Loading...
HomeMy WebLinkAbout5.n. Change Order #1, 145t h Street Reconstruction, City Project #235 , •� :� _ . CITY OF RdSEMOUNT . EXECUTIVE SUbIl�lARY FOR ACTION CITY COUNCIL MEETING DATE: January 4, 1994 AGENDA ITEM: Change Order ##1, 145th St. AGENDA SECTION: Consent Reconstruction City Project # 235 PREPARED BY: Bud Osmundson AGENDA �� City Engineer/Assistant Public Works Dir. ��� � � �� ATTACffi�iENTS: Change Order ##1 AP V Y: �� This item is a request for Council to consider Change Order #1 for City Project #235, the reconstruction of streets and utilities on 145th Street from Shannon Parkway to Chile Avenue in the amount of $15,291. 64 . The contractor had five items wha.ch added to the cantract cost. The additional work required was to provide: 1 . sanitary sewer service to the north side of 145th Street at Finnegan' s and Carroll's farm 2 . additional water main valving 3 . additional traffic control signage 4 . clean existing sewer lines and catch basins S . additional storm sewer These are i�ems not totally une�cpected on a reconstruction project through older areas with older utilities. Staff recommends approval of this change order. RECONIlytENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1, 145TH STREET RECONSTRUCTION, CITY PROJECT ##235, IN THE AMOUNT OF $15,291. 64. COtINCIL ACTION: 1 . , , Orr ' Scheien 300 Park Place Center 612-595-5775 Cn�,�ge O rder Mayeron& 5775 Wayzata Boulevard 1-800-753-5775 ASsoCiates,lnc. Minneapolis,MN 55416-Y228 FAX 595-5774 � . Ctzange Ocder No: 1 City Praject No. 235 Project: 145th Street West improvements, S.A.P. 208-103-07 OSM Project No. 4438.60 Ownars: Ciry of Rosemount Date of Issuance: December 20, 1993 2875 - 145th Street West Rosemount, MN 55068 Contractor: Northwest Asphalt, Inc. Engineer: Orr•Schelen-Mayeron 1451 County Road 18 & Associates, inc. Shako , MN 55379 You are directed to make the foliowing changes in the Contract Documents: Description: 1) Additionai work required to provide sanitary sewer service to existing homes located west of Chile Avenue and north of 145th Street. The location of the existing utilities prevented service construction as praposed with the original project. - Sanitary Sewer Manhole 2 Each @ $1,240.00/Ea. S2,400.00 2) Adciitional work required to cut in 16" gate vaive and box and tie back the existing 16`BFV at Chippendale Avenue that was requested by the City Staff (indtxiing fittings, retainer gtands and rodding). - Labor and Materials 1 Lump Sum @ $6,767.20 $6,767.20 3) Additional traffic controi signage that was not required as part of the originai projeet inGuding special detour signs for exisiing businesses. � � Traffic Contro! Signage 1 Lump Sum @ �3,750.00 53,750.00 { I 4) Cfean existing starm sewer lines and catch basins. ; � � � � - See attached Sdidification, Inc. lnvoice 5663.44 � � 5) Storm sewer not included in oriQinal project bid proposa(. ± i - 21" RCP CL 11f 59 Lin Ft @ �29.00/Lin Ft 51,711.00 � To.21 Change Order No. t �, 2gi,gq ' ! CHANGE (N CONTRACT PRfCE i CHANGE IN CONTRACT TIM� � � � Ori ina! Contract Price: $501,033.45 Ori inal Contract Time: N A � Previous Change Orders No. _to No. _ Net Change from Prev�ous Change Orders: S — � q � Contract Price Prior to this Change Order: Contract Time Prior to this Change Order: I $501,033.45 ��q �� Net Increase of this Change Order. Net Increase {decrease) of Change Order: ' 515,291.6�«« N A I Contract Price with a!I Approved Change Orders: Coniract Time witfi Approved Change Orders: � � �516,325.09 N q ( � Recommended By: • � APProved By: • ,,t,ti4��.. Brian J. Bourassa, P.E. Northwest Asphalt, Inc. � Approved �y; ; Approved By: Date of Council Action: � ; l�.L; C�..�-1tiut��;�- ;,,,_- !- 4--�f-4-- ` Citv Enaineer City_Mzna�e_�_