Loading...
HomeMy WebLinkAbout4.g. Recieve Bids/Award Contract, Valley Oak Pond Outlet, City Project #197 � CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 15, 1993 AGENDA ITEM: Receive Bids/Award Contract AGENDA SECTION: Valley Oak Pond Outlet, Phase 1, Project 197 Consent PREPARED BY: Bud Osmundson AGENDA NO. City Engineer/Assistant Public Works Director � ATTACI�NTS: Bid Tab, Resolution APP V � Y: � On Friday, June 11, 1993 bids for the xeferenced project were received and read aloud publicly. Six bids were received and are listed for your review on the attached bid'tabulation. ' The apparent low bid received is from Busse Construction, Bel1e Plain, Minnesota in the amount of $211, 800.91. The engineers estimate was $190, 000 based on 1992 construction costs. S.E.H. , Inc. will check the bids for accuracy and will have a recommendation as to award on Tuesday night. The appropriate resolution will be handed out Tuesday night. RECOb�lENDLD ACTION: MOTION TO ADOPT A RESOLUTIQN RECEIVING BIDS AND AWARDING CONTRACT FOR VALLEY OAK POND OUTLET, PHASE 1, CITY PROJECT 197. COUNCIL ACTION: 1 .�r � � BiDS RECEIVED �' FRIDAY, JUNE 11, 1993 EMClNEERSI ARCHRECT5IPLANNERS @ 10: oo A.M. �T ROSEMOUNT CUENT PROJ. N0. 1�� VALLEY OAK POND PR��C�' OUTLET _ PHASE I �N PR�. N�. 89245. 03 BIDDER � BID BOND g�p AMOUNT 5� B & D UNDERGROUND BROWN & CRIS BUSSE CONSTRUCTION �'� � 02 ��1 ��C'• �� O CARL BOLANDER & SONS � ��7 I-��• �� .� DLR EXCAVATING D.AVE PERKINS CONTRACTING �/� �.ZS� �I�• 5� � E & H EARTH MOVERS G.L. CONTRACTING l� "►' �� , 3 �?• 7� � S.M. HENTGES & SONS HUSTING & ENGSTROM �� `'� � �� q�'Z• � p IMPERI.AL DEVELOPERS KUSSKE CONSTRUCTION NORTHDALE CONSTRUCTION '-' PALDA & SONS RICHARD KNUTSON, INC. RYAN CONTRACTING � � a al �1d. ?O �- SCHERFF INC. STEINZNGER CONSTRUCTION R.J. VALEK CONSTRUCTION A s �.��Er�� � � ���� ��� (�� /f-Y� --AM 70A.51 a k CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1993 - � A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT VALLEY OAK POND OUTLET, PHASE 1 CITY PRDJECT 197 BE IT RESOLVED, by the City Councii of the City of Rosemount, Minnesota, as follows: 1 . All bids on construction of Valley Oak Pond Outlet, Phase 1 are hereby received and tabulated. " 2. The bid of Busse Construction in the amount of 5211,800.91 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowesfi bidders shall be retained until a contract has been executed. ADOPTED this 15th day of June, 1993. E. B. McMenomy, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Votedagainst: i , � . � 3535 VADNAlS CENTER DRIVE,200 SEH CENTER,ST.PAUL,MN 55i]0 612 490-200Q 800 325-2055 AACHITECTURE • ENGINEERING • ENVIRONMENTAL • TRANSPORTAT(ON June 14, 1993 RE: Rosemount,"Minnesota Valley Oak Pond Outlet-Phase I Storm Drainage Improvements City Project Na 197 SEH File No: 89245.03 Mr. Bud Osmundson, City Engineer/Assistant Director of Public Works City of Rosemount 2875145th Street West Rosemount,MN 55068 Dear Bud: On Friday, june 11, 1993 at 10:00 a.m., six bids were received for the above referenced projecE. The bids ranged from a high of$414,347.74 to a low of$211,800.91. The low bid was submitted by Busse Construction, Inc The Engineer's Estimate was $190,000. A summary of the bids is attached for your review We have investigated the qualifications of Busse Construction, Inc. and find that they (1) have a sufficient understanding of the project and equipment to perform the construction for which it bid;and(2)according to their bonding agent they presen�ly have the financial abiliiy to complete the project bid. SEH makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. Accordingly, we recommend the project be awarded to Busse Construction, Inc. in the amount of$211,800.91. Sincerely, . David F. Simons,P.E. DFS/cih Enclosure SHORT ELLIOTT HENDRlCKSON INC. MINNEAPOLIS,MN ST.CLOUD,MN CHIPPEWA FALtS;WI MADISON,Wl � . , E EI � BIDS R C VED ENCINEBRS I ARCHRECT51 PLANNERS ��T ROSEMOUNT, r� (�ENT PROJ. N0. 197 VALLEY OAK POND PROJECT PHASE z SE�{ PROJ. N0. 8 9 2�5 .0 3 BIDDER � BiD BOND g�D AMOUNT Busse Construction 5� $211, 800.91 Ryan Contracting So $221,492 .70 Dave Perkins Contracting 5� $226, 568 .50 Husting & Enqstrom 5s $261, 1R2 .50 Carl Bolander & Sons Sa $384,151 .60 G.L. Contracting 5� $414 , 347 .74 #'M 70A.51