Loading...
HomeMy WebLinkAbout4.u. Community Center/Armory Construction Change Orders F � : i • CITY OF ROSEMOtTNT EXECUTIVE SIII�2ARY FOR ACTION CITY COUNCIL MEETING DATE:September 21, 1993 AGENDA ITEM: Armory/Community Center AGENDA SECTION: Construction Change Orders Consent _ PREPARED BY:Stephan Jilk AGENDA �� � � U ATTACffi�IENTS:Change order listing AP O BY; Several orders have been introduced on the Armory and Communi y Center project: These change orders have all been reviewed by. the architect, the State of Minnesota project manager and city staff. Some of these change orders effect the "city only° and some effect the state;>--.city and� federal government depending on which section of the building the change orders effected. The "city only° share costs will be reductions to the cost that the city bonded for which was based on the construction bids. Their will be additional "city share" costs, funded through the portion(12 .5�) of the armory that the city is liable for, but these costs will be assumed by the debt carried by the MSABC. Attached is a listing of the changes requested for approval at this time and a breakdown of the total costs and the °city only" share which the city is directly liable for. RECO1+�lENDED ACTTON:Motion to approve change orders for the construction of the Armory and Community Center as listed on the City Administrators memo of September 15, 1993 totalling ($33, 775 .00) COUNCIL ACTION: _2 � r Date: September 21, 1993 Subject:Change orders - Armory and Community Center Construction Following is a listing of change orders requested for approval on ` the construction of the Armory and Community Center. Change Description Total Cost City Only Share Order # 3 Additional site grading and tree protection $919 .00 $919 . 00 6 Revised storm drainage on site (not pond work) $9350 .00 - - - - - - 11 Change light fixtures ($2042 .00) ($736.26) 21 Add steel angle at vault $1231.OD - - - - - - 23 Elevator electrical changes ($506.00) ($253 .00) , 26 Glazed block in Guard side of lobby area $33,400.00 - - - - - - - 27 Add wall board and covering in auditorium in lieu af block $18, 637. 00 - -- - - - - 30 Add structural angle - several locations at door/windows $7008.00 - - - - - - - 50 Miscellaneous electrical • $4257.00 . ($1753 .25) 58 Change steel doors to wood $582 .00 - - - --- - 60 Relocate lighting interlock swtch $501.00 - - - - - - - 62 Delete labor on installation of seating and skate tile in arena ($37402 . 00) ($37402 .00) 63 Eliminate concrete vapor barrier ($3642 . 00) ($1313 .16) 70 Misc electrical changes ($4488.00) ($3725.04) 71 Misc. Electrical changes ($359 .00) - - - -- - 76 Electrical rough in for firing Range computerization $1308.00 $1308, 00 78 Gymnasium scoreboard rough-in $1431. 00 $1431.D0 S0 Change corner brick style $510 .00 - - - - - - 83 Misc. Electrical changes $474 . 00 - - - - -- 85 Move electrical switch in banquet hall $31. 00 $31.00 � 86 Increase skylight joist size $909 .00 - - - - - ' 87 Heat detectors for fire alarms $338 .00 $169 .00 89 Change in arena locker rooms $887.00 $887.00 92 Revise footing in auditorium $1886.00 - -- - - - 93 Change eyewash in armory ($51.00) - - - - - - 102 Arena light fixture change ($26.00) ($26. 00) 103 Exterior lighting timer $527.00 - -- - - - 106 Increase starter motor size on air handler unit $530. 00 $530. 00 107 Misc electrical revisions $1708.00 $1244. 75 109 Water softener for ice system $2382 . 00 $2382 . 00 111 Auditorium lighting fixture chnge $1671. 00 $683 .59 114 Change light fixture sty�.e-Aud. $243 . 00 - - - - - - .�� . . 115 Change light fixture style-Armory $374 .00 - - - - - - 116 Change steel window lintel size $273 . 00 - - - - - - 117 Add security lock to armory vault $869 . 00 - - - - - - ; 122 Add conduit in auditorium for visual aids operation $269 . 00 - - - - - - 123 Add emergencey lighting on " exterior doors $6258 .QO - - - - - - 127 Upgrade electrical circuit breakers for motors on air handling units $2151.00 $222 .00 129 Additional concrete in arena to provide area for mounting dasher board system $2102 . 00 $2102 . 00 133 Fire alarm system relocation $1407,00 - - - - - - - _ 158 Brick shape change ($776.00) ($776.00) Total cost all , listed change orders- - $54,431.00 Total City only share costs as listed - - -- -- - - - - - ($33, 775 .00)