQNTRACT FOR SCHWQRZ POND STORM DRAIN OUTLET AND MISCELLANEOUS UTILITY IMPROVEMENTS CITY PROJECT 259 BE IT RESOLVED,`by the City Council of the City of Rosemount, Minnesota, as follows 1 . All bids on construction of Schwarz Pond Storm Drain Outlet and Miscelianeous improvements are hereby received and tabulated. 2. The bid of Richard Knutson, Inc. in the amount of 5289,750.14 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of-Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shafl be retained until a contract has been executed. ADOPTED this 4th day of October, 1994. `E. B. McMenomy, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: ! BID TABULATION FOR SCHWARZ POND STORM DRAIN OUTLET CITY PROJECT NO. 259 C1TY OF ROSEMOUNT, MINNESOTA BIDS OPENED: f0:00 A.M. ORR-SCHELEN-MAYERON September 30, 1994 & ASSOClATES, INC. , : :::;; .> .: :::: � ::. .......:... . ..... ...CONTRACTOR ..�: ,:: ,..... :...BID<SECURITY ....: ..;TOTAL BIQ:.; ..::< ARCON CONSTRUCTION CECA UTILITIES ✓' S 576,.8 FORD CONSTRUCTION CO., INC. HESELTON, B. H. C0. KNUTSON, RICHARD, INC. � Zg� 75�• 1�"' `� LOUIS, S. J. CONSTRUCTION MN PIPE & EQUIPMENT . NORTHDALE CONSTRUCTION �/" �Z-g S�S..7� QUAUTY FLOW SYSTEMS, INC. RYAN CONTRACTING, INC. L� � •� TRI-STATE PUMP & CONTROL, INC. WALDOR PUMP WATER PRO ��- C.a T ✓�- .,4 ENGINEER'S ESTIMATE $360,310.50 I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT TABUlAT10N OF THE BIDS AS RECElVED ON: DATE: September 30, 1994 BY: Henry C. Osmundson, P.E. Brian J. Bourassa, P.E. OSM Project No. 5498.00 *Denotes Co�rected Figure H:\5498.00\SPEC�BIDTAB