HomeMy WebLinkAbout4.k. Pay Estimate 2, Section 31, Trunk Sanitary Sewer Improvements, City Project #233 e r CITY OF ROSEMOUNT EXECIITIVE SUD�IARY FOR ACTION CITY COUNCIL MEETING DATE: June 15, 1993 AGENDA ITEM: Payment #2, Section 31 Trunk AGENDA SECT=ON: Sanitary Sewer, City Project 233 Consent PREPARED BY: Bud 4smundson AG� I City Engineer/Assistant Public Works Director �� # L,�• K ATTACHMENTS: Payment Voucher #2 OVE BY This item requests the second payment to Richard Knutson, Inc. in the amount of $95, 423 .37 for City Project #233, Section 31 Trunk Sanitary Sewer Facilities, Work completed and represented in this amount as of May 20, 1993 is 88% of contracted work. The work has been inspected and is in compliance with contract documents. As of June 7, 1993 the Contractor has completed all the pipe installation and the ma.jority of the restoration under this contract. Items remaining include installation of the new lift station pumps, backfilling around the lift station and further restoration. Attached is a copy of the pay voucher for your information. Staff recommends approval of this second paymen� request. REC01�2ENDED ACTION: _ MOTION TO APPROVE PAYMENT #2 TO RICHARD KNUTSON, INC. IN THE AMOUNT OF $ 95,423 .37 FQR THE SECTION 3l TRUNK SANITARY SEWER FACILITIES, CITY PROJECT #233 . COUNCIL ACTION: 5 CITY OF ROSEMOUNT APPLICATI�N FOR PAYMENT NO. 2 CITY PROjECT NO: 233 SEH FILE NO: �Z-y y�" PROJECT: S��-r�oE.! 31 -�'R.�►.�K. SA��r�a2`( S�w�� ��Gtt..tTIES COhTTRACT�OR: 12�c N fl�D Kr�v-�So�l ,�iJG,CONTR.ACT DATE: 12sg5 �zttdoE Ts�.AN� A�E. so.APPLICATION DATE: � ��Z" `� SAvACaE . Mnt 5537P� FORPERIODENDING: ��20 q� Total Contract Amount$315 4(p5."?o Total Amount Earned $ 2-11 r 2`f3•ZS Material Suitably Stored on Site, . Not Incorporated into Work � Contract Change Order No Percent CompletE $ Contract Change Order No. PercenE CompletE $ Contract Change Order Nc. Percent Complete $ GROSS AMOUNT DUE ................. ......................... $ 2'��,Zy 3.2 5 LESS 5% RETAINAGE................................................. $ 13, gh2. tb AMOUNT DUE T4 DA'I'E .......................................... $ Z(c3, 343t, t�y LESS PREVIOU5 APPLICATIONS............................ $ ����q 5�,'72. AMC?UNT DUE THIS APPLICATION $:`��� W 23•3� . APPROVED: ��� Bud Osmundson, City EngineerJAssistant Director of Public Works APPLICATION FOR PAYMENT (UNIT PRICE CONTRACT} NO. 2 )WNER: CITY OF ROSEM4UNT OWNER'S PR4JECT NO. 233 ---------------------------------------------------------- ENG. PRO7ECT'NO. 92442 .00ATION: ROSEMOUNT, MINNESOTA �ONTRACTOR RICHARD KNUTSON,INC. CONTRACT DATE ---------------------------------------------------------- 12585 RHODE ISLAND AVE. SO. CONTRACT AMOUNT $315,465.70 SAVAGE, MN 55378 ----------------------- - �ONTR.FOR SECTION 31 TRUNK SANITARY SEWER FACILITIES , �PPLIC.DATE 0 5/2 0/9 3 PERIOD END. 05/20/93 APPLICATION FOR PAYMENT CONTRACT QUANTITY UNIT ITEM NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TQTAL --------------------------------------------------------------------------------------------- - O150.5Q1 MOBILIZATION L.S. 1 1 b00�.(?Q �.00�.Q4 Q157.201 TRAFFIC CONTROL L.S. 1 1 7Q0.(?0 700. 00 0207.422 SALVAGE FLOATS &HARDWARE L.S: 1 0 200.00 -0- 0207.423 SALVAGE SUBMERSIBLE PUMPS L.S. 1 0 370.00 -�- 0207.424 SALVAGE VALVES L.S. 1 0 245.00 -0- 0207.425 SALVAGE GUIDE RAIL SUPPORT SUPPORT L.S. 1 0 175.00 -0- 0207.426 SALVAGE PEDESTAL MOUNTED CONTROL PANEL L.S. 1 4 300.OQ , -0- 0207.450 ABANDON EXISTTNG WET WELL L.S. 1 0 1420.00 -0- PAGE l OF 4 SH�RT-ELLI�TT-HENDRICKSON, INC. �, : ,� . �207.451 ABANDON EKISTING FORCEMAIN L.S. 1 0 2QC}.00 -0- �211.511 CLEARING AND GRUBBING L.S. 1 1 ,� 800.00 _ 800.0�� �c� )'W q ,a� )213.001 BALE CHECK EACH 100 .�2s1' S•00 �� '"1 "� gq•-� � � )213.003 SILT FENCE, PREASSEMBLED L.F. 1600 �,3�' �� 1.75 ,�.�4-�-�5 )213.005 ROCK CONSTRUCTION ENTRANCE EACH 2 l 225.Q0 2 2 5. 0 0 )221.IX}1 SITE GRADING L.S. 1 24 0 3000.00 600.00 )222.101 CRUSHED ROCK PZPE FOUND. TON 100 0 7.65 -�- )223.$03 AGGREGATE BASE, CLASS 5 TON 165A 15 13.75 2 U 6• 2 5 J230.004 BlJRE-MIN. 26" STEEL CASING L.F. 120 12 0 133.Q0 15,9 6 Q. 0 0 �230.016 JACK-16" DIP CARRIER L.F. 120 12 0 26.00 3 �I 2 0, 0 0 0251.108 TYPE 41 'WEAR COURSE MIX TON 45 � 45.00 -0' 0251.110 TYPE 31 BASE COURSE MIX TON 45 � 45.00 'Q- 0252.501 CONC. C &G, DES B618 L.F. 40 � 23.00 -0- 0254.7Q2 BIT MAT FOR TACK COAT GAL. 19 � �•� -�- 0273.111 4" DIP RISER PIPE L.F. 370 515 9.20 4,,7 3 8. 0 0 " L.F l Ofl 9 5 29.15 �,7 6 . _5 0273.12 1 8 D I P S E W E R A L L D E P T H S 0273.311 16" DIP SEWER 0'-ZS' DEEP L.F. 548 5 0� 56.45 �8,3 3 7 9 0 0273.312 16" DIP SEWER 25'-30' DEEP L.F. 590 5 7 5 Sb.45 3 2�,4 5$. 7 5 0273.313 16" DIP SEWER 30'-35' DEEP L.F. 883 7 7 5 56.45 �.3 7 4 8 '7 5 0273.314 16" DIP SEWER 35'-40' DEEP L.F. 240 2 2$ 56.45 1�8 7 0. 6 0 0273.5�1 STANDARD MANHOLE, 10' DEEP L,F. 7 7 82$.00 5,796, 00 0273.511 EXCESS MANHOLE DEPTH L.F. 140 13 5 66.50 8,9 7 7. 5 0 0273.521 MANHOLE DROP SECTION L.F. 75 61 132.50 8,0 8 2• 5 0 D273.614 16" X 4" DIP TEE EACH 19 2 4 513.00 12, 312. 0 0 0273.531 MANHOLE CONNECTION EACH 1 1 235.0(} 2 3 5. 0 0 0274.211 WET PIT SEWAGE PUMP STA L.5. 1 ?5� 44664.0(l 33 ,498. 00 0274.3 i 4 12" DIP FORCEMAIN L.F. 1485 1. 4 8 z 19.00 2 8. 15 8.0 0 PAGE 2 OF 4 SHORT-ELLIOTT-HENDRICKSON, INC. ►274.321 CONNECT TO EX, PIPE EACH 1 1 185.00 l 8 5. 0 0 ►274.401 VALVE VALJLT L.S. 1 1 10072.00 10,072. 00 )293.001 SEEDING ACRE 14 13: 9_ 125.00 � ��� . �p )293.003 SEED MIXTURE 700 LB. 960 8 8 0 2.30 2,0 2 4.0 0� 284.0 �C )293.004 SEED MIXTURE 1100 LB. 160 �60 �, 8.00 l�t�.ob _��j�' )293.005 SODDING,TYPE LAWNBL�, S.Y. 4600 � - =U 1.50 )293.011 NiULCH MATERTAL,TYPE 1 TON 28 �7_ R . 150.00 d i�n n n ' �293.019 DISC ANCHURING ACRE 14 13,9 85.00 1,181. 5 0 )293.023 COMM.FERT. ANAL 12-12-12 LB. 1500 1.3 0 0 0.25 3 2 5.0 0 �. PAGE 3 OF 4 SHORT-ELLIOTT-HENDRICKSON,INC. ` ' ' � - APPLICATION FOR PAYMENT - Continued ZS 2..�-�,2`�3 ��,�s otal Contract Amount $ 315,465 .70 Tota•1 Amount Earned $ iaterial Suitably Stored on Site, Not Incoporated .into Work $ :ontract Change Order No. Percent_Complete � $ :ontract Change Order No. Percent CompTete $ :ontract Change Order No. Percent Complete $ Z11�2 3.Z5 �� GROSS AMOUiVT DUE. . . . . .. . . . .. . . . $�•�'9�0':'75 . t3��,��- LESS 5 � RETAINAGE. . . . . .. .. $ .�.3-+ Z 'S�'"Tl )�-� . AMOUNT DUE TO DATE. . . . . . . . . . . . . $ .�-�':'t�' LESS PREVIOUS APPLICATIONS. . . . . $ 167 957.72 I/� _�� AMOUNT DUE THIS APPLICATION. .. . $ �'�'�'%'�'�''�"� -��T :ONTRACTOR'S AFFIDAYIT �he undersigned Contractor herebyswears under penalty of perjury that (1) ali previous progress. ayments received from the Owner on account of work performed under the contract referred t� bove have been applied by the undersigned to discharge in full all obligations of the under- igned incurred in connection with wark coverEd by prior Applications for Payment under said ontract, and (2) all :aterial and equipment incorporated in said Project or otherwise listed in or covered by this pplication for Payment are free and clear of all liens, claims, secur.ity interests and ncumbrances. ated 05/24 , ].9 93 . Richard Knutson, Inc. Con actor) B ��� Treasurer y � Name a Title) OUNTY OF Scott ) SS TATE OF �innesota ) efore me on this 22nd day of May_ , 19 93 personally appeared sheri Jo Boyum known to me, who being duly sworn, did depose nd say that he is the of the Contractor aboye mentioned; affice hat he executed the above Appl i cati on far Payment a �iAi�t�n.bAN��t sai d Contractor; nd that all of the statements contained therein ar y:.� o���� ' ��pi e. . '��; �i�t � �:,., y Cammission Expires: /D�Z7��d7' � � he undersigned has checked the Contractor's Application for Payment shown above. A part of nis Application is the Contractor's Affidavit stating that all previous payments to him nder this Contract have been applied by him to discharge in fu]1 all of his obligations in �nnection with the work covered by all prior Applications for Payment. � accordance with the Contract, the undersigned approves payment to the Cvntractor of the rrount Due. _ SHORT LIOT ND KSON, INC. �te �— �,6- �j3 gy ��e 4 of 4