CITY OF ROSEMOtTNT
EXECUTIVE SIII�2ARY FOR ACTION
CITY COUNCIL MEETING DATE:September 21, 1993
AGENDA ITEM: Armory/Community Center AGENDA SECTION:
Construction Change Orders Consent _
PREPARED BY:Stephan Jilk AGENDA �� �
� U
ATTACffi�IENTS:Change order listing AP O BY;
Several orders have been introduced on the Armory and Communi y Center
project: These change orders have all been reviewed by. the architect, the
State of Minnesota project manager and city staff.
Some of these change orders effect the "city only° and some effect the
state;>--.city and� federal government depending on which section of the
building the change orders effected.
The "city only° share costs will be reductions to the cost that the city
bonded for which was based on the construction bids. Their will be
additional "city share" costs, funded through the portion(12 .5�) of the
armory that the city is liable for, but these costs will be assumed by the
debt carried by the MSABC.
Attached is a listing of the changes requested for approval at this time
and a breakdown of the total costs and the °city only" share which the city
is directly liable for.
RECO1+�lENDED ACTTON:Motion to approve change orders for the construction
of the Armory and Community Center as listed on the City Administrators
memo of September 15, 1993 totalling ($33, 775 .00)
COUNCIL ACTION:
_2 � r
Date: September 21, 1993
Subject:Change orders - Armory and Community Center Construction
Following is a listing of change orders requested for approval on `
the construction of the Armory and Community Center.
Change Description Total Cost City Only
Share
Order
#
3 Additional site grading
and tree protection $919 .00 $919 . 00
6 Revised storm drainage
on site (not pond work) $9350 .00 - - - - - -
11 Change light fixtures ($2042 .00) ($736.26)
21 Add steel angle at vault $1231.OD - - - - - -
23 Elevator electrical changes ($506.00) ($253 .00)
, 26 Glazed block in Guard side
of lobby area $33,400.00 - - - - - - -
27 Add wall board and covering
in auditorium in lieu af block $18, 637. 00 - -- - - - -
30 Add structural angle - several
locations at door/windows $7008.00 - - - - - - -
50 Miscellaneous electrical • $4257.00 . ($1753 .25)
58 Change steel doors to wood $582 .00 - - - --- -
60 Relocate lighting interlock swtch $501.00 - - - - - - -
62 Delete labor on installation of
seating and skate tile in arena ($37402 . 00) ($37402 .00)
63 Eliminate concrete vapor barrier ($3642 . 00) ($1313 .16)
70 Misc electrical changes ($4488.00) ($3725.04)
71 Misc. Electrical changes ($359 .00) - - - -- -
76 Electrical rough in for firing
Range computerization $1308.00 $1308, 00
78 Gymnasium scoreboard rough-in $1431. 00 $1431.D0
S0 Change corner brick style $510 .00 - - - - - -
83 Misc. Electrical changes $474 . 00 - - - - --
85 Move electrical switch in
banquet hall $31. 00 $31.00
� 86 Increase skylight joist size $909 .00 - - - - -
' 87 Heat detectors for fire alarms $338 .00 $169 .00
89 Change in arena locker rooms $887.00 $887.00
92 Revise footing in auditorium $1886.00 - -- - - -
93 Change eyewash in armory ($51.00) - - - - - -
102 Arena light fixture change ($26.00) ($26. 00)
103 Exterior lighting timer $527.00 - -- - - -
106 Increase starter motor size on
air handler unit $530. 00 $530. 00
107 Misc electrical revisions $1708.00 $1244. 75
109 Water softener for ice system $2382 . 00 $2382 . 00
111 Auditorium lighting fixture chnge $1671. 00 $683 .59
114 Change light fixture sty�.e-Aud. $243 . 00 - - - - - -
.�� . .
115 Change light fixture style-Armory $374 .00 - - - - - -
116 Change steel window lintel size $273 . 00 - - - - - -
117 Add security lock to armory vault $869 . 00 - - - - - -
; 122 Add conduit in auditorium for
visual aids operation $269 . 00 - - - - - -
123 Add emergencey lighting on "
exterior doors $6258 .QO - - - - - -
127 Upgrade electrical circuit
breakers for motors on air
handling units $2151.00 $222 .00
129 Additional concrete in arena to
provide area for mounting dasher
board system $2102 . 00 $2102 . 00
133 Fire alarm system relocation $1407,00 - - - - - - -
_ 158 Brick shape change ($776.00) ($776.00)
Total cost all
, listed change orders- - $54,431.00
Total City only
share costs as listed - - -- -- - - - - - ($33, 775 .00)