HomeMy WebLinkAbout2. Discussion of 1994 CIP and Operating Budgets _ CITY OF ROSEMOUNT
;
; DAKOTA COUNTY, MINNESOTA
� RESOLUTION 1993 - 82
A RESOLUTION SETTING THE PRELIMINARY 1994 GENERAL FUND -
OPER.ATING BUDGET, THE 1994 C.I,P. BUDGET AND
THE 1994 LEVY REQUIRED BY THE CITY OF ROSEMOUNT
WHFREAS, the City Council of the City of Rosemount has determined
that budgets and special needs for the year 1994 will be in the
amount of $4, 199,432 for the General Operating Fund, CIP and
Retirement/Severance funds; and
WHFREAS, the City Council has determined that special levies for
Bonded Indebtedness, Certificates of Indebtedness and the Armory
Project total $604, 868; and
WHEREAS, the City Council has determined that actual incomes,
fund transfers and anticipated aids will total $2, 138,353 .
NOW, THEREFORE BE IT RESOLVED, that the total Preliminary Levy
certified to the Dakota County Auditor shall be $2, 665, 947; and
BE IT FURTHER RESOLVED, that the City Council of the City of
Rosemount will conduct a Public Hearing for the purpose of
presenting the proposed budget a•nd levy to the general publ.ic and
to comply with Truth in Taxation laws as set by.the Minnesota
- State Legislature, and that the hearing shall �ake place o�.
December 2, 1993, at 8 : 00 P.M. , in the Council Chambers at the
City Hall; and
BE IT FLIRTHER RESOLVED, that if a cantinuation of that hearing is
necessary it shall take place on December 15, 1993, at 8 :00 P.M. ,
and at that Public Hearing the final operating budget and levy
shall be adopted by the Rosemount City Council.
ADOPTED this 30th day of August, 1993 .
� E.B. McMeno y, Mayor
ATTEST:
�
us M. Wal , City Clerk
Motion by: Willcox Seconded by: Klassen
��! Voted in favor: Wip ermann, Staats, Willcox, Klassen
i
Voted Against : McMenomy
McMenomy illcox and Wippe�ann
TO:Mayar E.B• Staats !
Councilmembers:Klassen, ,
FROM:Stephan JiI �'�
�'�'_�
/
Date:August 27, 1993
RE
:1994 Proposed operating and CIP Budgets
items for your consider�ae ioS dfvers n of
Attached are several We have provided a
evenings budget discussion. a copy of the first full draft of
the operating budgets for 1994, ro osed debt service
the five year CIP, a revised version of the p p, and a resolution
read levy computational worksheet for 1994
levy, a n�W ���p ted, set the citys preliminary 1�s required
which will, when adop
d the hearing dates for thebud etsland levy n hearing
an tion of the 1994 g
for the adop eS in the
rovided them, and attempt
Monda I would like to takes we have peview the C ang We spend
On Y
budgets from last discussion, a es. Then I would sugg�s reement
to reach consensus on t the draf t CIp budget to arrive at ag
some time on discussing l�vels for the CIP budget.
on priorities and funding ou can
ud et levels we will work
to discuss the resolutio�n�ang determine if Y ed
I would like re ar
reach agreement on the overall levy an
ado tion which has to be done
with. zf
we can then the Resolution can be finalized an p
mber 7th meeting for pthe County-
e
te to
S d
the P if ie
for and cert
before September 15th
ppgR.ATING BUDGETS erating budgets for 1994
the proposed op funds
I have worked in reviewing o erating costs and increasing
ital expenditures through the citys
with the purpose af reducing P.
available for use in funding cap
��p program. 96, 531.00
erating costs bY $
Specifically we have:
- reduced op by
- increased estimated revenues,overall,
$6, 100 .
- proposed transfe e�e fu ds andthe amount
construction res
of $175, 000 . Certain Park and
- proposed shiftinJ Center
Recreation programso erallCoo t f the
which reduces the
operation of the Parks and Recr e a t i o n
Department by $78�26� ' of that
- proposed transfer of $70, 000 .
to the Community Center for
savings that portion of the
assistance in covering Center
costs that the Commu.nity
program erating.
staff will now be op
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1993 - 82 '
A RESOLUTION SETTING THE PRELIMINARY 1994 GENERAL FUND
OPERATING BUDGET, THE 1994 C.I.P. BUDGET AND
THE 1994 LEVY REQUIRED BY THE CITY OF ROSEMOUNT
WHEREAS, the City Council of the City of Rosemount has determined
that budgets and special needs for the year 1994 will be in the
amount of $4, 199,432 for the General Operating Fund, CIP and
Retirement/Severance funds; and
WHEREAS, the City Council has determined that special levies for
Bonded Indebtedness, Certificates of Indebtedness and the Armory
Project total $604, 868; and
WHEREAS, the City Council has determined that actual incomes,
fund transfers and anticipated aids will total $2, 138, 353 .
NOW, THEREFORE BE IT RESOLVED, that the total Preliminary Levy
certified to the Dakota County Auditor shall be $2, 665, 947; and
BE IT FURTHER RESOLVED, that the City Council of the City of
Rosemount will conduct a Public Hearing for the purpose of
presenting the proposed budget and levy to the general public and
to comply with Truth in Taxation laws as set by the Minnesota
State Legislature, and that the hearing shall take place on
December 2, 1993 , at 8 : 00 P.M. , in the Council Chambers at the
City Hal1; and
BE IT FURTHER RESOLVED, that if a continuation of that hearing is
necessary it shall take place on December 15, 1993 , at 8 : 00 P.M. ,
and at that Public Hearing the final operating budget and levy
shall be adopted by the Rosemount City Council .
ADOPTED this 30th day of August, 1993 .
E.B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by:_Willcox Seconded by:_Klassen
Voted in favor: Wippermann, Staats, Willcox, Klassen
Voted Against : McMenomy
Y
Page Two
f � �
5eptamber 15, 1993 FUNDING REQIIIREMENTS
1993 ADOPTED 1994 PROPOSED +/-
DEPJ�RTMENTS BtR?GET BUDGST DIFFERENCS PERCENTAGS
Couacil Hudget $166,747 $133,807 ($32,940} -19.75+k
Admiaistratioa Budget $224,608 $233,637 $9,029 4.02�k
Election Budget $7,615 $1D,570 $2,955 38.80k
Finance Budget $140,115 $148,496 $8,381 5.98ic
Ganeral Goverament Budget $156,500 $179,850 $23,050 14.73+k
Planning Budget $157,982 $165,031 $?,049 4.46+t
Governmeat Suildings Budget $92,600 $73,298 • $678 A.93�k
Police Sudget $794,706 $911,441 $116,735 14.69k
Fize Department Budget $160,182 $166,758 $6,576 4.11�
Public Worka Operatiag Budget $720,038 $807,683 $87,645 12.I9�S
Paved Streets Sudget $82,649 $98,098 $15,449 18.69�
IInpaved Streeta Budget $32,278 $57y951 $25,673 79.54�k
Ice & Saow Sudget $17,413 $20,413 $3,000 17.23�
Street Lighta Budget $64,294 $66,224 $1,930 3.00�
Signal Lights Budget $6,991 $7,201 $210 3.00�
Park & Rec Sudget-General 4peratiag $521,915 $542,561 $40,646 7.79�
Park & Rec Budget-Revenua Producing $101,000 $53,100 C$47,900) -47.43�
Ineurance Sudget $158,000 $188,000 $30,0-00 18.99&
Other Financing IIaes - Traasfera $0 $70,000 $70,000 100.00�
TOTAL OPERATING BIIDGETS - 53.585.633 $3.953.799 $368,I66 I0.2?$
Five t5) Year CIP Requirement $171,460 $185,633 $14,173 ' 8.27�
Retiremeat/Severance Fuad #204 $60,000 SO ($60,000) -100.00�k
Bonded Indebtednesa $435,887 $379,447 ($5�,440) -13.15�
*Of 1994'�, $103,877 for Comm Center*
Certificatea of Indebtednesa $50,054 $48,290 ($1,764) -3.52�
1994 Certificate Ieaue of $220,OQ0 $0 $50,000 $50,000 100.00�
Azmory Aaticipatory Levy(Value ae of 3/31/93) $125,329 $12T,131 $1,802 1.44�
*$95,OOD + ($402,639,ODOx.00798�)*
TOTAL FIINDING RSQBIREMENTS $4,429,363 $4,744,300 $314,937 Z.11�
. . sassm=x=cee=c-=m�aa_seaaee�z:ama�asam�a�aasszasxece==�m
i
PBgB �Ae . � . � � . � .
Saptember 15, 1993 REVEN4S SOiJItCES
1993 ADOPTED 1994 PROPOSED *�-
TYPES BUDGET Bt7DGET DZFFERENCS PERCBNTAGS
Local Goverment Aid $296,512 $380,794 $84,282 28.42�
(Iacludes Equalizatioa Aid foz 1994)
Homeetead & Agricultnral Credit Aid $0 $555,804 5555,804 100.00�
Intemal Reveaue Geaerated:
Licenaea and Permita $239,150 $250,850 $11,700 4.89�
Iatezgoverameatal $165.A00 $176,Q00 $11,000 6.67k
Chargas for Servicee $429,800 $368,025 ($61,775? -14.37+k
Fines aad Forfeits $42,000 $43,000 $1,000 2.38k
Recreatioaal Feea $101,090 $63,100 ($37,900) -37.52+k
Miecellaaeous Reveauea • $57,500 $55,780 ($1,720) -2.99�
Tranefers Ia $185,000 $70,000 ($115,000) -62.16�
Total Interaal Revenues $1,219,450 $1.026,755 ($192,695) -15.80+k
Dae of Resexve Funds - CIP Fund Budget $0 $175,000 $175,000 100.00�k
Levy Sourcea:
Special Leviea $612,270 $604,868 ($7,402) -1.21�
Geaeral Levy $2,301,131 $2,001,079 ($300,052) -13.04+k
Total Levy $2,913,401 $2,605,947 ($30T,454) -10.55�C
TOTAS. REV'ENIIE SOIIRCES • $4,429,363 $4,744,300 $314,937 7.11�
=�:s�:s=:==��_�==�:a=�:�a��a:===��a��====-�:a:===ss�:a:
. Pag� On� . � . �
�
� � 1994 BIIDGYT MORiB�ll3 � � . . .
6ffiRSGL RSVENIIHS � . . . . . . . �
SepE�mbar 15. 1993 � � 1993�OBJYCT 1993 1994 ObJYLT . 1444 � . � .
. � � 1991. .. 1992 � DLTAIL� ..� kDOPTm DETLSL YRQPOS� . . .
Pssnd Eceount t Obj f� Descriytioa � . � AC14)S. � 1lClO71L NSODNT EIIDGSP� . �NT. � BIIDG=T Caas�at� . .
. � """""""'."""""""""""""""'-""""'-""""" . .
101 -�31030 -00- 000 Currant Ad Valor�m Taxu� 5731,596 5966,464 =1,199,306 =1,6l�,636 � �
101 - 31010 -00- 000.1 lsoa Couaty � $1,199,306 {1,6l7,63!
� �101 - 31030 -00- 000 �Dalin4uant 11d Valor�Saz��(I) 529,526 $29,916 f15,000 t15,000
� � $15,000 � �515,000 .
ioi - 3io�o -oo- 000.i rro.co�nty
� SO1 - 31030 -00- 000 Yobils Ha�a Taxa�(2) 56,404 56.709 t9,000 59,000
� � 101 - 31030 -DO- 000.1 Prom Couaty . . � 59,000 59.000
101 - 31040 -00- 000 Yisul M�Duitiu � 5=46,�42 5330,034 � � � 5302,80! 5303,E08 .
101 - 31040 -00- 000.1 lsoa Couaty � . � . . 5301,80E. i301,806 .
. . $X.�Sf 53.f50 54.000 . ��54�.000 .
101 - 31?10 -00- 000 dravQ ?uet(2) . � �
� � ${�000 54.000 �
101 - 31710 -00- 000.1 7rom Covaty �
101 - 31610 -00- 000 Praachisa SaxesiZ) 518,540 531,643 5�5,000 525,000 .. .
ioi - sieio -oo- 000.i rro� ss.r cwi. s�s,000 s2s,000
101 - 31110 -00- 000 llltoholic Eevarage Lieenses(L) . � 59,900 510,640� � � �512�,000 . S11,Q00
101 - 32110 -00- 000.1 . � 514,OQ0 Si1,Otl0 . .
501�- 32160 -00- 000 Liaansu to do Susiaau(L1 � 57.585 57.360 55,000 515,000 ,
101 - 32160 -00- 000.1 . SS,000 . 515,000 � .
101 - 33161 -00- 000 Liceasas to do eu�iness-Laaael(L) . S=5 S�S SSO S50 � .
� .� ;SO . . S50 � . . .
� 101 - 32161��-00- 000.1 . . . � � �
101 - 32162 -00- 000 Liceaws to do Huaiae��- (L) $100 $100 5100 � 5100 . .
101 - 32162 -00- 000.1 Splal1�a11 Pezmits ;100 • 5100 .
101 - 32180 -00- 000 CSqaz�tt� Lieenau(L) � 5216 5204 $100 �5200 . .
� � � � � �$200 . 5200 .
ioi - a�iao -oo- 000.i
101 - 32210 -b0- 000 Huildiny Pessit Rev�aua(L) 5140,746 5233.a15 .�.. 5180,000 S1l0,000
Szao,000 Slaa,000
101 - 32210 -00-�000.1 �
$1,000 . � 5500
101 - 32211 -00- 000 Cwta� Eldg OfLtclal IImib(L1 � 5953 SO � � �
� � 51,000 -� t500 -
101 - 33211 -00- 000.1 � � �� � �
101 - 32212 -00- 000 �YinezA Eztractioa Paxmit(L) � . 5150 S� .. S�. s� . . . .
SO 50
101 - 32212 -00--000.1 - - �
� � � ;T,000 - 58,000 . .
SO1 - 32130 -00-�000 Eleetriesi Permit Aeveaue(L) 55,332 $12,991- . . . . .
. � -$7.000 � $8.000. . � . .
101 - 33330 -00- 000.1 . � � �
101 - 32230 -00- 000 Pitmbiag Parmit Ravmue(L) 58.945 5�6.492 � � 512,000 510,000 .
� 201 - 32270 -00- 000.1 . 512,000 � $10,00Q
101 - 32240 -00- 000 aniaal LSeease�4L) 51,790 51,906 . 51,500 � 51,50�
� 1�01 - 32240 -00- 000.1 � � 51,500 51,500� . . . . .
101 - 32250 -00- 000 Savar Permit Reveaue(L) . 56,725 513,267 � 56,000� 57,000
101 - 33250 -00- 000.1 . � � 56,000 57.000 � �
SO1 - 32255 -00- 000 Couaty Reeordiaq Pee-City Shra(L) . 522� 5170 � � 5100 � 5100 _ �.
. .. . . . . . . . ._ . ._ .. .. . .... . � � � ;100. . . . .. _. _ . 5100- . .
� � � 101 -� 32255 �-00-�000.1 -�� ' . � . � � � �
� 101 - 35160 -00- 000 Haatiag/air Coad Parmit Aevnue(LI . � 510,243 � 535,368 514,600 � 517�,000
101�- 32460�-00-. 000.1 - . � 514,000 . S1�,OQ0 �- � � .
. . 5200., . §400 .
SO1 - 33290 -00- 000 Other Noa-Husiaess Lie 4.fmts(L) ;250 5402 . � �
. . . . � $200 . � 5400 . � . . .
101 - 32290 -00- 000.1 � � �
101 - 33401 -00- 000 Local 6ovarnmani l.id tLG7�)� i300,761 5312,363 i�96,512 � S3S0,794 .
. . 101 �- 33401 -00- 000.1 Yzom Stat� 5296,512 � ;3a0�,79� � iaeludu =4�+alizatioa 7�l.d-1994
101 - 33403 -00- 000 Hstd�� Ag Cradit LSd (SAG) 53�=.365 544E�,063 S4E4,865 � . � SSSS,EC4 � �
101 - 33402--00- OOQ.1 Yrom Stats i484,l65 5555,804 � Sama as 1993 �eCwl �
SO1 - 33403 -00- 000 Mobile 8oma 8AG(Z) . � 514,899 510,676. 5=0,000 5�1,000 .
101.-�33403 -00- 000.1 Fraa Stat� . $30,000 � 521,000 � Sama a� 1993 actual
P�G$ TO1.�ys $1,912,995 53.466,259 52.595,641 52.595,6�1.53.Z51,694 53.251,894 .
r
. P�g� 1bo . � . .
1994 DVDGST NOAIC3HEET3 . . � . � . .
� � . . � 6�7SRAI. REVEN08S . � � . . .
Saptambar 15, 1993 . � . . � . 1993 OHJYC! 1993 199� OBJYC? 1994 � �
� 1991 � 1992 � DSTJIIL ADOPTID �� DHTAZL PROPOSID �
lvad� accouaG N Obj { �ucriptioa � xCRVT�L ACTV7�L � LttODNT DODO8i �A1cOONT � EIIDG=T � Coaaats .
""""""""""-'-""""-"-""""-""'--'-""""""""'-""'--"'•---'-""""."""".-"'-"'�--""""-'-""""'-""""'----'..._._
� 101 - 33416 -00- 000 Police Traiaing Aaimburswent(2) � 550,983 555,731 � � 5�0,000 t60,000�
� 101 -�33416 -00- 000.1 Po�t Hoard Traialaq Retmb . 55,000 . i5,000. �
101 - 33416 -00- 000.2 Stata l�id (ii�d to P�U) � 555,000 SS5,000 � � �
� 101 -.�33�1! -00- 000 YSA for Stzeau - MalaGmeace(I) . SSS,E25 5�1,555 516r000� 5�2.000 � �
101 - 3341! -00- 000.1 Pra� Stata � $16,000 � 521.000 � � �
101 - 37�24 -00- 000 Yquelizatioa kld St2,473 � $69�,719 582.69R . SO
101 - 33474 -00- 000.1 Frsm State � $l2,692 t0 Iaclud�d vitII LG7� for 1ff4
� 101 - 33630 -00- 000 Polica Ser�ieu Lavy-ISD =196(I) S0� 57.968 Sif,000 � $1l,000 � �
101 - 33630 -00- 000.1 � � ;16,000 � 518,000� � � �
101 - 34103 -00- 000 Zpaiag i Subtlividoa !aa(C) 53.606 SSO,S89 53.000 53.000 �
101 -�34303 -00- 000.1 � � �5�.000 • 53.000 � .
� 101 - 3�104 -00- 000 Ylaa CLaeking Lear(C) SdS,tl6 S14Z,099 . S1I0,000 . 513D,000
� 101 - 34104 -00- 000.1 65} of Dldg Pesait Yeu � �§120.,000 5120,000
101 - 3�105 -00- 000 Salai o! I6aps 4 Fublieationi(C) � 51,053 5757 . 51,000 - � � . 5500 �
� 101 - 34105 -00- 000.1 � 51,000 5500
� 101 - 34106 -00- 000 Deputy Registrar Yeas(C) � � 524,334 524,164 �� 525�,000 � � Y25,000 �
101 - 3l106 -00- 000.1 � 525,000 . 535,000 � �
101 - 34107 -00- 000 lusassmrst Seazches(C) SS)3 Sf35 � 5500 t500 �
101 - 34107 -00- 000.1 � � 5500 5500 �
101 - 34108 -00- 000 I�Saistrative Pea-OtLez Yvnda(C) � SO 576,365 5138,500 ;109,625
101 - 34108 -00- 000.1 all Tuads Exeapt Coastrcta 558,500 559,625 � �
ioi - 3�ioa -oo- 000.s coa,trueaioa ruaa, Sao,000 Sso,000
101 - 34109 -00- 000 Othar Caa•1 Chargea Lor Serace(C) 5��4 52.083 51,000 � S1,S00 .
- 101 - 34109 -00- 000.1 - . � 51,000 . 51,500 � � �
� 101 - 34130 -00- 000 Sazvica Chg oa A�tusaed Cheeks(C) 5203 5190 5200 5700 �
� 101 - 34110 -00-�000.1 � 5200 $200 . � �
� 101 - 34111 -00- 000 _Service.Lookup Cheek(81dg)(C) � � � SO . 51,�15_. 51,000 . � � 51,500 . � � �
� 101 - 35111 -00- 000.1 � � $1,000� $I,SQO � � � � �
101 - 34112 -00- 000 IItility Pazmit Applicatioa Pee(C) � SO 51,300 5200 � 5200 � � �
101 - 3�112 -00- 000.1 tter DevelopaenG � . 5200 5200 � �
101 -�34150 -00- 000 IIser Pees-IISPCI(G � SO SO � 5112,000 � SE0,000 � �
. 301 - 34150 -00- 000.1 Si17,OD0 � 58�.000 . � �
� 101 - 34151 -DO- 000 Dser Peea-Zoeh�Bauxite{C) �$0 Sa 515,000 � 512,000 �
101�- 3�151 -00- 000.1 §15,000 512,000 �
101 - 34302 -00- 000 Pire Servieu-Buzaiag Pexmits(C) 525 5540 $200 � � . 5300
101 - 34202 -00- 000.1 _. . $Y00 . �. 5300 � � �
� �� �- 101 - 3i203 -00- 000-� Accideat keports(C) - --� � - - 5863 � � � 5701 � - 5500 ;500 � � �
. 101 - 34203 -00- 000.1 - - . . � . . 5500 5500 �
. 301.- 3�104 -00- 000 Day Care IaapectLoa Fees(C) ���$0 5195 . � 5�00 � � . �5200 . � � �
. 101 -�3420! -00- 000.1 � - � � � 5200 . ��5200 �
101 - 34206 -00- 000 Othar Polica Servlcas(C) $263 . $SS � � �'SO j0 � �
101 - 34206 -00- 000.1. � 50 � . SO �
101 - 34307 -00- 000 Other lire Protectioa Servicea(C) 55,941 56,110 59.000 � 510,000 �
101 � 34207 -00- 000.1 II of M 4 Coates Cbatracts 58,000 510,000
. 101 - 34207 -00- 000.2 Othar�Fira Calis � 51,000 � �
""""--"'----"-'---""-"-"-"""""""""""""""' � �.. .
PAGS TOT)�7.5 � 5272.952 5443,C3! ¢600,�893 $600,992 ;{65,025 5465,025 �
4aqa Thr�� � . . . . . � . .
. 199� SIIDGYT NOW.SITYL?3 � . . .. � � . .
� � � C�(SR71L AYV�I06S � � .
SepCember 15, 1993 � � 1993 OaJBCT 1993 1994 OEJiCi 1994 � �
. . 1991 1l92 � DYTAIL 71DOYT� DZT7IZL� YROPOSm � . .
. �Puad� accoun� i Obj t �Da�cription � ACSOL7, 7�CTp11L ]111ppt7S H9DGET 7�1[OIIti'[ BODCYT �� � Co��ati .
. 101 - 34)01 -00- 000 Straat, Sidewalk i Curb Repair{�). SYS $0 $0 � . ¢0 �� �
101 �- 34301 -00- 000.1 � � �� � =0 � � � � S0� � � �
' � 101 - 3�303 -00- 000. Xor Maetls(C) � §ST1 $405 � 5500 5500 � � � �
101 - 34303 -00-�000.1 � � � f500 � . 5500 � �
101 - 34305 -00- 000 �Clelvarts 4 Aceauoriu(C) - 5335 51,346 � SD . t0 � �
. 101 - 34305 -00- 000.1 � . SO SO � �
101 - 34306 -00- D00 Othas Highvay 4 Streat Re�aau�(C) 5736 $4,361 � . 52.000 51,000 �
301 - 3t306 -00- 000.1 52.000 =1,000 �� �
� 101 - 34407 -00- 000 CS[y Shar�.o! ltatro Sac Chgs(C) 51,149 $2,859 51,000 � §1,500
101 - 34407 -00- 000.1 . =1,000 51,400 � � �
101 - 3i741 -00- 000 �Soltball Aevanues(R) S24,i71 53{.592 . =44,000 554,000 � �"
101 - 3{731 -00- 000.1 j44,000 �554,000 � �
101 - 34722 -00- 000 Volleyball Asv�av��tY) � 410,E90 511,232 516,000 � SO � �
l0i - 34722 -00- 000.1 � 516,000 � SO Ito�ed to Co�uaity Cmt�r �
� 101 - 34723 -00- 000 Playgrouad AeveauaslA) $156 . 513 . SO � � SO �
101 - 31723 -00- 000.1 . � S0 � � � �
101 - 34724 -00- ODO Teaais Aevmuu(A) 51,646 $792 � 52.000 52.000 �
101 - 34724 -00- 000.1 =2,A00 � $3,000 �
� 101 - 34725 -00- 000 Siay Sot Reveauea(R) 512,307 59,110 � � 516,200 $0
� 101 - 34725 -00- 000.1 � 516,]00 . . � SO . Xoved�to Co�uaity Caat�r
101 - 34726 -00- 000 Pos Poa Ye��auu(A) . �. $3,635 53,115 $4.300 SC � �
101 - �4T26 -00- 000.1 � � 5�.100 S0� 16ovad to Co�uaity Csntsr
� 101 - 74727 -00- 000 21a1d Tsly Aer�aua�(A) . . 55,321 5�.056 �57.000 � SO �
ioi - »�z� -oo- 000.i ' s�,000 so xooaa eo ca�uaicy cm�.r
101 - ����e -oo- o0o aroo�.il n..wau ca► sz.los tz.oas Sz.loo Sz,loo
ioi - a��ie -oo- 000.i Sz.ioo S�,ioo
- . � 101�- 3�7]9 -00- 000 Skatiag Lesson Rwvaauu(A) . -.- � - 5�51- 5750 - � � 5600 .. .. $0 �
101 - 3472! -00- 000.1 � � 5600 - 50 � tfoved to Cnn��uaity Caater �
101 - ]4730 -00- 000 Srack i Tidd Aev�auas(R) - 5863 �51,139 - . _ 53.G00 � 53.000 . � �
� 101 - 34730 -00-�000.1 � � � � 53.000 53.000 � � � � � � �
101 - 34731 -00- 000 �Soecnr Reveaues(A) � S*00 . SO � 52.OQ0 52.000 �
101 - 3{731 -00- OOO.T � � 52.000 � 52.000 � � ��
101 - 34733 -00- 000 Adult 8ukatball Revaau�stR) $0 5568 51,000 � $0 �
� 101 - 34732 -00- 000.1 � � . � S1,OOQ . �SO kowd to Ca�uaity CenG�r � .
. 301 - 34733 -00- 000 Other Program� Aeveaue(R) $1,431 5757 . 53.000 � . SO � �
.. � � . $3.OQO_ . . .. . . S�Q . . 1[oved�to Commssnity Ceataa
.___.. �101 - 34733 -00- 000 1. �
� �-�� �- - �101 -�3�790 -00- 000 Other Recreatica�Reveaua�(R) � � SO � ;30 � SO _ -. � � �SO � � � � �
� 101 - 3479-0 -00- 000.1 � ;p
� 101 - 35101 -00- 000 Court Pinea(Y) � . $47,371 54i,9�47 � �542.000 . � 543,000 - � �
101 - 35301 -00- -000.1�� Prom County � . � � � � . $43,000 � . 54�,000 �
. � � 101 - 35104 -OQ- 000 Other�?iaes(!) . . � . � SO S0. � SO � SO �
.101 - 35104.-00- 000.1 � - � �� � =0 � � �
101 - 36101 -00- 000 Priacipal-Speeial AsaassmeatsSZ} 516,175 � $b3,7Z0 55.000 52.000
101 - 36101 -00- 000.1 � � � 55,000 52.000 � � � �
� '-""""'--"'-""---'-""'-""""""""""'-"""""" �
PA6H SdT/1.S � 5130,115 5154,606 5151,500 5151,500 5111,100 �5111,100 � � �
f Paga Lous . . . � . .
� � . 1994 SIIDCiST MORxSHEST3 � " . � � . . . � �
�. G�(BRAL REV�7�YS . � � � � � . .
. Sapt�mber 15, 1993 � � � � � � � 1993 08JYCT 1943 1994 OSJECT . 1994 �
. � 1991 1992 D8TAIL 71DOYT�� D8T)�IL fROPOSHD � �
lnad 7lecount t Obj K DucrlDtioa � ACSVIIL aCTp1lI, NtppNT 8IIDG8? .7�{OIIiI'P aIIDCaT � � �CommanGs
""""""""_"""""""""""""""""""_""'_"""""""""'_""""""___"""""""."""_""""""""""""""'....."
101 - 36103 -00- 000 P�aalties 4 Iatarut-3/A(I) SO 51,960 . S0� � � SO .� � � �
_._....SOl�--36102...00_..OQ0�.1 .. .. .. .. .. . .. . . . . . _. .. .. .. _.. _..... .SO_.... ._ _ . . SO . . . . . . .. � .
101 - 36310 -00- 000 � Zaterut tarniaq�-Ia�astm�nts(x) 520,057 .531,532 �S1l,000 520,000 . �
� 101 - �6210 -00- 000.1 516,000 520,000 �
101 - 36215 -00- 000 Iat�rut Sarala4stY) Sd,335 $4,a6i � . 57.000 � 53.000 � �
101 - 36215 -00- 000.1 Ch�ekiap Accouat.. E?.000 � 53.000
101 - 3C120 -00- 090 kaati 4 Aoyaltf�s(Y) � 51.7l0 52.7l0 52.500 53.7l0 � �
� 1C1 - 7632D -00- 000.1 IIS Ne�t �ateaaa Rnnt ;3.500 . 53.7t0 � . �
101 - 36230 -00- 000 Coatributioas/Doaations(M) 510,553 512,l78 � S6 Sp � �
. � 301 - 3�6230 -00- 000.1 � � _ S0� . �SO �
� 101 - 36360 -00- 000. OtLer R�venv�(x) � §63,507� 535,l17. 525,000 530,000 � �
101 - 36260 -00- 000.1 City Zn�uraaca Retuads 515,000 � 515,000 �
. 101 - 36260 -00- 000.2 Yi�cellaneous � 510,000 515,000 .
301 - 39101 -00- 000 Sa]as o!� Gsaar�l Piznd Asseta.(M) � S0. 52Z5 � � SO - SO � �
. . 101 - ;9101 -00- 000.1 50�. SO �
. 101 -� 39203 -00- 000 Traasles irom � � (?) 5129,6]S� ;51,691 � 535,000 � 535,000 �
� 101 - 39203 -00- 000.1 Armory Repaymest t2 of 5 � . 535,000� 535,000 � �
101 - 34207 -00- 000 Traaifes lrom Port AutEority(2J� 550,000 550,000 550,000 SO �
101 -. 393C7 -00- 000.1 Aepaymeat t3 oL 3 . � �� 550,000 � � SO � � � �
� 101 - 39209.-00- 000 Traaai Lroa 8oads Paid Dp Fvad(T) 5265,051 $7Q,59] � 5100,000 535,000 �
101 - 347A9 -00- 000.1 . 5100,000 � 535,000
101 • 3l310.-00- 000 Loaa Proea�ds(Y) SO 552,500 SO SO � �
: 101 - 39330�-00- 000.1 � SO . SO � �
PAGQ 1'OT7�LS S54L,90! 5314,951 5237,500� �;237,500 5125,780 5125,7a0 � �
. � � CSGND�TOT]J,S � � - 5�.864,999 53,379,855 53,585,633 $3,585,633 53.953.,799 53.953,799� � � � . . � � � . .
. � � �- . aiY'SRNaL A.SVffi70aS � � t1,140,l63 S1,]51,313 S1,Z19,450 51,219,�50��51,026,�55 5�1,.0]6,755.Graad Total Less IW V�lozm. . ��
. . _. . ._ . . _._ . . .'.""' �.�.�.""�............c........�...............�.......��..i.G11.-shG i Piseal DisparitS�s
` r:y ri.•
199� n�cxx Konxs�ars � � � � � . .
- fiffi7YRAL RYY�iQlS � . . � .
Saptambar 15, 1993 . � . � � 1993 OBJECT 1991 199♦ OSdZCT 1l94 � � �
� � 1991 � 1997 . DETAIL )�DOPTm DiThIL PROPOS� . � .
lvad � Accouat r Obj � Desaription aCTOAL 71C14AL IdtOIINT � BODGHT� AitOOHT � SIIDGEi Ca�m�nt�
""""'_""""""""""""""""""""_"""'"'_""""""""_"""""""""""""""...."""""""""'_"""""""'......"
ioi - a�ioa -oo- o0o c.n.:.i z„aa�e.sn a..,
� � �� 101 - 3�lOd -00- OOQ.1 luad Admiaistrativ� Feaa SO . SO �558,500 � � � 559,625 ��
101 - 3410E -00- OOO.a Yuad 102 51,125 51,135 � Paid-IIp D�bt S�zv Eoad Zvad.
iCi - 14108 -00- OOO.b Tvad ]01 � . 55,625 55,625 � Port hutLozity fuad �
� 101 - 3410R -00--OOO.e lnad Z02 � � . . � 52.250 i2,250 5-Yaar CIP Progra luad.
101 - 3�106 -00- OOO.d Yvad ]03 � � � � � . S1,1I�5 . 51,125 . GpiCal Psroj�cts YSA lual � �
�101 - 34106 -00- OOO.e Pund 204 � 51,125 . --51,135 � . Savaraae� i Retirwa[ Tuad� .
101 - 3�10! -00- OOO.L Zund 205 . S2.]50 � � 52..350 Park Imyrwe�ats ?uad
� . 101 - 34106 -00- OOO.q Tuad 220 � 55,625 �;6 . Natioaal Cuard.Araory Yroj�eG �
101 - 3f10! -00- OOO.h lund 2;0 ._ 51,115 51.125 � Diaaoad path p=oj�cE � �
101 - ]410L -00- 000.1 lvad 301 . .. 51,134 . � g1,125 G.O. C�uaity C�ater 1!!2C �
101 - 3410t -00- OOO.j luad 303 � � 51,125 � � 51.125 G.O. Yuaieip�l�Eldga 19ti . �
101 - 3430d -00- OOO.k Pvad 304 � . � 51,125 51,125 G.O. Hquip Caztlfica[ai 1991C�
�101 - �410E -00- 000.1 hwd 321 . � � � � 51,135� . 51.125 C.O. �Iapr 8onds 1992A .
101 - 34108�-00- D00.1 Puad 322 . � $0 51,125 G.O. Impr Eonds 1893a
� 101 - 3430! -00- 000.1 lund 323 � $0 51,125 � � �G.O. Imp R�[uading 8ends 1993E
� � 101 - 3430E -00- OOO.m lvad 324 . 51,1]S SO . G.O. 2mpr Honds 19lSL . �
� �101 - 3410E -00- OOO.a" Tuad 325 51,135 . 51,175 G.O. Impr Boads 198711 ��
� 101 - 34108 -00- OOO.o� Puad 346 � � . 51,145� 51,125 G.O. Impr Soads 19E6E�
101 - 34108 -00- OOO.y Yvad 327 �� 51,125 51,1]S G.O. Za�r poads 1989E
101 - 34106 -00- OOO.q - Tund 328 51,1]S 51,125 G.O�. Impr eoads 1997L � .
� 101 - 3410D -00- OOO.r Zuad 329 � � 51,125 51,135 C.O. Impr EcnCa 1991D .
101 - 34108 -QO. OOO.s Tvad 330 . $1,1]S . 51,125 . . G.O. ImDr ponds 1992D
� 101 - 34308 -00- OOO.t lvad ]!1 � � 51,125 � 51,225 � C.O. kuaicipal Hldg 1992L
101 - 3410t -DO- OOO.0 ruad 362 - � ;1,125 � 51,1�5 C.O. Tax iac Sonda 196lA
� 101 - 3410d -00- OOO.o lund 601 . � � � 55,635 55,675 xatar IItility Tvad ����
. 101 - 3410f -00- 000-.v-- . fund 607 . � .� - � � 55,625 . � 55,624 . Sewsr IItility Puad . .. -�
� 101 - 3410i -00- OOO.x lund 603 � � . � 55,625 55,625 . . Storm xater Otility Pund �
101 - ;4108 -00- OOO.y . 7uad 604 � �� � � � 51,175 � 51,125 � � �Nater 4 Sawer CZP Prograa�7uad � �
. 101 - 34106 -00- OOO.s - Tuad 605 � . � � � - �� �-�� 51,125 � � 51,175 - ����- � �.Matar Hook-Op Core 7vad --�����- �-.--�
� � 101 - 3410d �-00- OOO.aa Tuad�606 � . . S1,iZ5 ;1,125 � Se�rez Hook-4p Cora Tund
101 - 34106 -00- OOO.ab tuad 607 51,135 ;1,125 � ��Stosm Mater Coaaacta !�u Tuad
101 - 34106 -DO- OOO.ac Fund 612 � � . � �51,125 51,175 . G.O, NaCer�Hoad� 19l9a
101 - 34108 -00- OOO.ad Fuad 61D � � 51,125 � j1,125 G.O. Storm Matar bond� 1993II
�101 - 3410�E -00- OOO.ad Puad 650 � . S9� � 55,624� - C�uaity Ceatar Puad
� �PL68 TOTlS.S � SO � � SO 556,500 558.,500 559,625�� " 559,635 -� �� � � � � �
Paq� On� . � � � . �
• � 1994 BIIDCST MOAIS8E8T3 � � � � � � �
COONCIL - 41110 - � . � � �
Septobar 15, 1993 � 1993 OBJiCT 1993 � 199{ OEJECT 1994 � �
. 1991 1993 DYTI�IL ADOPTBD �DYTAIL PROPOSBD � � � �
� . Pund �1lccouat � Obj R Dascriytioa ]1CTUAL � �CTp7�L� a7[pIINT gpDGgT 7�I(pDHS DIIDGYT �Comm�nG
. 101 - 41110 103.0 Part-Time S�larias 4 8eaeiits 523.973 523.550 517,607 577,607
. 101 - �3110 -03- 103.D Y. YClt�aomy, 1layor � j6,459 � 56,459 SS350fsoath r 150/aoath Dctra! �
. . . . . ... _. _ _ ... .. .� . . .. ._._._. .__. .. � ._ __ . . . . . . .
101 - 41110 -03- 103.0 - 8. Zla�saa, Couaeilnember � � � �.�- � � �55,167 55,167 (:5300/moath ♦ 100/aoatL Lxtral � � �
101 - 41110 -0{- 103.0 � J. Staats, Couaeilmembaa 55,407 � $5,407 . . (5300/aoath ♦ 100/aoath E�ttsa) �
� 101 - 41110 -05- 103.0 H. Nilleox, Couaeilaemb�r ;5,40� � . 55,407 � (5300/aoath * 100/sonth Ibctra)
101 - 41110 -06- 103.0 D. Nippasa�n, Covacllmmbr ;S,li7 . $5,167 � (i300/ioath a 100/aonth L�ctz�)
� 301 - 41110 -01- 209.0 Othar O!lic� Suppliu � SO � 3190 =0 =0 � �
� � 101 - 41110 -01- 209.1 SO SD �
� 101 - 41110 -01- 303.0 hrchit�ets' 7eea !0 $4,443 � Sa � SO - � �.
102 - 41110 -01-.302.1 SO SO � �
101 -.f1110 -01- 304.0 Lagal 7�e• 56,240 SO � � . �SO SO
101 - 41110 -01- 30�.1 • � �� � SO SO
101 - 41110 -01- 307.0 ]taa�qameat 7aes 538,113 640.414 St5,640 � 561,000 � � � �
101 - 41110 -OS- 307.1 Newslett�r � . � f27,690 � . ;7,000 � � �
101 - 41110 -01- 307.2 Spriag Cleaaup 535,000 510,000 �
101 - i1110 -01- 307.3 Pirevorks � 56,000 � 56,000 � �
101 - 41110 -01- 307.4 Aeey�liag Coatraet-Icnutsoa � 531,000 532.000 � �
.101 - 41150 -01- 307.5 Senior CiGizea's Ceater � �$6,000 � �56,000 � �
101 - 41110 -01- 319.O�Othar ?rofas�ioaal Servieea SO 51,96! 57.300 .� . St,000
101 - 41110 -OS- 319.1 Retraat/Goal Settiag � . � 51,300 . SO �
� 101 - i1110 -01- 319.Y Hduea�ioa Raisbursemeat . 56,000 54,000 � �
� 101 - 41110 -01- 331.0 Traval Ezp�ase .51,036 5617 5400 � 5300 � � �
101 - 41110 -01- 331.1 Yilaag� to LYC Coalareace s}00 � � SO � � �
101 - 41110 -01- 331.2 Yiuellaa�ou� . 5100 � �5300 �
101 - 41110 -OS- 751.0 Legal Soticu Publlahiag. ;0 S36 � SO f0 �
101 - 41110 -01- 351.1 SO SO .
� 101 - 51110 -01- 369.0 Othar Iaiuraace SO SO � 5900 5500 �. � �
,_ .. . . - . . _. . ., .
_� �� 101 - 11110 -Ol- 369.1� Couaell c Commicteei� � � � � � � � � 5900 - 5500 - Aeeidmtal Insuraae��� � � � � �
•101 - 41130 -01- 433.0 Duas a Sub�bziytioas 5405 .SC.048 � 57.950 54,500 � � -
101 - 41130 -01- U 3.1 L1IC Dua■ . - 55,000 . SS,250 �
. � 101 - 41110 -OS- 433.2 LXC r Amieua � � � � . f500� �� SSOD - � �
101 - �41110 -01- �33.3 Amt Dues � ;3,000 53.300 �
101 - 41110 -01- l33.4 NDCC Dues � � $450 t450 � �
� 301 - 41110 -01- 435.0 Sooks i PamphleG - SO � 5397 � $100 .$100 � � � � �
101 - 41110� -01- �35.1 xi�cellaaeous Literatura � 5100. 5100 � -
.101 - �1110 -01- 437.0 ConEereacas c Semiaars � $2,699 52.82! 52.300 52,300 �
� _ � 101.- 41110 -01- 437.1 ---Registration i Hotel-L16C ��__. . . � � S1,l00 � 51,800 �.� � � � � � � � .
� 101 - 41110 -01-�437.2 � uiscellaaaous L1SC 8veau � � � SS00 � � � � � ;500 � � � � � � � �
101 - 41110 -01- 439.O�Other Miscellaneous Charges S69 50 SO-� SO -
� . 301�- 41110 -01- �39.1 . � . . . S0� � $0 - �
� � � 101 - 41110 -01- 598.0 Comcil Deiiyaated 521,l6{ 518,926 �� � 517,000 ��512,000 � � �
101 - 41110 -01- 598.1 Coatlaqmciu . � 58,000 514,000 � �
� 101 - 41110 -01- 596.T� IIaloa Contract Coatiagmcy . 59.000 � SO � �
101�- 41110 -01- 601.0 Priaciyal oa Loaas � � SO SO 517,500 517,500 � . �
� 101 - 41110 -01- 601.1 Plaa hasiatanca-Comp Plaa . . §11,775 512,?75 Yaymeat �1 oi 3 . �
101 - �1110 -01- 601.4 Plaa Iusiscaaca-AirporC � � � 55,725 � 55,725 Paymeat i2 oE 3
� pAa$ 1'OTUS 594,098 ¢101,616 �5166,747 5166,749 5133,607 5137,807 � � '
DEPARTIffitT TOTALS $44,098 5101,626 5166,747 ;166,747 �5133,807 5133,D07 .
� Paq� Oaa . � . .
� 1994 DDDGET MOW.98S8T3 � .. . .
� .. ADY2NISTRATION DSPJ3tT�NT - �1320 - � . - . . .
� Sept�ab�r 15, 1993 1993 OEJECT 3993 1994�O8JECT 1994 � � �
1991 � 1992 DYT7IIL 11DOPT� DHS]�IL FAOPOS� � � .
lssad Account A Obj i D�seriptioa � ].CTGaL ACTUI�L )JtOONT SIIDGSi 7�[ODRi DIID6si Cwn�aCs � �
101 -�♦1D30 101.0 Salari�s 4 ienatits . 5173,759 ;163,861 .5105,69t 5�15,352 xll Selazy CosW Inclwiw o!
101 - f1320 -02- 301.0 S. Jilk, )�dmiaiitrator � � §60,105 382,113 . Salxry, taxu, pi1U i D�aeLiG� � .
101 - �13]0 -03- 101.0 S. Nal�h, Admin ]usistant � � $51,41D � � SS],6l9 � �
101 - �13]0 -04- 101.0 L. J�ntiak, l�dmia Sacretazy � 531,4b4 53��f,764 � �
101 - 41310 -OS- 201.0 D. Nidstro�, Perial Seertry � 515,324 � 517,119 � 50 } Gsn'1, SO4 Port Anihority
161 - 41320 �-06- SO1.0 C�. CouqLlin, A�eeptioaiat -. 527.2G2 � 529.167 � � �
101 - 41320 102.0 Yull-Tiaa�W�rhima $3,125 @3,628� 53,300 53.300
� 101 - {1330 -04- 102.1 L. Jaatlak � -� � � �2,SQ0 52.500
101 - 41370 -OS- 102.] D. NSNtroa Si00 i500 �� �
101 - 41330 -06- 102.3 C. Coughlia � ;300 5300 �� �� �
101 - 41320 �-01- 203.0 priat�d Pozmi 4 Paper � 5171 SO SO . SO �
- 101 - 51320 -01- 203.1 � �LO � ��t0 - �
SOS - 41320 -01- 207.0 Traiaiag i Iaatsuctal Suppliei §0 =0 ' $1,i00 S1,D00 � � �
101 - 41320 -01- 207.1 Sataty Ca�itt�e 5�50 S�SO � � �
101 - 41330 -01- 207.2 Right to lcaor � � . � $1,550 51,550 � �
101 -�41320 -01- 709.0 Other OfLiee Supyliu 573 SO . � 5300 . . 5300
101 - �1310 -01- 209.1 8lsenllaaewu Yuzchaies � 5300 5300 � �
101 - 41320 -01- 304.0 Legal �ees 5117 SO SO $0� � � � �
� 301 - 41320 -01- 304.1 � � $0 EO �
. 301 - 41320 -01- 305.0 Yadiul 4 Deatal Yee� . 545 579 SO . SO � �
101 - 41330 -01- 365.1 � SO . � S� � �
101 - 41320 -01- D�07.0 Yaaagas�at !�u � 5796 51,760 59,000 � 58.500
101 - 41720 -01- 307.1 Labor Conrultaat 57.500 SE,000 .
101 - 41720 -01- D07.3 Dept H�ad/Staft Ticainiag � S1,SQ0 5500 . � �
� 101 - �1320 -01- 319.0 Oth�r Prof�u loaal Ses�teu SO 52.262 S0� ' � � SO- � � . .
101 - 11320 -01- 319.1 . SO $0 � �
- 101 - 1I330 -01- 331.0 2rar�1 7xyanu � 530! 5691 � 5300 � 5300 � �
� - 101 - 41�20 -01- 371.1 SCaG Coaf�zance --L1tC � - � � � - � 5100 - 5100 � .
101 - 41320 -01- 331.2 State Coalcreaea - kOG � 5100 5100 �
101 - 41370 -01- 131.3 L�bor A�latloa� Morkshoy� � � 5100 5100 � � .
101�- 41130 -01- 339.0 Othar Transyortatloa Y�ry�asaa-- � � 5219 =157 . � � 5300 � . � 5300 '
_ .. ___.__. .
�. 101 - 41310 -01- 339.1 Reimbursa tor lltng Traval � . �� 5300 � 5300 � �
101 - 41330 -01- 341.0 �ploysent 1Wvertisiag � � � SO 5303 SO SO �
101 - 41320 -01- D41 1 � SO � � ;0
101 - 41320 .-01- 351.0 Legal Noticu Publi�hiag � $13 t0 SO SO
101 - 41320 -01- 351.1 SO � 50
. � 101 - t1320 -01- 3-53.0�6eneral�Notices i Public Inio . 53.566 �. � � .�.SO � � SO . . � � 50�.- � � � �
. . .101 - 41340 -01- 352.1 � � � . . . . . � . S0� . � . . . ..SO . � � � . .. � � . �.
� 101 -�41320 -01- 353.Q Ordi.aaaca Publieatioa . � 90 $0 . 5800 . � 51,000 � � ��
101 - 413]0 -01- 353.1 Codiiication of Codn � 5800 � � 51,000 � - � � � �
� 101 - 41330 -01- 433.0 Dua� 4 Subtcziptioa� � 5374 � 5193�� . 5110 5185 � � � � .
101 -��1330 -01- 433.1 1SCW Du�� � � � $60 - 560 � � �
101 - 41320 -Ol- 433.2 �1ts Dyu � . 525 525 .
301 - 41320 -01- 4;3.3 BCTW.Duas S�5 � �$25 � � �
101 - 41320 -01- 433.4 II1SC Du�s � � � SSO SSQ � �
101 - 41320 -01- 433.5 IPkL Duas $45 � S�5 � .
. 101 - 41320�-01- 433.6 �HAOMA Dues 525 SO �
PAGB TOS71L3� . � 5181,5�7 5173,053 $221,70II ;221,708� f331,037 ;231,037 �
� � Pty� 'hro � � . . . . . .
1994 EIIDGET NORICS�ST3 � .
11D1[2DiS3TR71T20H DEPARTI�QT - 41320 - . � � . . � . . � .
Stytembar 15, 1993 � 1993 OHJBCT 1997 1994 OSJYCP 1994 � � �
� � � 1991 � 1992 DSfAZL aDOYTID DBTAIL YROPOSBD � �
� Tvad Aeeona[�� Obi N Dueriytion aCiVAL aCPO11I. . 1�NOONT HIIDG=T hxOIINT sDDGYP Co��at�� �
� 101 - 41320 -01- 435.O�SooSu i ?amphlets � SO SO 5400 - 5400 � � .
� � � 101 - 41320 -01- 435.1 . TLSA Saadbook �5250 . � S�SO . � �
� 101 - 11720 -01- 435.1 81�aellaa�ow Pureh.sias . 5350 � 5150 � �
101 - 41320 -01- 437.0 Coaiar�no�s 4 Seainars 51,749� E1,SE6. 51.500 52.200
� 101 - 11320 -01- f37.1 aegSftration � Hotel - IJfC � 5�00 � � 5300 � � � �
101 - 41320 -01- �37,3 4�gisCratioa 4 Hotal - XCM11 5350 � 5400.
SO1 - 51320 -01- 437.3 RaslstraGioa - J�10f � � 5200 � . $0 �
301 - 4133a -01- l37.4 Aeqlstratloa n 8ota1-1SCP07,. � 5500 . . � 5�50
� 101 - 41320 -01- 437.4 LaDoz Relatioas Traiaiaq � . SS00 5500 � � �
� 101 - 41320 -01- 437.6 Staf! (2) EaeL � 5�00 . 5400 � .
- 101 - �13]0 -01- 437.9 ]ciie�llaaeow S�minar� _ 5100 f100
301 - �1320 -OS- 43�.8 HvalMpal'� Daaquat � - 5250 � 5250 . �
. 101 - 41320 -01- 439.0 Other Y1�cellaaeous Charq�s �SO S4! f0 50 � �
. 101 - 41320 -01- 439.1 � � $0 SO �
. � PaGB TOTAI.S S1,7S9 51,635 52.900 52.900 52.600 � 52,600 � . �
DSP71R17�7Y TOTAI.S 5183,326 5174,6E8 5=74,60d 5224,506 $133.637 5233,637
. Ps4� On� . � � �
. . 1994 SDDGET MOAICSITYETS �� �. � . �
ELECI'SONS - 41410 - . . � . . . .
� S�pt�mbar 15, 1993 - - � 1993 OBJ$CT 1993 1994 OSJYCS 199� � �
� 1991 - 1992 DHTI�ZL. 11D0?TID DZ'tAIL YROPOS� . � .
� � Pund� Accovat • Obj • .Ducriytion I�C'N71L .hClCI�S. �11NODNi 80DGST I�tOVNT BIIDfiBT Como�aG �
101 - �1410 103.0 Part-Siae Salariu �51,594 � 57.795 . 53.000 � �� 86,000 �
SOi - 41410 -01- 103.1 Slactioa-Judgu . � 53,-000 56,000 �
101 - 4141Q -01- 122.0 TIG Contributioas � � S99 5310 � � � $1!6 . � $372 � � �
101�- 41i10 -01- 122.1 Elactioa Judgas i186 . 5372 � � .
101 - 41410 -OS- 125.0 Y�diears CoatribuCioa� S23 ST3 . � 844 $!6
101 - 41410 -01- 125.1 83actioa Judqes 544� isa �
101 - 4141Q -01- 303.0 Priat�d losms 4 Papar 52.331 SO � 53.400 .SO -
101 - 11410 -01- 303.1 Sallota 4 Programminq� . � � � 53,400 SO � �
101 - 41lSO -01- 20l.0 Yisealisa�ous Suppliu . SO 5405 . 5135 5300 � �
101 - 41418 -Q1- �20l.1 Varioua Elaetloa PuzcLases . 5125 5200 � �
101 - 41410 -01-��219.0 Other Operating Suppllas i426 5656 .5250 . S25p .
• 101 - �1410 -01- 219.1 � Haals !or YlectSoa Judgas � 5250 � 5250 � � � �
101 - 41410 -01- 243.0 Itiaor iquipmant � $0 SO $150 � � f200 �
101 - 41410 -01- 34Y.1 Eallot xaeIIine Yquipment � 5150 5�00 �
l0i - �1410 -01- 319.D Other ProEasaioaal Serviees SO 51,100 � . � SO � � SO � �
101 - 41410 -01- 3i9.1 SO SO �
101 - �1410 -OS- 321.0 Telephoae Cosu � SO 5378 5250 5500 �
101 - 41410 -01- 311.1 Cwts Sor Praciaet Phoaai � $250 � 5500 ..
� 101 - 41410 -OS- 351.0 Legal Noticea Publi�hinq. �. SO $3 � � S50 � SO
101�-.41410� -01- 3�51.1 81actlon Publicatioas � S50 EO . �
101 - 41410 -01-�359.0 Othaz Pria[1aq 4 eindinq Co�b S2 SO � SO . . . SO .
101 - 41410 -01- 359.1 SO � � � . 50 � �
� 101 - <1410 -01- �09.0 OtL�r CoatractaQ Repair 4 ltala S50 � �51,966 �SO 52.640 �
10i - 41�10 -01- 409.1 2 Yur Ysint 1lgreeaeat SO � 5�.640 - � � �� �
• 101 - 41410 -01- 419.0 Othar Ylaeallaaeous Charg�s SO 5160 5160 . 5320 �
101 - �1410 -01- 139.1 Jaaitorlal Sarvieu 5160 5330 � � _
101 - 41410 -01- 570.0 Oftie� Lquip � Turnishiaq ?ure - 5310 . SO . � SO � � � $0 � � . _
.. 101 - 41410 -01- 570.1 � . . . .. . . . .. � .� .. _.. . - . . . .. . . . �SO� . . .$0. . . . . �� .
101 - 41110 -01- 560.0 Othar Equiyaaat Puzehaaes SO 51,000 SO SO � �
101 - 41410 -U1- 580.1 � � � � � SO � SO �
. . FhCB�TOS7II.S � SS.73T SSD,l15 57.615 57.615� . 510,570 510,570 . �
. DEPI3tTl�NT TOTa7.3 ;4,737 513,845 57.615 57.615 �510,570� 530,570.
Psy� Oa� � . � � �
� � � 19!♦ SIIDCYT NOW.S8YET3 . . � .
PINLNCt DHP71RTl�iT - 41520 - . � .
Ssptamb�r 15, 1993 � 1993 OBJYCT 1993 1994 ODJYCT 1994 � . �
. � � � , 1991 �1492� DYTLIL 11DOPTED DYTA2L PAOPOSm � �
Yund 7lcconnt � Obj f Dsscriytioa ACTT77�L ]1CTOAL . I�S09NT BIIDCaT AIWIINT DODCYi Co��ats �
_"'""""""""""""'"""""""'___""""""""""""""'_""__'_"'_"""""""'»"""""""""_"""""'__"""""""
� . all Salary Co�ts Iaclwi*� ot� -�
101 - 41520 SO1.0 Salariss i saaefits 5102,933 599,717 5113,915 i131,846 Salazy, Tax��, p�G i E�n�lits.
� 101 - 41520 -02- 101.0 J. 1tay, !ia Dlraetor(75k) 546,.216 � 547�,189 � 75k 6�a�1, 25t IItiliti�s .
� 101 - 415R0 -03- 301.0 J. Gilb, Jusistant !/D(TSt) 535,361 f3E,{d6 75t Gen'1, 35} IICSliti��
101 - 11520 -04- 101.0 D. l.orpala, 1�ccouaGaG(Ok) . SO � SO . SOOk Paid by IItiltiei �
. 101 - 4i530 -OS- 101.0 D. lfazaar, Accouataatt100}) 530.143 t32,46t
1�1 - �1570 -!!- 103.0 1/2 Daputy 8�qiatrar(100A�) f13,173 � 513,603 � � �
101 - 41520 102.0 lull-Ti�m� Overtim� 51,224 5982 51,�000 51,000 � � . �
101 - 41520 101.1 Jaaa fiilb 50 � SO
101 - 41520 102.2 �aaaise xaxaer � . s1,900 � � 51,000 � � �� �
101 - 41520 -01- 301.0 Auditing a �ecouating Servicas� $0 SO SSDO 5200 . .
iCi - 41520 -01- 301..1 Coasultiag Sezvices � 5500 . � . 5�700� . . Roa-Eudit AalateA�.S�zvieu �
� . 101 - 41520 -01- 304.0 L�gal Yees �� � � $O SO SO SO
. 101 -. �15]0 -01- 304.1 � � . SO � � � �
101 - 41520 -01- 305.0 Medical 4 Dantal �su S61 SO � �5300 � SO �
� 101 - 4152D -01- 305.1 Phy�icals � . 5300 . SO � �
101 - 41520 -01- 319.0 OGhar Proiusional Services SO 52.ZC1 SS00 � � - 5300
101 - 41570 -01- 319.1 Spriag�ted Coaaultlag 5500 � 5300 � � ��
101� - 41520 -01- 331.0 Trdvei 8�cpsass � 5255 5168 � � 5800 �� 5500
101 - 41520 -01- 331.1 � Ylaaace�Director � 5500 5300 � . �
101 - 41530 -01- 331.Y Staft � � �5300 � � � $300 �
� 101 - 41520 -01- 341.0 F.mploymest AdveztSsiag SO $0 � 5500 � � � SO � �
� . 101 - 41520 -01- 341.1 I�ds for Pazmaneat P/S � SS00 � � SO � � .
101 - i1570 -01�- D91.0 4.C. Yaiataaaac• S6,2i6 510,621 � � 56,200 � Ss,950
. 101 - 41520 -Ol- 391.1 Yiero Syrto Yalntaaaaca � � 52.SQ0 $3,000� � �
101 - 11520 -01- 791.2 , Yiero SoLtru� Lieaas• . . 51,500 ' $3.000 _ � �
101 - 41520 -01- 391.3 C�aaral N�trork Suyyort . . � .51,000 � � S3.SQ0 � ',
101.- 41510 -01- 241.4 YS�ullaa�ous P.C. Repaizs � - 5200 � � 3450 . � �
. � � � 101 - 41520 -01- D9].0 Y.C. l.ee��soriu 4 Supplies �� 5625� 51,496�� � . � . .� . S?00.�_ � .� .. 51,000 � � � � � -
� 101 - i1530 -01- 393.1 CSty�Sy�tm Supyllu � � � � 5700 � 51,000 ' � �
101 - 41530 -01- ]93.0 P.C. Hardraz��Pyzehaw� SO 55,956 � . . 80� � SO �
. 101 - 41520 -01- 397.1 � . ' � SO �. � � SO � � �
101 - 41420 -01- 394.0 P.C. Soltrar� PurcLasea 56l0 588i . 50 � � 5500 .
101 - 41520 -01- 394.1 xi�cellaaeous S/N paekagu � � $500 � � �
. 101 - �1520 -01- 409.6 Othar Coatzaet�d Yeyair a 1lsia SQ 5��5 5300 �� � ;300 � � .
101 -�41520 -01- 109.1 GsL Ragirtaz Naiat ConGzct $300 . 5300 . �
101 - 41510 -01- l33.0 Dua� i Subseriptioas 5313 �5=37 � 51,200� 51,100 �
� 101 - �1520 -01- 433.1 1�1tA Aanual Fnes � � . . 5150 . . 5150 . � .
. 101 - 41520 �-01- 433.2� � �MGPOA-- Yinaaee Director . � �. � � � �5150`� - � �5140� �� � - � - - � � - � �. �
101 - �1540 -01- 433.3 MGF011 - SCaL1 . -..5300 �5300 � � � .
S01 - 41520 -OS- i33.4 GlOA - Yiaaace DSrecGar � � � � � $150 � � 5150 �- � �
101 - 43520 -OS- �33.5 CPOII- Stalt � � . 5300 � � 3300 . � �
. 101 - 415]O -OS- 433.6 Nagaziaa Sub�criptioas � 5150 5150� � � � � �
� 101 - 41510 -01- 435.0 Soolu i Pamphlata � 50 ;150 5200 . 5200 � � .
101 - 41520 -01- 135.1 Accouatiag Related��800ks � . 5100 5100 � ��
� 101 - �1540 -01- 435.2 Piaaaca Ealated Books 5100 5100 � �
. PAGS TOTI�LS � � $112,3i7 5122.,907 5136,115 5136,115 5145,996 $145,946� � �
. � . ?aq� 2Mo � � . .
1994 HIIDGET NORJFS888T3 . . � � ��
PIDi11NCI DSYNtTIffiiT - 41540 - . � . � � � .
S�pt�bar 15, 199] � . 1994 ObJYCT . 1993 1994 OEJLCT 1494 � � �
� � . 1491 1992 �DSSAIL hDOPT� . D=ihZL PRGPOS� - . . � � �
Tliad� account i Ob� i Daserlptioa � � AC74AL � ]�CiVA7+ ANOVNT EODCYT L1(ODNS � HDDGST Ca�ats � � �
101 - 415i0 -01- 437.0 ConL�r�aeu 4 Seainan $576 =l,tbb 53.500 � 52.000 � �
101 - 11520 -01- �l?,1 )m�CoaLar�ne�tlor Thr�a) � . 5300 i300
� 1Q1 - 41520 -01- 437.] Computar Syaposi�s� � . 5500 SSOQ � � �
101 - �1520 -01- 41�.7 YGlOL ha¢wl Coa1 .- 7JD 5300 � 5100 � .�
101 - 41530 -01- �37.4 FGFW�11aaw1 CoaS - Stat! � 5500 � SS00 . - �
101 - 11520 -01- 437.5 CI07�Natioaal Coai - ?/D � . 51,300 � .. f0 . � � �
101 - �1520 -01- �37.6 Yiaullaa�oua Samiaar� i600 5400 � �
101 - �1520 -01- 439.0 OChar Yiicdlaa�ous Cbarqes � 5306 5647 � � 5500 � � $500 �
101 - 41520 -01- �39.1 Chgs.Not Co�trad Ylsevhara 5500 � 5500 � � �
101 - 41520 -01- 570.0 Oftica BQuip�eat PuzcLases SO . 52.332 � - f0 � SO
101 - 41520 -01- 570.1 � � $0 -
� PACS 20tALS 56d3 � 54,756 34,000 54,000 52.500 =2,500 � � � � �
DEP11ATl�iT TO•lN.S 5113,2]9 5127,66] 5140,115 5140,115 S14E,496 $14E�,496 �
Paga Oa� � � � � � �
� 1994 EIIDGBT MOR1CS88ET3 � � � �
�CEIQSRhL GOVERNKffi7T - 41610 - � � � .
Saptambar 15, 1993 � . 1993 OaJBCR . 1993 199� OSJtCT 1994
��� 1491 � 199] DHTAIL 1�DOPTID DLTAIL PROPOSm . � � � �
� Yuad ��1lccouat R Obi t Dascriptioa AC'PQIJ. ACTOAi. LItOIINT ���BDDGYT �7�1t0DlIS EODGET Cam�at� '
� """"""""""'--"""""""""-""""""""-"""""""""""""'--"-"---"""'-""""""""""'-"""""'•""""'..
� 101 - 41810 -01- 201.0 O!lica Lecuaories f0 E60 t0 SO
iai - +ieio -oi- 2oi.i so so
101 - 41l30 -01- Y02.0 Duplicatiag 4 Copying ;7,655 112,474 512,500 S11,S00 . � � �
301 - �1l10 -01- ]02.1 1[ierofilmiag � 53.000 53,000 �
101 - �1i30 -01- 102.2 Copyiag Costi � . E9,500 tl,500 �
301 - �1f10 -01- 203.A Yrlat�d losss 4 Paper 54.OSE i6,02S . 59,150 59,150 � .
. S01 - 41810 -01- 203.1" �Coyy Payar . � =3,100 53,100
301 - 41810 -01- 203.2 G�aaral Aeceipt Sooks . � 5750 � 3750 �
101 - 41610 -01- 103.3 PurcLase Orderi � 5650 � it50 �� �I�
101 - 41l10 -01- 203.4 Yayroll Cheeks � 51,100 51,100 . � . �'�..
141 - 43b10 -OS- 203.5 A/P Chaeks � . $2,10� =2,100 . ��.
101 - �1610 -01-.203.6 Greaabar Compueeri30 Bozu) S1,iS0 � t1,150 � . �,
� 101 - 41l10 -01- 304.0 ffivalopa� 4 Lattarhaads 51,957 L4.254 � 56,550 � 53.100 .
101 - 41l10 -01- 204.1 Letterhaad 53.100 S1,OOC
� 101 - 41610 -01- 204.2 Plaia Hav�lopas 5450 � 5600 . � �
, 301 - 41610 -01- 201.3 x/P 4 Payroll Eavelopns � 5�00 5400
101 - 4181C -01- 204.4 10 x 13�Ry'vek 8avelopes s1,300 . 5750 � � .
101 - 41i10 -01- 304.5 10 x�15 Syvek Eavelopes � . � 51,300 i350 �
301 - 41610 •01- 206.0 Yiero!!lm Supplies 5105 S5� . SO SO � �
101 - 41630 �-01- 206.1 $0 SO .
301 - 41l10 -01- 20E.0 Yiscellanaoui Supylla• .id.747 � 510,947 � . 59,500 . �58.000 � � � ' �
101 - 41i10 -01- 206.1 JanlGozial 4 Yisc City 8a11 59,500 � 58,000 � � �
101 • 41l10 -01- 209.0 Othar Oiiic� Supplles S�1,D17 S1E,151� . S1l,000 516,000 � .
101 - SU10 -01- 20f.1 G�a�zal OSL1ca Supyliu S1l,Q00 � 316�,000 � �
101 - �1t10 -01- 212.0 ltotor Tu�ls � 5359 5166 � 50 � � � SO � �
101 - �1110 -01- 213.1 SO � SO � � �
101 - 41610 -01- 219.0 OtLaz Oparating Supplia• � S0� S37 - �- SO � . - � � SO
. . . . _ .__.... _. .
� �- 101�--�<iD10 -Ol- 219.1 � � �- 50 . � �� �� SO � � � � � � � � � �
101 - 41610 -01- 221.0 YQulpmeaG Pasts . SO f178 51,100 51,100 �
� 301 - �1l10 -01-� 271.1 City Eall Yquips�aG Aayaira � . .51,100 51,100 � � � � � �
101 - 41E10 -01- 229.0 Other xaiatansac• Supyliu � 549 � - 5�7i . 5300 . � � 5300 -�
101 - 41II10 -01- 239.1 ]Siscallaneou� Suppliu � . 5300 i300 � � �
101 - �1620 -Ol- 242.0 Hinor Equipmeat � 5399 Sl61 � SO SO � �
101 - �1810 -01- 211.1 � . SO � SO � .
101 - 41810 -01- 301.0 auditiaq 4 xecounGing Sezviea� 56,063 S1'f,806 � 520,000 520,000 � � .
� � S01 - 11810 -01- 301.1 1992 Ludit Yau . $20,000 520,000 �
101 - 418i0 -01- 302.0 LzehiGects' Peaa - � SO 52.]81 � SO . . . SO �. �
.__:._�.�.101 --42810 �-01-�3�02�.1 -... . . ._.._. _... . . . . ..__._. . . � ._..... $0. _. .. _.... �...SO . .. . . . _.__ . . . :_-.� _. :. _ �. ._ �_
� 101 - 41E10 -01�- 304.0 Legal Pees � . 513,576 ¢52,37� � 511,000 531,000 � �
101 - 41l10 -01- 304.1 6eaeral City Legal Tees � - 531,000� � $31,000 � � � � . -
101 - 41610 -OS- 319.0 Othez Yrofa�sional Sarvicas 532.990 534,161 516,000 516.,100 � � � �
� 101 - 41l10 -01- 319.1 Hra Aeliaf lu�'a � . 526,000 536,000 � .
301 - �1l10 -01- �319.2 City ltaps . 31�,200
101 - 41E10 -01- 319.3 Dirnctory � . 51,000 � � �
101 - 41l10 -01- 321.0 Taleyhoae Cosb � 533,571 523.719 � . 520,000 � � . 521,000
101 - 41D10 -01- 321.1 MoatLly 8illiagr . � 520,000 521,000 � � �
101 -�41810 -01- 312.0 Postage Coati �f11,669 511,669 � 531,000� � 512,000 �
101 - 41810 -01- 322.1� Geaeral Poskage Cost� � 5�11,000 . 513,000 �
----'-"'-'-"""""""""--'--"""""""'-•--'----"'-"' .
- PLCY TOTN.S 5132,645 �5196,313 $155,100 $155,100 5161,350 5161,350 . �
� 199� SIIDGSf KORICS�8S3 � . � � � � � � �
. .GENiRAL COVYiNI�iT - 41630 • . � � . .
Jua� 26, 199] . , � . . 1443 OSJECT� 1993 199� ODJECT 199! � �
� � 1991 199] DBiAIL LDOP2� DETIIZL pAOPOS� � .
zt,an a��o�e � obj r Ducriptioa 71CT07�7. 71CTII]�L ]JtOONT BDDGYT 7�1tOQNT DIIDGBT Co�nt�
101 - �1610 -01- 339.0 Othez Traaiportatioa H�ryaasn� �59ti2 ;82! 5300 51,000 �
101 - 41l10 -01- 379.1 C�aeral Co�b� . 5200 � 51,000 �
� 101 - 41l10 -01- 311.0 moployaeat hdvartisiag � � SO 5211 g0 SO �
301 - 41E10 -01- 341.1 � � $0 SO �
� � 101 - 41l10 -01- 351.0 L�gal Noticu Pablishiaq � SO SO - 51,200 510,000
101 - 41l10 -01- 351.1 Notices CwCr-a11 Depts 51,200 510,000 � � �
101 - �1610 -01- 352.0 Gmaral Notieei 4 Pub11C Ia10 5�.7�2 SO SO �L7.200 �
ioi - uaio -oi- ss2.i so s�.�oo
301 - 41610 -01- 415.0 OtDar =quipmeat Reatel S40 �� SO SO � $0
� 101 - 41E30 -01- 415.1 � � � � � jp . j.p � •
301 - 41l1Q -01- 439.0 OtLer Yiscellaa�ous CLazges . SO 569 i0� � SO � �
� � . 101 - 41810 -01- 439.1 � ;0 SO . �� �I
� � PLGY TOTN.3 � 55,753 Sl,iZ4 51,400 - $1,<00 S1E,200 � S1l,200 ��
D8PId[17�P7' TOT7ILS . 5138,39! 5197,436 5156,500 5156,500. 5179,550 5179,550� � . �
� Pa4� Ona . � . . . .
�. � � � 1994 EDDCM NOR[S8=STS � . � . . � .
.. � � PLIRatII70 DSPARTI�iS - 41910 - � . . . .
� � Saptemb�r 15, 1993 � 1993 OSSSCT � 1993 1494 OEJiCT 1994 �
� � 1991. 1992 DET7IIL ADOPT� D=TXSL . PROYOSm � �
� . Pund Jlccouat R Obj � Ducriptioa aC19LL ACNI�L .NtOONi' � SIIDGBT ]11[OONT �BIIDGST. Co�ants
"""""""""""""'_"""'"_'__"'___"'_"""""""""""'."""""""""""""""'.""'_""""""""""_'_"""""""'
101 - 41l10 SO1.0 Salariu a Dm�tit� 5192,138 5121,l87 � .;139,�07 5140,l96 L11 Salary CosG Iaciwi�� oL �
� 101 - �1910 -03- 101.0 L. Traa��, P1aaaSaq�Dir � � 5�62,39� 561,246 Sa�ary, Tucei, fPIG L�SinsliG
101 - 41l10 -03- 101.0 D. Quintw, Plaaaiag S�ctry � 537.956 � 539,686 . .
101 - f1910 -04- 101.0 R. Pursoa, ]ust Plaanac � 539,052. ;39,960 �
SO1 - 41l10 102.0 Pull-Tia� Ovartim� � 51,679 53.0l3 56,000 56,000 � �
101 - �1910 103.1 D. Quiatus � � � 5�.000� 5�.000 �
� �� 101 - �1930 103.2 � A. Fur�oa � . S*.000 �54.000 � �
101 • 41930 -99- 103.0 Part-Tima Salari�a 4�Seaetits 57.37! 55,900 � i4.500�. . 59.350 �
� 101 - 41910 -99- 103.1 Plaaaiag Ca�missioa � 54,500 54,500 � 5 Ysmb�rs • t35/Yaat�ag �
301 - 41910 -99- 103.2 P1aaalaQ Sntesa(13 Meslu) � � =4,750 � � .
101 - 41910 -01- 202,0 Duplicatiag 4 Copyiaq SO 53� 5300 $300 �
101 - 11910 -01- 302.1 Zoalag/Subdirisa Ordlaaace � � 5300� � ;300 �
101 - 11910 -01- 303.0 Yriatad Poxms a Paper � � 5290 t0 � SO � SO I
101 - 41910 -01- 203.1 � � .� t0 SO . '
101 - 41910 -01- 205.0 Drattiag Supylies SO � 5995 5160 5160. � �
101 - 41910 -01- 205.1 Yiacellaasow Supplias 5160 . 5160 � �
� 101 - 41910 -01- 209.0 Othez OLLice�Supplies . SO 51,097 SO SD �
�101 - i1910 -01- 209.1 � $0 . SO � � .
101 - 41930 -01- 212.0 l[otor funla � $1,006 595 � �SO SO � � �
101 - 41910 -oi- 213.1 lord T�yo � �� � 30 .SO
�101 - 41910 -01- 241.0 Small Sool• � , 564 � SO SO � 40 . .
101 - 41930 -01- 3�1.1 . SO . � SO � � �
101 - 41910 -01- 242.0 1[inor Lquipaaat SA 5297 SO 575 �
301 - 41910 -01- 243.1 Di�tation Equipmeat SO S75
101 - 41910 -01- 30�.0 L�gal Yp� 5198 S17 SO . .5750 � �
101 - 41910 -01- 304.1 Contingaaciu � ��� . � SO . 5750 , �
101�- 41910 -Ol- 305.0 ]qdiul 4 D�atal Tees . � � � f0 � -SO � � SO SO .�..
� 101 - 41910 -01- 305.1 � � SO - � � SO � � �
101 - 41910 -01- I12.0 Contract Iaapectioa ieu 51�,l40 SO 50 - � SO � � �
101 -� 41910 -01- 312.1 � � � SO � � SO � �
� 101 - i1910 -01- 313.0 2empozary Servic• Ta�a - 5955 SO SO .SO �
101 - 41930 -01- 313.1 � SO SO � �
101 - 41910 -01- 319.0 OtLer ProLesaioaal Sarriea� 531,592 521,686 .� � $3,120 . 51,500 � . �
301 - 41910 -01- 319.1 Dakota Couaty Property Deta � � 52.320 � 5500 . � � �
� 101 - 41910 -01- 319.2 � Ordinaae� Codllieatioa . 5800 51,000 � �
SO1 - 41910 -01- 321,0 Radio Vaits � 5137� SO SO � �SO �
. . 301--- f1910 -OS- 323.1 -.-.-. .. .. . . . §0 .. . . . .. � $0-. . . . � � .
� 101 �- 41910 -01- 32l.0 OtLer Co�uaieatioa Costs�� � 5393 - 50 � � � . � � SO � � �SO � � �
101 - 41910 -OS- 329.1�� Mobile Phoae SO $0 .
. S01 - 41910 -01- 331.0 Travel fixpeata � - $199 5187 . 5450 5450
201 - 41910 -01- 3]1.1 AeQ, State i Local-0oat � 5300 � � 5300 � � � �
101 - 41910 -01- 331.4 Hiscallaaeous Exyaasss . . 5150 5150 � � .
� 101 - �1910 -01- 351.0 Lagal Notices.Publishiaq ;15� SO . � .SO � 51,600
101 - 41910 -01- 351.1 . $0. 51,600 �
i01 - 41910 -01- 391.0 P.C. Mainteaaaca SO 5255 - � SO SO �
101 - 41910 -01- 341.1 � $0 SO �
� """"""""-""""""""'-"'_""-"'-"""""'-"-"' .
PaGB TOT7�LS ��� 5250,884 5156,532 5153,932 5153,932 5160,961 � 5160,9l1 � � � � �
Yay� 1Mo . . � . . . .
1994 DIIDGBT MORICSHLER'S � � � � . �
� � YI.7�NHING DYYAATI�iT • 41910 - � � � � . . �
Septembar 15,� 1993 1993.OSJ8CT 1993 1994 OBJBCT 1994 � . � �
� . . 1991 1992 - DETEIL �I�DOPTm DETAIL �PIIOPOS� � �
lund Aecovnt # Obj r Ducriptioa ACTU71f. xCLRAL axOIIti� HIIDGYS 111tOIINt � DIIDfiET. Co��at� . � �
"""""""""""'_""""""""_"""'""""""""""""""""""""""_""""""""""""""""""""""""""'._.. .
101 - 4Y910 -01- 392.0 P.C. 1�eeessorias c Supplias SO 5502 � ��i410 � �5205 � �
101 - iil10 -01- 391.1 P.C. Acc�ssoria� 5310 5205 � �
101 - �1910 -01- 39Y.2 Phoa� Lia� Iast�llatioa � � t100 � � � � SO � � �
301 - 41910 -Q1- 393.0 P.C. Hardras� PurcLasas SO 5827 SO �� SO �
� 101 - 41910�-01- 393.1 � SO �=0 �
SO1 - 41910 -01- 794.0 P.C. Soltrara PureLasas SS7 id14 SO 5205
� � S01 - 41910 -01- 394.1 IItilitiaa/IIpgzadu � 60 � 5305 � �
101 - �1910 -D1- 431.0 Aua 4 Subscriptioas � 51,073 $1,10� 51,240 �S1,210 � �
SO1 - 41910 -01- 433.1 LP1�/AICP Itesbezship� � 5310 � �� . 5330 � � �
� 101 - 41910 -01- 433.2 IIA3SA Xsmbership . . S!0 � S!0 � �
101 - 41910 -01- 433.3 � Planaers 7Wvisory Sarviu 5350� � . 5350 � .
� 101 - 41910 -01- 433.4 Yi�eellaaeous Ymbezship� 5300 5�00 �
. 101 - 11410 -01-.l33.5 Subseriytions . 5700 � . . 5300
� 101 - 41910 -01- 435.0 Eoo]u i Pamphlets . 5596 S2a6 E300 � � � 5300 �
101 - 61910 -01- 435.1 Ylaaainq Eoolu . 530Q � 5300
101 - 41910 -01- 437.0 Coalermeas i Semiaari 51,363 51,050 S1,l00 � S1,E00 � �
301 - 11910 -01- 437.1 P1�naiaQ Coaf-Dizector 5300 � 5300 � � � � . � �.
101 - 41910 -01- �37.2 State Coai-7u�'t Plaaaer � 5200 S]00 � �'
101 - 41910 -01- 437.3 Loeal Coaterences/Seniaars 5300 5300 �� .
101 -�41910 -01- 437.4 Plaaaing Ca�fasar 1Yaiaiag� � 5250 � 5250 � � .
101 - 41l30 -01- �3T.5 S�cr�tarial 1Yciaiaq Sx50 5150 � �
� 102 - 11910 -01- 437.6 Co�putar iraiaing . 5600 5600 � �
101 - 41l10 -01- 439.0 Othar Yi�c�ll�aeous Chargss t141 5160� . 5300 5300
. 101 - 41f10 -01- 43f.1 ll��tiaq Lsy�aa�s � . 5150 5150 � � � �
� � 101 - 41l30 -01- {�f.2 YS�eallaa�ous�CLarg�• 5150 � . 5150 � � � ��
� 101 - 41l10 -01-.570.0 Ottic• Zquipaaat z luraiihiaqs -SO � 5359 SO- � �� . �. � SO � - � � � � . .
� 101 - �1f10 -01-�570.1 � � � � SO � � 30 �
PACY SOtaI.S � 5�.219 55,101 54.OSD 54.050 Si.050 �54,�050 � �
. DiP11Y17mfT 2'02)SS 5354,103 �5161,633 5159,9!] 5157,9l3 5165�,031 � 5165,031 . � �
P�9� On� � � � � � � . � � .
• � . � � 1994 DDDGtP NORLS88ET8 � � � . �
COViRDA�7T EIIILDZNGS - 41940 - . � � � � � �. .
�� . Sept�mb�r 15, 1991 � . . . � � . 1993 OBdECT� �1993 199f OSJtCT 1994 � � �
1991 .1992 � DiTAIL.� ADOPTm� D=TLIL �YROPOSm � . �
. Pund Aecouat�• Obj � Dascriytion . ACTRAL I.CiV7�I. Al[OONT � DIIDGBT . LItOODIS � DQDGET Cos�nts � �
"'_"""""""""'."""""""""""'__"""""""""'_"""""""""""'_..�..""""""""'_""."""....""..._�....:"""'
� 101 - 41940 -01- 211.0 Cl�aalaq Supplias � 5259 t0 =0 � � . �0 � �
101 - 41f40 -01- 211.1 � - SO f0 � �
� 101 - 41l40 -01- 219.0 Oth�r Op�ratiag Supplia� 836! $0 � SO � 5300 � �
101 - �19�0 -01- 119.1 Zc� Coatrol Chemieal• . � � E0� � i300 -.
SO1 -�41940 -01- 223.0 Duildiag R�yais Supplip S�.O55 56,213 56,800 50,176 �
101 - 41940 -01- 223.1 Aayair Caraga Dooz� 51,000 �� i1,000 � � �
201 - 41940 -01- 223.2 1[iscallaaeow�Eldy Aepairs 57,500 S3.D7E �� Enqiaaar's Closat additioaal �
�. � , 101 • 41940 -01- 123�.3 Ananal RP2 Znsy�ctioa �;2,500 � - .$2,500 . �
� 101 - 41940 -01- 223.4 Llactrlul Aepairs � � id00 � . . SS00� � � � �,
101 - 11940 -01- 225.0 Laadscayinq i4tar�ials , 5412 � Sa . 51,500 51,.000 . � '��.
� 1D1 - 41940 -01- 225.1 Timbars, •tc. . . SS00 � SS00 . � � '
_ . ._ . . .. . ... ... . . . . . . . ..
� . 101 - 419�0 -01- 125.2 Tr�es 4 Shrubs � - � $1,000 � i500 � �
101 - 41940 -01- 3t1.0-S�all Tool■ � 537 SO � 5100 5100 � � � � . �
101 - 419i0 -01- 241.1 � � . 5100 � � 5100 �
101 - 41940 -01- 242.0 Yiaor tqulp�eat . $0 SO S10D 5100 � �
101 - 41940 -01- 342.1. . 5100 � 5100 �
101 - 41910 -G1- 302.0 LzchiteeG' Peni � SO 51,534 � � 5500 � 5500 � � �
� 101 - �1940 -01- 302.1 � � � � 5500 5500 � � �
S01 - 41940 -01- 319.0 Otbar ProieesSoaal Sarvices � 55,210 $4,676 . �54,500 . 54,500 �
101 - 41940 -01- 319.1 Sla�ator Nainteaaaca . 51,000 � 51,000 � �
. � 101 - {1940 -01- 319.3 Hutiag/Cooliag Naiateaanea . 53.500 � 53,SOQ� � � � ..
� 101 - 419f0 -01- 361.0�=l�etrie IItilltias 520,268 519;140 � S1E,500. � Sid,500. �
� 101 - 41l40 -01- 361.1 � � S1D�,500 � ;iL,500 � .
� 101 - 41l�0 -01- 383.0 C�s IItlliti�s S1],003 513,734 � 512,000 512,000 � �
� 101 - 41?�0 -01- ]D3.1 � 813,000 � 512,000 � �� � � .
� 101�- �1l40 -02• 36�.0 R�ius� Disyo�ai � 59.243 511,724 � 513,000 511,600
101 - 41940 -01- 384.1 � Geaeral Eldgs 4�Parka- � � �-� . ��-513,000 - ��511�,600. � � � �
101 - i1940 -01- 3�9.0 Othaz IItility Sarvieu � � � 563 SO . 51,200 � 51,200 � � � �
. 101 - 41l�0 -01- 3l9.1 lloor�llats-xoathly Ctuzgu � � $1,]00 . ��51,200 � � �
� 101 - 41940 -01- �01.0 Coatract�d IIuildiag Aepaira SO 52.38] . 52.500 . 52.500 � �
� - 101 - 41940 -01- �401.1 OuUid� Vsador nldq Aepaizs 52,500 - 53.500 � . . �� � . .
101 - 41910 -01- 413.0 Eulldiag�Auta1 � . 55,646 58,097 $12,000 . 512,000 � � "� � - � �
� 10i�-�41940 -01- 413.1 � - O-of Y SGoraqa � � � � � � � 512,000 ��� � �512,000 � . - � �� ���
lpl - 41940 -01- 415.0 OtLar Yqulpmeat Aeatal � SO �SO � � 5400 . 5400
101 - 41940 -01- 415.1 Carpat�Cl�aaer � ;400 5400 �
101 - 41940 -01- 439.0 Othar ttiscellaasous Chargea 5650 SO 5500 . . .5500 �
� . 101 - i1940 -01- 439.1 Other Buildiag�Cherges � � � 5500 � 5500 .� � _ � � .�.
. P11G8 TOT7SS - . 558.213 .565.449. 572.600 S7I.600 573.276 573.278 � � .
� � � DSPAATI�iT TOTIU.S . . . .. . ESl.213 $66.499 572.600 574.600. 573.2�8 ��573.275 � . � . . . . �. .
� � Paq� Ona . � . . � . . . .
• . 1994 D9DC8T NORICSS8iT8 . � . � .. � �
POLICt DYPART1�iT - 42110 - � . . � � . � .
. Saptembar 15, Y993 � . � � � 1993 OBJECT 1993� 199• OnJECT 1994 . . �� .�
� 1991 199Z DSThSL LDOPTYD Di27�IL PAOPOSm � . . � � . . .
� . Puad l�coouat #.Obj i .Daseriptioa ACT01lL hC1911L 7JtOOHT . BIIDCBT �IdODH2 ELTDGYS Commts � � . �
101 - 42110 101.0 Salariu 4 Beaallta 555?,867 $549,569 5671,132 � 5762.676�A11 Salary Costs Iaelusiv�oL
� 101 - 42110 -02- 101.0 L. tnuGen, Poliea ChieE� � ;65,787 � 566,l41� � . Salary, Taxae, FY1G a Ean�iits�
101 -��1130 -OS- 101.0 D. xuhns, L1ant�naat 555,596. � SSl,619 � �
101 - 42310� -01-.101.0 J.. 8ricsoa, ?�am Sarg�ant . � - 553,137 �_. 552,l34 . .�
� 101 - 12110 •05- 101.0 J. O'fwary, Taam Sezqaant � SSS,Sl4 553,32E� . �
� 101 - 43110 -06- 161.0 D. DurkLaltez, Patrol OLZer � � 552,716 456,029 �
101 - <2110 -07- 101.0 . C. Thor�tad, Fatrol OlLiur . � 547.575 � 553,562 .� � � � �
� � �101 - 42110 -08- 101.0 N. O'Doaaell�,�Patrol.0lLicz 551,0!! SSG,029 � � � �
101 - 42110 -09- 101.0 � Y. Aobid�au,� Pa[rol Otticar � 553,033 555,372 � � ��
101 - 42130 -10- 101.0 J. Sa�ers, Ystrol Otticar . � 552,102 � SSS,39!
. 101 - 42110 -11- 101.0 D. MeaGh�ztord, Patrol OL! . ;54,009 � SSi,029 � � �
. SO1 - 42I10 -12- 101.0 T. Yuzphy, ?atrol�0lLieer � � � -. S�{.403 � . 552,376 • � �
. 101 - �2110 -13- 101.0 S. Eaberg, Patrol OLticer 529,136 � 544,642 . . �
101 - 42110 -14- 101.0 Ner Patzol O!liter . 59,920 � �f'14,226� � � �
� 101 - 42110 -20- 101.0 D. YarthaUr, Admin Iu�t � 53E,714 539.53! .
101 - 42110 -21- 103.0 J. Dri�eoll, P/T Secretasy . 511,432 $17,940� � �
101 - 42110 102.0 Overtime � � � � �521,300 �
� 101 - 42310 -04- 303.0 J. Ericsoa, Seam Sergeaat. � � � �;330 10��8ours •�21.T707/Sr x 1504 � ',
101 - 42110 -OS- 103.0 J. O'Leary, ?eam Serqeaat - 53;0 � 10 8ourt.0 21.9841f8r x 150t
� 101 - 42110 -Q6- 102.0 E. Durkhaltez, Patzol Oftcr , . . 52,350 75 8our� • 520.9166/Hr.x 150��
101 - �3110 -07- 102.0 C. Thozstad, Patrol Otticer . � . � � 52.350 � 75 Hours ! ;20.9166/Hr x 150} �
101 - 42110 -0l- 102.0 x. O•Doaaall, Patrol Offier � . .52,350 75 8ours • 52G.9i66/Hz x i50t
101 - 42110 -0l- 102.0 Y. Robidua, Patrol Oflicar � � . . 53.350 _ 75 Sour� • 3�0.9166/Hr�x iSOk
101 - 42130 -10- 102.0 J. S�azi. Patrol O!liear � � � 52.350 75 Hcur� • 5�0.9166/Er z 1SOk
iQl-- 42110 -11- 102.0 E. M�athaztord, PaGrol OL€ � � � 52,350 , � � 75 8ouzs • 520.91t6/Sr x i50t
� . � 101 - 43110 -12- 102.0 T. Yusyhy, Patrol OLileer� � . � . � � .� � . 53,180 � ��- � 75 Hours�•;19.3l25/Sz x�1SOt
� ��� -101�- 42110 -13-�102.-0� S.�D�basp, Patrol�OtLiclr----- ---� �� . - �� - �- ... -�� 51,940- - . - ��.� 7S 8ours-i�317.3706/Er-x�iSDt�- � � �
� � 101 - �2110 -1�- 10].0 Nw�Patrol OLlSe�z � � $1,810 75�Hour� • 516.0931/8r z 150i �
� 101 - �3110 -20- 302.0 D. Itatihalar, Adnia Jurt •� �� � � 5610 . 2.S�Houzs i 516.3123/Sr x 150'k �
� � � 101�- �2110 -OS- 202.O.Duylicatiay 4 Copying . SO � SO � . 5533 5500 � � � � �
101 - 42110 -�1�- 202.1 lila D���lopinq CosG ` - � � 5533 � 5500 � � �
101 - �2110 -01- ]07.0 ?zataiaq i 2nstruetnl Suppliu 55,2�1 5444 � � $7!3 5900 �
101 -. 42110 -Ol- 207.1 PraeCiee 7�wilioa � 5533 �� �.i600 -� -� � � � �� � '
� 101 -�t2110 -01- 2Q7.]-� 1liscellaaeous Ia�tsuetioaal SS50 � 5300 � � �
101�- 42110 -01- ]OE.O Yiscallan�ous Suypliu � 52.065 . 53.170 � . 50 � SO �
101 - 12110 -01- 108.1 � . SO . SO .
101 - 43110 -01- 409.0 Othaz OLtice Supplies � � 51,431 �51,535. � � 51,598 � � . $1,600 . - � � �
lU1 - 43110 -01-�209.T Miscellaaeous Supplie� . - � � � . 51,598 51,600 � � . �
� 101 - 42110 -01- 211.0 Clesaiag Suppliei � � SO � S0. ;214 5200 �
101 - 4ri10 -01- 211.1 Slankat Clsaaiag � 510� . 3100 . � � �
101 - f2110 -01- 211.2 Squad Iaterioz Cluaiag � � � � � � ��5107 5109 � � . . �
101 - 42110 -01• 112.0 1Sctor luaL � i11,9�7� � S1D,553 � 50 � SO � �
101 - f3110 -01- 212.1 � � SO � ;0 . � .
101 - 42110 -01-.313.0 Lubricaats i Ldditivu $0 t0 � $0 �. S0� . . .
101 - 42110 -01-.213.1 �SO SO .
101 - 47110 -01- 217.0 Clothing.xllovaaca - Poliu � $0 � S0 . 51,000 . �SO �
101 - 42110 -01- 217.1 New Ofiicar 111 5500 � . SO � �
� 101 - 43110 -01- 217.2 � Nev OLiieer Ik2 � � 5500. , SO �
P71GH TOTALS � � � 5578,481 5614,270 5675,260 5675,260 5781,176 ;767,176
PaQ� 11ro� � . . .� . . � .
� � 1991 DIIDCET NOA7.S8EHTS � � � �. . � �
POLICi DYP71R17�iT - 4]110 - � . � . . . � .. .
Saptamb�r 15, 1993 � � . 1993 OEJBCT 19l3 1944�OEJYC! 1994 � � � �
1991 1992 DBTAIL ADOPTID DLS712L PROAOSm � . � �
PuaA Accovat • Obj � D�aerlytioa I�CZV7�L ACTOItL Al[OOt7T DODGHS a7[ODNT SIIDGSI Co��at• �
-"""""-""""""""""""""""-"""""'-"""'-""""""""""""""""""'�.....__..."..'�""""...""".._-._..""-"'
� 101 - 42110 -01- ]19.0 Othaz Oparatiaq Suyyliu 517! i295 � 5293 � t300 �
101 - 42110 -01- 219.1 Duty 7�unitioa � � 5293 . 5300 _ � � � �
� 101 - 12110 -01- 221.0 Equiymsat Yuts 54,923 54,513 . 51,065� 52.500� �
� 101- 45110 -01- 221,1� ltiseellaa�ous 8quip�aat 51,065 � � S�.S00 �
. 101 - 42110 -01- ]12.0 Tis�� 51,463 51,�9! $0 t0
lOS - 42110 -01- 212.1. SO . SO . .
101 - 42110 -01- 211.0 9ma11 Sools � 5�64 5127 5160 . 5150 � .
102 - �2110 -01- 241.1 1ti�eallan�ow Tools . 5160 5150 �
101 - 42110� -01- 304.0 Leqal !�u � ��� 536,l71 547,000 551,400 253,000 .
101 - 47130 -CS- 30t.1 Pro�ecutioa � � � 551,400 552,000 .
. SO1 - ti2110 -01- 305.0 8edieal 4 Dmtal laas SE63 8766 .51,000 51,000 � � �
� 101 - 42110 -01- 305.1 1[iscallaasous Y�dical Co�ts � 51,000 f1,000 � � �
101 - 42110 -OS- 306.0 Peraoaaal Tasting a Aacsuitmat � .$0 51,861 � . 53.700 � SO �
101 - 42110 -01- 306.1 H.p.A.S. leas 51,500 50 � � �
301 - 42110 -01- 306.4 Prychologieal T�atiag � � � 5600 . 5�
101 - 42110 -01- 306.3 Pze-8mploymaat Physlcal■ $1,200 SO � �- � �
SO1 - 42110 -Q1- 306.4 Hepatitis •8• Vacciaations 5400 SO
101 - f2110 -01- 112.0 Coatraet Iaspeetioa Peei SO $6,700 � � 58.300 � 58.200 ����
101.- l3110 -01- 312.1 Aai.mal Mardea Teei � 56,]00 56,300 � �
� 101 - 4211D -01- ;14.0 Othar Protassioaal.Snzvicu 570,170 $Y7,250 � � � 523.500 SZ7�,325 .
101 - 41110 -01- 319.1 Di+paCcL Sasvica-Eagaa 523.500 � 537.335 � �Spaeial Phoa� Charqb Also �
101 - 4]130 -01- 331.0 ialfphoaa Co�G � =0 53,050 53.400 � �52.700 .
101 - 42110 -01- 331.1 Gllular PLoae aills � 52.400� t2.7Q0 .
� � � 101 - 42110 -01- 323.0 Aadio Oaits . � . 54,997 . 53.499 52�130 � � S3,Q00 - �
101 - 42110 -01- 33D.1 Aadio G Radar 3teyair� � 53.130 53,000 �
.. . 101.._.4]110 -Ol- 371-.0 2z�r�1`Lxpaaa• . .. . ... 5�6!�� : SS33 - . _ � 5800 � . .. . 5800 � . .. -.. .. - - . .
- 101 - f1110 -01- 331.1 '��I[i�cellaa�ou� Lxpaasas � � 5800 �� - � � 5800 ��� � �� �� �- � � "�- � �
101 - 12110 -01- 391.0 P.C. Malat�aaac� � SO . 5109 � . � 5250 � �� ��5250 � � �
101 - 42110 -01- 191.1 Y1iCallaaaoui ttaiatenaaea . . 5250 � 5750 � � �
iD1 - f1110 -01- 396.0 Computar )falateaaace � 59.066 58,344 511,84'E� � 513,740 �
� 101 - 42110 -01- 396.1 �iTOAS 1Liatenaae� . $9,285 � � 510,460 � �
101 - 42110 -01- 396.2 . Pack ClaaainQ � . 5760 . � 5760 . � �
� 101 - 42110 -01- 396.3 CJDN Hook-np Chargu � � 51,803 $3,520 �
101 - 53110 -01- 397.0 Ca�utar 7�ccassoziu 4 Supply $4,�l73 54.426 � SO � . S� � � � ��
101 - 42110 -01- 397.1 � � � SO � .� . .
-_ 101 - 42110 -01- �09.0 Other Coatrsetad IIepair c Naia 51,.075 �� Si�;081. � � � �� � �51,500� ��: � � � 51;500 '_.... � - . .
. 101 - 42110 -01- 409.1 Outdoor Siren R 4 x . 51,500 51,500 � � . � �- � � �
101 - 42110 -01- 415.0 Other Hquipmmt Reatal � .512,122 55,289 54,800 54.D00
� 101 - 42110 -A1- �15.1 Aaimal Gra, Shamrock, atc. 34,l00 54.800 �
� 101 - 42110 -01- 433.0 Dua� i Sub�criptloas � � � 5365 5255 5500 � � 5500 � � � �
l0i - �2110 -01- 433.1 Ylscnllanaow 5500 5590
�� 101 - 42110 -D1- 135.0 Sooks r. Pamphlats $530� 5230 5300 � .$300
. .101 • 42110 -01- 435.1 Hi.scallan�ow 5300 � � 3300 - �
101 - i3110 -01- 636.0�Toring Charges 534 .� 5184 �fZ00 . 5200 �
101 - 42110 -01- 436.1 IIaaaticipated Toxiag � . . � � $200 5200
101 - 42110 -01- 437.0 Coatareacas 4 Semiaarr � � $314 53.719 � 55,400 55,000 �
101 - 42110 -01- 437.1 Hiscallaaeons Traiaiag. . . $5]5 � 5500 . �
101 - �2110 -01- 437.2 OfEicez Traiainq Cost� S�.a75 � 54,500. � � �
PAGE TOTALS 5100,190 5119,8]3 5119,446 5119,446 $124,265 5134,265 � � . � .
. � � � . DSPIvtT!ffi7T TOTIS,S . $678,771 5734,092 ;794�,706 � $794,706 � 5911,441 5911,441 � � -� � �� �
, Paq� Oa�� . � � . � .
1994 EIIDG=T MORL4HfEi8 � . � �
PIRB ABPNtT1�iiT - i3210 - � . .. �
. 5apt�sh�r S5, 1993 1993 OeSBCT 1993 1994 OBJYCT. 199� � . �
� � � 1941 . � 1993 DYTAIL � LDOP'Pm DlTAIL . ��PROPOSm � .
Puad Account • Obj t Ducriptioa� � I�CRVA7. 7�CTOAL A7SOONT aOnC=T �NtODN? DIIDG2'L Com�nts
101 - 43210 103.0 Salariu 4 Daaafit� 5100,384 �5113,499 Silt,382 S11l,901 L11 Salary Cmts Iaclusiv��oL
301 - 42230 -02- 103.0 Pir� fall�, TralalaQ, ete. � � 596,?70 t9i,896 . Salary, Sucas, PYB� 4�E�a�lSts
101 • 42T10 -03- 103.0 G�ozg� Luady, fir�ISars]ul 519,612 520,005 . 1/3 Tim� Positlon �
101 - fS210 -01- 101.0 O!lie� Accaswries� 596 50 SO SO � �
101 - �2210 -01-� 701.1 . . s� � � . �
� 101 - 42]10 -01- 302.0 Duplicatiag a Copyiag S94 . SO . 5�60 - ¢260 � �
� 101 - 42110 -01- 207.1 Sarox Dry Im�qa i95 S95
� 101 - 42210 -01- 202�.3 zezox Copy Cutridge S80 SEO
101 - 42210 -01- 203.3 Lasar Yriater � S!5 S!S �
�101 - 41310 -01- 204.0 Eavelop�i�4 Lattnrheads $0 591 5100 $300 � �
101 - 42210 -01- 204.1 .Snvaloya� ... . . .. . . � 565 . . =40 � � �
� 101 - 42410 -01- 204.3�� Letterhead�4 7orms � S35 • 560 � � �
101 - 42210 -01- 309.0 Other Oitiee Suppliat �� 5199 � SO SO SO � �
101 - 42210 -01- 309.1 � � =0 � t0 � �
� 101 - 4]210 -01- 211.0 C1aaalaQ Suppllas 5317 S91 ;300 5290 � �
101 - 42310 -01- 211.1 Soap � . 565 S65 �
101 - 43210 -01- 211.2 Chamo�is � � . 5170 5160 . � .
� �101 - 41410 -01- 211.3 Spoages S]S � �525 .
101 - 42210 -01- 211.4 SCB� Cleanar � 540 $40 . � �
101 - 42110 -01- 212.0 xotor luels � 5978 51,006 SO 8� � ��,
101 - �2210 -01- 212.1 SO . gp � � I,,
101 - 42210 -01- 213.0 Lubricaats i Additivas S1l5 � S0� SO � �SO �
� 101 - i2210 -01- 213.1 SO S� � � � . �
. 101 - 42210 -01- 21L.0 71re Departxant C1otLiag 52.964 5��,069 514D � 51,360 � �
101 - 42310 -01- 21l.1- Gaa�ral Daitosa Co�t� � -- 5140 � � . 51,260 �. � � �
�101 - �2110 -01- 219.0 OChar Op�ratiaQ Suypliu 5540 5872 � � 5630.. �5640 �
� . -��101 - i2210 -01- 219.1 �- -C1o�ufYadieall . . .. . . .... .. . . . .. . � . . �SllO � � � � �. � 5165� - . . . . � _. ..
. � 101 - 42I10 -01- 219.2� Saadagaa . � � � 5110 5120 �
� 101 - �2210 -01- 319.3 8quiya�nt(YedicelL� � � $95 b95 � �
101 - 42210 -01- 219.4 2yoak Su1b . S70 . � �555 �
� 101 - 42210 -01- 219.5 Coasv�abis Hedieal 5175 5185 � � ' �
� 101 - f2210 -01- 221.0 8quiymaat Partr 52.962 54,301 - . SO SO � �
101 - 42210 -01- 221.1 � � .SO � SO
101 - 42210 -01- Z79.0 Other 16aiateaaau Supplie• 54.000 59,746 515,500 535,500 � �
101 - 44210 -01- 229.1 a�rial Txuek{Outside) 512,900 � . 514,900 � � � .
� 101 - �2210. -01- 229.2 Pumper Trucks(Outiide) 51,600� 51,800 � � � . �
_ . .- .101 -�42210 -01- 449.3 . Other . . � � � .. . . � . --� 5300., . . . 5300�. . . . . . � . �. . .. . ..
� � -� �101 - 42310 -OS- 229.4 Vehicle NodilScaGioas ����.� � � � � � -�5500 � �� SS00 �
101 r 42210 -.01- 230.0 8quipmeat Repair Materiale .;1,13! 57T5 � 5450 � 5325 - � �
��r 101 - 43210 -01- ]30.1 Light Sars � � � � 5100 � � $100 � . - �
101 - 42210 -01- Y30.2 Smok� kachiaa S50 S50 . �
101 - 42210 -01- 230.3 Lsatern� 550��� �� S50 . � � � �
101 - 42210 -01- 130.4 Miwellaaeow � � 5100 � 5100 �
101 - 42210 -01- 230.5 Zarox � � 5150 � . � 525 �
101�- 45210 -01- 241.0 Saall Tools � 5448 $681 � 5425 � .5395 �
101 - 42110 -01- 341.1 Jncaa, Sars 4 Other . 5150 5120 � � �
101 - �42]10 -01- 2�1.2 Grsss Fira � � 5325 i�25 . . � � � � �
101 - 42210 -01- 241.3 xiscellaaaour � � SSQ � � �550 . �
PA6H TOT)SS � 5114,298. $133,130 5136,187 5134,167 5137,671 5137,671 . �
� Paga 'ltiro � � � .
� 1993 BOD6YT x0II1CSSESTS � . � - �
� � PIRY DSP11RTl�NT - 47210 - . . . .
Septmbas 15, 1993 � 1993 OSdECT � 1993 1l94 OSJYCT 1994� � .
� � 1991 � 194I DM'AIL ADOPS'8D DETLSL fROPO3ID � '
. .. luad Aeeouat i�Obi� t Dueriytion aC1V11L ACiV1�L AMOQNT SIIDGa'P 1�tOIIHT � EIIDGET � � Co�wts . . . .
101 - �3=10 -01- 305.0 ]tadical 4 D�ntal 7eu ;2,260 52�.661 53,450 53,640�
101 - 42210 -01- 305.1 Lnau�l Sts�ss Ss�ts � . 53,250 � . � �t3,t�0
� 101 - 42210 -01- 305.2 Fa�r4meY CII�eks . Y2�0 50 �
101 • 42110 -OS- 306.0 Parsonnel Tutiag 4 Aacruitant i4,3l8 53.030 . i4,800� � 52.400
�� 101 - 42210 -01- 306.1 N�w Phyaieals{;) � . . 51�,600 51.�l00
1C1 - 41210 -01- 306.2 8epatitis Shota(3) � 51,200 5600
� iCi - 43310 -01- 30d.0 iastsuetors' Peu . 52.356� 51,965 56,740 59,745 �
IQ1 - 47210 -01- 308.1 fira lighter 2 . 51,700 51,665
101 - 43210 -01- 308.2 Zir�t Aespoadar � 51,700 � 52.360 � �
. � 101 - 42210 -01- 30E.3 All Othar 'lYaiaiag Cos G 5450 f915 � � ..
- 101,- 42210 -01-�308.� .Stata lir� School(6) � 5660 � � -� Ss00 � � � �
� � �101 - i2210 -01- 30l.5 Sactioaal SehooL � . SS10 5910� � � �
101 - 42210 -01- 30E.6 Has-YaG Traiaiag(15) 51,�00 53�.075 � .
101 - 42210 -01- 310.0 TastiaQ Scsvices 51,0�1 51,029 � 5250 51,450
101 - 42310 -01- 310.1 � Yumpars 4 SCa7i Hydro Tastag � 5250 51,950 . �
� 101 - 43210 -01- 313.0 Temporary Snrviee Pena 52 - 5�50 51,050 51,375 -
�101 -.42210 -01- 313.1 SCE11 Coatraet�E Maiateaanu . 5850 � 31,150 � �
101 - {2210 -01- 313.4 Zarox kainteaaaee Coatraet � 5200 � � 5225 . �
101 - 62210 -01- 319.0 Other Profeuioaal Serviees 54,125 . SO � � 51,850 � 51,850
101 - 42110 -OS- 319.1 liza PrevenCioa Yaterials 5900 5900 .
� 101 - 42210 -01- D19.2 Szaiaiag.Budqet � � �5950 5950 �
ioi - ���io -oi- a�i.o rai.ynoa. co.0 SiiT 53�a Ssio Ssaz
101 - 42210 -OS- 321.1 CLie!'• Yhoaa 5120 � .5120 � .
101 - 42]10�-01- 3I1.2- Aasiataat Chlaf'• Phoaa � 5120 . - 5120 . ' � �
l0I - 13210 -01• 321.3 Aateu� PLoaa . . . . . ¢150 � 5150. . . . � .-. ...... . . . . �
.. � � 101 - 42210 -Ol- 321.{ Nuserie Pagera � .. . .. � . . . . . . . � - .5120 � �5192 .� . . . � -� � . ..
101 -��2210� -03- 322.0 Yost�g� Costi � � S1E � 522 � S50 � . SSO �
� 101 - 42210 -01- 322.1 IIPS � � . S50 � S50 �� �
�101�- 42210 -01- 323.0 Yadio Daits � � 53.Od0 $1,6G0 � SO � �50 �
101 - 42210 -01- 323.1 � . SO - SO � � � � ,
. � . 101 - �3310 -01- 329.0 Othaz Cammuaicatioa Costs � 5822 51,2H2 . 51,100 . 51,�000�� � � '�.
� 101 - 43210 -01- 329.1 Pagni Anpairs 520Q 5300 � .
101 - 42210 -01- 329.2 Hand Held Radio Repairs 5300 . 5300
101 - 42210 -01- 329.3 Mobila Radio Aepairs . 5400 � 5300 �
101 - 42210 -01- 329.4� Base�Repairs � , $200 � 5100 .
- �---� 101 -_.42�210 -01- 331.0 Travel-8xpanse � 51,911 52,0�2 - . ;3,510 � _ � �;4,060 .�� � � � � � . �
101 - �]210 -01- 331.1 . Xian Chiet'■ CoaEereate . 2600 � � $750 � �� � �
101 - 42210 -01- 331.2 State Pirs Contermea 51,200 � � 51,200 � �
. . 10i-- 42110 -01-�331.3 � Sectioaal Schools � $510 � -� .5910� �
101 - 4221D -01- 331.� Natioaal Coai/Aeeademy . 51,200 51,700 . � �
� PAGB TOTIS.S 520,139 � 514,361 5�3.310 523,310 526,852 $26,l52 � � �
• Pag� ThrN � � � � . � �
� . 1993 DDDCBi MOR7CSSBETS � � . . � � : . . .
- PIRs DSPNtT�72 - 42210 - � � � � � .
� . Sept�mbaz 15, 1993 � 1993 OEJECT 149� 1494 OSJSCT 1994� � � �
1991 1993 DBSXIL hDOYT� DET7IIL PROPQS� � � � . �
� Puad 7lccouat�i Obj • Drseriytioa ACPCRI.� aC79AL JUfODi7T EIIDGST 1�l[OUiiT. DOD6S't � Co��ats � �
101 - 42230 •OS- 433.0 Duu i-Svbseziytioas 5451 SS35 ;460 � 5475 � ��
101 - �2310 -01- 437.1 74gasinu � � . S30 � � E30 . � � . � � �
. 102 - 42230 -01- 4D7.3 VTSA Znauranc� . � � $170 �5170 � � � � �
�101 - ♦2210 -01• 4]3.3 Stala liz� � � ;90 � SDO � �
.� 101 - 42210 -01- �77.� Staie Ch1als� . S65 � S65 � � � �
� 101.- 42210 -01- 433.5 DCtC S30 . . . $30 � .
� 101 - 13210 -01- 433.6�. .. 1GLOSA Yutnal Lid $10 � � $15 . � . . �� �
Y01 - �]310 -01- �33.7 Purc]using Coasortivm � �535 � ' � 535. � �
� 101 - 42310 -01- 433.6 Capital City . S25� � S35 �
. 101 - 42210� -Ol- 433.9 72J11[ � � SS SS � � � � �
� �.� 101 - 42210 -01- 43T.0-Coafaraaces 4 Sml.aars � , 5170 � 56�0 � $700 � 5650 - � - � � � -
101 - 44210,-OS- t37.1 Stat� liza Coaiar�aca � � Sl40 � � � . 5440 � � �
101 - 42210 -01- 437.3 Stata Chi�!'• Coatermee . . � 5210 � S210 � �
� 101 - �2210 -01- 437.3 Vo-Taeh 4 Patlqnal � . S50 $0 �.
101 - 42210 -01- 439.0 Othar Mitcellaaaou� Charges 53.355 51.715 � $1,5]S 51,110
1C1 - 42210 -01- 439.1 Pood 4 Cofiea . � S1l0 � 595 � � -
� 101 - 42210 -01- 43l.2 Oxygea 5325 . � 5144 � �
� - 101 - 42210 -01- 439.3 Bxtiaguisher � � �5�50 �. . 5250 �
101 - 42310 -01- 439.4 Pleques. � $20 . $ZO � � �
101 - 42210 -01- 139�.5 Faiat � � � S50 � SSO � �
- 101 - �2210 -01- �39�.6 Othpz � � $!00 . SS50 .
. S01 - 42210 -01- 570.0 Oftiee 8quip a lurnisIIiag Purc 5300 -SO � SO ��SO � � � � �
� � � 301 - 42210 -01- 570.1 SO �
101 - i3210 -01- 560.0 Other 8quipmaat Pureluses . S17,OSS 5675 YO � .SO- �. �� � � �
. . . . . .._-- `-- . . .
ioi - •2�io -oi- sao.i ao
. .� PI�CE TOiALS SZ1,D33� � 54,534 '.SZ-.685 52.685 �52,435 52,735 � �
� DYPl1YTl�f TOTIILS � 5155,771 5153,9�5 5160,182 $160,1d2 5166,758 5166,958 � - �� �
_ Paq� Oa� . �. .. .
1994 DQDCBT NORlSHSITS� � � � �
PIIELIC NORICS/EIIZLDIIiG/ffi7bZNSSRINC - �3100 - � � � �
. Sept�mbar 15, 1997 � � 1993 OSJBCT 1993� � 1994 OEJZCT .199f - � �
. 1991 1992 DYikSL ADOPTm DlPAZL PROPOS� : �
duad Account ��Obj t Daseziptioa . ACIVAL ACTW�L NtpUNT SIIDGYT hl(OUN2 E9DGET � � Co��aG � � ��
. 301 - 43300 101.0 Salarias i S�aaLiG $293,SOi� 5�51,144 - 5531,9�1 � ¢632,41!
101 - 43100 -02- 101.0 k. Ma�muad, P/N Diz(SOt) � � �532.57! 533,3�0 � SOt 6�a'1, 50} 9tiliti�s .
�� 101 - 43300 -03- 101.0 ]S. MSAsGro�, P/x Tormaa 554,997 556,218 � .
� 101 - 43100 -04- 101.0 8. O�muadsoa, Y¢qiaaar � � 553,5T9 . E56,047 L11 Salary Co�ts Iaclusi�� o! �
� 301 - 4�100 -OS- 101.0 D. Dailay, Hngiaaez Sach� 53E,280 539,515 Salary, Taxq,�pmql i E�a�lits �
- 101 - 43100 -Oi- 101.0 A. Lonaquist, 8agiaear Taeh � � �SO =76,00'7� � �
101 - 43100 -07- 101.0 Y. Haimka�, lu�t Sldg dtiel 541,132 t47,104 � � �
101 - �3100 -08- 101.0 x. lriek�, IIldq Iaayector 537.642 . � S�8,Si6 �
101�-�43100 -09- 101.0 .Y. Stoflal, Sldq Sacratary � � � 531,143 ;3�,iSi � � �
� 101 - 43100 -10- 101.0 R. Dasflmeeht, Hsiat ZII 540�230 f43,3l4 � � � � �
101�- 43100 -11- 101.0 D._Jerda, lcaiat 2 . . 531,135. � 533.301 � �
� 101 - 43100 -I3- 101.0 8. Day, Yaint ZI � 534,546 . . � 836,7T0 � ' �
101 - 43100 �-13- 101.0 D. StaulLez, ltaiat I . � $2L,496 � 533.134 � � � � ��
� 101 - 43100 -14- 101.0 Naiataaaaea I ;6,5�0 . S�a�,4�0 � � �
� 101 - 43100 -15- 101.0 D. Saadstrom, 8ech ZII � 539,261 � 539,924 � � �
101 - 43300 -16- 101.0 J. Pr�1ng, 16aiat I SD0,641 � � 573,017 � � �
101 - 43100 -17- 101.0. D. AhldriGh, Yech I � 528,751 '� 533.473 �
101 - f3100 102.0 Pull-Time Overtime 59,009 56,b2! . 516,103 � � 517,954
101 - 43100 -OS- 102.1 B. Sailey, Sagineer Yech 5877 � 58�7 � -� � �
�101 - 43100 -06-102.1 A. Loaaquiit, Sagineer Teeh SO 58�� �
� 1Q1 - 43100 -07- 101.1 P. Haimkas, ]u�t Sldg OLtcl . 5514 . 5514
� 101 - 43300 -0l- 302.1 X. lriek�, lldg Inapector . � 5431 � 5�31 � � �
iGl - �D100 -Ol- 102.1 ]t. StoLLal, E1dq S�cratasy � 5754 5754 � �� �
301 - 4)100 -10- 102.1 R. barlkaeeIlt, yaiat ZZI � 52.295 � 52.295 �
� 101 - 43100 -11- 302.1 D. Jazd�, Yaiat.I � 51,710 � 51,730 - �� � � �
� SO1 - 43100 -12- 102.1 Z. Day, Yaint SZ . � 52.081 SZ.081 �. � � � � � �� .
. � � 101 - 13100 -iD- 102.1� D.�Stauifaz, 16aint Z � � � � � � �� �51,697 � � � � 51,692 � -� � � � � �
_-
. 101 - 41100 -14- 102.1 ldelatenanea Z � �� � � 5427�� �� . 51,341 � � � � � --�
101 - �1100 -15- 102.1 D. Saadstzom, Yeeh ZZZ � 53,384 -� 52.384 � � � .�
101 -- 43100 -16- 102.1 - J. Tr�iaq, ltaiat S� 51,391 . �51,391 � � �.
101 - �3100�--17- 102.1 D. Ahldrich, 16ech I � � � � � 31,557 51,557� � � �
� 101 - 43100 -99- 103.0 Yart-Tima Salariaa 4 SeaaElts 520,�849 533.06II . 513,816 � - 513,216 �
� 101�- 43100 -99- 103.1 Engiaeariag Iateza � � . 510,200 . $0�
101 - 43100 -99- 103.2 P/T Seasonal Maiataaaaee � 512,616 513,216 � �
� 101 - 43300 -01- -201.0 ptLica aeceswries $0 � (571) 51,.3l5 � 51,3lf � � �
. 101 - 43100 -01- 201.1 A�sorted Dept Suppliea 51,065 . $1,065 � � � .
. . . . .101 -. 43100 -01- 201.2 100•.TaDe . . � .. � � .. ��553 .. � .. . . 553 . � .� .. � . . � . �. . �.. .
�101 - 43100 -01- 201.3 Miscellaaews Suppliea 5266 5266 �
101 - 43100 -01- 103.0 Printnd Posma n Payer g0 51,361 � . 51,607 � � 51,807 .
- 101 - 43100.-01- ]03.1� Iaapection c Permit Porms . � . . $1,065 - � � 51,065 � � � � - �
101 - 43100 -01- 203.2 R/x Peimi.t 4 Iaspeta Yorms .� � ;530 5530
SOS - 43100 -01- 203.] Nork Ordar� � $21] . $312 � � .
� 101 - �3100 -01- 205.0 Dralting Supplias � 52.632 S1,OL5 �51,217 . $1,�227 � �
101 - 43100�-01- 205.1 Payer tor ?laa AeprodueGioa ;575 $575 � � �
� 101� • 43100 -01- 205.3 Of1-Site Reproduetioas � . s;26 � 5326 ��
� 101 - 43100 -01- 205.3 Miscellaneous Tools �� $326 � 5376 � �
101 - 43100 -01- 209.0 OtLer Olfica Suppliet. 5601 5525 5533 �5533� � �
101 - 43100 -01- 209.1 Gas Iaspectioa Tags � . $266 � $266 � � � � �
101�- i3100 -01- 209.2 Door itaockers � $267 . . � 5�69 �
""""""'-"--"""""""-"'-'---'-"-'---"'-"--'--""' � .
PaGB TOTa7.S $326,595 5484.940 5575,812 5575,812 �565�6,539 5658,539 � � � �
. Yaq� Two � . . � � � ... . � .
. 19lf SUDCET 1fORLS�BTS � � � . . . � . .
� YIIDLZC NORICS/DIIILDII7C/IIIGINEERILi6 - }3100 - � � � � � ��
� Sspt�mb�r 15, 1991 � . . . � � . 1993 ODJiC! 1993� 1494 OIIJSCT 1994 . � � �
. 1991. 199I � DSTEIL aDOPT� . DETAIL PROYOSm � � �� �
luad Aecouat k Obj t Descriptioa ACT011L aCCOAL � I�kppi7T BIID68T a1[OIIH7 . BDDCYT � ��Co�mis ��� � � �
� 101 - �3100 -01- 211.0 Claaainq Suppliu . 5�41 5325� . 5�26 � j426 � � �
. 101 -�43100 -01- 211.1 Shoy . 5713 . 5213 � � �
101 - 43300 -01- 211.3 Vahielas � 5113 $213 � �
101�- {3100 -01- 212.0 xotor luds . S1l,361 532,25d s36,425 . . � �536,�25 � � � ��
� 101 - 43100 -01- 311.1 Pssblie Norks � � � q12,�l0 � i12,7L0 � � �
101 - U100 -01- 113.2 Pasks . � � F5,325� :5,325
101 - �31017 •01- 212.3 Poliea� � � � $1�,910 � � 514,910 � �
101 - {3100 -01-.212.f 11ra � � . � �$2,663 � �52.663 � � �
101 - �3100 -01-�212.5 hdatial�Gration . E533 - SSD3
301 - 43100 -01- .S12.6 Ylaaalnq 521� � 5214 � � �
. � -� 101 - 43100 -01- 213�.0 LubrltanG i addltives - . 52.442 53,3�0 56,392 � � 56,393 � � � ' � � � �
. 101 - 43100 -01- 213.1 Public Norks 52.663 � 53.663 � �
� 101 - 13100 -01- 313.3 Parks . $1,29! 51,278 � �
. . 101 - 43100 -01- 213.3 � Polica $1,OG5 51,065 �� . � � �
101 -�43100 -01- 213.4 �Yira . � � 51,065 � 51,065 � � �
iCl - 43100 -01-.213.5 Admiaiatratioa� � 5214 5214� � � � �
� 101 - 43100 -01- 213.6 fl�aniag $10? . . 5107 � � �
101 - 43100 -01- 215.0 Shoy Material■ $0 �59,039 � .S9,5!! � 59,588 � �
SO1 - 43100 -01- 215.1 Public Norks � 56,390 � 56,390 �
101 - 43100 -01- 315.2 pazka 51.130 � 52.130 � . � � �
101 - {3100 -OS- 215.3 Poliu � � 5320 � 5320 . � . �
101 - 43100 -01� 215.� Tire � � � ;320 � 5320 � � . .
� 101 - U200 -01- 115.5 � adtiaistratioa � . � � . s314 4214 . �
� - � .101�- 43100 -01- 215.f ?lannlag � � . , � 5214 � . -.�5214 _ � � � � � .
. . _ � - _� . . . � .
- �101 - 41100 -01--319.0 Oth�r�Oper�tiag Supplies� g7,.944 . � SO � � � � SO � 5250 � �
� � � �301 - 13100 -01-� 21l.1 � 711a i.Yi�callaaeow � �' � � - ' �50� - � . �� 5350 � � � � - - � - � � - � .
. 101 - 43100 -01-�221.0 Yquiysaat PerG � 529,]77 534,821 � 538�,0]1 . � � �53E,021 -� . �
101 - 41100� -01- 221.1 Public Morki . � $21,300� . $21,300 � � �
- � 101 - 43100�-01- 231.2 Pazks � � � SE,530 � . 58.520 � - � � �
� 101 - 43100 -01- 321.3 Police � � ' 53,40! � � �53�,408 �
101 - 43100 -01- 221.4 Pira . $2,663 SZ.663 � .
-� � � � � 101 - 43100 -01- Z31.5 xdmiaistration 51,065 51,065 ' � �
- . 101 - 43100 -01- 221.6 Pleaaiag � 51,065 � � 51,065 �
. 101 - 43100 -01- 222.0 Tires � � � 52.f45 ;1,376 55,913 � 55,913 � �
: 101 - �3100 -01- 223.1 Publie Moik� . � � � $2,130 53.130 �
101 - 43100 -Ol- 223.2 Yarkr � . . .. .. -... . .. .. . . . ... 51..065 ... . $1.065 . .�. � . . � � � . .
101 - 43100 -01-�222.3 � Poiiee . $1,757 51,757 � . �
101 - 43100 -01- 222.4. Pisa � . $533 . 5533 � �
101 - 43100 -01- 222.5 Admiaistratioa . � j214 . - 5�14 � � � � -
�101 - -43100 -01- 222.6 Pleaaiag. � 5214 � 5214 �
101 - 4310Q -01- 224.0 Street Itaiataaane� Nateria}�s S0� 5346 � SO � SD �
� 101 - 43100 -01- 524.1 . gp � =p . . . �
101 - 43100 -01- 225.0 Laadacapiag Nat�rlals SO � ;�0� � �. � $0 . � $0 � � �
. 101 - 43100 -01- 425.1 � $0 . SO . � �
� "-""""""""."""""""--"'-"""-'-'--""--'--""' �
.� � PA68 SOT1r.LS 560,710 571,497 596,765 596,765 � $47,015 $97,015 � � �
Faq� Thrs� � � .. � � � . . � .
� 1994 EDDGY2 NOALS�ET3 . � . � � � � . . �
PIIBLIC 110RIS/DOZLDZNC/ffiiGINHBRING - 43100 - � � . . �
S�yt�mbar 15, 1993 . � 1993 OSJYCT 1993 199� ODJLCT 1994 � �
� � � �1991 1992 D8iLIL ADOPTSD DITAiL PROYOS� � �
. luad l�ccovat�t �j t .Dascriptioa �AC1V/S. xC1VNL 111[OONT . DDDGBi AMODNT BIIDCYS .� Ca��nU� � � � � I
� 101 - 43100 -01- 241.0 �all TooL � 51,838 52.551 � 5�.140 54,675 � . �.
101 - 13100 -01- 2i1.1 Yaebaaiea' Shop Sools � � 51,596 � . � . 51,546 . .
1G1 - �3100 -01- 241.2 Truck 2ools � � � � . 553] 5533 � � � � �
. .._101 - 43100 -01-.241.3 �Parka Toola . . . . .. ..$214 � .. .. � 5114 � � �
101 - 47100 -01- 2�1.4 SLov�ls 4 Aaku � 51,1]0 51,130 - � � .
� 101 - i3100�-01- 3f1.5 SaLety squipsaat . � � S6i5 � � 5000 . �
101 - 13100 -01- 241.6 Yi�eallaaaow � � 54D0 . � � .
101 - 43100 -01.- 24�.0 7Siaor iquipaaat � . � 54.710 53.193 � � i215 SS00 � �
�� 101 - 43100 -01- 242.1 35 n[Cameu .. � 5215 5400� �
.. . . _101 -.43100 -01-_303.A Eaqineariaq ��es. . . - . - . S9,d95 511,255 � 514,000 � � - �- -S1i,000 � � � . �� �
101 - 53100 -01- 303.1 . G�a'1 Dioa-PsojeCt Aelated $1,000 $1,000 � � �
101 - 43100 -01- 303.2 . Str�at LiqLt Susvey � �� � 51,000 51�,000 �
� 101 - 43100 -01- 303.3 Traaspoztation Plaa Vpdats � 58,000 SS,000 � .
101 - 43100 -01- 303.4 Pavemeat 16saagmrst S2,OOQ � 52.000 � �
101 - 43100 -01- 303.5 S a 2 Zavestigalioa � � � 52.000. � 52.000 � � .
101 - 43100 -01- 30�.0 Legal Pees 5347 5106 SO SO �
101 - 43100 -01- 304.1 " . SO SO
101 - 43100 -01- 305,0 Medieal 4 D�a�al Pees 3183. 547 5300 ;300 � �
101 - 43100 -01- 305.1 IDmploymmt Physieal• � � 5300 � � $300 �
101 - 43100 -02- 314.0 Coatraet Zaspeetioa Tses SO 528,580 SO � SO
101 - 43100 -01- 312.1 � � 50 �SO � � �
. 101 - 43100 -01- 319.0 OtLar ProEeuioaal Serricea SO 50 52.000 $2,000
l0I -.43100 -01- 319.1 Plaa Aevler � . . � 51,000 . 51,000 � � �
.101 - 43160 -01- 319.2 �. 3rQ Party Tartiag - . � . � 51,000 . �51,000. � � � � �. �
. ... .... ___ . ..... .
�-��� 101 - �3100�-01- 321.0 Talephoaa Co�ts �53! S99 . SO SO � � '
� 101 - 43100 -01- 321.1 � � � � � �SO SO � � �
�'101 �-��7100 -01- 3]3.0 3tadio Dait• t�.69] 5330 51,350 S1",250 � �� -
. 101 - 13100 -01- 323.1 Repair Daita � � � � 51,250 51,150 �
301 - �)100 -01- 37�.0 Yeoenqar Sezvie�s SO SO 5100 � 5100 � � � .
� 101 - 41100 -Ol`S34-.1����� CourieY�3azvie� � ` � �' - ��- � � � � � � � - �`S10P -� � - � � �` $100 - � � � � � �� " � � -�
� . � 101 - 43100 -01- 339.0 OtDar Co�uaicatioa Co�ts 5180 5725 51,565 � 51,565 � . �
� 101 - 43100 -01- 329.1 Calluler Yhoas �onthly Chgs � $1,054 � � S1,p54 . �
101 - 43100 -01- 329.2 Yagar Aaatal SS11 SS11 � �
101 - 43100 -01- 331.0 Traval 8zpeate $48 $101� � 5747 51,727 �
101 - 43100 -OS- 331.1 APNA . 5533 5533 � � �
� 101 - 43100-�-01- 331.3 -� A.S.PIE. � . .. � � 5214 . .. ...-.-` � . S214 � ...-.. . ... .. ... . . ..... . . . .. ....
�101 - 43100 -01- 331.3 Geaeral Meetiag�Expmses � .5980 � � ' � �
101 - 43100 -01- 339.0 Other Traaspostation 8xpaasns � 52 SO 5100 -5100
. 101 - 43.100 �-01- 339.1 Parsoaal VehScle Mileage � � 5100 � . 5100� � � �. � � - - � � �
. 101 -�43100 -01-�3�1.0 8mploymsat hdvartisiag --�- 5309 � � 5260 � � � 5852 � . SO � � � �
101 - 43300 -01- 341.1 euildiag Znspactor � =426 . - SO �
. 101 - �3d00 -01- 341.3 Itaiateaaaea I 5426 SO � �
.....:.101 - 43100 -01-�3�9.0 Other Advarti�iag ..... ... .. ..565 .. . ..5362 . ..... ...... .... . .. S0� . . ... .... ...... SO .... ... .. . . .. . . . . . .
301 - 43100 -01- 349.1 .. s0 . . $0 �
S01 - 43100 -01- 384.0 ReLw�Disposal SO 5946 5=.000 . � 52�,000 � �
101 - 43i00 -D1- 384.1 Hazardow Naata � • . � $2,000 � SZ.D00 �
PACB TOTN.S 522.285 $47,554 527.369 527.269� 52d,117 526.117 �
+ � �Yaqa lour � . . � . .
. 1994 EIIDCIT MOR7CS88E2'S � � � � � � �
PIISLSC MORiS/DIIILDING/ffi7GINSHRING - 43100 - � � � � � � . �
Saptamber 15, 1993 . � �. . 199] OEJECf 1993 1994 OSJZC7 1994 � �
1991 � 1992 D8T71IL 11DOP'I8D DY21�ZL PROPOSm �. �
Yund accouat � Ob� • �Da�eriytioa - aCiVAL ACiUAL � �Al[OVtiS� . BppCg? 1UtpDNT �HUDCEY Co�aats� . . .
101 -�43100 -01- 391.0 P.C. Y�lataaaace SO �372 � � S1.B00 5��,l00 � �
101 - 43300 -01- 391.1 �Gophar�Oaa-Call � . 5500 =500 � �
� 201 - �3100 -01- 391.2 Stata Aid .5500 5500 � � � .
� 101 - 4310D �O1- 391.3 uaaatroa i lastport � S1,t00 . S1,l00 � � � �
� 101.- 13300 -01- 392.0 P.C. Accusoria 4 Supplies � � �SO � S50 . 51,066 � 51,066 � �� �
301 - 43100 -01- 392.1 Yodm � . . 5310 � S3]0 � �
� � 101 - �3100 -01- 3l2.3 . Srainiag Lor 1(aaatroa � 563! � 563! � ..
� . 101 - 43100 -OS- D92.] YrinGer Papar 5107 � $107 . � �
101 - �3100 -OS- 393.0 P.C. 8ardrare Purchaaes $0 SC Sa � 51,500 � � �
. 101 - 43100 -01- 393.1 GopLar I Psizim . SO � 51,500 -
_.._ . . . .. . .
• S01 - 13100 -Ol- 394.0 P�.0. Soltwara Yurcha�as SO ��. $301 . . =1,066 -� � � 5514 � � � � �� �� ��
101 - 43100 -01-�394.1 Geaeral Sottrare Suyport Sd53 5300 .
101�- 43300 -01- 394.3 PDS Dpgrade . $314 5714 �
101 - 43100 -01- 403.0 Coatr�eted R n x-OtLer Imp.rovm ;4�5 $0 SO . SO
� 101 - 43I00.-01- 403,1 � � SO � SO �
101 - 43300 -01- 404:0 Coatraeted 7cach a Squip Repair 51,8l6 S1,SS5 510,440 , $10,440 � � .
101 - 43100 -01- �04.1 Public Morks � - 56,390 56,390
101 - 43100 -OS- 50�.2 �Yarka - � . 5�.130 � 52.130�
101 - 43100 -01- 104.J Poliee $746 � 5746 �.
� 101 - 43100 -01• iO4.4 Pir� 5746 5746 � �
101 - 43100 -01- 404.5 AdnialatratSoa . � 5314 5214 � �
101 - 13100 -01- 404.6 Planalag . S21i . 5214 �� � �
101 -�11100 -01- 409.0 OCLer Coatraetad Aepair� 4 Naia 51,669 51,.405 � SO SO � �
.� � ��. 101 - ��100 -ol- 409.1. - � . . . . _ . . �,50. .. ...� - -.30 � . _ . - �_ .. � . . . . ....
� 101 - 4D100 -Q1- 415.0 Oth�r Squlp�ant Raatal � 535 SO � 5320 5330� � �
... .. - 101 - 43100-�-01-.�15.1 -1[ise�llaaeoua Rental• -... � � . . � 5330 .. � _ .. � �5340 .. .. .. ... .�� � .
101 -. 43100 -01-.�16.0 lSecLinary peatal � � - � S0.��� � 531# � � � � 50 � � - SO � � � � :�
� 101 - 43100 -01- 116.1 � � . � SO �� � � SO � �- �
. 101 - 43100� -01- �17.0 Daiforas Rmtai � 5423 5403 � � $0� SO - �
� � � 101 - 43100 -01- 117.1 - � � � � � � SO � $0 �
� 101 - 43100 -01- 413.0 Duai 4 Subscriptioas� � � $287 Sa10 5690 59E2� � �
� � 101 - 43100 -Ol- 433.1 aYxA � $150� � � � . 5150 ����
� 101 - 43100 -01- 433.5 �ICHO � $75 � S90 � �
: 101 - 43100 -01- i33.3 NPPA � � 575 � i90 � � � .
. 101 - 43100 -01- i33.# CEaM Reqistratioa S50 � . 5192 � �
101 - �3100 -01- 433.5 -Lakn Couatry � . 590 � E90 - � �
101 - 43100 -01- 433.6 � North Star � 590 � 590 � �
101 - 43100 -01- l33.7 Professioaal Secretariea � � $60 . 5180 � � �
101 - 4310� -01- 433.8 Trada Naqaziaes . � $100 � �$100 � �
. PaG8 TOSa7.S � � g4,743 $5,199 516,383 516,383 517,623 317,632 � � �
.. .. .. . � . . . . � `. . . . . . .. . . . . .
f� �Y�y� Tlv� � . � . �
. 1994 DOD6=T MOR1CS8i8i3 . . � � � � �
� PDBLIC KORICS/lIIILDIIiG/IItGIN88pZN6 - 43100 - . . . . �
Jua� 28, 1993 1993 OSdsCi� 1993 1994 OEJYCT 1994 � �
. 1991 � 1992 DY2RIL 71DOFT� DYTAZL YAOPOS� . .
� Tuad l�eeouat f Obj / Ducriptioa aCiV1�L aCPQaL ... ]�MOIINT nIIDGBY' 7utGONT avDf38'P � � Co��at� . �
""""""""'_"'_""""_""""^_"'__""""""""""""""_"""""""___________""""""'_"""'_""""""""".""'._...
�101 - 43100 -01- 435.0 Eooks E Pamphl�G . S�4 51,301 � 52.200� � 52.200 �
. 101 - 47100 -01- 435.1 IIOY'CD 5300 5�00� . � � �
101 - 43100 -01- 435.1 7�Dot Sp�c1a1 - � . 5600 5600
101 - 43100 -01- 435.3 I1Z 5400 � t400 � � � .
101 - 43100 -01- 435.4 Yaaval IIydates . ;1,000 � 51,000 . . . � � �
� 101 - 4�100 -01- 437.0 Coalar�acer 4 Semiaars 5797 ;E72 51,610 54,190 �
101 - t3300 -01- 437.1 Aaaual Duildiag Ofticials . � 5390 5390 -
101 - 43100 -01- 437.2 Camputer Traiainq � 5300 SS00 -
101 - 43100 -01- �37.3 Stat� Coda Samiaars � . i1II0 � 5150 � � � .
� 101 - 43100 -01- 437.4 Clarical 5300 5300 . � .
� 101 - 13100 -01- 437.5 Saka Covatry ICbO � � � � i300-- � � �� .� SSOQ � � � � �
101 - 63100 -01- 43�.6 11PML � - - SO � 5150
101 - 43100 -01- 437.7 CF.WI � SO � 5150 �
101 - 13100 -01- 437.d 7�N1O� � � � SO 5150
� 101 - 43100 -01- 437.9 NTPI�� � SO � 5400 �
101 -.43100 -01- 437 10 Hi�aallaasou� Traiaiaq � SO 51,500 . �
� S01 - 43100 -01- 439.0 Othar Xisceilaaeous Charqes SE4 � 5111 �50 � � S0� � � �
101 - 43100 -�1- 439.1 SO � SO
101 - 13100 -01-�570.0 Oltic� iquipmmt Purehasea 5197 �5890 SO � SO
� 101 - 43100 -01- 570.1 . � � SO SO
� PaCE TOSJILS 51,102 53,171 �� 53,i10 S3.D10 96,390 =6,390
� _ D8Y7�tTl�7T ?OT]�LS � . 5415,436 @612,364 5920;036 572D,038. 5807,683� . 5807.,6t3 � �� �� . . � . -�� � - � -�
Paq� On� � � . � . . �
1994 IIIIDGti MOSlxS88L'PS � . . . . . . � . .
P11VSD STR88TS - 43121 • . .. . � � � . .
� Sayt�mbar 15�, 1993 � . 1993 OSJSCT 1993 . 199� OSJLCT 1994 . � � . �
� � 1991 1994 DSTAIL 7�DOF'i'� DH'fLZL PROPOStD �
lvad Lccount t Obi t �Da�criptlon � aCTR7�L xC7V7J. . 7�ISOIIN2' SDDcaT� I�ItOIIN'P HODGst Co��ats - .
101 - 43111 -01- 23{.O.Stre�t ltainCaaaaca ltstarisls 5�1,l04 5�2.503 538,872 53b,8?2
101 - 4D121 -01-�724.1 Eitusiaon� ?atehing � � 527.796 527.796 ��
101 - 43131 -01- 22i.2 Stripinq � ¢2�,130 52.130 � �
101 - 41131 -01- 224.3 Graval Shouldariag 53.195 53,195 � .
� 101 - �3131 -01- 424.4 Crack S�alaat 55,751 t5,��51 � �
101 - 43121 -01-.215.G L�adsupin4 �akax'ials . 51,062 51,404 - 53.726 53.72E .
101 - �3121 -01- 225.1 Sod � - 51,065 31,065 � �
101 - 43i21 -01- 315.2 Saad � . 51,065 � �f1,065 � � .
101 - 431Z1 -01- 325.3 alack Dlrt � � 51,065 �. � S1,OG5 � � � .
� 101 - f3121 -01- 125.4 Tr�a� � 55I3 . 4533. � . � � .
101 - 43121 -01-� 247.0 Hiaoz Equipmmt � SO L3.500 � _5267 . � . � 5267� �
.. .� . . 101 -�43121 -01- 242.1_ T�seplat�Ya[arial . . . � � . � .. 5�67 . 52b7 � � � � � .
101 - 43121 -01- 303.0 8aqiaeeriag lees � � �� SO . 51,000 S� . SO � �
101 - 431Y1 -01- 303.1 SO � S�� �
101 - 43121 -01- 310.0 Seatiag Servicea � � � SO 51,000 SO � 40 � � �
101 - 431I1 -01- 310.1 � � SO SO . �
101 - 43121 -01- 319.0 Othe= Protassioaal Sezvlce� 533.373 � $15,000 � 533.,zas .- � s�a,7�31 � �
. 101 - 53121 -01- 319.1 Seal Coatiag� � � ;26,892 . � . 533.778 . . .
� 101 - 43121 -01- 319.3 ?rattic Harkiags 56,390 . 510,953� � �
101 - 43121 -01- 319.3 Str�at Sraepiay � 54,000 �
101 - 43121 -01- 364.0 Aelusa Di�yosal� S1,f39 51.417 � 5�.000 54,000 � �
101 - �3121 -OS- 3s�.1 Hazardoui Nuta Disposal 5�.000 53.000 �
� . 101 - 43121 -01- 364.3 Roadsid� Carbag� � � � 52.000 � 52.000
� 101 - 43121 •01- 115.0 Othar 8qulDamt Rmtal � S45 SO . 52.000 52.000 � . �
101 - �1121--01- ♦iS.i - Xiscallaa�ous_Yquipaent . - . � -: - -.S?.000. . � �� .. . 52.000 : - �
� 101 - 43121 -01- U 9.0 OtLar Yi�eallaa�ous Char4a+ � � �- SO � - SO 5500 �� � SS00 � � � �
101 • �3121 -01- �39.1 �� �IIalozs�ea IneideaG � . 5500 � SSQO . � .�
PACB TOT7S.5 � 556,613 546,223 .582,649 562,649 594.096 59E,-09�! � � � . �
� DBYART1�77'TOTALS � � � 556,643 546,223 $82,6�9� . SS2,649 596.09E � .59E,09! . . �
. . Paq� Oa� � . . � � � � . � . � � .
� 199��DDDGYT MOAES8L8TS . . � � � � .
VN4LV8D STAYETS�- 43122 - . � � � �
Saytrabar 15, 1993 � � 1993 OBJICCT 1993 1994 OaJBCT� 1994 . �. � ��
1991 . 1992 �DBTAIL.. kD0Y1� DS1112L PROAOSm . � � . .
� ivad �ecouae • Obj � Ducription � � ACT011L ACTUIIL Luomii SIIDCST 111[OmtT� noDGST- Cosa�nts . .
� """"""""""'.�.._.."""""'""""""""""""""""""""""""""""""'""""""""""""""."""""""'."""" .
101 - ♦1127 -01- 221.0 Yquip�ent Parts SO �SO � 50 � � � t980 � � �
. 101 • 43122 -01- 221.1 � . S0� S9t0 . � �
101 - 41122 �-01- 314.0 SGr��t Yaiat�naac�]tatarials 525,985 512,570 � 525,015 548,740 � �
� 101 • 43122 -01- 421.1 Cza��l aayairs . . i16,105 . 533.5�00 � � �
� 101 - 0112 -01- 22�.2 . ChloriA� � � 38,910 t15,240 � � .� �
101 -�43122 -01- 325.0 Laadaeapiag Yataziais � 5395 � 50 - . ;3,i63 52.663 � �
101 - 43112 -01- 425.1 Sod � � � SSD3 . . .SS33 �
101 - 43123 -A1- 125.3 Saad � 51,065 �� 51,065 .
� �101 - �3133 -01- 325.3 Elaak Dirt . � � 51,065 51�,065 � .
101 - 47122 -01- 230.0 8�ulp�ant Aepair ltateriala $0 EO SO . 5966
101 - 43132 -01- 230.1 Cltttiag Edges � . . .SO . S9f6 � � .
. 101 - 43122 -01- 310.0 TasGiaq Sarvica� - � � SO � S0. � ��S1,OQ0 i1,000 � � �
. . 101 - 43112 -01- 310.1 Awd ldluru, D�adty $1,000 51,000 � �
501�- 43122 -01- D8{�.0 Reluse Disposal 5360 53.795 . 51.600 . 5�.600 � � �
101 - 43122 -01- 384.1 Sazudov xast� Disposal 52.000 5�.000 . .
101 - 43121 -01- 3l�.Y Roadslda Garbaqe 560A . � 5600 -
101 - 43122 -01- �15.0 Other Yquip�rst Aaatal . . . � SO SO � � SS,Q00 �� � . � 51,000 � �
� 101 - l3122 -01- 415.1 Cradaz . � � � i500� 5500 � �
101 - 4312Z -01- 415.3 Hitcallaaaous Equip�eat � 5500 . 5500 � � � � � �
101 - 43122 -01- 439.0 OtLar Miaeellaneous Charges SO SO . � SO SO � �
101 - 43122 -01- 439.1 . SO � SO � �
� PAGS 10T1S.5 � 536,740 515,964 533.278 532.27d� 55T,951 557,951 .
.. . -._. - .. DEP71X'17Q+NT�TOTALS - . . �526.740...._�515.9b4. � .532,]7II 532�.178 557.951.��- $57.951 � � . � . . � . -
P�qe Ona . . � . . . .
1994 SDDCYT NORl.SBlLTS � . � � � . �
� ICE 4 SNOff RAt0Y71L - 43135 - . � . � . . . . .
Seyt�mbaz 15, 1993 . � 1993 OBJSCT 1993 1994 ODJYCT lf9f . � � �
� � 1991 1992 . DE2hSL� 11DOPTID DYTAZL PAOPOS� � � � �
fvad 1�ccomt f Obj * Ducriptioa ACTQ7S. J1CTOl�L AISOIINT SIIDGE2 � A1tO0NT EODCYT � � Co��at� .
� 101 - 43125 -01- 216.0 Cha�ical 4 Chemital Produett 511,720 59,419 . 58.520 511,520
101 - �3125 -Q1- 216.1 Salt(l�pprox �00 Toa�) � �SD,S]0 � 511,520 �
� 101 - 43125 -01- 224.0 Stre�t Yaiatenaaca Yaterials 51,�94 51,047 5�.130� � 52.130 � .
. 101 • �3125 -01-.324.1 SaaG 52.130 52.130 � .
� 101 - 43125 -01- 230.0 =qulpiant Aspaiz Itateri�ls SO 5253 � i3.131 52.131 .
101 - 431]S -01- 230.1 Plow Sdgu . � 51,065 S1.0B5 � . . �
101 - 43135 -US- 230.2 Saadar � . . 5533 5533 � � � �
i01 - 43125 -01- 230.D Sydraulie� . 5533 � � � � SS33 � �. �
101 - U125 -01- 415.0 Othar Yquipaant Rental 51,689 5351 5�.��� =4�132 .
� 101 - l3135 -01- 415.1 Tzvck Rantal 53�,067 53.067 � �
101 - 43125 -01- 415.2 � Grad�r Nith Miag Rmtal. - 51,065 51,065 . � �..
� � 101�- 43124 -01- 439.0 OtLar Ylseellaawui ChaFges � . 534• S0� � . 5500 . � SS00 � � � �
101 - 43115 -01- 439.1 Oaaaticipatad Cost� . - 5500 5500 . � �
� � . PAG8 TOT71L3 515,136 � 511,072 ;17,413 517,413 � 520,413 520,413 .� . �� � .
DBPI�tTl�iT TOTIILS 515,13i 511,072 517,413 517,413 $20,413 5�0,413 � �
� .�_. . . . .. .. - . ._ _ . . . . � .
� Pay� Ona � . � � . � .
. � � � 1994 EIID6ET MOAf.S88ET3 . � � .
� . STAEET LZGBTIIiG/SIRgiB� - 43160 - � � . � . . �
Seytmbar 15,� 1993 � . 1993 OSJBCT . 1993 199i OSJECS 199� �
� � 1991 1992 D8T71IL 1lDOPTYD� DH7AZL PROPOS�
puad Accouat t OLj � Dmscriytioa � 11CTOJS. AC147S. 1�MODNT EIIDGST ANOIIN2 B9DGYT Co�aaG �
""..�""""""""""""""'"""""""""�"__'_""""""""""_'_"_•'_"""""""""""""""___"""'•"""..._..__.�.....
101 - 43160 -01- 237.0 IIti11Gy SysYm kai¢t Suypliai SO SO ¢1,065 . 51,065 � �
101 - �31f0 -OS- 327.1 Dulb Replae�m�at � 51,065 L1,065 . � � �
� 101 - 43160 -01- 381.0 Ylectric Dtilitlai 542.SS0 550,320 � 551,5�6 551,546
1C1 - ♦3160 -01- 361.1 koat8ly Charqu � . � 551,546 � . 551,�546 �
101 - t3160 -01- 403.0 Coatract�d R 4 lS-OtIIar Smprvs 5603 SO SO . 50
101 - 13160 -01- 403.1� SO . � i0� � � �
101 - �3160 -01- 409.0 Othar Contracted Aapair 4 xaia 52,460 � $6,.661 � � 511,id3 � � t13,113 � �
101 - 43160 -01- 109.1 aeyairs-Scattarad Locations 56,390 56,390 � �
101 - 43160 -01- 404.2 R�locata Y LigDt� ' S2.663 52..663 �
101 - 43160 -01- 409.3 8i�eellaaaow Repair� � 5=.130 54,060 .
. 101 -��3160 -01- 439.0 Othnr 1[lacellaaaou�.Chargas � SO . . SO � 5500 �5500 � -
101 - 43160 -01- 439.1 � ��IIasatieipatad Costs � - � SSOD �5500 � . . � � �.
PL6E TOTALS 5�5,602 557,003 S6i,294 =64,294 $66,224 ¢66,224 . .�
� DEP7�8Tl�i? TOT7ILS� 545,602 557,002 564,294 564,294 566,244 -566,124 �, � �
. ."'............"'......�..'�'.................."""".......... .. ..
. . � �. . .:_._ .. __... _ ... - � .
PsQ� On� � � . � . . . . '.�
. . . 1994 EIIDGES 1fOASSE8iS3 � . . � � � . � �''
SIQIAL LIGSTS 4 SZf�T3 - 43170 - . � . � . . � . ���.
� SapGambar 15, 1993 � � 1993 OEJtCT 1993 1994 OSJtCT 1994 � � � ����
1991 1492 � DEi7�IL �I�DOPTm DiT71IL � �PROPOSYD � � . � �
. Puad 7lceouat M Obj • Dascriytioa ACtOAL ACTv11.L 1utOIIHT SIIDGaT NlODtiT D9DGlP � � Comanti � .
101 - 43170 -01- 226.0 SiQn Aepair ltaterial• 82.228 . 54,091 .53.195 � 53,405 � � �
101 - 47170 -01- 126.1 Slga Ia�antory i Aeplacemat ;2,130 � 53.3{0 . � � � .
101 - 4�170 -01- 216.2 Str�at ID Sigas �51,06b 51,065 � �
� .101 - �I170 -01-�237 A Otility Systm llaint Suppli�• SO SO � E533 � . 5533 . �
. ��301 - 43170 -01- 227.1 Du1Ds, Laaau, Sigaa, •te. =53�3 � � � � 5533 . � � �
. 101 - 43170 -01- 329.0 Othar Yaintaaaac• Supplies S1,1A0 � SO SO � SO � � ��
101 - �3170 -01- 229.1 � �SO . SO �
� . 101 - 43170 -01- 381.0-Zl�ctrie Vtilitiu . . �� S=.1i7 51.651 � �SZ.663 . 52.663 � .
� 101-- 43170 -01- 381.1 riontLly CLarges � f1.663 � � 52.663 � �
101 - 43170 -01- 409.0 Othez Coatraatad Rspair 4 kaia EO � SO � � . �5500 � � 5500� �
�501 - 43U-0 -01- �09.1 Du� to Auto Lccidmu � . . . $S00 5500
. 101 - 43170 -01- 439.0 Othar 1SS�e�llaaaous CLargaa SO � SO f100 � 5100 � -
101 - 43170 -01- 439.1 Oaaatieipat�d Costs � � . 5100 . � 5100 �
YACY TOTALS � 55,516 56,712 56,991 � 56,941 57.201 57,201 � . � � �
� DBYI�RTI�JT TOTALS � 55,516 56,744 56,991 56,991 57,201 57.201 � �
F�q� On� � � . . . � � � . .
19l4 BIIDCET MORICSSYETS . . . . . . � ..
. PAR]C i RSC DYP71AT1ffiiT - 45100 - � �
� S�yt�mbar 15, 1997 . . �1993 OBJBCl 1993 1994 OSJYCT 1994 � .
� . 1991 199] D8TIIIL � 71DOPT� DBShZL YROPOS� �
luad kccouat t Obj ♦ � Ducription aCTCAL xCTa7�L 7JIODNT SDDGri' AIt�OH2 DODGHT Comsnta
"""""""_""'_'_"""""""""_""__"""_"""""_"""""""""""""""'_'_""""""""'_"""""""....�..�.._..""
101 - 45300 � 101.0 Salaries 4 baaeflG � 5304,396 5326,1N� � S3dl,901 � � 5403,252 all Salary Co�ta Zaclvlv� 01 �
�SO1 - 45300 -OZ- 101.0 D. Dachtold, P a R Dir�ctor 562,357 �i63,607 . Salary, Ta�c��, YE1G a:E�a�lib �
101 - 45100 -03- 101.0 R.�Cook, Park� Suparvisor . 555,993 � 557,234 � �
101 • 45100 -0�- 101.0 L. Jost, Just P a R Mractor � 551,525 552,6b9 � � � �
� � 101 - �5100 -OS- 101.0 J. lfollma, Progra�ar-Rac 530,113 � � �533,191 . . � �
101 - 45100 -06- 103.0 L. Dudiag�r, Sacretary 7Sda 512,.l66 � � 519,341 .
� 101 - 45100 -07- 10D.0 L. Cordu, Programar-Parks . . 511,265 �S�~.�d95 �
� 101 - 15100 -0!• 103.0 x. loraa�n, asit Yrogra�er-Aac 56,419 . SO . Mov�d to Casuaity Caater
� 101 - 45100 -30- 301.0 Progr�ez-Ree (Yull-time) � . � SO SO � � llo��d to Casuaily�:C�ntar �
101 - 45100 -21- 103.0 Saeratary 711da (ParG-TSme) � � 50�� � � SO Yoved Go Co�ualty C�ataY
101 - 45100 -10- 101.0 C. Dahnka, xaiat Z � � � 531,.303 _ 533,.373 . - � - � � .
��� � 101 - 45100�-11- 101.0 15..Joostan, Maiat IZ - _ � � �. � 537,731 . 53E,666 :: • -.. �
101 - 45100 -1]- 101.0 S. Stre�a, 14iat ZII � � � 542.666 543�,366 ,,
101 - 45100 -13- 101.0 J. 1Coslovskl, Naiat ZZ � 536,614 � . 537.991 '�,
. 101 - 55100 102.0 Pull-?ima Ovartime 56,932 39.945 � 56,164 56,164 �
101 - 45100 -05- 102.1 J. Yollmaa . . 5521 � 5521 � �
101 - 45100 -20- 103.1 Progra�er-Rec (Pull-Time) � SO . � SO Hoved to Co�uaity Cmtar � �
101 - 45100 -10- 102.1 C. Dahake �51.151 51,151 � .
ioi - �sioo -ii- ioz.i x. aoo,c� si,�sa si,4se
101 - 45100 -12- 302.1 S. SGtesa � 51,566� $1,566 . � ��
101 - f5100 -13- 102.1 J. Soslovski . � 51,468 51,468 � � � � � �
. � 101 - �5100 103.0 Part-Sima Salariu 4 Heaefits 537.000 552,OOD � �. �
101 - i5100 -83- 103.1 AaeraaCion Leader� � � 57.730 ;6,553 59,000 � 59,000 � � �
101 - 45100 -91- 103.1 xassiag..House Atteadanta 53.bE9 � ;4,.729 56,000 . 59�.000 ..
� . � 301 - 15100-96- 107.1� ..Park� Satarn . - �%� 50 � 52.665 - SO � . - �� � SO . . . . . � .. �� � � �. � � �
. .101 - 45100 -97- 103.1 Geaaral Clazieal - St,Ot7 511,01! � SO . � SO � � - �
� � 101 - 45100 -96- 103.1 Parlu Itaiatenaaea � 513�,322 515,395 �S16,500 � 524,000 . � �
. 101 - 15100 -99- 103.1 f a A Ca�isaioa xobers � 51,195 51,398 53,500 � 510,000 � � �
101 - 45100 -01- ]05.0 Dratting Supplies 53.122 51,3�9 5�50 51,000 � � -
101 �- 45100 -01- 205.1 Gaa�ral Draftiag � � 5500 . 5500�
- 101 - 45100 -01- 305.3 Pilm, Developiag 4 Lamiatag - 5250 �5500 - � . .
101 - i5100 -01- 207.0 Traiaiag 4 Iastxuetnl Supplies 5240 $407 SO � - SO
101 - �5100 -01- 207.1 � � SO . � SO � � �.
101 - 45100 -OS- 208:0 Hiseallaaeov Supplies � � SO 516,SS0 . SO � �50 � �
101 - 45100 -01- 208.1 � � . �$0 SQ . �
. 101 - 45100 -OS- 3Q9.0 OLhar OEfiee Suppilai $0 ;177�� SO � .� SD � � . �
. 101 - 45300 -01- 209.1 � $0� � � $0 .
101 -.45100 -01- 212.O�ttotor Fuel■ - � � 59 SD � 50 � .SO � . �
101 - 45100 -01- 21].1 � SO � SO �
.101 - �5100 -01- �215.0 Shoy.Materisl■ 517,191 � St,667 . SII,000 � � SB.000 �
101.- 45100 -01-..215.1 Saed. Sod., etc. �._.._ ....._ . �.._.. _ . .-.52,500 ._.__. .... .:52.500. .... .. � � � . .
. . 101 - 45100 -OS- 215.3 Asd Rock, Saad, Graval, •tc � � 55,000 . 55,000 �
. � 101 - 45100 -01- ]15.3 � Xisc Equlpm�at a Suyplies 5500 �� 5500 .
101 - 45100 -01- 116.0 Chamieal i Chemical YrodueG SO 52,l36 � � 511,500 . 511,500 � � _
101 - f5100 -01- 216.1 Herbicidas(Gea`1 Pazk IIse) � ;3,000 � . 53.000 �
� 101 - 45100 -01- 316�.2 �Pertilizaa � 57.000 � 57.000 �
101 - �5100 -01- 216.3 Herbieidas(Carroll's�Noods) 51,500 . 51,500. � � � � �
101 -�45100 -01- 219.O�Other Operatinq Suppliaa 53,065 � SZ.605 5750 .52,000 � . �.
� 101 - �5100 -01- 319.1 nrts a Cr�its Suppliu . � 5500 ' 51,750 � � �
101 - 45100 -01- 219.3 Brushea, 8roomi, etc. . � . 5250 . � . � � 5250 � - � �
� PAGB TOTALS � 5369,176 5406,462� 5453,065 .5453,065 . 5463,916 S4E3,916 � � � � �
,
� Yaga 'h+o - � . . .
. 1994 DIIDGET NORlCS8L8T3 . . � . . . . .
� PL7tZ 4 REC DBPhSt'I7�7T - 45100 -. � � . .. . . .
� � . Saptembar 15, 1993 � . . 1993 OBJELT 1993 � 199i OEJiCT 199� � .
. � 1991 1942 DETl�IL �ADOPT��� DEZ'�IL. PROPOS� � �. . . . .
. luad .l�ceovat N Obj t Descriytion � � aCRVIJ. . 7.CTOaL ]�1SOIINi BDDGET IWODNT EIIDGHT � Co�aaG �
"""""""""""'_'______"_'"""__""'__"_"'_'_""""""'"'_'..._"'_"""""""""""""""""""""""""""""_""".' �
SO1 - 45100 -01- 321.0 Yquipmant PazG 513,26! 57.465 . 53,500 . S'f.500 �
� 101 - 45100 -01- ]21.1 lane� AepairtNon-Lsadscap�) =500 � 3500 � � �
� 101 - 45100 -01- 211.2 LSqhtSaQ Repairs � 5500� SS00 . � �
101 - �5100 -01- 131.3 Irrig Aepaiz(Noa-Contract) � 52.000 52.000 � � � � �
. . 101 - 45100 -01- 121.4 xise/Sp11t Aail, ate. 5500� � 51,500 � � �
101 - �5100 -01--3]2.0 Tisu . �� 5398 SO � SO SO � .
101 - �5100 -01- 221.1 � � SO � . f0 �
� SO1 - 45100 -01- 213.0 Building Aepair Supplia• 57.d44 56,l03 � 52.250 � 53,250 . � � �
� 301 - 45100 -01- 123.1 Palat, Ezuahu, Aolles�,ete � � 51,000 51,350 . � �
101 - 45100 -01- 223.1 Shinqlaa�, Hoards, etc. _ � _ � � 5750 . 51,000 . � �
� 101 - �5100 -01- 233.3 xiscallaa�ous � � 5500 � 51,000 . � � � � � � � � � �.� .
101 - 45100 -01-�245.0 Laadscapiaq Yateriala � SS{,BE9 � 55,623 57,000 53.500 � � .
. . 101 - 45100 -01- 225.1 Tree�, Shrub;, Sod, ete. � � 51,500 . 51,500 �
l0Y- 45300 -01- 225.2 2imbari, PeaCa, stC. SS00� $2,000 �
101 - �5100 -01- 225.3 Paviaq 4 Snaleoatiag(Pazk�) � 35,000 SO � - �
101 - 45100 -OS- 226.0 Siqn Repair Ratarialt 53.922 SO SO �SO �
101 - 45300 -01- 136.1 � SO SO � � .
101 - 45100 -01- 339.0 Other Nainteaaaea Supplies 514 53.738 53,000 53.500 � �
101 - 45100 -01- 229.1 Nats, Poles, S�se�, etc. � 52.500 52,500 � � �
� � � 101 - 45300 -01- 229.2 Hiscellaaeoui � . 5500 51,000� . � �
101 - �5100 -01- 2{1.0 S�all Sools 55,486 56,516 51,000 51,500 � �
. 101 - 45100 -01- 241.1 -�-8amara, wraaehas,�•te. - . � � . 5500 . 5500 �� � �
101 - 45300 -01- 241.2 Sari, Dzaga, ete.(Lasqer) � 5500 51,000 � �
� � IOT - 45100�-01- 302.0 l.rehit�eta' 7us S0. - 50 ' �� 52.�000 � 53�.000 - ' � �
301 - {5100 -01- 302.1 �. Laadacaye Architaet Mork $2,000 _ . 5�.000 �-� . � -� � �
101 - 15100 -01- 303.0 8agiaaeriaq T�u �52.350 5364 S1,00D. 51,000
� 101 - �5100 -01- 303�.1 Various Park work � � 51,000 51,000 � � � � ��
101 -�45100 -01- 30�.0 L�gal Tea� 5211 SO SQ SO � �
� 101 - 45100 -01- 304.1 � SO � SO �� � �
101 - 45100. -01- 305.0 YadScal 4 Daatal iaea . � 5174 � 5247 . � 53�0 � - �5300 �
101 - 45100 -01- 305.1 �ploynent Phyaieals � � 5300 . � 5300 � .
101 - 45100 -01- 315.0 Spacial Yrograms 57.578 55,672 56,650 57.650 � �
� 101 - 45100 -01- 315.1 Suaday Speeiala � 51,500� � 51,500 � .
.� 101 -��5100 -OS- 315.2 Lepreehaua Days � � . � 5100 5100 . �
� 101 - 45300 -01- 315.3 Hallovem � $500 5500 � � � ..
. � 101 - 45100 -01- 315.4 Grouad Povndera(Runaing) 5400 � �5400 � . �
101 - 45100 -01- 315.5 Nature Programs/Arbor, ete. � 5500 SSUO �.
101 - 45100 -OS- 3Y5.6 Puppet Programs � - � 5650 � . �5650� , � � . �
101 - 45100 -01- D15.7 Spaci�l Svents(Z-xas, etc) � 5500 $500 . � � �
101 - 45100 -Ol- 315.6 adopt - L -.Park Program� .. . . . . . . .52.Q00 . . . . .... ..._51.000 .. . ..._. . � .
� �101 - 45100 -01- 315.9 � Hi�eallaaeou� Programs 5500 � 51,500 � �
� 101 - l5100 -01- 319.0 Other YroLassioaal Sasroices .� 53,323 S75 SO SO
. 101 - 45300 -01- 319 1 � � ;0 � SO � . �.
101 - 45100 -01- )23.0 Radio IIaits 51,34$ $748 � � $500 . . � $500
. 101 - �5100 -01- 323.1 Cellular Phoaa 8111s � 5�500 $500 . � � �
. � P�CS TOTALS 556,724 536,754 529.200 527.ZOQ 5�7.700 �-537.700
,w �. _.. .. ,_ . �� .. _�.., �:. . .._ . .�. - _ _
�. ...,..r,s- .�.-,�r�, __. ,;� _ __ _ .-.,. .. �_... __. _._ . . ..�.� �...'= - ,,; ..-:� . _ - � -
. o . . . .. � � � . . . .. . .
� Paga 'thr�a �. � � . � �
� � � 1994 SIIDGYT MOR[S88ETS . � � �� �. �
� � �P11RR 4 AYC DYPA3tT1�7T - �5100 - � . � � .. � - � . .
Sept�ab�r 15, 199D . 1993 OBJYCT � 1993 1994 OSJLCT 1994 � �
. � 1991 . 1492 . DBTAIL ADOP28D DY1'AIL PAOPOSED�� . � ..
� Tuad �ccount t Obj t D�acriptioa . xCTaAL aCTU7J. Al[OONi HDDCET . lJtOpNT SIIDGET . Co�sat�
101 -�45100 -01- 331.O�Traval Ysyeasa 5132 E91 � 5350 �5350 � ,
� 101 - 45100.-01- 331.1 Saniaar� 4 Mork�hop� � � 5125 . � � 5125� � � '�
. �101 - �5100 -01- 331.2 Geaaral Yiscallaaeous 5225 S]25 � � � �
101 • �5300 -01- 341.0 Esploysent]Wvaztiday SO 51,564 51,000 51,000 � � .�
. - 101 - 45100 -01- 341.2 fi�aaral �ploymeat 11ds 51,000 � 51,000 � �
� 101 - �5100 -01- 349.0 Othar ]�vertiaiaq 55,903 Si15 � � 52.=DO . 512,]00
� � 101 - 45100 -OS- 3�9.1 Lrochures 4 Papar . 51,000 . 511,000 � �
101 - �5100 -01- 3�9.3 Copy 4 Duplicatiag � 5500 3500 � '
�. 101 - 45100 -01- 349.3 Diiplay Hoazds, etc(SOAR) . ;400� 5200 � �
� �� 101 - 45109 -01- 349.4 .Saaaeri. � 5300 . 5300 . .
� � � l0i - 15100�-01- 349.5 Hiscallaneow Advertisiaq � 5200 � 3200 �
� 101 - 45100 -01- 3D1.O�81ectrie IItilitl,aa � 59,45T 57.954 516,000 - 516,000 � � � �
101 - 45100 -01- 3L1,1 Skating 81aks � 56,000 . 56�,000 � � �
101 - 45100 -OS-�361.2 Soltball ?ialdi � � � . .56,OG0 �86,000� � .
� 101 - 45100 -OS- 381.3 Irrigatioa 53.SU0 � 53.500 � � � �
301 - �5100 -01- 381.4 Hivallaaeou� 5500 . $500
� 101 - 45100 -01- 383.0 Gas IItilitias� . 562 S85 SO � SO
101 -�45100 -01- 383�.1 $0 SO �
101 - 45�100 -01- 38l.0 Refuse Di�posal SO 5170 SO � � . $0� � �
ioi - asioo -oi- 3e�:i so so
101 - 45100 -01- 393.0 P.C. Hardrara Purcha�as 51,058 $0 � SO . SO �
. 101 - 45100 -01- 393.1 � � � � � - � SO ' SO �� - - � � - �
101 - �5100 -01- �09.0 Other Contzaeted Repair 4 ttaia 54,158 �� 55,696 � 54,000 � 54.000 � . .
. � �101 - �5100�-01- 409.1 � Zrzigation Aeyaiz- � - 51,500 � � ' S1y500� � � � � � �
� . 101 - t5100 -01- 409.2 8lsetrieal Aeyair � � 52,000 .� 52.000 �
� 101 - 45300 -01- �09.3 Yi�eallaa�ous � � SSDO� SS00 � � �
� 101 -�45100 -01- 415.0 Oihar Equiyamt Reatal - 55,462 56,617 514,000 512,500 �
101 - �5100 -01- 415.1 Portebl• Yoileta - � 57.000 57.000 � � , �
101 - 45100 -01- 415.2 St. JoIIa's - Yiny 2ots 51,500 � 50 Mov�d to C�uaity Ceater�
� . 101 - 45100 -01-.415.3 SQuipmeat, Machiaea, ete. � '- � � 52.500 � ' S2.500 . �
101 - 45100 -01- 115.4 . Erush 8og(Carrolls Moods) . � 5�.000 . - � 52.000 . � � �
SO1 - 45100 -01- 415.5 Ytood Chipper(Carroll■ Nood) � 51,000 51,000 � � .
. 101 - 4�5100 -01- 433.0 Dues G Sub�eriptioas ;361 5737 51,050 . � 51,050� � �.
101 - 45100 -01- 433.1 xemberehip• � . � 5650 $650 -
101 - 15100 -01- 433.2 Dup � 5400 . 5400
101 - 45100 -01- 435.0 800ka 4 paa�hlets 5525 . 5194 5350 � 5850. .
� 101 - 45100 -01- �35.1 Aeerestion � 5200 � 5350 �
101 - 45100 -01- 435.2 Parka � � 5150 � SS00 � �
� 101 -�45100 -OS- 437.0 Coateraneas 4 Semiaara Sb99 ��52.305 � 51,700 � 51,700 � �
101 - 45109 -Oi- i37..1- Seminazs �z Norkahops.�. � � . -� . � . . 51,000� � . . � ;.SS,000 �. . . _ . ..
101 - 45300 -01- 437.4 StaEL/Yuk� Co�. Meetinga . . 5300 � � � � 5300 .
101 - 45100 -01- l37.3 ScLool i 1liitioa � 5�00 � � 5400 � �
� 101 - 45100 -01- 439.0 Othei xiscallaaeous CLarqes . =273 $1,481 51,000 � 51,295
101 - 45100.-01- �39.1 �Daaaticipated Costs =1,000 51,494 � �
� . P�CB TOT)S.S 528.2E9�� 527.317 $41,650 $41,650. 550,94$ $50,945 . �
� .. __ . .. :. �� � . . � .
� � NOH-RSVffi708 f80DIICING D8Y)�ATD�7T TOT)S.S � 5�54,1D9 5470,533 $521,925 ;531,915' $562,561 5564,561 . � � � .
�
. Paq� lour � . � . . � � .
.� � 1994 BODGBT 1fORICSHEET3 � � . � . .
. . P11R7. i RYC DYYAR17�iY - 451Q0 - . � � � .. .
. . Septamber 15, 1993 � 1993 OSJBCT 1993 1994 OEJYCS 1994
� � 1991 1992 DETaZL ADOYTSD DYTAIL PROPOB� � � �. �
.. TuaE hccouat • Obj t� Dueriptioa . . � aCiOIS hCSOIU. #1500l�'! 8IIDG8T �(OONT aUDGET Com�at�
. � 5101,000 � E53,100 � � �
101 - 451Q0 -EI- Softball 5�0,442 .531,030 544,000 �5�4,000 � .
� � 101. - 45100 -i2- Volleyball Sd,015 59,038. ;16,000 SO . .]dov�d to C�uaity C�aCar
� 101 - 45100 -6f- Teaai•� . � 51,591 � Sl26 ;2,000 � 52.000 � �
101 -� 45100 -OS- �Tiay Tots � 513,t57 SE,687 516,200 � SO Xov�d t0 Comuaity C�ntez
101 - 45300 -66- Pa� Pcma ¢2,836 52,701 5�.100 � SO . Xov�d to�Co�muaity Ceat�r � �
101 - 45100 -87- ?iald 1Yips 55,713 . 53,722 57,000 � SO �1(o�ed to Comavaity Cwt�r � � �
� � 101 - 45100 -6l- Brooeball � 51,902 51,968 52.100 53.100 '
� 101 - 45100 -89- � Skatinq Luaona 5320 5474 � 5600 SO � Yov�d to Ccomuaity Cantaa
101 - 45100 -90- Traek o Tield 5116 51,354 . 53.000 . 53,000 �
. 101 - 45100 -91- Soccez - 5163 � S0 � 52.000 � � 53.000 - � - � � � �
. 101 -�i5i00.-92-� •ACuik DasketDall � LO =177 51,000 SO . � Yov�d to Co�uaity C�atar�
101 - 45100 -93• Othar Prograa� 51,349 � 5468 53,000 . t0 lioved to�C�uaity C�atsz
� REVIIiQi PRODIICING DEPIcRT!ffi7'P TOTLLS SSS,305 559,663 5101,000 5101,000 553,100� 553,100 � � . . .
G➢.A27D TOTIS. OP ALL PAR3C5 DEPARINffi7TS 5509,594 $530,.196 � 5622,915 5622�,.915 5615,661 $615,661 �
� � . R8VE27D8 PRODIICRiC DSfASLS ON POLLONIItC PAGYS �� �
�
� . � ... . . . . . .
. � Pay� Plva . . . . . �
� 1994 BIIDGET NORZS�STS . � � . . . . . . . � .
� � YaRZ 4 R8C DBPhR'Il�i'[ - 45100 - � .� � � . . .
� Sapt�mb�z 15, 1993 � 1993 OBJ8CT 1993 1994 ODJLCT ��1994 . � �
� � � . . � 1991 1497 DSTI�SL . ADOPTID DtYAIL. PROPOSm . . .� � �
luad �. Aceouat r Obj ! Ducriptioa �. . ACNJJ. I�CTO7S. N[OIINT SODGSi.. NSUONT EIIDGY'P Comaats �. . �
""""""""""""""""""""""'_""""_"""""'"""""'__'"_"_""'_"_"_'_"'__'""_""�""""__""""""""""_"""'
�� 101 - .45100 -al- 103.0 Part-Tisr Salazias 5�1,461 53,503 . � 58,000 � 58.000 � � �
. 101 - �5100 -11- 107.1 58,000 � SII,000 . � �
� � 101 - 45100 -61- 121.O.PLR)�MitLholdiag 5114 �5102 5300�� � �5300 �
301 - 45100 -81- 121.1 � 5300 5300 � � � �
101 - 45100 -l1- 132.0 P2G KithLoldlag 5177 $140 � 5350 � � 5750 � �
101 - 45104 -il- 133.1 � - � 5350 � 5350 � � � �
� - 101 - 45100 -dl- 125.0 Yadiear� NSGhLolding $17 547 SSO� S50 � �
101 - 45300 -l1- 125.1 S50 �550 � � � �
101 - l5100 -81- 219.0 Oparatiaq Supplies � 56,56a 511,7l9 � 512,000 512,000
� � 101 - �5100 -81- 219.1 . . . . . 512,000. . . . �.�.512,000: � � � � � � . �
. 101 - 45100 -E1- 311.0 OlLiciatinq !eu � � SB,l37 512,9U1 • 517,000 � . . �17,000 � � � � � �
� - 101 - 45100 -81- 311.1 $17,000 � 517,000 � � '
�101 - 45100 -81- 319.0 Other Protessional Sasvices. 52.274 52.54t 56,000 � 56,000 �
101 - 15100 -al- 319.1 � $6,000 56,OOQ �
� 101 - 45100 -81- 115.0 Othnr 8quipment Reatal .SO $0 � $200 , 5200 � � � ��
101 - �5140 -81- 415.1 � � . � $Z00 S�OQ . � �
101 - 45100 -Di- 439.0 Othnr Hiscellaneous Charges SO SO � 5100 . 5100 �
101 - 45100 -81- 439.1 � � 5100 � � 5100 �
101 - 45100 -82- 103.0 Yart-Sime Sslaries �� 51,055 � $1,501 53,850 � SO .
1G1 - 45100 -82- 103.1 � - 53.d50� SO . Yoved to Com�uaity CmCer � �
301 - 45100�-t7- 1]1.0 PSR11 XithholQiag -� 549 S43 � � 5150 � � SO
�� � - 101 - 45100 -a2- 121.1 � . - �� � � .�9150 . '�� � - � SO � � �� � )loved-��Co Co�uaity Cantar -
� 101 - �5100 -l2- 122.0 PIG NithLoldiag � S76 560 . 5225� � SO �
� 101 - 45100 -82- 122.1 � � � . � � ;225 SO �Xoved co Co�uaity Ceater �. �
�. 101 - 45100 -84- 125.0 ltediur� MSthho161ag S7 520 . � 575 -� � SO �
� �� - 101 -�45100 -6]-�125.1� � . � � 575 SO � xo�ed Co Ca�uaity�Cea[er � �� �
101 - 45100 -S]- 219.0 operatinq Suypliu � � 51�,619 � 51,693 51.750 � �� SO � � � � ��
� 101 - 45100 -83- 219.1 � - 52.250 � SO Xoved to.Co�uaity Caater � .
� 101 - 45100 -62- 311�.0 Oltieiatiag 7au - 5�3,916 54,609 � 57.700 SO � .�
. 101 - 45100 -82- 311.1 � ' � 57.700 � .' $0 .Mov�Q�tO Co�uaity C�ater . � .
� . �� . 101 - 45300 -l2- 319.0 OtLer Yrofusioaal Sazvices 51,394 51,110 51,750 . � � SO � �
101 - 45300 -62- 319.1 � � 51,750 50 � Moved to Co�vaity Ceater �
. . 101 - 45100 -64- 103.0 Pazt-Sime Salarles 5903 5763 � � 51,500 � 51,500
ioi - ~sioo •a�- ios.i si,soo Si,soo
� 101 - �5100 -84- 122.0�PIG Nithholdiag . 538 SO 5100 � 5100 � � .
101 - 45100 -8{- 122.1 � � 5100 � � 5100 � � . �
101 - 45100 -84- 125.0 Kedicare NitLholdiag � 513 510 5100 5100 � � �
101 - 45100 -84- 125.1 � � � $100� 5100 � �
. � 101 - 45100 -84- 219.0 Oparatlag Supplies � � � . 563�E � 553. 5300 � $300 � � � � �
� _. .. 101.- 45300 -l4- 219..1 �. _ . .. . _ . ,5300 . � . 5300. -.-. � . ...- . . . ..
� YhGB TOTALS 530,049 540,l93 562,000 56Z,000 546,000 546,000 . . � .
.
r
Paq� Six � . . . . . . . � . .
1994 EIIDGHS pORICSHZES3 . . .. � � . . .
� PARZ 4 A8C DHP7IRTl�7Y - 45100 - �� � � � � �
Septambar 15, 1993 . . � 1993 OBJ8CP 1993 1994 08JlCT 199� � � �
. � 1991 1992 DETI�IL ADOPTBD DETAIL PROPOS� � � .
- Yuad Aceovat � Obj � Ducriytioa � . 71CNl�S. AC2V/�L A1t0IINT. aDDCET A][OONS SDDOiT � Co��nu �
""""""""""""""'__"""""__""'___""""""""""""""___""__""""""""_"""""'_"""""""""""""""" .
� 301�- �5100 -[S- 103.0 Part-SSme S�lazia• 59,510 56,496 511,000 . � . S0� � �
� 101 - 45100 -ES- 103.1 811,000 � SO xov�d.to�C�uaity Csatsr
. 101 - �5100 -65- 141.0 P8R7�Mithholdiag - 5132 SO 5200 S0.
1G1 - �5100 -lS- 131.1 � � . 5200 SO . IIov�d to Co�unity�C�atar
101 - 15100 -65- 122.0 TIG XStLholdiag � 545b �SS � 5600 SO
301 - 45100 -65�- 113.1 . _ _.. � .,, 5600 .... � -SO -� � �����W to�Co�unity,C�at�z � -
101 - �5100 -lS- 125.0 Yedicara xlthLnldiag . S10D 586 �5�00 SO
� 101 - 45100 -DS- 1]5.1 � S2Q0 � . �SO Movad�to Co�unity Ceat�r �
101 - 45300 -85- 219.0 Oparatiag Supplia� - 51,930� 5564 � .5�.�00 � SO - � . �
.� . 101 - 45100 -85- 319.1 . � � � $Y,200 -S0� � ko�ed to Ca�uaity Cent�z �
101 - 45100 -II5- 339.0 Othar TraasDoztatioa CEaxyu 5180 S2]0 � � � 5350 . . f0 � � � �
� 101 -�45100 -55.- 339.1 � � � 5350 � SO � I[ovad.to Co�u�nity Caater
101 - 45100 -DS- 415.0 Othar 8quipment Rental � 5540 51,516 � � 51,600 . SO
101 - 95100 -85- 415.1 � � ��51,600 � � SO � Noved to C�vaity Centar �
� 101 - 45300 -85-�439.0 Other Hiieellaneous CLargea . � SO SO � SSO � � � SO � � � � . �
101 - 4510�0 -85- 439.1 S50 � � . �SO � Xoved to��C�muaity Caa[ar � � �
� � 101 - l5100 -66- 1�3.0 Part-Yime Salaries 51,567 $1,600 52.350 � � SO
101 - 45100 -86- 103.1 ' � $2,250 SO �koved Go C�uaity CanYez
101 - 45100 -86- 127.0 TIG Nithholding 556 ;0 S1U0 � SO �
101 - 55100 -86- 122.1 5100 � �SO Moved to C�uaity Ceatar �
S01 -�45100 -l6- 125.0 Yediure NitLholding � 52] S20 � � S50 � . SO �
� 101 - 45100�-.l6- 125.1 � � � � � � � - . � 550� � . � SO � � �-xoved.�to�C�uaity Ceatas�� . ..- �
. 101 - {5100 -l6- 714.0 Opazatiag Supplie■ 51,187 51,080 51,550 SO � .
. 101 -�45100 -86- 219.1 � � � � � � - � � 51,550 - � SO 16oved to Co�uaity Caater � �
101 - 45100 -l6- 339.0 Othez Traaspoztatioa Charga• � SO . SO � - 5150 SO � � ��
., _ . 101_--_45100 -t6- 339.1� � � 5150 . . SO xored to C�ualty:Caatar . .
101 - 45100 -E7- 219.0 Other Operatinq Supplie•.� 51,9�9 SO . SO � � � . ��SO i
� 101 - �45100 -l7- 219.1 � SO SO � �� MoveQ to Co�uaity Caater � '
101 - 45100 -87- 339.0 Othez Tzaasportation Charqe� 53,�63 52.723� . 57.000 � 50 � � ��
101 - 45100 -87- 339.1 - - 57.000 � SO � xoved to C�unity.Ceater � �
� 101 - �5100 -86- 214.0 Operatiag Supyliea � 5296 � �.5231 5100 � 5100 �� � � � �
101 - 45300 -db- 219.1- 5100 . � 5100 � �
� 101 - 45100 -8l- 311.0 OtLieiatiag Pees $630 � 5735 51,000 � � . 51,000
101 - 45100 -88- 311.1 � 51,000 $1,000 � � �
� 101�- 45100 -88- 319.0 OChar Proianioaal Servieer . � 5976 51,012 � � � 51,000 . 51,000 � � ..
101 - 45100 -68- 319.1 51,000 51,000 � �
101 - 45100 -89- 103.0 Part-Time Salarie• 5315 5468 . . 5450 SO � � .
101 - 45100�-89- 103.1 � �5450 - � SO . xoved to C�unity Csntar �
101 - 45100 -89- 122.0 FIG NitLholdiag . � . SO $0 . . $35 � SO � �
101 - 45100 -89- 122.1 � � � f25 ... - . � � $0: .._. .. _.Movad�.Yo-C�uaity.Ceatar� �-- � .... .
� � � � 101.- 45100. -89-_�125.0 ltedicarg Kithtwldiag . . � SS � �56 . . --� - � S25 � - -SO � . �
� 101 -.45100 -t9- 125.1 � 535 ;0� xoveQ to�C�uaity C�ntar . �
� 101 - 45100 -69- 219.0 Operatiag Supplies SO SO 5100 SO � .
1�1� - 45100 -89- 219.1 � � 5100� . SO xwad to Co�uaity Cmter � � �
. P7.C8 TOT)S.S 523,628 516,751�� 530,000 5;0,000 52.100 52,100 .
.
A . � . .. . . . . . .
.P�qa Sw�a � � �
� 1994 E9DGST MORICSH88T3� . � � . . . � � . .
� � - PAAT. 4 RHC DSPIOtTit�iT - �5100 - . . . . . . . � � � .
Septamber 15, 1993 � . � 1993 OBJ8Cf�. 1993 1994 OaJ=CT 199� � � � �
� . .1991 1993 DSThZL �ADOPTSD DETI�SL� PROPOS� � � . .�
Tuad Aeeonat r Obj i Daacriytioa AC'POAL ACIVAL �NIOIIN2 - BIIDGBT 111tOOHT EIID6ST Co��ats . �
""'"""""""""""""""_"""_"'_""__""""'___"_'_.__'_""""""".'____""""'""""""""""""""""""""_"""""
�101 - 45100 -l0- 219.0 Oparatiag Suppli�■ � 5316 51,35{ � . �52.500 � � ;2,500 � �
101 - 45100 -90- 219.1 � � 52.500 � �$1,500 � �
101 - 45100 -90- �39.0 Othar Yiaeellaa�ous CLaz4as SO S0� 5500 5500 �
� 301 - �5100 -90- 439�.1 5500 � i�500� . .
..101 - 45100 -l1- 219.0 Oparatlag Supplias �5163 SO . 5150 5150 �
� � 301 - 45100 -91- 219.1� 5150 . 5150 . . � �
S01 - {5100 -91- 311.0 OfliciatiaQ laes �SO SO � S1,D50 . S1,l50� .
� . 101 - 45100 -91- 311.1 � � � S1,l50 �� S1,8S0 � � �
SO1 - 45100 -92- 219.0 Opezatiag Supplies � - � SO . 5177 51,000 . . SO � �
� 101 - 45100.-92- 219.1 51,000 �50 Itovad to Camualty�Ceat�r � �
- ..-._--.101�_._45140 -93---219:0-Opardtia4 Suppliss-Othez Prog- -_..51.330� . .--.� .i�6! . . �. . . S;i..700 . .� , -. ... . . SQ_ . � . � . .. .. � —.:
� 301 - 45100 -93- 119.1 � � � � . 53.700 - $0 Ilored�to C�ualty Caatar . �
� 101 - 45100 -93- 322.0 Po�taqa�Costs � . � � 5119 � SO . . 5��5 � . SO � �
101 - 45100 -43- 322.1 � � � 5225 � So lfoved to Ca�mity Cmtar � �
� 101 - 45100 -93- 415.0 Other 8quipmeat Reatal SO SO . � 575 SO � � .
. 101 - 45100 -93- 415.1 � 575 � SO . xoved to Ca�auaity Ceater �
PAGE TOTIU.S � � 51,628 $2..018 $9,000 $9,000 . 55,000 SS,000 � �� . �
� REV&NII8 PRODIICZNG TOT)S.S � 855�,305 559,663 �5101,000 5101,000 553,100 �553,100
�
� ?�Q� Oa� � . . .. . .
� � 1994 HQDGYT NOW.SHEYTS . � �
. . � INSIIRaHCB - �9240 • . . � . � . . � .. I
S�yt�sbar 15, 1993 � . 1993 OBJECT .� 1493 1994 OBJYCT 1994 � �. � �� I
� � � 1991 � � 1992 DHTASL � hDOPT� DESAZL PAOPOS� � �,
� Puad Acco�sat i Obj N De�criytioa xCTO1S. xCSOAI, ),7i00NT . SODGET 711SOUNT BIIDCSt Co�snta� .
� """"""""""""""""""_"_'__""""'____""""""""'__'_'_"'_""""""'."_""_"""'..�"'_""""""""""""""'..
10i - 493�0 -01- 365.0 Norlman's Ca�p Zn�uranc� 570,315 582.634 � 570,000 � 990,000 � �
� 101 - �9250 -01- 365.1 Lanwl Pramivm . Y/0,000 590,000 11k Zacrus• oL 1993 actual .
101 - 4l240 -01- 369.0 OtIIer Iasuraaee 575,422 � 57l,334 . . �. Sa8,000. . 598,000 � � � �.
101 � 49]40 -OS• 369.1 Geaeral Liability 4 Luto � . . SE8,000 �598,000 � 1]t Iacr�au oi 1993.8udgaC �
� � P71CY T02ALS 5145.737 5160,947 �515l,000 S15L,OOQ 5168,000 j168,000 . . � .
�. . DYPART1�iT TOTALS � 5345,737 . ;160,947 SSSE,000 S15l,OQO aiee,000 S181,004 �� � � � �
.
� Paq� Oc� � � .. � . . .
1994 SODC8S MOR1CS88iTS . �� � � � � � � � . . . � .
� . OT88R IISE3 ('17taNSlEAS) ' 49300 � � � � � � . �
. � Seytmb�r 15, Y993 . � 1993 OEJBCT 1993 1994 OBJSGR 1994 �. �� � � � �
�� . 1991 1992 DHT7IIL 7�DOPTID DZ'P71IL pAOPOSED � .� � � �
. .1uad Aacoua! • Obi f Dascriptioa ACTOI�I, aCTOaL AMOIINT SIIDCHT � AttOIINT� H9DC8T . Caom�at��� .. �
301 - 49300 -01- 710.0 Translezi � SO SO . � � SO .;70,000 � �
101 - 4930Q -OS- 710.1 To Co�mity Csatar � � SO f70,000 . . 1or Op�ratioa oL Programs � �
101 - 49300 -01- 710.2 � � =0 EO � .
� - � PAG=.24T31LS - SO =0 LO � SO =70,000 �570.000 . � � . � .� �
� DEP)O[Tl�7T R'OTRLS � SO . SO � � SO SO S'70,000 �570,000 � . .�
•
1993 GENERAL PROPERTY TAX LEVY PAYABLE 1994
General Levy
GENERAL FT7ND $1, 9 9 0,4 4 6
S-YEAR CIP PROGRAM FUND 10, 633
RETIREMENT/SEVERANCE FUND -0-
TOTAL GENERAL LEVY $2, 001,079
Bonded Indebtedness
G.O. MUNICIPAL BLDG BONDS 1986 (Author�22ed-$150,570) -�. -150, 5?0
G.O. IMPROVEMENT BONDS 1987A(Authorized-$311, 964) 125, 000
G.O. IMPROVEMENT BONDS 1988B (Authorized-$66, 552) -0-
G.O. IMPROVEMENT BONDS 1989B (Authorized-$86, 247) -0-
G.O. IMPROVEMENT BONDS 1991A(Authorized-$0) -0-
G.O. IMPROVEMENT BONDS 1992A(Authorized-$0) -0-
G.O. COMMUNITY CENTER BONDS 1992C (Authorized-$103 , 877) 103, 8'77
G.O. IMPROVEMENT BONDS 1992D(Authorized-$6, 715) -0-
G.O. MUNICIPAL BLDG BONDS 1992E (Authorized-$326, 669} -0-
TOTAL BONDED INDEBTEDNESS $ 379,447`
Certificates of Ind�:btedness
G.O. EQUIPMENT CERTIFICATES 1991C (Authorized $48, 290) $ 48,290 -
** G.O. EQUIPMENT CERTIFICATES 1994 ** . 50, 000
TOTAL CERTIFICATES OF INDEBTEDNESS $ 98,290
Principal and Interest on Armory Bonds
ARMORY ANTICIPATORY LEVIES ($95, 000 + $402, 639, OOOx. 00798%) $ 127, 131
. TOTAL PRINCIPAL AND INTEREST ON ARMORY BONDS $ 127, 131 _
GRAND TOTAL 1993 PROPERTY TAX LEVY $2, 605, 947
i
t>
SPREAD LEVY COMPUTATIONAL WORKSHEET
�,
1992 1993 1994
Total Funding Requirements 4,061,064 4,4Z9,363 4,744,300
Less:Internal Revenues 1,025,092 1,219,450 1,026,755 _
Less:Use of CIP Reserves 0 0 175,000
Equals:Revenues Needed 3,035,972 3,209,913 3,542,545
(City Ad justments-Subtractions)
Local Government Aid(LGA) 287,859 296,512 380,794
Homestead&Agriculturai Credit Aid(HACA) N/A N/A 555,804
Levy Certified by City to County Auditor 2,74$,113 2,913,401 2,605,947'
(County Auditor Ad justments=Subtractians)
Fiscal Disparities Distribution Levy(Metro Area) 310,034 302,8Q8 302,8D8
Certified Homestead&Agricultural Credit Aid(HACA) 448,063 525,257 N/A
Fyualization Aid 82,692 82,692 N/A
Disparity Reduction Aid N/A N/A N1A
Spread Levy(Used to Compute Local Tax Rate) 1,907,324 2,002,644 2,303,139
Increase from Frevious Year in Spread Levy 5.00% 15.00°10
•
r
w
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1993 -
A RESOLUTION SETTING THE PRELIMINARY 1994 GENERAL FUND
OPER.ATING BUDGET, THE 1994 C.I.P. BUDGET AN'D
TFIE 1994 LEVY REQUIRED BY THE CITY OF ROSEMOUNT
WfiEREAS, the City Council of the City of Rosemount has determined
that budgets and special needs for the year. 1994 will be in the
� amount of $4, 139, 432 for the General Operating Fund, CIP and
Retirement/Severance funds; and
WiiEREAS, the City Council has determined that special levies for .
Bonded Indebtedness, Certificates of Indebtedness and the Armory
Project total $604, 868; and
WHEREAS, the City Council has determined that actual incomes,
fund transfers and anticipated aids will total $2, 138, 353 .
NOW, THEREFORE 8E IT RESOLVED, that the total Preliminary Levy
certified to the Dakota County Auditor shall be $2, 605, 947; and
BE IT FURTHER RESOLVED, that the City Council of the City of _
Rosemount will conduct a Public Hearing for the purpose of
presenting the proposed budget anc� levy to the general public and .
to comply with Truth in Taxation laws as set by the Minnesota �
State Legislature, and that the hearing shall take place on
December 2 , 1993 , at 8: 00 P.M. , in the Council Chambers at the
City Hall; and
BE IT FURTHER RESOLVED, that if a continuation of that hearing is
necessary it shaTl take place on December 15, 1993 , at 8 : 00 P.M. ,
and at that Public Hearing the final operating budget and levy
shall be adopted by the Rosemount City Council .
ADOPTED this 30th day of August, 1993 .
- E.B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk .
Motion by: Seconded by:
Voted in favor:
Voted Against :
TO: The Honorable Mayor Edward B. McMenomy
Council Members Klassen, Staats, Willcox, &
Wipperman
City Administrator Jilk
FROM: Planning Commission Chair Busho '
Planning Commissioners Baago and Ingram '
RE: 1994 Proposed Planning Department Budget
DATE: August 26, 1993
The Planni.ng Commission wishes to express our strong support for the proposed 1994 Planning
Department Operating Budget as presented by Planning Director Freese. It is our firm belief that
the budget proposal represents necessary operati.ng expenditure whi.te reca, i�ing the need for
fiscal restraint.
We acknowledge that the proposal exceeds the three per cent increase as asked for by
Administrator Jilk. We do believe, however, the additional expenditures to be quite critical to
the overall effectiveness of implementing programs that the City of Rosemount has in the past
deemed important. Such examples are:
� *Zoning and Subdivision Ordinance Amendments. Strict and.thorough implementation
of the recently adopted Comprehensive Guide Plan is based primarily on the nuts and bolts
review of these two documents. Why plan comprehensively when all the while ignoring
the mechanisms that enforce it?
*Development/Application Review. It is our belief that at current staff levels, proper
review of development requests will come at the expense.of upda.ting the documents
discussed above. We feel extremely confident that planning staff will continue to provide
us with thorough coverage of all applications but we are concerned that long range planning
will be put back because of it.
*Downtown Planning and Enforcement. We have a concern tha.t the recently completed-
but not yet adopted- Downtown Scoping Plan may lack the "teeth" it will need to be truly
effective if not properly standardized and enforced. Again, let's not assume that by simply
' adopting a planning document it will work. Planning staff research and Commission
recommendation are key in the overall scoping framework.
Essentially we believe that the addition of a summer intem could help ease the current workload
requirements of the Planning Department and allow for the above mentioned programs to take
place in a timely manner, Director Freese has budgeted for no additional expenditures in staff
or Commission workshops and we feel has put together an operating budget that is not only
necessary but justifiable.
,
�rn� y�.
,
�
� '
Capital Improvements Program (1994-1998)
Pro'ect Costs b De artment
�---------------- Year ---------------�
Department
1994 1995 1996 1997 1998 Totals
1 Administration 78,500 3,260,000 0 1,622,000 0 4,960,500
2 Finance 90,000 170,000 24,000 29,000 24,000 337,000
3 Planning 22,700 16,000 1,200 1,200 1,200 42,300
4 Police 57,065 78,000 92,885 106,535 95,500 429,985
5 Fi re 334,800 488,800 144,800 345,800 198,500 1,512,700
6 Parks&Recreation 690,000 2,279,000 501,000 146,000 192,000 3,808,000
7 Public Works 1,118,183 2,300,892 3,048,948 2,167,675 4,788,666 13,424,364
8 Utilities 0 0 0 0 0 0
g ___ 0 0 0 0 0 0
10 --- 0 0 0 0 0 0
11 --- � � � � 0 �
12 --- 0 D 0 0 0 0
13 --- 0 0 0 0 0 0
14 --- 0 0 0 0 0 0
15 --- 0 0 0 0 0 0
Other(not specified above) 8,800 15,000 0 0 0 23,800
2,400,048 8,607,692 3,812,833 4,418,210 5,299,866 24,538,649
(06—Aug-93)
Capital Improvements Program (1994-1998)
Pro'ect Costs b T e
�----------------
Year ---------------�
Type
1994 1995 1996 1997 1998 Totals
1 Equipment 754,165 1,025,300 471,685 521,335 318,000 3,090,485
2 Park Development 237,000 160,000 265,000 106,000 95,000 863,000
3 Land Acquisition 288,000 1,992,000 120,000 0 0 2,400,000
4 Curb&Gutter 12,000 12,360 12,854 13,497 13,902 64,613
5 Sidewalk 28,325 29,174 30,050 31,853 33,764 153,166
6 Storm Sewer 0 0 0 0 0 0
7 Street 0 0 0 0 0 0
8 Facilities 0 0 0 0 0 0
g ___ 0 0 0 0 0 0
10 --- 0 0 0 0 0 0
14 --- 0 0 0 0 0 0
12 --- 0 0 0 0 0 �
13 --- 0 0 0 0 0 �
14 --- 0 � � � � �
15 --- Q � 0 � � �
Other(not specified above) 1,080,558 5,388,858 2,913,244 3,745,525 4,839,200 17,967,385
2,400,048 8,607,692 3,812,833 4,418,210 5,299,866 24,538,649
(06—Aug-93)
Capital improvements Program (1994-199E3) .
Revenue b Source
�-----�----------- Year ---------------�
Source
1994 1995 1996 19�J7 1998 Totals
1 Assessments 206,Q00 668,000 992,000 1,047,420 727,D00 3,640,420 •
2 General Levy 1,706,248 5,812,692 1,695,833 3,040,790 3,900,866 16,156,429
3 Generai Budget 0 0 0 0 0 0
4 General CIP 0 0 0 0 0 0
5 MSA 205,000 0 1,005,000 300,000 672,000 2,182,000
6 Port Authority 0 0 0 0 0 0
7 Park improvements 214,000 1,701,000 120,000 30,000 0 2,065,000
8 Other General 60,000 381,000 0 0 0 441,000
9 Other General 0 0 0 0 0 0
10 Other Genera) 0 0 0 0 0 0
1 l Other General 0 - 0 0 0 0 0
12 Other General 0 0 0 0 0 0
13 Water Gore 0 0 0 0 0 0
14 Sanitary Core 0 0 0 0 0 0
15 Storm Core 0 0 0 0 0 0
i 6 Water Operating 0 10,000 A 0 0 10,000
17 Sanitary Operating 0 10,000 0 0 0 40,000
18 5torm Operating 0 10,000 0 0 0 10,000
19 lttility CIP 8,800 15,000 0 0 0 23,800
20 Other Enterprise o 0 0 0 0 0
21 Other Enterprise 0 0 0 0 0 0
22 Other Enterprise 0 0 0 0 0 0
2,400,048 8,607,692 3,812,f333 4,418,210 5,299,866 24,538,649
(06—Aug-93)
Capita{Improvements Program(1994-1998)
Project Table
7otai Totai Cost=
# Name Project� Department TyQe ___ Year Cost Revenue Rev.? #
1 Office Furniture PIN 94-101 Administration Equipment 1�J94 2,500 2,500 1
2 Office Furniture PIN 94-102 Administration Equipment 1994 1,000 1,000 2
3 Gouncil ChamberFiemodeling PIN 94-103 Administration Equipment 1994 15,000 15,000 3
4 Councii Chamber Remodeling PIN 94-104 Administration Equipment 8 Installation 1994 40,000 40,000 4
5 Copy Machine PIN 94-105 Administretion Equipment 1994 20,000 20,000 5
6 City Hall Remodeling PIN 95-101 Administration Building Construction 1995 110,000 110,000 6
7 New Fi�e Station/Land Acquisition PIN 95-102 Administration Fire Station construction,Public 1995 3,150,000 3,150,000 7
8 Copy Machine PIN 97-101 Administration Equipment 1997 22,000 22,000 8
9 City Hall Expansion PIN 97-102 Administration Building Addition 1997 1,600,000 1,600,000 9
10 PC Replacement Program(and Printers) PIN 94-201 Finance Equipment 1994 20,000 20,000 10
i t Armory PC Hardware 8 Software PIN 9d-202 Finance Equipment 1994 40,000 40,000 11
12 Armory PC Networking PIN 94-203 Finance PC Hardware&Software 1994 30,000 30,000 12
13 PC Replacement Program{and Printers) PIN 95-201 Flnance Equipment 1995 20,000 20,000 13
14 Accounting/Utility Biiling Software PIN 95-202 Finance Equipme�t 1995 150,000 150,000 14
15 PC Repiacement Program(and Printers) PW 96-201 Finance Equipment 1996 24,000 24,000 15
i6 PC Repiacement Program(and Printers) PIN 97-201 Finance Equipment 1997 24,000 24,000 16
17 Copy Machine PIN 97-202 Finance Equipment 1997 5,000 5,000 17
18 PC Replacement Program(and Printers) PIN 98-201 finance Equipment 1998 24,000 24,000 18
19 GIS System Development PIN 94-301 Planning Software&Professional Servic� 1994 7,700 7,700 19
20 Vehicle Replacement PIN 94-302 Planning Equipment 1994 t5,000 15,000 20
21 Furniture/Equipment PIN95-301 Planning Equipment 1995 1,000 1,000 21
22 GIS System PIN 95-302 Planning Equipment 1995 15,00a 15,000 22
23 GIS System Development PIN 96-301 Planning Soffinrare 1996 1,200 1,200 23
24 GiS System Development PIN 97-301 Planning Software 1997 1,200 1,200 24
25 GIS System Development PIN 98-301 Planning Software 1998 1,200 1,200 25
26 Police Vehicie Replacemenis PIN 94-401 Police Equipment 1994 56,000 56,000 26
27 Mobile Squad Radio Addition PIN 94-402 Police Equipment 1994 1,065 1,065 27
28 Po{ice Vehicle Replacements PIN 95-401 PolicA Equipment 1995 33,000 33,000 28
29 Computer Update PIN 95-402 Police Equipment 1995 45,000 45,000 29
30 Police Vehicle Repiacements&Addition PIN 96-401 Police Equipment 1996 62,000 62,000 30
31 Mobile Squad Radio Replacements PIN 96-402 Police Equipment 1996 10,650 10,650 31
32 Police Hand-Held Radio Replacements PIN 96-403 Police Equipment 1996 6,390 6,390 32
{06-Aug-93) Paget
Capital improvements Program(1994-1998)
Project Table
Totai Total Cost=
# Name Project# Department Tvpe Year Cost Revenue Rev.? #
33 Base Radio Replacement PIN 96-404 Police Equipment 1996 5,325 5,325 33
34 Radar Equipment Replacement PIN 96-405 Police Equipment 1996 8,520 8,520 34
35 Police Vehicie Replacements PIN 97-401 Police Equipment 1997 64,000 64,000 35
36 Mobile Squad Radio Additions PIN 97-402 Police Equipment 1997 4,260 4,260 36
37 Radar UnitAdditions PIN 97-403 Police Equipment 1997 3,195 3,195 37
38 Lab Equipment PIN 97-404 Police Equipment 1997 5,325 5,325 38
39 Emergency Vehicle Opticom Units PIN 97-405 Police Equipment 1997 3,195 3,195 39
40 Mobi1 Data Terminal Additions PIN 97-406 Police Equipment 1997 26,560 26,560 40
41 Police Vehicle Replacements&Additions PIN 98-401 Police Equipment 1998 83,000 83,000 41
42 Mobile Squad Radio Addition PIN 98-402 Police Equipment 1998 2,500 2,500 42
43 Hand-Held Radio Additions PIN 98-403 Police Equipment 1998 6,000 6,000 43
44 Office Equipment-ReplacemenUAddition PIN 98-404 Police Equipment 1998 4,000 4,000 44
45 Fire Fighting Equipment PIN 94-501 Fire Equipment 1994 3,800 3,800 45
46 8unker Gear PIN 94-502 Fire Equipment 1994 6,000 6,000 46
47 Aeriai Fire Truck PIN 94-503 Fire Equipment 1994 325,000 325,000 47
48 Grass Fire Pump PIN 95-501 Fire Equipment 1995 12,000 12,000 48
49 Grass Fire Vehicie PIN 95-502 Fire EGuipment 1995 22,Q00 22,000 49
50 Pumper PIN 95-503 Fire Equipment 1995 100,000 100,000 50
51 Aerial Fire Truck PIN 95-504 Fire Equipment 1995 325,000 325,000 51
52 Fire Fighting Equipment PIN 95-505 Fire Equipment 1995 3,800 3,800 52
53 Bunker Gear PIN 95-506 Fire Equipment 1995 6,000 6,000 53
54 Fire Nose&Couplings PIN 95-507 Fire Equipment 1995 20,000 20,000 54
55 Pumper PIN 96-501 Fire Equipment 1996 100,000 100,000 55
56 Suburban -Command Vehicle PIN 96-502 Fire Equipment 1996 25,000 25,000 56
57 Fire Fighting Equipment PIN 96-503 Fire Equipment 1996 3,800 3,800 57
58 Bunker Gear PIN 96-504 Fire Equipment 1996 6,000 6,000 58
59 Computer Additions and Updates PIN 96-505 Fire Equipment 1996 10,000 10,000 59
60 Gress Fire Pump PIN 97-501 Fire Equipment 1997 9,000 9,000 60
61 1!2 Ton Pickup-Command Vehicle PIN 97-502 Fire Equipment 1997 22,OOo 22,000 61
62 Grass Fire Vehicie PIN 97-503 Fire Equipment 1997 22,000 22,000 62
63 Tanker Addition PIN 97-504 Fire Equipment 1997 165,000 165,000 63
64 Pumper PIN 97-505 Fire Equipment 1997 100,000 100,000 64
(06-Aug-93) Page2
Capitai Improvements Program(1994-1998)
Project TabJe
Total Total Cost=
# Name Project� Department Type Year Cost Revenue Rev.? #
65 Fire Fighting Equipment PIN 97-506 Fire Equipment 1997 3,800 3,800 65
66 Bunker Gear PIN 97-507 Fire Equipment 1997 6,000 6,000 66
67 Pagers PIN 97-508 Fire Equipment 1997 18,000 18,000 67
68 Refurbish Reserve Rescue Truck PIN 98-501 Fire Equipment 1998 30,000 30,000 68
69 Pumper Replacement Payment PIN 98-502 Fire Equipment 1998 150,000 150,000 69
70 Fire Fighting Equipment PIN 98-503 Fire Equipment 1998 4,500 4,500 70
71 Bunker Gear PIN 98-504 Fire Equipment 1998 6,000 6,000 71
72 Water flescue Equipment PIN 98-505 Fire Equipment 1998 8,000 8,000 72
73 Aerator PIN 94-601 Parks$�Recreation Equipment 1994 3,000 3,000 73
74 Phase I Vegatation-Carroii Woods P!N 94-602 Parks 8�Recreation Park Development 1994 10,000 10,000 74
75 Phase IIA Vegatation-Carroil Woods PIN 94-603 Parks&Recreation Park Development 1994 10,000 10,000 75
76 Park Shelter-Shannon park PIN 94-604 Parks&Recreation ParkDevelopment 1994 10,000 10,000 76
77 Playground Equipment-Connemara Park PIN 94-605 Parks&Recreation Equipment 1994 10,000 10,000 77
78 Tree Spade for Skid Steer Laader PIN 94-606 Parks&Recreation Equipment 1994 40,000 10,000 78
79 Basketball Courts PIN 94-607 Parks&Recreation Park Enhancements 1994 12,000 12,000 79
80 Office Furniture PIN 94-608 Parks&Recreation Office Fumiture 1994 15,000 15,000 80
81 Parking Lot-Erickson Community Square PIN 94-609 Parks&Recreation Park Development 1994 20,000 20,000 81
82 Replace 8�Upgrade Playground Equipment-Kidder P�PIN 94-610 Parks&Recreation Equipment 1994 40,000 40,000 62
83 Phase II B-C Vegatation-Carroll Woods PIN 94-611 Parks&Aecreation Park Development 1994 27,000 27,000 83
84 Park Shelter-Twin Puddles PIN 94-612 Parks&RecreaGon Park Development 1994 30,000 30,000 84
85 Grading-Erickson Community Square PIN 94-613 Parks&Recreation Park Development 1994 35,000 35,000 85
86 Parking Lot-Erickson Park PIN 94-614 Parks&Recreation Park Development 1994 35,000 35,000 86
87 ADA&Safety Upgrades to Playground Equipment PIN 94-615 Parks&Recreation Equipment 1994 35,000 35,000 87
88 General�ighting-Shannon Park PIN 94-616 Parks&Recreation Construction 1994 40,000 40,000 88
89 Park Shelter-City Ha0 PIN 94-617 Parks&Recreation Park Development 1994 60,000 60,000 89
90 Land-Biscayne/145th PIN 94-6t 8 Parks&Recreation Land Acquisition 1994 120,000 120,000 90
91 Land-Carroll Woods PIN 94-619 Parks&Recreation Land Acquisition 1994 168,000 168,000 91
92 Phase l Vegatation-Carroil Woods PIN 95-601 Parks&Recreation Park Development 1995 10,000 10,000 92
93 Phase IIA Vegatation-Carroll Woods PIN 95-602 Parks&Recreation Park Development 1995 10,000 10,000 93
94 Bridge-Carroii Woods PIN 95-603 Parks&Recreation Park Development 1995 10,000 10,000 94
95 Park Benches&Tabies PIN 95-604 Parks 8 Recreation Equipment 1995 10,000 10,000 95
96 6'John Deere Mower Replacement PIN 95-605 Parks&Recreation Equipment 1995 12,000 12,000 96
(06-Aug-93) Page 3
Capitai Improvements Program(1994-1998)
Project Table
Total Total Cost=
� Name Project� Department Type Year Cost Revenue Rev.? �
97 Park Sheiter-Kidder Park PIN 95-606 Parks&Recreation Park Development 1995 15,000 15,000 97
98 Playground Equipment-Erickson Community Square PIN 95-607 Parks&Recreation Equipment 1995 15,000 15,000 98
99 Piayground Equipment-Biscayne Park PIN 95-608 Parks&Recreation Equipment 1995 20,000 20,000 99
100 Dredgi�g-Carroli Woods PIN 95-609 Parks&Recreation Park Development 1995 25,000 25,000 100
101 Park Shelter-N7 PIN 95-610 Parks 8 Recreation Park Development 1995 30,Q00 30,000 101
102 Howard Mower Replacement PIN 95-611 Parics&Recreation Equipment 1995 30,000 30,000 102
103 Land-Winds Park PIN 95-612 Parks&Recreation Land Acquisition 1995 36,000 36,000 103
104 Playground Equipment at New Park jN-� PIN 95-613 Parks&Recreation Equipment 1995 40,000 40,000 104
105 Park Shelter-Schwarz Park PIN 95-614 Parks 8�Recreation Park Development 1995 60,000 60,000 105
106 Land-Schwarz Park PIN 95-615 Parks 8�Recreation Land Acquisition 1995 90,000 90,000 106
107 Land-Birger Pond PIN 95-616 Parks&Recreation Land Acquisition 1995 180,000 180,000 107
108 Land-Hart Property PIN 95-617 Parks 8 Recreation land Acquisition 1995 336,000 336,000 T08
109 Land-Erickson Community Square PIN 95-618 Parks 8 Recreation Land AcquisiUon 1995 350,000 350,000 109
110 Land-UniversityProperty PIN 95-619 Parks&Recreation Land Acquisition 1995 1,000,000 1,000,000 i 10
111 Bike Trail Through Camfield Park PIN 96-601 Parks&Recreation Construction 1996 6,000 6,000 t 11
112 Phase I Vegatation-Carroli Woods PIN 96-602 Parks 8 Recreation Park Development 1996 10,000 10,000 112
113 Phase IIA Vegatation-Carroll Woods PIN 96-603 Parks&Recreation Park Development 1996 10,000 10,000 113
114 Parking Lot-Twin Puddles PIN 96-604 Parks 8 Recreation Construction 1996 10,000 10,000 114
115 Piayground Equipment-Biscayne Park PIN 96-605 Parks 8 Recreation Equipment 1996 15,000 15,000 115
i 16 Pond Restoration-Connemara Park PIN 96-606 Parks&Recreation Construction 1996 15,000 15,000 116
117 Tennis Courts R Basketbaii Courts-Jaycee Park PIN 96-607 Parks&Recreation ConstrucGon 1996 30,000 30,000 117
118 Playground Equipment-Shannon Park - PIN 96-608 Parks&Recreation Equipment 1996 40,000 40,000 118
119 Ornamental Pond-Erickson Community Square PIN 96-609 Parks 8 Recreation Park Development 1996 65,000 65,000 119
120 Deck-Erickson Community Square PIN 96-610 Parks 8 Recreation Park Development 1996 70,000 70,000 120
121 Park Shelter-Shannon Park PIN 96-611 Parks&Recreation Park Development 1996 110,000 110,000 121
122 Land-Shannon Park PIN 96-612 Parks&Recreation Land Acquisition 1996 120,000 120,000 122
123 Ornamental Sculpture-Erickson Community Square PIN 97-601 Paris&Recreation Park Development 1997 5,000 5,000 t23
124 Pond Observation Blind -Carroll/Schwarz PIN 97-602 Parks&Recreation Park Development 1997 8,000 8,000 124
125 Environmental Education Dock-CarrolVSchwarz PIN 97-603 Par{cs&Recreation Park Oevelopment 1997 8,000 8,000 125
126 Phase I Vegatation-Carroll Woods PIN 97-604 Parks&RecreaGon Park Development 1997 10,000 10,000 126
127 Phase IIA Vegatation-Carroll Woods PIN 97-605 Parks&Recreation Park Development 1997 10,000 10,000 127
128 Park Shelter-Winds Park PIN 97-606 Parks&Recreation Park Development 1997 30,000 30,000 128
(06-Aug-93) Page 4
Capital Improvements Program (1994-1998)
Project Tabie
Total Total Cost=
#� Name Project# Department Type Year Cost Revenue Rev.? �
129 Lighting-Erickson Community Square PIN 97-607 Parks&Recreation Park Development 1997 35,000 35,000 129
130 Walkways&Bridge-Erickson Community Square PIN 97-608 Parks&Recreation Construction 1997 40,000 40,000 130
131 Phase IIA Vegatation-Carroll Woods PIN 98-601 Parks&Recreation Park Development 1998 10,000 10,OOQ 131
132 Stone Path-Erickson Community Square PW 98-602 Parks 8 Recreation Construction 1998 12,000 12,000 132
133 Pond Restoration-Erickson Communiry Square PIN 98-603 Parks 8 Recreation Park Development 1998 15,000 15,000 133
134 Trail-Erickson Community Square PIN 98-604 Parks&Recreation Park Development 1998 20,000 20,000 134
135 Grade forAmphitheater-Erickson Community Square PIN 98-605 Parks&RecreaUon Construction 1998 35,000 35,000 135
136 Landscaping 8 Amenities-Erickson Community SquanPlN 98-606 Parks&Recreation Construction 1998 50,000 50,000 136
137 Parking Lot/Entrance Drive-Carroli Woods PIN 98-607 Parks 8 Recreation Park Development 1998 50,000 50,000 137
138 Sander PIN 94-701 Public Works Equipment 1994 3,000 3,000 138
139 Utiliry Box PIN 94-702 Public Works/Utilities Equipment 1994 3,800 3,800 139
140 Water Tower Maintenance PIN 94-703 Public Works/Utilities Improvements Maintenance 1994 5,000 5,000 140
141 Diagnostic Computer PIN 94-704 Public Works Equipment 1994 6,000 6,000 141
142 Truck PIN 94-705 Public Works Equipment 1994 18,000 18,000 142
143 Truck PIN 94-706 Public Works Equipment 1994 20,000 20,000 143
144 TrUck PIN 94-707 Public Works Equipment 1994 100,000 100,000 144
145 Curb 8 Gutter Replacement PIN 94-708 Public Works Curb&Gutter 1994 12,000 12,000 145
146 Sidewalk Replacement PIN 94-709 Public Works Sidewalk 1994 28,325 28,325 146
147 Gravel Road Resurfacing PIN 94-710 Public Works Road Resurfacing 1994 37,158 37,158 147
148 Street Reconstruction- 143rd Street West PIN 94-711 Public Works Street ReconsVuction 1994 49,000 49,000 148
149 Street Reconstruction-Cameo Avenue PIN 94-712 Public Works Street Reconstruction 1994 83,000 83,000 149
150 Street Reconstruction- 145th Street West PIN 94-713 Public Works Street Reconstruction 1994 761,700 7fi1,700 150
151 Lift Cart PIN 95-701 Public Worics Equipment 1995 4,500 4,500 151
152 Vehicle Hoist PIN 95-702 Public Works Equipment 1995 5,000 5,000 152
153 Paint Gun PIN 95-703 Public Works Equipment 1995 6,000 6,000 153
154 Lawn Mower PIN 95-704 Pubfic WorksNtilities Equipment 1995 15,000 15,000 154
155 Laader PIN 95-705 Publie Works Equipment 1995 115,000 115,000 155
156 Curb&Gutter Replacement PIN 95-706 Pubiic Works Curb&Gutter 1995 12,360 12,360 156
157 Sidewaik Replacement PIN 95-707 Public Works Sidewalk 1995 29,174 29,174 157
158 Gravel Road Resurfacing PIN 95-708 Public Works Road Resurfacing 1995 37,158 37,158 15$
159 Street Reco�Vuction-Cameo Avenue PIN 95-709 Public Works Street Reconstruction 1995 83,000 83,000 159
160 Street Reconstruction-Camero Avenue PIN 95-710 Public Works Street Reconstruction 1995 100,000 100,000 160
(06-Aug-93) Page 5
Capital Improvemenis Program(1994-1998)
Project Table
Total Total Cost=
# Name Project# Department Tvpe Year Cost Revenue Rev.? �
161 Street Reconstruction-lower 147th Street West PIN 95-711 Public Works Street Reconstruction 1995 118,000 118,000 161
162 Street Reconstruction-Cambrian Avenue PIN 95-712 Public Works Street Reconstruction 1995 132,000 132,000 162
163 SUeet Reconstruction- i60th Street PIN 95-713 Pubiic Works Street Reconstruction 1995 430,300 430,300 163
164 Street Reconstruction- 160th Street PIN 95-714 Pubiic Works Street Fieconstruction 1995 1,228,400 1,228,400 164
165 Skid Steer Loader PIN 96-701 Public Works Equipment 1996 25,000 25,000 165
166 Truck PIN 96-702 Public Works Equipment 1996 30,000 30,000 166
167 Truck PIN 96-703 Public Works Equipment 1996 100,000 100,000 167
168 Curb&Gutter Replacement PW 96-704 Public Works Curb&Gutter 1996 12,854 12,854 168
169 Sidewalk Replacement PIN 96-705 Public Works Sidewalk 1996 30,050 30,050 169
170 Gravel Road Resurfacing PIN 96-706 Public Works Road Resurfacing 1996 71,944 71,944 170
171 StreetReconstruction-Cimmarron Avenue PIN 96-707 Public Worics Street Reconstruction 1996 40,000 40,000 171
172 Street Reconstruction-Chippendale Avenue PIN 96-708 Public Works Street Reconstruction 1996 484,900 484,900 172
173 Street ReconsUuction- 145th Street West PIN 96-709 Public Works Street Reconstruction 1996 1,019,200 1,019,200 173
174 Street Reconstruction-Biscayne Avenue PIN 96-710 Public Works Street Reconstruction 1996 1,235,000 1,235,000 174
175 Truck PIN 97-701 Public Works Equipment 1997 18,000 18,000 175
176 Curb&Gutter Repiacement PIN 97-702 Public Works Curb&Gutter 1997 13,497 13,497 176
177 Sidewalk Repiacement PIN 97-703 Public Works Sidewalk 1997 31,853 31,853 177
178 Street Reconstruc6an-Akron Avenue PIN 97-704 Public Works Street Reconstruction 1997 842,025 842,025 178
179 Street Reconstruction-Conemarra Trail PIN 97-705 Public Works Street Reconstruction 1997 1,262,300 1,262,300 179
180 Curb&Gutter Repiacement PIN 98-701 Public Works Curb&Gutter 1998 13,902 13,902 180
181 Sidewalk Replacement PIN 98-702 Public Works Sidewaik 1998 33,764 33,764 181
182 Street Reconstruction-Dodd Boulevard PIN 98-703 Pubiic Works Street Reconstruction 1998 761,400 761,400 182
183 Street Reconstruction-Dodd Boulevard PIN 98-704 Public Works Street Reconstruction 1998 761,400 761,400 183
184 Street Reconstruction-Dodd Boulevard PIN 98-705 Public Works Street Reconstruction t998 761,400 761,400 184
185 Street Reconstruction-Diamond Path PIN 98-706 Public Works Street Reconstruction 1998 1,228,400 1,228,400 185
186 Street Reconstruction-County Road 38 PIN 98-707 Pubiic Works Street Reconstruction 1998 1,228,400 1,228,400 186
187 --- --- --- --- --- 0 0 187
188 --- --- --- --- --- 0 0 188
189 --- --- --- --- --- 0 0 189
190 --- --- --- --- --- 0 0 190
191 --- --- --- --- --- 0 0 191
192 --- --- --- --- --- 0 0 192
(O6-Aug-93) Page 6
Capital ImprovemenLs Program(t994-1998)
Project Table
Toffii Total Cost=
# Name Project� DepartmeM Type Year Cost Revenue Rev.? �
193 --- --- --- --- --- 0 0 193
194 --- --- --- --- --- 0 0 194
195 --- --- --- --- --- 0 0 195
196 --- --- --- --- --- 0 0 196
197 --- --- --- --- --- 0 0 197
198 --- --- --- --- --- 0 0 198
199 --- --- --- --- --- 0 0 199
200 --- --- --- --- --- 0 0 200
201 --- --- --- --- --- 0 0 201
202 --- --- --- --- --- 0 0 202
203 --- --- --- --- --- 0 0 203
204 --- --- --- --- --- 0 0 204
205 --- --- --- --- --- 0 0 205
206 --- --- --- --- --- 0 0 206
207 --- --- --- --- --- 0 0 207
208 --- --- --- --- --- 0 0 208
209 --- --- --- --- --- 0 0 209
210 --- --- --- --- --- 0 0 210
211 --- --- --- --- --- 0 0 211
212 --- --- --- --- --- 0 0 212
213 --- --- --- --- --- 0 0 213
214 --- --- --- --- --- 0 0 214
215 --- --- --- --- --- 0 0 215
216 --- --- --- --- --- 0 0 216
217 --- --- --- --- --- 0 0 217
218 --- --- --- --- --- 0 0 218
219 --- --- --- --- --- 0 0 219
220 --- --- --- --- --- 0 0 220
221 --- --- --- --- --- 0 0 221
222 --- --- --- --- --- 0 0 222
223 --- --- --- --- --- 0 0 223
224 --- --- --- --- --- 0 0 224
(06-Aug-93) Page 7
Capital improvemenis Program(1994-1998)
Project Table _ _
ToffiI Total Cost=
# Name Project# Department Tvpe Year Cost Revenue Rev.? #
225 ——
--- --- --- ---
0 0 225
226 --- --- --- --- --- 0 0 226
227 --- --- --- ' --- --- 0 0 227
228 --- --- --- --- --- 0 0 228
229 --- --- --- --- --- 0 0 229
230 --- --- --- --- --- 0 0 230
231 --- --- --- --- --- 0 0 231
232 --- --- ---
--- --- 0 0 232
233 --- --- --- --- --- 0 0 233
234 --- --- --- --- --- 0 0 234
235 --- --- --- --- --- 0 0 235
236 --- --- --- --- --- 0 0 236
237 --- --- --- --- --- 0 0 237
238 --- --- --- --- --- 0 0 238
239 ---" --- --- --- --- 0 0 239
240 --- --- --- --- --- 0 0 240
241 --- --- --- --- --- 0 0 241
242 --- --- --- --- --- A 0 242
243 --- --- --- --- --- 0 0 243
244 --- --- --- --- --- 0 0 244
245 --- --- --- --- --- 0 0 245
246 --- --- --- --- --- 0 0 246'
247 --- --- --- --- --- 0 0 247
248 --- --- --- --- --- 0 0 248
249 --- --- --- --- --- 0 0 249
250 --- --- --- --- --- 0 0 250
________________________________________-____________-________________________=_____________________�=•________�'____
Capitai Improvements Program(1994-1998)
Proiect Table �------------------------------------ General Revenue Sources -----------------------------------(
General General Generaf Port Park Total
Assmnts. Levy Budget CIP MSA Authority Improve. Other Other Other Other Other General
# Proiect#t 1 2 3 ' 4 5 6 7 8 9 10 11 12 Revenue �
1 PIN 94-101 0 2,500 0 0 0 0 0 0 0 0 0 0 2,500 1
2 PIN 94-102 0 1,000 0 0 0 0 0 0 0 0 0 0 1,000 2
3 PIN 94-103 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 3
4 PW 94-104 0 25,000 0 0 0 0 0 15,000 0 0 0 0 40,000 4
5 PIN 94-tA5 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 5
6 PIN 95-101 0 110,000 0 0 0 0 0 0 0 0 0 0 110,000 6
7 PIN 95-102 0 3,150,000 0 0 0 0 0 0 0 0 0 0 3,150,000 7
8 PIN 97-101 0 22,000 0 0 0 0 0 0 0 0 0 0 22,000 8
9 PIN 97-102 0 1,600,000 0 0 0 0 0 0 0 0 0 0 1,600,000 9
10 PIN 94-201 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 10
11 PIN 94-202 0 40,000 0 0 0 0 0 0 0 0 0 0 40,000 11
12 PIN 94-203 0 30,000 0 0 0 0 0 0 0 0 0 0 30,000 12
13 PIN 95-201 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 13
14 PIN 95-202 0 120,000 0 0 0 0 0 0 0 0 0 0 120,000 14
15 PIN 96-201 0 24,000 0 0 0 0 0 0 0 0 0 0 24,000 15
16 PIN 97-201 0 24,000 0 0 0 0 0 0 0 0 0 0 24,000 16
17 PIN 97-202 D 5,000 0 0 0 0 0 0 0 0 0 0 5,000 17
18 PIN 98-201 0 24,000 0 0 0 0 0 0 0 0 0 0 24,000 18
19 PIN 94-301 0 J,700 0 0 0 0 0 0 0 0 0 0 7,700 19
20 PIN 94-302 0 15,000 0 0 0 0 0 0 0 0 Q 0 15,000 20
21 PIN 95-301 0 1,000 0 0 0 0 0 0 0 0 0 0 1,000 21
22 PIN 95-302 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 22
23 PIN 96-301 0 1,200 0 0 0 0 0 0 0 0 0 0 1,200 23
24 PIN 97-301 0 1,200 0 0 0 0 0 0 0 0 0 0 1,200 24
25 PIN 98-301 0 1,200 0 D 0 0 0 0 0 0 0 A 1,200 25
26 PIN 94-401 0 56,000 0 0 0 0 0 0 0 0 0 0 56,000 26
27 PIN 94-402 0 1,065 0 0 0 0 0 0 0 0 0 0 1,065 27
28 PIN 95-401 0 33,000 0 0 0 0 0 0 0 0 0 0 33,000 28
29 PIN 95-402 0 45,000 0 0 0 0 0 0 0 0 0 0 45,000 29
30 PIN 96-401 0 62,000 0 0 0 0 0 0 0 0 0 0 62,000 30
31 PIN 98-402 0 t0,650 0 0 D 0 0 0 0 0 0 0 10,650 31
32 PIN 96-403 0 6,390 0 0 0 0 0 0 0 0 0 0 6,390 32
(06-Aug-93) Page1
Capital Improvemenis Prog�am(1994-1998)
Project Table �------------------------------------ General Revenue Sources -----------------------------------�
General General General Port Park Total
Assmnts. Levy Budgei CIP MSA Authority lmprove. Other Other Other Other Other General
# Project#t 1 2 3 4 5 6 7 8 9 10 11 12 Revenue #
33 PIN 96-404 0 5,325 0 0 0 0 0 0 0 0 0 0 5,325 33
34 PIN 96-405 0 8,520 0 0 0 0 0 0 0 0 0 0 8,520 34
35 PIN 97-401 0 64,000 0 0 0 0 0 0 0 0 0 0 64,000 35
36 PIN 97-402 0 4,260 0 0 0 0 0 0 0 0 0 0 4,260 36
37 PIN 97-403 0 3,195 0 0 0 0 0 0 0 0 0 0 3,195 37
38 PIN 97-404 0 5,325 0 0 0 0 0 0 0 0 0 0 5,325 38
39 PIN 97-405 0 3,195 0 0 0 0 0 0 0 0 0 0 3,195 39
40 PIN 97-406 0 26,560 0 0 0 0 0 0 0 0 0 0 26,560 40
41 PIN 98-401 0 83,000 0 0 0 0 0 0 0 0 0 0 83,000 41
42 PIN 98-402 0 2,500 0 0 0 0 0 0 0 0 0 0 2,500 42
43 PIN 98-403 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 43
44 PIN 98-404 0 4,000 0 0 0 0 0 0 0 0 0 0 4,000 44
45 PIN 94-501 0 3,800 0 0 0 0 0 0 0 0 0 0 3,800 45
46 PIN 94-502 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 46
47 PIN 94-503 0 325,000 0 0 0 0 0 0 0 0 0 0 325,000 47
48 PIN 95-501 0 12,000 0 0 0 0 0 0 0 0 0 0 12,000 48
49 PIN 95-502 0 22,000 0 0 0 0 0 0 0 0 0 0 22,000 49
50 PIN 95-503 0 100,000 0 0 0 0 0 0 0 0 0 0 100,000 50
51 PIN 95-504 0 325,000 0 0 0 0 0 0 0 0 0 0 325,000 51
52 PIN 95-505 0 3,800 0 0 0 0 0 0 0 0 0 0 3,800 52
53 PIN 95-506 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 53
54 PIN 95-507 0 20,Q00 0 0 0 0 . 0 0 0 0 0 0 20,000 54
55 PIN 96-501 0 100,OQ0 0 0 0 0 0 0 0 0 0 0 100,000 55
56 PIN 96-502 0 25,000 0 0 0 0 0 0 0 0 0 0 25,OQ0 56
57 PIN 96-503 0 3,800 0 0 0 0 0 0 0 0 0 0 3,800 57
58 PIN 96-504 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 58
59 PiN 96-505 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 59
60 PIN 97-501 0 9,000 0 0 0 0 0 0 0 0 0 0 9,000 60
61 PIN 97-502 0 22,000 0 0 0 0 0 0 0 0 0 0 22,000 61
62 PIN 97-503 0 22,000 0 0 0 0 0 0 0 0 0 0 22,000 62
63 PIN 97-504 0 165,000 0 0 0 0 0 0 0 0 0 0 165,000 63
64 PIN 97-505 0 100,000 0 0 0 0 0 0 0 0 0 0 100,000 64
(O6-Aug-93) Page 2
Capital Improvements Program(1994-1998)
Project Table j------------------------------------ General Revenue Sources -----------------------------------�
General General General Port Park Total
Assmnts. Levy Budget CIP MSA Authority lmprove. Other Other Other Other Other General
# Proiect# 1 2 3 4 5 6 7 8 9 10 11 12 Revenue �
65 PIN 97-506 0 3,800 0 0 0 0 0 0 0 0 0 0 3,800 65
66 PIN 97-507 0 6,000 0 0 Q 0 0 0 0 0 0 0 6,000 66
67 PIN 97-508 0 18,000 0 0 0 0 0 0 0 0 0 0 18,000 67
68 PIN 98-501 0 30,000 0 0 0 0 0 0 0 0 0 0 30,000 68
69 PIN 98-502 0 150,000 0 0 0 0 0 0 0 0 0 0 150,000 69
70 PIN 98-503 0 4,500 0 0 0 0 0 0 0 0 0 0 4,500 70
71 PIN 98-SQ4 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 71
72 PIN 98-505 0 8,000 0 0 0 0 0 0 0 0 0 0 8,000 72
73 PIN 94-601 0 3,000 0 0 0 0 0 0 0 0 0 0 3,000 73
74 PIN 94-602 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 74
75 PIN 94-603 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 75
76 PIN 94-604 0 0 0 0 0 0 10,000 0 0 0 0 0 10,000 76
77 PIN 94-605 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 77
78 PIN 94-606 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 78
79 PIN 94-607 0 12,000 0 0 0 0 0 0 0 0 0 0 12,000 79
80 PIN 94-608 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 80
81 PIN 94-609 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 81
82 PIN 94-610 0 40,000 0 0 0 0 0 0 0 0 0 0 40,000 82
83 PIN 94-611 0 27,000 0 0 0 0 0 0 0 0 0 0 27,000 83
84 PIN 94-612 0 30,000 0 0 0 0 0 0 0 0 A 0 30,000 84
85 PIN 94-613 0 35,000 0 0 0 0 0 Q 0 0 0 0 35,000 85
86 PIN 94-614 0 35,000 0 0 0 0 0 0 0 0 0 0 35,000 86
87 PIN 94-615 0 35,000 0 0 0 0 0 0 0 0 0 0 35,000 87
88 PIN 94-616 0 40,000 0 0 0 0 D 0 0 0 0 0 40,000 88
89 PIN 94-617 0 60,000 0 0 0 0 0 0 0 0 0 0 60,000 89
90 PIN 94-618 0 0 0 0 0 0 120,000 0 0 0 0 0 120,000 90
91 P�N 94-619 0 39,000 0 0 0 0 84,000 45,000 0 0 0 0 168,000 91
92 PIN 95-601 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 92
93 PIN 95-602 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 93
94 PIN 95-603 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 94
95 PIN 95-604 0 10,000 0 0 0 0 0 Q 0 0 0 0 t0,W0 95
96 PIN 95-605 0 12,000 0 0 0 0 0 0 0 0 0 0 12,000 96
(06-Aug-93} Page 3
Capitai Improvements Program(1994-1998)
ProjectTable �------------------------------------ GeneraiRevenueSources -----------------------------------�
General Generai General Port Park Total
Assmnts. Levy Budget CIP MSA Authority Improve. Other Other Other Other Other General
� Pro'tect# 1 2 3 4 5 6 7 8 9 70 _11_ 12 Revenue �
97 PIN 95-606 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 97
98 PIN 95-607 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 98
'99 PIN 95-608 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 99
100 PIN 95-609 0 25,000 0 0 0 0 0 0 0 0 0 0 25,000 100
101 PIN 95-610 0 0 0 0 0 0 30,000 0 0 0 0 0 30,000 101
102 PIN 95-611 0 30,000 0 0 0 0 0 0 0 0 0 0 30,000 102
103 PIN 95-612 0 0 0 0 0 0 36,000 0 0 0 0 0 36,000 103
104 PIN 95-613 0 40,000 0 0 0 0 0 0 0 0 0 0 40,000 104
105 PIN 95-614 0 0 0 0 0 0 60,000 0 0 0 0 0 60,000 105
106 PIN 95-615 0 0 0 0 0 0 45,000 45,000 0 0 0 0 90,000 106
107 PIN 95-616 0 0 0 0 0 0 180,000 0 0 0 0 0 180,000 107
108 PIN 95-617 0 0 0 0 0 0 0 336,900 0 0 0 0 336,000 108
109 PIN 95-618 0 0 0 0 0 0 350,000 0 0 0 0 0 350,000 109
110 PIN 95-619 0 0 0 0 0 0 1,00�,000 0 0 0 0 0 1,000,000 110
111 PIN 96-601 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 111
112 PIN 96-602 0 10,000 0 0 0 0 0 0 0 D 0 0 10,000 112
113 PIN 96-603 0 10,000 0 0 0 0 0 0 0 A 0 0 10,000 113
114 PIN 96-604 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 114
115 PIN 96-605 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 115
116 PIN 96-606 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 116
117 PIN 96-607 0 30,000 0 0 0 0 0 0 0 0 0 0 30,000 117
118 PIN 96-608 0 40,000 0 0 0 0 0 0 0 0 0 0 40,000 118
119 PIN 96-609 0 65,000 0 0 0 0 0 0 0 0 0 0 65,000 119
120 PIN 96-610 0 70,000 0 0 0 0 0 0 0 0 0 0 70,000 120
121 PIN 96-611 0 110,000 0 0 0 0 0 0 0 0 0 0 110,000 121
122 PIN 96-612 0 0 0 0 0 0 120,000 0 0 0 0 0 120,000 122
123 PIN 97-601 0 5,000 0 0 0 0 0 0 0 0 0 0 5,000 123
124 PIN 97-602 0 8,000 0 0 0 0 0 0 0 0 0 0 8,000 124
125 PIN 97-603 0 8,000 0 0 0 0 0 0 0 0 0 0 8,000 125
126 PIN 97-604 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 126
127 PIN 97-605 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 127
128 PIN 97-606 0 0 0 0 6 0 30,000 0 0 0 0 _ 0 30,000 128
(06-Aug-93) ' Pege 4
Capital Improvements Program (1994-1998)
Project Table �------------------------------------ General Revenue Sources -----------------------------------�
General Generei General Port Park Total
Assmnts. Levy Budget CIP MSA Authority Improve. Other Qther Other Other Other General
# Project# 1 2 3 4 5 6 7 8 9 10 11 12 Revenue #
129 PIN 97-607 0 35,000 0 0 0 0 0 0 0 0 0 0 35,000 129
130 PIN 97-608 0 40,000 0 0 0 0 0 0 0 0 0 0 40,000 130
131 PIN 98-601 0 10,000 0 0 0 0 0 0 0 0 0 0 10,000 131
132 PIN 98-602 0 12,000 0 0 0 0 0 -0 0 0 0 0 12,000 132
133 PIN 98-603 0 15,000 0 0 0 0 0 0 0 0 0 0 15,000 133
134 PIN 98-604 0 20,000 0 0 0 0 0 0 0 0 0 0 20,000 134
135 PW 98-605 0 35,000 0 0 0 0 0 0 0 0 0 0 35,000 135
136 PIN 98-606 0 50,000 0 0 0 0 0 0 0 0 0 0 50,000 136
137 PIN 98-607 0 50,000 0 0 0 0 0 0 0 0 0 0 50,000 137
t38 PIN 94-701 0 3,000 0 0 0 0 0 0 0 0 0 0 3,000 138
139 PIN 94-702 0 0 0 0 0 0 0 0 0 0 0 0 0 139
140 PIN 94-703 0 0 0 0 0 0 0 0 0 0 0 0 0 140
141 PIN 94-704 0 6,000 0 0 0 0 0 0 0 0 -0 0 6,000 141
142 PW 94-705 0 18,000 0 0 0 0 0 0 0 0 0 0 18,000 142
143 PIN 94-706 0 ' 20,000 0 0 0 0 0 0 0 0 0 0 20,000 143
144 PIN 94-707 0 100,000 0 0 0 0 0 0 0 0 0 0 100,000 144
145 PIN 94-706 0 12,000 0 0 0 0 0 0 0 0 0 0 12,000 145
146 PIN 94-709 0 28,325 0 0 0 0 0 0 0 0 0 0 28,325 146
147 PIN 94-710 0 37,158 0 0 0 0 0 0 0 0 0 0 37,158 147
148 PIN 94-711 40,000 9,000 0 0 0 0 0 0 0 0 0 0 49,000 148
149 PIN 94-712 61,000 22,000 0 0 0 0 0 0 0 0 0 0 83,000 149
150 PIN 94-713 105,000 451,700 0 0 205,000 0 0 0 0 0 0 0 761,700 150
151 PIN 95-701 0 4,500 0 0 0 0 0 0 0 0 0 0 4,500 151
152 PIN 95-702 0 5,000 0 0 0 0 0 0 0 0 0 0 5,000 152
153 PIN 95-703 0 6,000 0 0 0 0 0 0 0 0 0 0 6,000 153
154 PIN 95-704 0 0 0 0 0 0 0 0 0 0 0 0 0 154
155 PIN 95-705 0 115,000 0 0 0 -0 0 0 0 0 0 0 115,000 155
156 PIN 95-706 0 12,360 0 0 0 0 0 0 0 0 0 0 12,360 156
157 PIN 95-707 0 29,f74 0 0 0 0 0 0 0 0 0 0 29,174 157
158 PIN 95-708 0 37,158 0 0 0 0 0 0 0 0 0 0 37,158 158
159 PIN 95-709 63,000 20,000 0 0 0 0 0 0 0 0 0 0 83,000 159
160 PIN 95-710 59,000 41,000 0 0 0 0 0 0 0 0 0 0 100,000 160
(06-Aug-93) Page 5
Capital improvements Program(1994-1998)
Project Table �------------------------------------ General Revenue Sources -----------------------------------�
General General Generel Port Park Total
Assmnls. Levy Budget CIP MSA Authority Improve. Other Other Other Other Other General
� Proiect# 1 2 3 4 5 6 7 8 9 10 11 12 Revenue #F
161 PIN 95-711 88,OD0 30,000 0 0 0 0 0 0 0 0 0 0 118,000 161
162 PIN 95-712 86,000 46,000 0 0 0 0 0 0 0 0 0 0 132,000 162
163 PIN 95-713 220,000 210,300 0 0 0 0 0 0 0 0 0 0 430,300 163
164 PIN 95-714 152,000 1,076,400 0 0 0 0 0 -0 0 A 0 0 1,228,400 164
165 PIN 96-701 0 25,000 0 0 0 0 0 0 0 0 0 0 25,000 165
166 PIN 96-702 0 30,000 0 0 0 0 0 0 0 0 0 0 30,W0 166
167 PIN 96-703 0 100,000 0 0 0 0 0 0 0 0 0 0 100,000 167
168 PIN 96-704 0 12,854 0 0 0 0 0 0 0 0 0 0 12,854 168
169 PIN 98-705 0 30,050 0 0 0 0 0 0 0 0 0 0 30,050 169
170 PIN 96-706 0 71,944 0 0 0 0 0 0 0 0 0 0 71,944 170
171 PIN 96-707 37,000 3,000 0 0 0 0 0 0 0 0 0 0 40,000 171
172 PIN 96-708 281,000 63,900 0 0 140,000 0 0 0 0 0 0 0 484,900 172
173 PIN 96-709 254,000 300,200 0 0 465,000 0 Q 0 0 0 0 0 1,019,200 173
174 PIN 96-710 420,000 415,000 0 0 400,000 0 0 0 0 0 0 0 1,235,000 174
175 PIN 97-701 0 18,000 0 0 0 0 0 0 0 0 0 0 18,000 175
176 PIN 97-702 0 13,497 0 0 0 0 -0 0 0 0 0 0 13,497 176
177 PIN 97-703 0 31,853 0 0 0 0 0 0 0 0 0 0 31,853 177
178 PIN 97-7Q4 651,420 190,605 0 0 0 0 0 0 0 0 0 0 842,025 178
179 PIN 97-705 396,000 566,300 0 0 300,000 0 0 0 0 0 0 0 1,262,300 179
180 PIN 98-701 0 13,902 0 0 0 0 0 0 0 0 0 0 13,902 180
181 PIN 98-702 0 33,764 0 0 0 0 0 0 0 0 0 0 33,764 181
182 PIN 98-703 141,000 396,400 0 0 224,000 0 0 0 0 0 0 0 761,400 182
183 PIN 98-704 141,000 396,400 0 0 224,000 0 0 0 0 0 0 0 761,400 183
184 PIN 98-705 141,000 396,400 0 0 224,000 0 0 0 0 0 0 0 761,400 184
185 PIN 98-706 152,000 1,076,400 0 0 0 0 0 0 0 0 0 0 1,228,400 185
186 PIN 98-707 152,000 1,076,400 0 0 0 0 0 0 0 0 0 0 1,228,400 186
187 --- 0 0 0 0 0 0 0 0 0 0 0 0 0187
188 --- 0 0 0 0 0 0 0 0 0 0 0 0 0188
189 --- 0 0 0 0 0 0 0 0 0 0 0 0 0189
190 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 190
191 --- 0 0 0 0 0 0 0 0 0 0 0 0 0191
192 --- 0 0 0 0 0 0 0 0 0 0 0 0 0192
(O6-Aug-93) Page 6
Capitai Improvements Program(1994-1998)
ProjectTable �------------------------------------ GeneraiRevenueSources -----------------------------------�
Geoeral General General Port Park Totai
Assmnis. Levy Budget CIP MSA Authority Improve. Other Other Other Other Other General
# Proiect# 1 2 3 4 5 6 7 8 9 10 11 12 Revenue #
193 --- 0 0 0 0 0 0 0 0 0 0 0 0 0193
194 --- 0 0 0 0 0 0 0 0 0 0 0 0 0194
195 --- 0 0 0 0 0 0 0 0 0 0 0 0 0195
196 --- 0 0 0 0 0 0 0 0 0 Q 0 0 0196
197 --- 0 0 0 0 0 0 0 0 0 0 0 0 0197
198 --- 0 0 0 0 0 0 0 0 0 0 0 0 0198
199 --- 0 0 0 0 0 0 0 0 0 0 0 0 0199
200 --- 0 0 0 0 0 0 . 0 0 0 0 0 0 0 200
201 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 201
202 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 202
203 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 203
204 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 204
20S --- 0 0 0 0 0 0 0 0 0 0 0 0 0 205
206 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 206
207 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 207
208 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 208
209 --- 0 0 0 0 0 0 -0 0 0 0 0 0 0 209
210 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 210
211 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 211
212 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 212
213 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 213
2t4 - 0 0 0 0 0 0 0 0 0 0 0 0 0 214
215 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 215
216 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 216
217 --- 0 0 0 Q 0 0 0 0 0 0 0 0 0 217
218 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 218
219 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 219
220 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 220
221 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 221
222 - 0 0 0 0 0 0 0 0 0 0 0 0 0 222
223 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 223
224 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 224
(06-Aug-93 j Page 7
Capital Improvements Program(1994-1998)
ProjectTable �------------------------------------ GeneralHevenueSources -----------------------------------�
General General Gene�l Port Park Total
Assmnts. Levy Budget CIP MSA Authority Improve. Other Other Other Other Other General
#t Project# 1 2 3 4 5 6 7 8 9 10 11 12 Revenue #
225 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 225
226 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 226
227 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 227
228 - 0 0 0 0 0 0 0 0 0 0 0 0 0 228
229 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 229
230 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 230
231 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 231
232 --- 0 0 . 0 0 0 0 0 0 0 0 0 0 0 232
233 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 233
234 --- 0 0 0 0 Q 0 0 0 0 0 0 0 0 234
235 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 235
236 --- 0 0 0 D 0 0 0 0 0 0 0 0 0 236
237 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 237
238 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 238
239 --- 0 0 0 0 0 0 U 0 0 0 0 0 0 239
240 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 240
241 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 241
242 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 242
243 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 243
244 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 244
245 --- 0 0 0 0 0 0 0 -0 0 0 0 0 0 245
246 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 246
247 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 247
248 --- 0 0 0 0 A 0 0 0 0 0 0 0 0 248
249 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 249
250 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 250
---------- --------------- ------•-----___-•---------•--------=--- ----•---------•---------•---------•---------•---______'____=___ -- •---
--------------------------'___----_•----- -•---------•- -------•-----
- ------•---------•-------------------•---------•--- �:���--��a=•---
3,640,420 16,156,429 0 0 2,182,000 0 2,065,000 441,000 0 0 0 0 24,484,849
(O6-Aug-93) Page 8
Capitai improvemenis Program(1994-1998)
Project Tabie �---------------------------- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total Totai
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Jotal
� Project#� 13 14 15 16 17 18 19 20 21 22 Revenue Revenue Revenue #
1 PIN 94-101 , 0 0 0 0 0 0 0 0 0 0 0 2,500 2,500 1
2 PIN 94-102 0 0 0 0 0 0 0 0 0 0 0 1,000 1,000 2
3 PIN 94-103 0 0 � 0 0 0 0 0 0 0 0 0 15,000 15,000 3
4 PIN 94-104 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 4
5 PIN 94-105 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 5
6 PIN 95-1Ot 0 0 0 0 0 0 0 0 0 0 0 110,000 110,000 6
7 PIN 95-102 0 0 0 0 0 0 0 0 0 0 0 3,150,000 3,150,000 7
8 PIN 97-101 0 0 0 0 0 0 0 0 0 0 0 22,OQ0 22,000 8
9 PIN 97-102 0 0 0 0 0 0 Q 0 0 0 0 1,600,000 1,600,000 9
10 PIN 94-201 0 0 0 0 0 0 0 0 Q 0 0 20,000 20,000 10
1 t PIN 94-202 0 0 0 0 0 0 0 0 0 0 0 40,000 40,OOQ 11
12 PIN 94-203 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 12
13 PIN 95-201 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 T3
14 PIN 95-202 0 0 0 10,000 10,000 10,000 0 0 0 0 30,000 120,000 150,000 14
15 PIN 96-201 0 0 0 0 0 0 0 0 0 0 0 24,000 24,000 15
16 PIN 97-201 0 ' 0 0 0 0 0 0 0 0 0 0 24,000 24,000 16
17 PIN 97-202 0 0 0 0 0 0 0 0 0 0 0 5,000 5,000 17
18 PIN 98-201 0 0 0 0 0 0 0 0 0 0 0 24,000 24,000 18
19 PIN 94-301 0 0 0 0 0 0 0 0 0 0 0 7,700 7,700 19
20 PIN 94-302 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 20
21 PIN 95-301 0 0 -0 0 0 0 0 0 0 0 0 1,000 1,000 21
22 PIN 95-302 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 22
23 PIN 96-301 0 0 0 0 0 0 0 0 0 0 0 1,200 1,200 23
24 PIN 97-301 0 0 0 0 0 0 0 0 0 0 0 1,200 1,200 24
25 PIN 98-301 0 0 0 0 0 0 0 0 0 0 0 1,200 1,200 25
26 PIN 94-401 0 0 0 0 0 0 0 0 0 0 0 56,000 56,000 26
27 PIN 94-402 0 0 0 0 0 0 0 0 0 0 0 1,065 t,065 27
28 PIN 95-401 0 0 0 0 0 0 0 0 0 0 0 33,000 33,000 28
29 PIN 95-402 0 0 0 0 0 0 0 0 0 0 0 45,000 45,000 29
30 PIN 96-401 0 0 0 0 0 0 0 0 0 0 0 62,000 62,000 30
31 PIN 96-402 0 0 0 0 0 0 0 0 0 0 0 10,650 10,650 31
32 PIN 96-403 0 0 0 0 0 0 0 0 0 0 0 6,390 6,390 32
(06-Aug-93) Page 1
Capitai Improvements Program(1994-1998)
Project Tabie �---------------------------- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total ToffiI
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Total
# Project� 13 14 15 16 17 18 19 20 21 ___ 22 flevenue Revenue Revenue #F
33 PIN 96-404 0 0 0 0 0 0 0 0 0 0 0 5,325 5,925 33
34 PIN 96-405 0 0 0 0 0 0 0 0 0 0 0 8,520 8,520 34
35 PIN 97-401 0 0 0 0 0 0 0 0 0 0 0 64,000 64,000 35
36 PIN 97-402 0 0 0 0 0 0 0 0 0 0 0 4,260 4,260 36
37 PIN 97-403 0 0 0 0 0 0 0 0 0 0 0 3,195 3,195 37
38 PIN 97-404 0 0 0 0 0 0 0 0 0 0 0 5,325 5,325 38
39 PIN 97-405 0 0 0 0 0 0 0 0 0 0 0 3,195 3,195 39
40 PIN 97-406 0 0 0 0 0 0 0 0 0 0 0 26,560 26,560 40
41 PIN 98-401 0 0 0 0 0 0 0 -0 0 0 0 83,000 83,000 41
42 PIN 98-402 0 0 0 0 0 0 0 0 0 0 0 2,500 2,500 42
43 PIN 98-403 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 43
44 PIN 98-404 0 0 0 0 0 0 0 0 0 0 0 4,000 4,000 44
45 PIN 94-501 0 0 0 0 0 0 D 0 0 0 0 3,800 3,800 45
46 PIN 94-502 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 46
47 PIN 94-503 0 0 0 0 0 0 0 0 0 0 0 325,000 325,000 47
48 PIN 95-501 0 0 0 0 0 0 0 0 0 0 0 12,000 12,000 48
49 PIN 95-502 0 0 0 0 0 0 0 0 0 0 0 22,000 22,000 49
50 PIN 95-503 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 50
51 PIN 95-504 0 0 0 0 0 0 0 0 0 0 0 325,000 325,000 51
52 PIN 95-505 0 0 0 0 0 0 0 0 0 0 0 3,800 3,800 52
53 PIN 95-506 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 53
54 PIN 95-507 0 0 0 0 0 0 0 0 0 0 0 24,000 20,000 54
� 55 PIN 96-501 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 55
56 PIN 96-502 0 0 0 0 0 0 0 0 0 0 0 25,000 25,000 56
57 PIN 96-503 0 Q 0 0 0 0 0 0 0 0 0 3,800 3,800 57
58 PIN 96-504 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 58
59 PIN 96-505 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 59
60 PIN 97-501 0 0 0 0 0 0 0 0 0 0 0 9,000 9,000 60
61 PIN 97-502 0 0 0 0 0 0 0 0 0 0 0 22,000 22,000 61
62 PIN 97-503 0 0 0 0 0 0 0 0 0 0 0 22,000 22,000 62
63 PIN 97-504 0 0 0 0 0 0 0 0 0 0 0 165,000 165,000 63
64 PIN 9�-505 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 64
(06-Aug-93) Page 2
Capital(mprovements Program(1994-1998)
Project Table �---------------------------- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total Total
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Total
� Pro'ect� 13 14 15 16 17 18 19 20 21 22 Revenue Revenue Revenue #
65 PIN 97-506 0 0 0 0 0 Q 0 0 0 0 0 3,800 3,800 65
66 PIN 97-507 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 66
67 PIN 97-508 0 0 0 0 0 0 0 0 0 0 0 18,000 18,000 67
68 PIN 98-501 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 68
69 PIN 98-502 0 0 0 0 0 0 0 0 0 0 0 150,000 150,000 69
70 PIN 98-503 0 0 0 0 0 0 0 0 0 0 0 4,500 4,500 70
71 PIN 98-504 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 71
72 PIN 98-505 0 0 0 0 0 0 0 0 0 0 0 8,000 8,000 72
73 PIN 94-601 0 0 0 0 0 0 0 0 0 0 0 3,000 � 3,000 73
74 PIN 94-602 0 0 - 0 0 0 0 0 0 0 0 0 10,000 10,000 74
75 PIN 94-603 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 75
76 PW 94-604 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 76
77 PIN 94-605 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 77
78 PIN 94-606 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 78
79 PIN 94-607 0 0 0 0 0 0 0 0 0 0 0 12,000 12,000 79
80 PIN 94-608 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 80
81 PIN 94-603 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 81
82 PIN 94-610 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 82
83 PIN 94-611 0 0 0 0 0 0 0 0 0 0 0 27,000 27,000 83
84 PIN 94-612 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 84
85 PIN 94-613 0 0 0 0 0 0 0 0 0 0 0 35,000 35,000 85
86 PIN 94-614 0 0 0 0 0 0 0 0 0 0 0 35,000 35,000 86
87 PIN 94-615 0 0 0 0 0 0 0 0 0 0 0 35,000 35,000 87
88 PIN 94-616 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 88
89 PIN 94-617 0 0 0 0 0 0 0 0 0 0 0 60,000 60,000 89
90 PIN 94-618 0 0 0 0 0 0 0 0 0 0 0 120,000 120,000 90
91 PIN 94-619 0 0 0 0 0 0 0 0 0 0 0 168,000 168,000 91
92 PIN 95-601 0 0 0 0 0 0 `' 0 0 0 0 0 10,000 10,000 92
93 PIN 95-602 0 0 0 0 0 0 0 . 0 0 0 0 40,000 10,000 93
94 PIN 95-603 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 94
95 PIN95-604 0 0 0 0 0 0 0 0 0 0 0 10,000 1D,000 95'
96 PIN 95-605 0 0 0 0 0 0 0 0 0 0 0 12,000 12,000 96
(06-Aug-93) Page 3
Capital Improvements Program(1994-1998)
Project Table �--- --- ------ Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total Total
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise Generai Totai
# Proiect# 13 14 15 16 17 1 B 19 20 21 22 Revenue Revenue Revenue #t
97 PIN 95-606 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 97
98 PIN 95-607 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 98
99 PIN 95-608 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 99
100 PIN 95-609 0 0 0 0 0 0 0 0 0 0 0 25,000 25,000 100
101 PIN 95-610 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 101
102 PIN 95-611 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 102
103 PIN 95-612 0 0 0 0 0 0 0 0 0 0 0 36,000 36,000 103
104 PIN 95-613 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 104
105 PIN 95-614 0 0 0 0 0 0 0 0 0 0 0 60,000 80,000 105
106 PIN 95-615 0 0 0 0 0 0 0 0 0 0 0 90,p00 90,000 106
107 PIN 95-616 0 0 0 0 0 0 0 0 0 0 0 180,000 180,000 107
108 PIN 95-617 0 0 0 0 0 0 0 0 0 0 0 336,000 336,000 108
109 PIN 95-618 0 0 0 0 0 0 0 0 0 0 0 350,000 350,000 109
110 PIN 95-819 0 0 0 0 0 0 0 0 0 0 0 1,000,000 1,000,000 110
t t t PIN 96-601 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 111
it2 PIN96-602 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000112
113 PIN 96-603 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 113
114 PIN 96-604 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 114
115 PIN 96-605 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 115
116 PIN 96-606 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 116
117 PIN 96-607 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 117
118 PIN 96-608 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 118
119 PIN 96-609 0 0 0 0 0 0 0 0 0 0 0 65,000 65,000 119
120 PIN 96-610 0 0 0 0 0 0 0 0 0 0 0 70,000 70,000 120
121 PIN 96-611 0 0 0 0 0 0 0 0 0 0 0 110,000 110,000 121
122 PIN 96-612 0 0 0 0 0 0 0 0 0 0 0 120,000 120,000 b22
123 PIN 97-601 0 0 0 0 0 0 0 0 0 0 0 5,000 5,000 123
124 PIN 97-602 0 0 0 0 0 0 0 0 0 0 0 8,000 8,000 124
125 PIN 97-603 0 0 0 0 0 0 0 0 0 D 0 8,000 8,000 125
126 PIN 97-604 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 126
127 PIN 97-605 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 127
128 PIN 97-606 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 128
(06-Aug-93) Page 4
Capital Improvemenls Program(1994-1998)
Project Table �---------------------------- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total Total
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Total
� Pro'ect# 13 14 ' 15 16 17 18 19 20 21 22 Revenue Revenue Hevenue #
129 PIN 97-607 0 0 0 0 0 0 0 0 0 0 0 35,000 35,000 129
130 PIN 97-608 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 130
131 PIN 98-601 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 131
132 PIN 98-602 0 0 0 0 0 0 0 0 0 0 0 12,000 12,000 132
133 PIN 98-603 0 0 0 0 0 0 0 0 0 0 0 15,000 15,000 133
134 PIN 98-604 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 134
135 PW 98-605 0 0 0 0 0 0 0 0 0 0 0 35,000 35,000 135
136 PIN 98-806 0 0 0 0 0 0 0 0 0 0 0 50,OOd 50,000 136
137 PIN 98-607 0 0 0 0 0 0 0 0 0 0 0 50,000 50,000 137
138 PIN 94-701 0 0 0 0 0 0 0 0 0 0 0 3,000 3,000 138
f39 PIN 94-702 0 0 0 0 0 0 3,800 0 0 0 3,800 0 3,800 139
140 PIN 94-703 0 0 0 0 0 0 5,000 0 0 0 5,000 0 5,000 140
141 PIN 94-704 0 0 0 0 0 0 0 0 0 0 0 6,000 6,000 141
142 PIN 94-705 0 0 0 0 0 0 0 0 0 0 0 18,000 18,000 142
143 PIN 94-706 0 0 0 0 0 0 0 0 0 0 0 20,000 20,000 143
144 PIN 94-707 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 144
145 PIN 94-708 0 0 0 0 0 0 0 0 0 0 0 12,000 12,000 145
146 PIN 94-709 0 0 0 0 0 0 0 0 0 0 0 28,325 28,325 146
147 PIN 94-710 0 0 0 0 0 0 0 0 0 0 0 37,158 37,158 147
148 PIN 94-711 0 0 0 0 0 0 0 0 0 0 0 49,000 49,000 148
149 PIN 94-712 0 0 0 0 0 0 0 0 0 0 0 83,000 83,000 149
150 PIN 94-713 0 0 0 0 0 0 0 0 0 0 0 761,700 761,700 150
151 PIN 95-701 0 0 0 0 0 0 0 0 0 0 0 4,5W 4,500 151
1S2 PIN95-702 0 0 0 0 0 0 0 0 0 0 0 5,000 5,000 152
153 PIN 95-703 0 0 0 0 0 0 0 0 0 0 0 6,000 6,�0 153
154 PIN 95-704 0 0 0 0 0 0 15,000 0 0 0 15,000 0 15,000 154
l55 PIN 95-705' 0 0 0 0 0 0 0 0 0 0 0 115,000 115,000 155
156 PIN 95-706 0 0 0 0 0 0 0 0 0 D 0 12,360 12,360 156
157 PIN 95-707 0 0 0 0 ' 0 0 0 0 0 0 0 29,174 29,174 157
158 PIN 95-7�8 0 0 0 0 0 0 0 Q 0 0 0 37,158 37,158 158
159 PIN 95-709 0 0 0 0 0 0 0 0 0 0 0 83,000 83,000 159
160 PIN 95-710 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 160
(O6-Aug-93) Page 5
Capital Improvements Program(1994-1998)
ProjectTabie �---------------------------
- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utitity Total Total
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Total
# Pro'ect# 13 14 15 16 17 18 19 20 21 22 Revenue Revenue Revenue #F
161 PIN 95-711 0 0 0 0 0 0 0 0 0 0 0 118,000 118,000 161
162 PIN 95-712 0 0 0 0 0 0 0 0 0 0 0 132,000 132,000 162
163 PIN 95-713 0 0 � 0 0 0 0 0 0 0 0 430,300 430,300 163
164 PIN 95-714 0 0 0 0 0 0 0 Q 0 0 0 1,228,400 1,228,400 164
165 PIN 96-701 0 0 0 0 0 0 0 0 0 0 0 25,000 25,000 165
166 PIN 96-702 0 0 0 0 0 0 0 0 0 0 0 30,000 30,000 166
167 PIN 96-703 0 Q 0 0 0 0 0 0 0 0 0 100,000 100,000 167
168 PIN 96-704 0 0 0 0 0 0 0 0 0 0 0 12,854 12,854 168
169 PIN 96-705 0 0 0 0 0 0 0 0 0 0 0 30,050 30,050 169
170 PIN 96-706 0 0 0 0 0 0 0 0 0 0 0 71,944 71,944 170
171 PIN 96-707 0 0 0 0 0 0 0 0 0 0 0 40,000 40,000 171
172 PIN 96-708 0 0 0 0 0 0 0 0 0 0 0 484,900 484,900 172
173 PIN 96-709 0 0 0 0 0 0 0 0 0 0 0 1,019,200 1,019,200 173
174 PIN 96-710 0 0 0 0 0 0 0 0 0 0 0 1,235,000 1,235,000 174
175 PIN 97-701 0 0 0 0 0 0 0 0 0 0 0 18,000 18,000 175
176 PIN 97-702 0 0 0 0 0 0 0 0 0 0 0 13,497 13,497 176
177 PIN 97-703 0 0 0 0 0 0 0 0 0 0 0 31,853 31,853 177
178 PIN 97-704 0 0 0 0 0 0 0 0 0 0 0 842,025 842,025 178
t79 PIN97-705 0 0 0 0 0 0 0 0 0 0 0 1,262,300 1,262,300 179
180 PIN 98-701 0 0 0 0 0 0 0 0 0 0 0 13,902 13,902 180
181 PIN 98-702 0 0 0 0 0 0 0 0 0 0 0 33,764 33,764 181
182 PIN 98-703 0 0 0 0 0 0 0 0 0 0 0 761,400 761,400 182
183 PIN 98-704 0 0 0 0 0 0 0 0 0 0 0 761,400 761,400 183
184 PIN 98-705 0 0 0 0 0 0 0 0 0 0 0 761,400 761,400 184
185 PIN 98-706 0 0 0 0 0 0 0 0 0 0 0 1,228,400 1,228,400 185
186 PIN 98-707 0 0 0 0 0 0 0 0 0 0 0 1,228,400 1,228,400 186
187 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0187
�gg --- 0 0 0 0 0 0 0 0 0 0 0 0 0188
�gg - D 0 0 0 0 0 0 0 0 0 0 0 0 189
�gp ___ 0 0 0 0 0 0 0 0 0 0 0 0 0190
�91 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0191
�gp --- 0 0 0 0 0 0 0 0 0 0 0 0 0192
(O6-Aug-93) Page 6
.
Capital improvements Program(1994-1998)
ProjectTable �-------------------
--------- Enterprise Revenue Sources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Totai Total
Core Core Core Operating Aperating Operating CIP Other Other Other Enterprise General Total
#F Pro'ect# 13 14 15 16 17 18 19 20 21 22 Revenue Revenue Revenue #
193 --- 0 0 0 0 0 0 0 0 0 0 0 0 0193
�gq ___ 0 0 0 0 0 0 0 0 0 0 0 0 0194
195 --- 0 0 0 0 0 0 0 0 0 0 0 0 0195
�gg ___ 0 0 0 0 0 0 0 0 0 0 0 0 0196
�g� ___ 0 0 0 0 0 0 0 0 0 A 0 0 0197
198 --- 0 0 0 0 0 0 0 0 0. 0 0 0 0198
�gg ___ 0 0 0 0 0 0 0 0 0 0 0 0 0199
200 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 200
201 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 201
2p2 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 202
203 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 203
204 ___ p 0 0 0 0 0 0 0 Q 0 0 0 0 204
205 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 205
206 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 206
207 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 207
208 --- 0 0 0 0 0 0 0 0 0 0 Q 0 0 208
209 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 209
p�p ___ 0 0 0 0 0 0 0 0 0 0 0 0 Q 210
2�1 __- 0 0 0 0 0 0 0 0 0 0 0 0 0 211
P12 ___ 0 0 0 0 0 0 0 D 0 0 0 0 0 217
p�g _ _ 0 0 0 0 0 0 0 0 0 0 0 0 0213
2t4 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 214
215 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 215
p�g ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 216
P17 ___ 0 0 D 0 0 0 0 0 0 0 0 0 0 217
2t8 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 218
219 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 219
P20 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 220
22� ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 221
222 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 222
223 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 223
22q ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 224
(06-A�9-93) Page 7
,
Capital Improvements Program(1994-1998)
ProjectTable (---------------------------- EnterpriseRevenueSources ---------------------------�
Water Sanitary Storm Water Sanitary Storm Utility Total Totai
Core Core Core Operating Operating Operating CIP Other Other Other Enterprise General Total
#F Pro'ect� 13 14 15 i6 17 18 19 20 21 22 Revenue Revenue Revenue #
225 ___ 0 D 0 0 0 0 0 0 0 0 0 0 0 225
22g ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 226
pp7 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 227
22g _-- 0 0 0 0 0 0 0 0 0 0 0 0 0 228
22g --- 0 0 0 0 0 0 0 0 0 0 0 0 0 229
230 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 230
23� ___ 0 0 0 0 0 0 0 A 0 0 0 0 0 231
232 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 232
233 -- 0 0 0 0 0 0 0 0 0 0 0 0 0 233
P3q --- 0 0 0 0 0 0 0 0 0 0 0 0 0 234
235 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 235
236 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 236
2S7 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 237
238 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 238
239 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 239
240 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 240
241 ___ 0 0 0 0 0 0 0 0 A 0 0 0 0 241
P42 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 242
243 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 243
244 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 244
245 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 245
246 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 246
pq� ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 247
248 ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 248
pqg ___ 0 0 0 0 0 0 0 0 0 0 0 0 0 249
250 --- 0 0 0 0 0 0 0 0 0 0 0 0 0 250
--
------------------------------------•---------•---------•---------•-------------------•-------__'_________'_=_______'_________°___=_____°______�_=°___
------------------------------------•---------•---------�---------�-------------------•-------
0 0 0 10,000 10,000 10,000 23,800 0 0 0 b3,800 24,484,849 24,538,649
(06-Au9-93) Page 8
• .
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Office Furniture Project No.: PIN 94-101
Department Requesting: Administration Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
File cabinents for administrative assistant and receptionist. E ui ment 2 50Q
Other
Other
Total Pro'ect Costs 2 500
Revenue Sources
Yea� t�f Request: 1994 1. Assessments
2. General Lev 2 500
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Irn rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Exisiin Pr ram No 11. Other General
New Pr ram/Unit Yes 12. Other General
Re lacement — Unit No. 13. Water Core
Useful Life of Pro'ect 10 Yc�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utilit CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 2 500
•
r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
Project Name: Office Furniture Project No.: PIN 94-102
Department Requesting: Administration Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Bookcases for City Administrator's Office. E ui ment 1 ��
Other
Other
Total Pro'ect Costs 1 000
Revenue Sources
Yea� of Request: 1994 1. Assessments
2. Genera) Lev 1 000
Type of Project: Equipment 3. Generat Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Po�t Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit Yes 12. Other General
Re lacement — Unit Na 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other En#er rise
22. Other Enter rise
Total Revenue Sources 1 000
• •
.
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Council Chamber Remodeling Project No.: PIN 94-103
Department Requesting: Administration Project Costs
Rlannin /Desi n/En ineerin
Land
Project Description (use back for additiona! information): Construction
Extension of Council dias for staffing area and improvement of sound system. E ui ment 15 000
Other
Other
Totat Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 15 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park tm rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion ofExistin Pr ram No 11. Other General
New Pr ram/Unit Yes 12. Other General
Re lacement — Unit Na 13. Water Core
Useful Life of Pro'ect 10 Years 14.Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratirr Bud et
19. Utili CIP Funds
20. Other Enter r'rse
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• •
r
CITY OF ROSEMOUNT ^
CAPITALlMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Council Charnber Remodeling Project No.: PIN 94-104
Department Requesting: Administration Project Costs
Plannin /Desi NEn ineerin
�and
Project Description (use back for additionai information): Construction �
Purchase and installation of cable equipment to provide cable cast of ineetings from City Hall. E ui ment . 40 000
, Other
Other
Tota) Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 25 000
Type of Project: Equipment&instailation 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General — Donations 15,000
Prior Pro'ect Re uests? Yes 9. Other Generat
Years 1991, 1992 & 1993 10. OtherGeneral
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit Yes 12. Other General
Re lacement — Unit No. 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1990 (For 1991) 18. Storm Water O eratin Bud et
19.Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Copy Machine Project No.: PIN 94-105
Department Requesting: Administration Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace main copy machine at City Hall — Move present copier to Community Center. E ui ment 20 000
Other
Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Request: 1994 �. Assessments
2. General Lev 20 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
Present copier is at the end of its useful like at 12-31-93 unless utilized in 7. Park lm rovement Funds
a less demandin fashion — Communi Center will be able to use it. 8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. Existin Co ier 13. Water Core
Useful Life of Pro'ect 3 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc): 17. Sewer Opecating Budget
Original Year of Request - 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
No impact if purchased. If not purchased will cause delays in staff work 20. Other Enter rise
because machine is overloaded and needs excessive maintenance. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: City Hall Remodeling Project No.: PIN 95-101
Department Requesting: Administration Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional informationj: Construction 100,000
Remodel City Hall to: E ui ment 10 000
1) Add second story above Police Department for office area Other
2) Fill in section of stairway to add one office on 2nd floor Other
Total Pro'ect Costs 110 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 1 t0 000
Type ofProject; Building Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
City Hall office space is lacking for proper staff space allocation 7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 50 Y�rs 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other lnformation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 110 000
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: New Fire Station/Land Acquisition Project No.: PIN 95-102
Department Requesting: Administration Project Costs�
Plannin /Desi n/En ineerin
Land 210 000
Project Description {use back for additional information): Construction 2,940,000
Purchase land for new Fire Station E ui ment
Purchase land for new Public Works Facility Other
Construct new Fire Station Other
Remodel existing Fire Station for Public Works and small remodeling at City Hall Total Pro'ect Costs 3150 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 3 150 000
Type of Project: Fire Station construction, Public Works remodeling and 3. General Operating Budget
Public Works land acquisition 4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
Expand &Relocate Fire Station; Public Works facility space needed also 7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 5Q Y�rs 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18, Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 150 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Copy Machine Project No.: PIN 97-101
Department Requesting: Administration Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace main copy machine at City Hall E ui ment 22 000
� Other
Other
Total Pro'ect Costs 22 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 22 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
Utilization of main copier allows for 3 years use under rental/maintenance program. 7. Park Im rovement Funds
This urchase allows for rotational ro ram of re lacement. 8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. Existin Co ier 13. Water Core
Useful Life of Pro'ect 3 Years 14. Sanitar Sewer Core
Prioriry Necessary t5. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 22 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEM�NTS PROGRAM
PROJECT WORKSHEET
Project Name: City Hall Expansion Project No.: PIN 97-102
Department Requesting: Administratio� Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 1,600,000
City Hall expansion for additional Police Department space and General Government offices E ui ment
Other
Other
Total Pro'ect Costs 1 600 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 1 600 000
Type of Project: Building Addition 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
Additional space needed 7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other Generaf
New Pr ram/Unit No 12. Other Generat
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 50 Yeers 14. Sanita Sewer Core
Prioriry 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information {i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
This expansion is based on Space Needs Study completed in November of 1990. 20. Other Enter rise
This study recommended expansion of City Hall based on staffing needs to match 21. Other Enter rise
growing population. 22. Other Enter rise
Total Revenue Sources 1 600 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: PC Replacement Program (and Printers) Project No.: PIN 94-201
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The yearly replacement of 6 PCs with new machines covered by a 5—year E ui ment 20 000
warranty. This program, now in place, covers all Ciry PCs with warranty, Other .
eliminating maintenance costs. Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 20 0�0
Type of Project; Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit Na 6 Re lacement Units 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20.'Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
• � .
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Armory PC Hardware&Software Project No.: PIN 94-202
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin 10 000
Land
Project Description (use back for additional information): Construction
The setting up of the city staff PC and software requirements would include purchase of E ui ment 23 000
9 PCs, 2 dot matrix printers, 1 laser printer, 9 packages of Word Perfect 5.1, Other — Software 7 000
9 packages of Cauatro Pro 4.0, and 9 packages of Paradox 4.0. Other
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. Generai Lev 40 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds .-
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit Yes 12. Other General
' Re lacement — Unit No. 9 PC's and 9 of each S/W acka es 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Minimum equipment necessary for start—up of operations at Armory. 20. Other Enter rise
(This is with no type of networking at all). 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Armory PC Networking Project No.: PIN 94-203
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin 10 000
Land
Project Description (use back for additional information): Construction
Consists of: 1) PC Hardware(File Server) E ui ment 10 000
2) Network Wiring Other — Software 10 000
3) Network Software — Novell&Lanspoof Other
4} Outside Vendor to do Installation Total Pro'ect Costs 30 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 30 000
Type of Project: PC Hardware& Software 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Author�ty
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
•
� •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: PC R.eplacement Program (and Printers) Project No.: PIN 95-201
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The yearly replacement of 6 PCs with new machines covered by a 5—year E ui ment 20 000
warranry. This program, now in place, covers aII Ciry PC's with warranry, Other
eliminating maintenance costs. Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Requesfi 1995 1. Assessments
2. General Lev 20 000
Type of Project: Equipmenf 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park (m rovement Funds
8. Other Generaf _
Prior Pro'ectRe uests? No 9. Other General
Years NA 10. Other Generat
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. 6 Re lacement Units 13. Water Core
Useful Life of Pr 'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993(For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
• •
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PRC?JECT WORKSHEET
Project Name: Accounting/Utility Billing Software Project No.: PIN 95-202
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The replacement of existing accounting software due to changes in technology E ui ment
with the City's growth. The necessity for advanced technology will have become an issue. Other 150 000
Other
Total Pro'ect Costs 150 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 120 000
Type of Ptoject: Equipment 3. General Operating Budget
4. Gene�al C�P Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generaf
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et 10,000
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget 10,000
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et 10 000
19. Utili CIP Funds
20. Other Enter rise
21, Other Enter rise
22. Other Enter rise
Total Revenue Sources 150 000
r
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: PC Replacement Program (and Printers) Project No.: PIN 96-201
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The yearly replacement of 6 PCs with new rnachines covered by a 5—year E ui ment 24 000
warranty. This program, now in place, covers all City PCs with warranry, Other
eliminating maintenance costs. Other
Total Pro'ect Costs 24 000
Revenue Sources
Yea� of Request: 1996 1. Assessments
2. General Lev 24 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion'of Existin Pr ram Yes 1]. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. 6 Re lacement Units 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): i�. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19.Utili CIP Funds
20. Other Enter rise
21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 24 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: PC Replacement Program (and Printers) Project No.: PIN 97-201
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The yearly replacement of 6 PCs with new machines covered by a 5—year E ui ment 24 000
warranty. This program, now in place, covers all Ciry PC's with warranty, Other
eliminating maintenance costs. Other
Total Pro'ect Costs 24 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. Genera) Lev 24 000
Type of Pfoject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. (�ther General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit Na 6 Re lacement Units 13. Water Core
Useful Life of Pr 'ect 5 Years 14. Sanita Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997j 1 S. Storm Water O eratin Bud et
19. Utili CIP Funds
20. OtherEnter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 24 000
•
r t
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Copy Machine Project No.: PIN 97-202
Department Requesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace copy machine located at front of City Hall administrative area. E ui ment 5 000
Other
Other
Total Pro'ect Costs 5 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 5 000
Type of ProjeCt: Equipment 3: General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
Present copier wilt be 5 years old and at the end of its useful life. 7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated irnpact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (for 199'n 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 5 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: PC Replacement Program (and Printers) Project No.: PIN 98-201
Department flequesting: Finance Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
The yearly replacement of 6 PCs with new machines covered by a 5—year E ui ment 24 000
warranty. This program, now in place, covers all City PCs with warranty, Other
eliminating maintenance costs. Other
Total Pro'ect Costs 24 000
Revenue Sources
YeaF of Request: 1998 1. Assessments
2. General Lev 24 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
� 8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. 6 Re lacement Units 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998j 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 24 000
•
i •
CITY OF ROSEMOUNT
CAPITA� IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: GIS System Development Project No.: PIN 94-301
Department Requesting: Pianning Project Costs
Plannin /Desi n/En ineerin
La�d
Project Description (use pack for additional informationj: Construction
Upgrade Software — AutoCad, ArcCad &ArcView($1,500) E ui ment
Add 1 ArcView license ($1,200) Other — Software 2 700
Consultant services for software customization ($5,Q00) Other — Consultant Fees 5 000
Total Pro'ect Costs 7 700
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 7 700
Type of Project: Software&Professional Services 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 7 70Q
•
. �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Vehicle Replacement Project No.: PIN 94-302
Department Requesting: Planning Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace 1987 Ford Tempo with similar vehicle. E vi ment 15 000
Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 15 000
Type of �ojecfi Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Ae lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Nal'tne: Furniture/Equipment Project No.: PIN 95-301
Department Requesting: Planning Project Costs
Plannin /Desi n/En ineerin
< , Land
Project Description (use back for additional information): Construction
Lateral file for record storage E ui ment 1 000
Other
Other
Total Pro'ect Costs 1 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 1 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
' 8. Other General
Prior Rro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 15 Ya�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 000
. • t
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: GIS System Project No.: PIN 95-302
Department Requesting: Planning Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Add second unit because of Public Works application development. E ui ment 15 000
Upgrade existing software and hardware. Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year af Request: 1995 1. Assessments
2. General Lev 15 000
Type of Project: Equipment 3. General Operating Budget
4. General GIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generaf
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement = Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Tota)Revenue Sources 15 000
•
r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMEN7S PROGRAM
PROJECT WORKSHEET
Project Name: GIS System Development Project No.: PIN 96-301
Department Requesting: Planning Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Upgrade Software — 2 ArcCad, 2 AutoCad &2 ArcView E ui ment
Other — Software 1 200
Other
Total Pro'ect Costs 1 200
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 1 200
Type of Project: Software 3. General OperaUng Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA f 0. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 200
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: GIS System Development Project No.: PIN 97-301
Department Requesting: Planning Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back fo� additional information): Construction
Upgrade Software — 2 ArcCad, 2 AutoCad&2 ArcView E ui ment
Other — Software 1 200
Other
Total Pro'ect Costs 1 200
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 1 200
Type of Project: Software 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
(�riginal Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 200
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: GIS System Development Project No.: PIN 98-301
Department Requesting: Pianning Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Upgrade Software — 2 ArcCad, 2 AutoCad&2 ArcView E ui ment
Other — Software 1 200
Other
Tota� Pro'ect Casts 1 200
Revenue Sources
Year of Requesfi 1998 1. Assessments
2. General Lev 1 200
Type of Project: Software 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ectAe uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Exis#in Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanita Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 200
• •
�
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Police Vehicle Repiacements Project No.: PIN 94-401
Department Requesting: Police Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Aeplace four squads E Ui ment 51 000
Squad #10 — 1990 Ford Other 5 000
Squad #20 — 1991 Chevrolet Other
Squad #40 — 1992 Ford LTD Total Pro'ect Costs 56 000
Squad #60 — 1991 Chevrolet Revenue Sources
Year of Request: 1 s94 1. Assessments
2. General Lev 56 000
Type of Project: Equipment 3. General Opera#ing Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6: Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generat
Ex ansion of Existin Pr rarn No 11. Other General
New Pr ram/Unit NA 12, Other General
Re lacement — Unit No. 20/40/60/70 13. Water Core
Useful Life of Pro'ect 2 Plus Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Informa#ion (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin' Bud et
19. Utili CIP Funds
Three squads to be ordered through Hennepin County or the State of Minnesota fleet bids. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 56 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PRfJGRAM
PROJECT WORKSHEET
Project Name: Mobiie Squad Radio Addition Project No.: PIN 94-402
Department Requesting: Police Pro1ect Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for �dditional information): Construction
One additional squad radio for additional squads. E ui ment 1 065
Other
Other
Total Pro'ect Costs 1 065
Revenue Sources
Year of Request: 1994 1. Assessmenis
2. General Lev 1 065
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSAFunds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1992 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 1 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 5-10 Y�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Othe� Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Radios to be purchased through Hennepin County or State of Minnesota bids. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 065
•
• •
CITY C�F ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Police Vehicle Replacements Project No.: PIN 95�401
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace two squads E ui ment 33 000
Squad #30 Other
Squad #50 — 4x4 Utility Vehicle Other
Total Pro'ect Costs 33 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 33 000
Type of Projeet: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re (acement — Unit No. 30/50 13. Water Core
Useful �ife of Pro'eet 2 Plus Years 14. Sanita Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
One squad to be ordered through Hennepin County or the State of Minnesota fleet bids. 20. Other Enter rise
#50 may also be purchased in this manner. 21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 33 000
�
• �
CITY OF ROSEMOUNT
CAPfTAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Computer Update Project No.: PIN 95-402
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Computer Update E ui ment 45 000
Original equipment in use since 1982 Other
Other
Total Pro'ect Costs 45 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 45 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port'Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General �
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. Yes 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Desirable 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
MASYS — CJIS Computer Equipment— Police Use Only 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 45 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Police Vehicle Repiacements &Addition Project No.: PIN 96-401
Department Hequesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace four squads and purchase one additional to fleet. E ui rnent 60 000
Squad #t0 Squad #40 Other 2 000
Squad #50 Squad #70 Other
Squad #80(New) Total Pro'ect Costs 62 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 62 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit Yes — #80 12. Other General
Re lacement — Unit No. 10/40/50/70 13. Water Core
Useful Life of Pro'ect 2 Plus Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating eudget
Original Year of Request — 1993 (For 1996} 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Five squads to be ordered through Hennepin County or the State of Minnesota fleet bids. 20. Other Enter r'se
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 62 000
• •
r
CITY OF ROSEMOUNT
CAPFTAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Mobile Squad Radio Replacements Project No.: PIN 96-402
Depattment Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace five squad mobile radios E ui ment 10 650
Other
Other �
Total Pro'ect Costs 10 650
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 10 650
Type ofProject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovemsnt Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Othe�General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit No. 5 13. Water Core
Useful Life of Pro'ect 5-10 Y�rs 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP�unds
Radios to be purchased through Hennepin County or State of Minnesota bids. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 650 ,
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Pofice Hand-Held Radio Replacements Project No.: PIN 96-403
Department Requesting: Police Project Costs
Piannin /Desi n/En ineerin
Land
Project Description: Construction
Replace ten hand—heid radios with leather holsters E ui ment 6 390
Other
Other
Total Pro'ect Costs 6 390
Revenue Sources
Project Year 1996 1. Assessments
2. General Lev 6 390
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA t0. Other General
Ex ansion of Existin Pr ram No 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement - Unit Na 10 Radios 13. Water Core
Usefui Life of Pro ect 5-10 Yaars 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Current hand—held radios in use since 1987 and will be in need of replacement. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 390
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Base Radio Replacement Project No.: PIN 96-404
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace police base radio system E ui ment 5 325
Other
Other
Total Pro'ect Costs 5 325
Revenue Sources
Year of Request: 1996 1. Assessment�
- 2, General Lev 5 325
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 1 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary i5. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Radio base unit in use sinee 1984. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 5 325
•
r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Narne: Radar Equipment Replacement � Project No.: PIN 96-405
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Five radar units need to be replaced in squads. Units in service since 1982. E ui ment 8 520
Other
Other
Total Pro'ect Costs 8 520
Revenue Sources
Year of Request: 1996 1. Assessments
2. Generai Lev 8 520
Type of PI'oject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 5 units 13. Water Core
Useful Life of Pro'ect 5 Years , 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Some of these radar units were purchased in 1980. Minnesota State Patrol 20. Other Enter rise
advises replacement every 5 years: 21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 8 520
• •
�
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
ProjeCt Name: Police Vehicle Replacements ProjeCt No.: PIN 97-401
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace three squads and purchase one additionai squad to fleet E ui ment ' 60 000
Squad #20 Other 4 000
Squad #50 Other
Squad #60 — 4x4 Utility Vehicle Total Pro'ect Costs 64 000
Squad #90 (Additional Squad) Revenue Sources
Year of Request: 1997 t. Assessments
2. General Lev 64 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr rarn Yes 11. Other General
New Pr ram/Unit 90 12. Other General
Re lacement — Unit No. 20/50/60 13. Water Core
Useful Life of Pro'ect 2 Plus Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.�: 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Four Squads to be ordered through Hennepin Counry or the State of Minnesota fleet bids. 20. Other Enter r'se
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 64 000
•
r �
CITY OF ROSEMOUNT
CAPITAL iMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Mobile Squad Radio Additions Project No.: PIN 97-402
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Two additional squad radios for projected additional squads. E ui ment 4 260
Other
Other
Totai Pro'ect Costs 4 260
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 4 260
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 2 radios 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 5-10 Y�rs 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
fladios to be purchased through Hennepin County or State of Minnesota bids. 20. Other Enter rise
21. Other Enter rise
22. O#her Enter rise
Total Revenue Sources 4 260
•
• s
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Radar Unit Additions Project No.: PIN 97-403
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
�and
Project Desc�iption (use back for additional information): Construction
Two additional squad radars for projected additional squads. E ui ment 3195
Other
Other
Total Pro'ect Costs 3 195
Revenue Sources
Yeat' of Request: 1997 1. Assessments
2. General Lev 3 195
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. PortAuthoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 2 radars 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3195
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Lab Equipment Project No.: PIN 97-404
Department Requesting: Police Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Expansion of Police Department's capabilities by equipping updated laboratory materials. E ui ment 5 325
Lab—fingerprinting materials and camera equipment. Other
Other
Total Pro'ect Costs 5 325
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 5 325
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 1?. Other General
New Pr ramNnit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 2-10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water 0 eratin Bud et
19. Utili CfP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 5 325
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Emergency Vehicie Opticom Units Project No.: PIN 97-405
Department Requesting: Police Project Costs
Plannin JDesi n/En ineerin
Land
Project Description {use back for additional information); Construction
Two additional Opticom units for projected additional squads. E ui ment 3195
Other
Other
Total Pro'ect Costs 3195
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 3195
Type ofiProject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovementfunds
8. Other GeneraF
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 2 O ticom units 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Y�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3195
• �
�
CITY OF ROSEMOUNT ,
CAPITAL IMPROVEMENTS PROGRAM '�
PROJECT WORKSHEET '
Project Name: Mobil Data Terminal Additions Project No.: PIN 97-406
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Installation of mobil data terminals into two vehicles initially. E ui ment 26 560
Other
Other
Total Pro'ect Costs 26 560
Revenue Sources '
Year of Request: 1997 1. Assessments
2. General Lev 26 560
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds -
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit 2 terminals 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Mobil data terminals are currently being installed into squad cars throughout the 20. Other Enter rise
Met�o area. The units will become the direct communication links between 21. Other Enter rise
office�s on the street and State and Local records. 22. Other Enter rise
Total Revenue Sources 26 560
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Police Vehicle Replacements &Additions ProjectNo.: PIN 98-401
,
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace squad cars purchased in 1996 and add one midsize investigative vehicle. E ui ment 83 000
Squad #10 Squad #40 Other
Squad #50 Squad #70 Other
Squad #90 (Additional investigative vehicle) Total Pro'ect Costs 83 000
Revenue Sources
Year of Request: t 998 1. Assessments
2. Generat Lev 83 000
Type of Project: Equipment , 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 100 12. Other General
Re lacement — Unit No. 10/40/50/IO 13. Water Core
Useful Life of Pro'ect 2 Plus Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating eudget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
All vehicles to be ordered through Hennepin County or the State of Minnesota fleet bids. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 83 000
.
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Mobile Squad Radio Addition Project No.: PIN 98-402
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
One additional squad radio for additional squad. E ui ment 2 500
Other
Other
Total Pro'ect Costs 2 500
Revenue Sources
Year of Request: 1998 1. Assessments
2. Generat Lev 2 500
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 1 radio 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other lnfo�mation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17.Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
� 19. Utili CIP Funds
Radios to be purchased through Hennepin County or State of Minnesota bids. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 2 500
•
• •
CITY OF ROSEMOUNT
CAPITAL FMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Hand-Held Radio Additions Project No.: PIN 98-403
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Add 4 hand—held radio units E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Gene�al
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 4 radios 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Yaars 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Additions to and replacements of radios purchased in 1996. 20. Other Enter rise
Radios will be needed for projected increase in officers. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Office Equipment - Replacement/Addition Project No.: PIN 98-404
Department Requesting: Police Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace and add to dictation equipment E ui ment 4 000
Add office furnishings for add itional investigator. Other
Other
Total Pro'ect Costs 4 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 4 000
Type of Project: Equipment 3. General Operating Budget
4. Generai CiP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General '
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary t 5. Storm Sewer Core
16.Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Equipment will be necessary for projected growth of office staff. 20. Other Enter rise
21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 4 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Fire Fighting Equipment Project No.: PIN 94-501
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Large/permanent pieces of fire fighting equipment, new and replacement items. E ui ment 3 800
Other
Other
Total Pro'ect Costs 3 800
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 3 800
Type of ProjeCt: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovementfunds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generat
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 50% 12. Other General
Re lacement — Unit No. 50% 13. Water Core
Useful Life of Pro'ect 15 Y�rs 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Items to be specified and approved as need arises. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 800
.
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WURKSHEET
Project Name: Bunker Gear Project No.: PIN 94-502
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Protective fire fighting gear. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. Generat Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Yea�s NA 10. Other General
Ex ansion of Existin Pr ram No � 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na Gear 13. Water Core
Useful Life of Pro'ect 5-7 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eraiin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
• •
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Aerial Fire Truck Project No.: PIN 94-503
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Elevated platform of approximately 100'for structural fire fighting and high level rescue. E ui ment 325 000
Other
{Part 1 of 2) Other
Total Pro'ect Costs 325 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 325 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. O#her General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No *Lar er vehicle 11. Other General
New Pr ram/Unit No 12. �ther General
Re lacement — Unit Na 35180 13. Water Core
Useful Life of Pro'ect 20+ Years 14. Sanita Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993(For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Current vehicle has many problems (ISO and mechanical). 20. Other Enter rise
Does not provide necessary protection. 21. Other Ente rise
Will be funded 50% in 1994 and 50%in 1995. 22. Other Enter r'�se
Total Revenue Sources 325 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Grass Fire Pump Project No.: PIN 95-501
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
This pump and tank is carried in the bed of a pick—up and used for grass fire suppression. E ui ment 12 000
Other
Other
Tota) Pro'ect Costs 12 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 12 000
Type of ProjeCt: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other GeneraF
New Pr ram/Unit NA 12. Other General
Re lacement - Unit Na 13. Water Core
Useful Life of Pro'ect 20 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. olVater O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
This is a slip—in unit and can be moved to a new vehicle as needed. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 000
• i r
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Grass Fire Vehicle Project No.: PIN 95-502
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 22,00�
This vehicle fights wildland fire in off—road rural areas of Rosemount E ui ment
Also responds to accidents for traffic controL Other
Other
Total Pro'ect Costs 22 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 22 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification; 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generat
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na 35192/94 13. Water Core
Useful Life of Pro'ect 5-10 Yaars 14. Sanitar Sewer Core
Priority Necessary for rotation, Deferrab le for fire 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
� 21. Other Ente r'�se
22. Other Enter rise
Total Revenue Sources 22 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Narne: Pumper Project No.: PIN 95-503
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Class A pumper for rural response and city fire back—up. E ui ment 100 t?00
Other
(Part 1 of 3) Other
Total Pro'ect Costs 100 000
Revenue Sou�ces
Year of Request: 1995 1. Assessments
2. General Lev 100 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovemenf Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 35 13. Water Core
Useful Life of Pro'ect 30+ Years 14. Sanita Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Once this vehicle is replaced, we should have 3 pumpers that may need re—certification 20. Other Enter rise
in the future but not replacement for 25+ years. 21. Other Enter rise
Will be funded 1/3 in 1995, 1/3 in 1996 and 1/3 in 1997. 22. Other Enter r'�se
Total Revenue Sources 100 000
• • .
r
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM '
PROJECT WORKSHEET
Project Name: Aerial FireTruck Project No.: PIN 95-504
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Elevated platform of approximately 100'for structural fire fighting and high level rescue. E ui ment 325 000
Other
(Part 2 of 2) Other
Total Pro'ect Costs 325 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 325 000
Type of P1'oject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
PriorPro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No *Lar er vehicle 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. 35180 13. Water Core
Useful Life of Pro'ect 20+ Years 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Current vehicle has many problems (tS0 and mechanical). 20. Other Enter rise
Does not provide necessary protection. 21. Other Enter rise
Will be funded 50% in 1994 and 50% in 1995. 22. Other Enter rise
Total Revenue Sources 325 000
•
• •
GITY OF ROSEMOUNT
CAPITA� IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Fire Fighting Equipment Project No.: PIN 95-505
DepartmentAequesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Large/permanent pieces of fire fighting equipment, new and replacement items. E ui ment 3 800
Other
Other
Total Pro'ect Costs 3 800
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 3 800
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 50°� 12. Other General
Re (acement — Unit Na 50% 13. Water Core
Useful Life of Pro'ect 15 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Origina)Year of Request — 1993 {For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Items to be specified and approved as need arises. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 800
•
• •
CITY OF ROSEMOUNT I
CAPITAL IMPROVEMENTS PROGRAM . �
PROJECT WORK3HEET
Project Name: Bunker Gear Project No.: PIN 95-506
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Protecfive fire fighting gear. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Dther General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement - Unit Na Gear 13. Water Core
Useful Life of Pro'ect 5-7 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
- 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Fire Hose&Coupiings Project No.: PW 95-507
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Large permanent pieces of fire fighting large diameter sypply hose. E ui ment 20 000
Replacement and upgrade of current equipment. O#her
Other
Total Pro'ect Costs 20 OOQ
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 20 000
Type of Project: Equipment 3. General Operating Budget
4. General ClPfunds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit 50%New 12. Other General
Re lacement - Unit No. 50°k Re lacement 13. Water Core
Useful Life of Pro'ect 10-20 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter r'�se
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
• •
�
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Pumper Project No.: PIN 96-501
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project pescription (use back for additional information): Construction
Class A pumper for rural response and city fire back—up. E ui ment 100 000
Other
(Part 2 of 3) Other
Total Pro`ect Costs 100 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 100 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
_ Ex ansion of Existin Pr ram No 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re (acement — Unit Na 35 13. Water Core
Useful Life of Pro'ect 30+ Years 14. Sanita Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Once this vehicle is replaced, we should have 3 pumpers that may need re—certification 20. Other Enter rise
in the future but not replacement for 25+ years. 21. Other Enter rise
Will be funded 1/3 in 1995, 1/3 in 1996 and 1/3 in 1997. 22. Other Enter rise
Total Revenue Sources 100 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Suburban - Command Vehicle Project No.: PIN 96-502
Department Requesting: Fire Project Costs �!
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
This vehicle is used by the officer in charge to respond to the scene of fire calis E ui ment 25 000
and some medical calis. Other
Other
Total Pro'ect Costs 25 OOfl
Revenue Sources
Yea1' of Request: 1996 1. Assessments
2. General Lev 25 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No ' 11. Other General
New Pr ramNnit NA 12. Other General
Re lacement — Unit Na 3599 13. Water Core
Useful Life of Pro ect 10 Years 14. Sanitar Sewer Core
Priority Necessary for robtion, Deferrable for fire use 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Ente rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 25 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Fire Fighting Equipment Project No.: PIN 96-503
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Large/permanent pieces of fire fighting equipment, new and replacement items. E ui ment 3 800
Other
Other
Total Pro'ect Costs 3 800
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 3 800
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generat
Years NA 10. Other General
Ex ansion of Existin Pr rarn Yes 11. Other General
New Pr ram/Unit 50% 12. Other General
fle lacement — Unit No. 50°� 13. Water Core
Useful Life of Pro'ect 15 Ya�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 {For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Items to be specified and approved as need arises. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 800
•
• i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Bunker Gear Project No.: PIN 96-504
Department Requesting: Fire Project Costs
Plannin IDesi n/En ineerin
Land
Project Description (use back for additionaf information): Construction
Protective fire fighting gear. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existln Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit Na Gear 13. Water Core
Useful Life of Pro'ect 5-7 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 {For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
�
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Computer Additions and Updates Project No.: PIN 96-505 !
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 10,000
Add to current IBM system and update. Add new Macintosh system. E ui ment
Other
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 10 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit Yes 12. Other General
Re lacement — Unit No. NA 13. Water Core
Usefui Life of Pro ect 5+ Years 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request— 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Grass Fire Pump Project No.: PIN 97-501
Department Requesting: Fire Project Costs �I
Plannin /Desi n/En ineerin �
Land
Project Description (use back for additional infarmation): Construction
This pump and tank is carried in the bed of a pick—up and used for grass fire suppression. E ui ment 9 000
Other
Other
Total Pro'ect Costs 9 000
Revenue Sources
Year of Request: 1 s97 1. Assessments
2. General Lev 9 OQO
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generai
Ex ansion of Existin Pr ram No 11, Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 13. Water Core
Useful Life of Pro'ect 20 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
This is a slip—in unit and can be moved to a newvehicle as needed. 20. Other Enter r'�se
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 9 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: 1/2 Ton Pickup - Command Vehicle Project No.: PIN 97-502
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
This vehicle is used by the officer in charge to respond to fires and medical calls. E ui ment 22 000
Other ',
Other
Total Pro'ect Costs 22 000
Revenue Sources
Year of Request: 199z 1. Assessments
2. Genera) Lev 22 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Qther General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na 3598 13. Water Core
Useful Life of Pr 'ect 10 Years 14. Sanita Sewer Core
Priority Desirable—roiation, Deferrable—fire 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 22 000
• �
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM I
PROJECT WORKSHEET
Project Name: Grass Fire Vehicle Project No.: PIN 97-503
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 22,000
This vehicle fights wildland fire in off—road rural areas of Rosemount. E ui ment
Also responds to accidents for traffic controL Other
Other
Total Pro'ect Costs 22 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 22 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generat
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit Na 35182/94 13. Water Core
Useful Life of Pro'ect 5-10 Years 14. Sanitar Sewer Core
Priority Necessary for roiation, Deferrable for fire 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997� 18. Storm Water-0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 22 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Tanker Addition Project No.: PIN 97-504
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replacement of old tanke�chasis and incorporate current tank into new vehicle. E ui ment 165 000
Other
Other
Total Pro'ect Costs 165 000
• Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 165 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6: Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other Gener�f
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na Addition to 35195 13. Water Core
Useful Life of Pro'ect 25 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Replace chasis or sell entire unit and replace tank and chasis depending on cost effectiveness. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 165 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM '
PROJECT WORKSHEET
Project Name: Pumper Project No.: PIN 97-505
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Class A pumper for rural response and city fire back—up. E ui ment 100 000
Other
(Part 3 of 3) Other
Total Pro'ect Costs 100 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 100 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Ge�eral
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — UniY No. 35 13. Water Core
Useful Life of Pro'ect 30+ Years 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating eudget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utiti CIP Funds
Once this vehicle is replaced, we should have 3 pumpers that may need re—certification 20. Other Enter rise
in the#uture but not replacement for 25+ years. 21. Other Enter rise
Will be funded 1/3 in 1995, 1/3 in t996 and 1/3 in 1997. 22. Other Enter rise
Tota)Revenue Sources 100 000
• •
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WOFtKSHEET
Project Name: Fire Fighting Equipment Project No.: PIN 97-5�6
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Large/permanent pieces,of fire fighting equipment, new and replacement items. E ui ment 3 800
Other
Other
Total Pro'ect Costs 3 800
Revenue Sources
Yea� of Request: 1997 1. Assessments
2. General Lev 3 800
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 50% 12. Other General
Re lacement — Unit No. 50% 13. Water Core
Useful Life of Pro'ect 15 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Items to be specified and approved as need arises. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 21. Other Enter rise
22. Other Enter r'se
Total Revenue Sources 3 800
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Bunker Gear Project No.: PIN 97-507
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Protective fire fighting gear. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1 s97 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. Generai Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na Gear 13. Water Core
Usefui Life of Pro'ect 5-7 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. OtMer Enter rise
Total Revenue Sources 6 000
� • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
Project Name: Pagers Project No.: PIN 97-508
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Pagers for notifying firefighters of an emergency. E ui ment 18 000
Other
Other
Total Pro'ect Costs 18 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 18 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5-10 Y�rs 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impacf on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 18 000
•
• �
CITY OF ROSEMOUNT I
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Refurbish Reserve Rescue Truck Project No.: PIN 98-501
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Update/Redo 1978 Reserve Rescue Truck E ui ment 30 000
Other
Other
Total Pro'ect Costs 30 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. Generai Lev 30 000
Type of Project: Equipment 3. General Operating Budget
4. General CiP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. Backu Rescue Truck 13. Water Core
Useful Life of Pro ect 10-15 Years 14. Sanita Sewer Core
Prioriry 15. Storm Sewer Gore
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et '
19. lltili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
i . • .. � � . � � . � � .
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Pumper Replacement Payment Project No.: PIN 98-502
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
�and
Project Description (use back for additionai information): Construction
Replace Pumper#181 E ui ment 150 000
Other
(Part 1 of 2) Other
Totat Pro'ect Costs 150 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 150 000
Type of Project:� Equipment 3. Generai Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 181 13. Water Core
Useful Life of Pro'ect 20-25 Years 14. Sanita Sewer Core
Prioriry Top 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Funded 50%in 1998 and 50% in 199J. 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 150 000
.
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEM'ENTS PROCRAM
PROJECT WORKSHEET
Project Name: Fire Fighting Equipment Project No:: PIN 98-503
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionaf information): Construction
Largelpermanent pieces of fire fighting equipment, new and repiacement items. E ui ment 4 500
Other
Other
Total Pro'ect Costs 4 500
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 4 500
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Yea�s NA 10. �ther General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit 50°� 12. Other General
Re lacement — Unit Na 50% 13. Water Core
Useful Life of Pro'ect 15 Years 14. Sanita Sewer Care
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
Items to be specified and approved as need arises. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 21. Other Enter rise
22. Other Enter rise
Total Aevenue Sources 4 500
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Bunker Gear Project No.: PIN 98-504
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Protective fire fighting gear. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1998 1, Assessments
2. General Lev 6 000
Type of Project: Equipment 3. Generai Operating Budget
_ 4. General CtP Funds
5. MSA Funds
Project Justification: 6. Porti Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement - Unit Na Gear 13. Water Core
Useful Life of Pro'ect 5-7 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): �7. Sewer Operating Budget
Original Year ofAequest — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
.
� •
CITY OF R�SEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET •
Project Name: Water Rescue Equipment Project No.: PIN:98-505
Department Requesting: Fire Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Floatation and rescue equipment for portion of Mississippi River we are responsible for. E ui ment 8�
Other
Other
Totat Pro'ect Gosts 8 0�0
Revenue Sou�ces
Year of Request: 1998 1. Assessments
2. General Lev 8 000
Type of Project: Equipment 3. General Operating Budget
4. Generai CIP Funds :
5. MSA Funds
Project Justificatiom 6. Port Authority
7. Park Im rovementfunds
� 8. Other General
Prior Pro'ect R uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA� 13. Water Core
Useful Life of Pro'ect 15-20 Years 14. Sanitar Sewer Core
Prioriry 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 8 000
� •
�
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Aerator Project Na: PIN 94-601
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Add to present equipment — Currently have one E ui ment 3 000
Other
Other
Total Pro'ect Costs 3 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 3 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit Na NA 13. Water Core
Usefui Life of Pro'ect 14. Sanitar Sewer Core
Prioriry 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Needed for increase in acres of park maintained 2Q Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Phase I Vegatation - Carroll Woods Project No.: PIN 94-602
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Work on prairie restoration — includes seed and labor. E ui ment
Other 10 000
Other
Tota) Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General GIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Othe�General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re tacement — Unit Na NA 13. Water Core
Useful Life of Pr 'ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
• •
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Phase IIA Vegatation - Carroll Woods Project No.: PIN 94-603
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information�: Construction
Buckthorn irradication, use herbicide and cutting methods. E ui ment
Plant savannah type plants. Continue prairie area development. Other 10 000
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
S. Other Genera)
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA t3. Water Core
Useful Life of Pro'ect Permanent 14. Sanita Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993j 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
r
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter - Shannon park Project No.: PIN 94-604
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 10,000
Construct small shelter(gazebo)at area near fields 2-3-4. E ui ment
Other
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1 s94 1. Assessments
2. General Lev
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds 10,000
8. Other Genera�
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Sewer O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Tota►Revenue Sources 10 000
�
r �
ClTY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Ptayground Equipment - Connemara Park Project No.: PIN 94-605
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Add playground equipment to Connemara Park(Original set was $5,000 to get project started) E ui ment 10 000
Other
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 10 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/U�it NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storrn Water O eratin Bud et
19. Utiti CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Tree 5pade for Skid Steer Loader Project No.: PIN 94-606
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Tree spade for use in nursery area — smaller trees to plant cannotbe moved E ui ment 10 000
or dug up with the larger tree spade. Nursery stock is at point where it needs Other
to be transplanted. Other
Tota) Pro'ect Costs 10 D00
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev t0 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Basketball Courts Project No.: PIN 94-607
Department Requesting: Parks &Recreation - Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Put free throw lanes with backstops in Biscayne, Connemara, Winds, Camfield &Kidder Parks E ui ment
Other 12 000
Other
Total Pro'ect Costs 12 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 12 000
Type of Project: Park Enhancements 3. General Operating Budget
4. General CIP Funds
� 5. MSA Funds
Project Justifiication: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 1 S. Storm Water O eratin Bud et
19. Utili CtP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 000
•
r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Office Furniture Project No.: PIN 94-608
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction
Furniture for present staff and replacement of Parks Programmer(Engineer Tech). E ui rnent 15 000
Also for added 3/4 time Parks Secretary and 3/4 time Athtetic Assistant Programmer. Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 15 000
Type of Project: Office Furniture 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General'
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 {For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Needed for staff to work efficiently 20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• •
• .
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Parking Lot — Erickson Community Square Project No.: PIN 94-609
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 20,000
Upgrade and expand parking lot at south end of Erickson Community Square. E ui ment
Other
Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 20 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
- 16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEE7
Project Name: Replace &Upgrade Playground Equipment — Kidder Park Project No.: PIN 94-610
bepartment Requesting: Parks 8�Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace&upgrade worn out playground equipment (Meet ADA requirements also) E ui ment 40 000
Other
Other
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 40 000
Type of Project: Equipment 3. General Operating Budget
4. General CtP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other Generaf
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Othe�Generai
New Pr ram/Unit NA 12. Other General
Re lacement— Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated irnpact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994j 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Narne: Phase It 6—C Vegatation — Carroil Woods Project No.: PIN 94-611
Department Requesting: Parks &Recreation Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 13,500
Method B: Eliminate buckthorn as much as possible/plant shade tolerant shrubs and species. E ui ment 13 500
Method C: In areas without much canopy, plant trees adaptable to this environment. Other
Other
Total Pro'ect Costs 27 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. Generai Lev 27 000
Type of Project: Park Development 3. General Operating Budget
4. General GIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park lm rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 27 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter- Twin Puddies Project No.: PIN 94-612
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional informationj: Construction 30,000
Construct small sheiter (gazebo). E ui ment
Other
Other
Total Pro'ect Costs 30 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 30 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
- 22.Other Enter rise
Total Revenue Sources 30 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Grading - Erickson Community Square Project No.: PIN 94-613
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back fo� additional information): Construction 35,000
Grading for amphitheater and shaping for concrete work. E ui ment
Other
Other
Total Pro'ect Costs 35 000
Revenue Sources
Year ofi Request: 1994 1. Assessments
2. General Lev 35 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA t2. Other Generai
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) t8. Storm Water O eratin Bud et
- 19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Totai Revenue Sources 35 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT Wt3RKSHEET
Project Name: • Parking Lot — Erickson Park Project No.: PIN 94-614
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 35,000
Pave parking lot to decrease dust and prevent erosion. E ui ment
Includes curb and gutter, parking lanes and bumpers. Other
Other
Total Pro'ect Costs 35 000
Revenue Sources
Year,of Request: 1994 1. Assessments
� 2. General Lev 35 000
Type of Project: Park Development 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Othe� Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Ente rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 35 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: ADA&Safety Upgrades to Playground Equipment Project No.: PIN 94-615
Department Requesting: Parks &Recreation , Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Requirements to meet ADA and safety guidelines for playground equipment. E ui ment 35 000
This is start of projects to bring parks to higher standards. Other
Other
Total Pro'ect Costs 35 000
Revenue Sources
Year of Request: 1994 � 1. Assessments
2. General Lev 35 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes t 1. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacemen#= Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): t7. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
� 19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 35 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: General Lighting - Shannon Park Project No.: PIN 94-616
Department flequesting: Parks &Recreation Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 40,000
Lighting for trails and generai walking and parking areas E ui ment
Other
Other
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1994 • 1. Assessments
2. General Lev 40 000
Type of Project Construction 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11, Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): t7. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
. • �
•
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter- City Hail Project No.: PIN 94-617
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Desc�iption (use back for additional information): Construction 60,000
Addition to original shelter concept — Erickson Community Square. E ui ment
Other
Other
Total Pro'ect Costs 60 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 60 000
Type of Project: Park Development 3. Generaf Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Yeats 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
• Re lacement — Unit Na NA 13. Water Core
Usefui Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): t 7. Sewer Operating Budget
Original Year of Request — 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 60 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land — Biscayne/145th Pfoject No.: PIN 94-618
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land 120 000
Project Description (use back for additionai information�: Construction
Addition of new park when development occurs — west of Biscayne and 145fh Street. E ui ment
Should be acquired through park dedication. Other
Other
Total Pro'ect Costs 120 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. Generai Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. Genera� CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds 120,000
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement— Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request— 1992 (For 1993) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
2t. Other Ente rise
22. Other Enter rise
Total Revenue Sources 120 000
•
. �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land — Carroll Woods Project No.: PIN 94-619
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land 168 000
Project Description {use back for additionai information): Construction
Acquire land for nature area on north of park to Carroll Woods land for prairie area E ui ment
and location of conservatory Other
Other
Total Pro'ect Costs 168 000
Revenue Sources
Year of Request: 19s4 1. Assessments
2. Generai Lev 39 000
Type of Project: Land Acquisition 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Port Autho�iry
7. Park Im rovement Funds 84,000
8. Other Generai 45 000
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re Jacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 168 000
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
Project Name: Phase I Vegatation- Carroll Woods Project No.: PW 95-601
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Work on prairie restoration — includes seed and labor. E ui ment
Other 10 000
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1994) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Phase IIA Vegatation — Carroll Woods Project No.: PIN 95-602
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Buckthorn irradication, use herbicide and cutting methods. E ui ment
Plant savannah type plants. Continue prairie area development. Other 10 000
Other
Totat Pro'ect Costs 10 000
Revenue Sources
Year of Request: 19s5 t. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authority
7. Park Im rovement Funds
S. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): t 7. Sewer Operating Budget
Original Year of Request — 1992 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
r • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Bridge - Carroll Woods Project No.: PIN 95-603
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
l.and
Project Description (use back,for additiona! infiormation): Construction 10,000
Construct bridge in southwest area over drainage and edge of pond site. E ui ment
Other
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. Genera) Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park 1m rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Fnformation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Originai Year of Request - 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Qther Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
�
• s
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Benches &Tables ProjectNo.: PIN 95-604
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Add items to inventory for use in parks and in trail areas E ui ment 10 000
Other
Other
Totai Pro'ect Costs 1 Q 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 10 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds �
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other in#ormation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Originai Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
� •
CiTY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: 6' John Deere Mower Replacement Project No.: PtN 95-605
Department Requesting; Parks�Recreation Project Costs
Plannin /Desi n/En ineerin
�and
Project Description (use back for additionai information): Construction
Rotation of mowers to keep efficiency in place E ui ment 12 000
Other
Other
� Total Pro'ect Costs 12 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. Generai lev 12 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanita Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 000
•
r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter - Kidder Park Project No.: PIN 95-606
Department Requesting: Parks &Recreation Project Costs
Piannin /Desi n/En ineerin
�and
Project Description (use back for additional information): Construction 15,000
Construct shelter to improve park uses. E ui ment
Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 15 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. PortAuthority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CtP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• • i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Playground Equipment- Erickson Community Square Project No.: PIN 95-607
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Installation of playground equipment in area of Erickson Community Square E ui ment 15 000
for family uses at picnics,social events, eta Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
_ Year of Requesfi 1995 1. Assessments
2. General Lev 15 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA t0. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating 8udget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• � . •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Playground Equipment- Biscayne Park Project No.: PIN 95-608
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace&upgrade existing equipment at Biscayne Park E ui ment 20 000
Other
' Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 20 000
Type of Project: Equipment 3. Generai Operating Budget
4. General CIP Funds
5. ' MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA ' 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other Generai
Re lacernent — Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Prioriry 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other information (i.e. estimated impact on revenues� expenses, staffing, etc.): �7. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: D�edging - Carroll Woods Project No.: PIN 95-609
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 25,000
Dredge and form a large pot hole site in southwest corner of park. E ui ment
Other
Other '
Total Pro'ect Costs 25 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 25 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 25 000
� r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
Project Name: Phase IIA Vegatation - Carroll Woods Project No.: PIN 97-605
Department Requesting: Parks &Aecreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Desc�iption (use back for additional infarmation): Construction
Buckthorn irradication, use herbicide and cutting methods. E ui ment
Piant savannah type plants. Continue prairie area development. Other 10 000
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. Generat CIP Funds
5. MSA Funds
Project Justification: 6. Po�t Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect Permanent 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
-0riginal Year of Request — 1992 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter- Winds Park Project Na: PIN 97-606
Department Requesting: Parks&Recreation Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional informationj: Construction 30,000
Construct shelter following land acquisition and devetopment of area south of present E ui ment
park land, in conjunction of redesign of park area. Other
Other
Total Pro'ect Costs 30 000
Revenue Sources
Yea� of Request: 1997 1. Assessments
2. General Lev
Type of Project: Park Developmenf 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds 30 000
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ramNnit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
�
• �
CITY OF ROSEMOUNT _
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Lighting — Erickson Community Square Project No.: PIN 97-607
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
ProjectDescription (use back for additional information): Construction 35,000
Add lighting around shelter and amphitheater. E ui ment
Other
Other
Total Pro'ect Costs 35 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 35 400
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA � 12. Other General
Ae lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199'� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 35 000
r
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Walkways &Bridge — Erickson Community Square Project No.: PIN 97-608
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction 40,000
Construction of bridge and paved walkways in shelter area. E ui ment
Other
Other
Total Pro'ect Costs 40 000
Revenue Sources
Yeae of Request: 1997 1. Assessments
2. General �ev 40 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
, 5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansian of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Narne: Phase IIA Vegatation - Carroll Woods Project No.: PIN 98-601
Department Requesting: Parks&Aecreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Buckthorn irradication, use herbicide and cutting methods. E ui ment
Plant savannah type plants. Continue prairie area development Other 10 000
Other
Total Pro'ect Costs 10 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 10 000
Type of Pt'oject: Park Development 3. General Operating Budget
4. General CtP Funds '
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1992 (For 199� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Aevenue Sources 10 000
.
• �
CITY OF ROSEMOUNT
CAPiTAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Stone Path - Erickson Community Square Project No.: PIN 98-602
Department Requesting: Parks 8�Recreation Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction 12,000
Construction of stone path through gardens and around ponding. E ui ment
Other
Other
Total Pro'ect Costs 12 000
Revenue Sources
Year of Request: 1998 t. Assessments
2. General Lev 12 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
PriorPro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Prioriry 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Ehter rise
Total Revenue Sources 12 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Pond Restoration — Erickson Community Square Project No.: PIN 98-603
Department Requesting: Parks &Recreation Project Costs
Plannin 7Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 15,000
Restore vegatation around pond following amphitheater construction. E ui ment
Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. Genera) Lev 15 000
Type of Project: Park Development 3. General Operating Budget
', 4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. qther General
Re lacement'- Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other lnformation (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
•
• •
CITY OF ROSEMOUNT
CAPITALIMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Trail - Erickson Community Square Project No.: PIN 98-604
Department Requesting: Parks &Recreation Project Costs
' Plannin /Desi n/En ineerin
Land
, Project Description (use back for additional information): Construction 20,000
Construct paved trail from building to park&ride. E ui ment
Other
Other
Total Pro'ect Costs 20 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 20 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr rarn Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1998) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter ri.se
22. Other Enter rise
Total Revenue Sources 20 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMfNTS PROGRAM
PROJECT WORKSHEET
Project Name: Grade for Amphitheater — Erickson Community Square Project No.: PIN 98-605
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 35,000
Grading for construction of farmal (concrete) seating amphitheater. E ui ment
Other
Other
Total Pro'ect Costs 35 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. Genera) Lev 35 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Gore
Prioriry 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O era#in Bud et
19. Utili CIP Funds
20. OtherEnter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 35 000
•
� �
CITY OF ROSEMOUNT
CAPITA� IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Landscaping &Amenities — Erickson Community Square Project No.: PIN 98-606
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional infprmation): Construction 50,000
Finish landscaping, trees, tables, benches, planters, etc. around amphitheater. E ui ment
Other
Other
Total Pro'ect Costs 50 000
Revenue Sources
Yea� of Request: f998 1. Assessments
2. General Lev 50 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
� 16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter �ise
Total Revenue Sources 50 000
•
• - i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Parking Lot/Entrance Drive — Carroll Woods Project No.: PIN 98-607
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 50,000
Construction of parking lot and entrance drive on north end of site in corner of E ui ment
Carrotl Woods and Schwarz Parks in prairie area and the neighborhood park area of Schwarz. Other
Other
Total Pro'ect Costs 50 000
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 50 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Uther General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other Generat
Ex ansion of Existin Pr ram Yes 11. Other Genera(
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993(For 1998j 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 50 000
•
• r
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Sander Project No.: PIN 94-701
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Additional Sander for new plow&truck for added street mileage. E ui ment 3 000
Other
Other
Total Pro'ect Costs 3 000
Revenue Saurces
Yea� of ReqUest: 1994 1. Assessments
2. General Lev 3�00
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justificatian: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit No 12. Other Generaf
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years � 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Utiliry Box Project No.: PIN 94-702
Department Requesting: Public Works/Utilities Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Fiberglass utility box for 3/4 ton truck. E ui ment 3 800
Other
Other
Totai Pro'ect Costs 3 800
Revenue Sources
Year of Request: 1 s94 1. Assessments
2. Genetal Lev
Type of Project: Equipment 3. General Operating Budget •
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 1�Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds 3 800
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 3 800
•
, r
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Water Tower Maintenance Project No.: PIN 94-703
Department Requesting: Public Works/Utilities Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Inspection, cleaning &disinfection of Chippendale Tower. E ui menf
Other — Maintenance 5 000
Other
Total Pro'ect Costs 5 000
Revenue Sources
Year of Request: 1994 1. Assessments
2 General Lev
Type of Project: Improvements Maintenance 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds 5 000
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 5 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Diagnostic Computer Project No.: PIN 94-704
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
�and
Project Description (use back for additional information): Construction
Electronic diagnostic equipment for automotive repair. E ui ment 6 000
Other
Other
Total Pra'ect Costs 6 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core '
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili ClP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
r
� •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PIN 94-705
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
314 Ton 4x4 Pickup Truck replacing 75 Dodge 4x4 E ui ment 18 000
Other
Other
Total Pro'ect Costs 18 000
Revenue Sources
Year of Request: 1 s94 1. Assessments
2. General Lev 18 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 90 13. Water Core
Useful Life of Pro'ecf 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CtP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 S 000
.
� •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PIN 94-706
Department Requesting: Public Works Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
3/4 Ton Pickup Truck Replacing Chevy#86(Using funds from 1995). E ui ment 20 000
Other
Other
Total Pro'ect Costs 20 000
Revenue Sources
Yea� of Request: 1994 1. Assessments
2. General Lev 20 000
Type of Pt'oject: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. 101 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Infarmation (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget .
Original Year of Request — 1993 (For 1994) 1 S. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 20 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PIN 94-707
Department Requesting: Public Works Project Costs
Plannin JDesi n/En ineerin
Land
Project Description (use back for additional information): Construction
Additional single axle truck plus plow and wing for added sYreet mileage. E ui ment — Truck 90 000
Other — Plow&Win 10 000
Other
Total Pro'ect Costs 100 000
Revenue Sources
Yeaf of Request: 1994 1. Assessments
2. General Lev 100 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No i 1. Other General
New Pro ram/Unit - Yes 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 {For 1994) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 100 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET -
Project Name: Curb&Gutter Replacement Project No.: PIN 94-708
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
� Land
Project Description (use back for additional information): Construction � 12,000
1000 feet of bituminous curbing. E ui ment
1000 feet of concrete curbing and removaL Other
Other
Total Pro'ect Costs 12 000
Revenue Sources
Year of Request: 1994 1. Assessments
2. Generai Lev 12 000
Type of Project: Curb &Gutter 3. General OperatingBudget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. �ther General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 000
•
a �
CITY OF ROSEMOUNT '
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Narne: Sidewalk Replacement Project No.: PIN 94-709
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
�and
Project Description (use back for additional information): Construction 28,325
1,500 feet of concrete sidewalk replacement and removaL E ui ment
500 feet of bituminous sidewaik or bike paths and removaL Other
Other
Total Pro'ect Costs 28 325
Revenue Sources
Year of REquest: 1994 1. Assessments
2. General Lev 28 325
Type of Pt'oject: Sidewalk 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years < NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanita Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 1 S. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22, Other Enter r'�se
Total Revenue Sources 28 325
- -
�
� � �
CITY OF ROSEMOUNT
CA1'ITAL IMPRUVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Gravel Road Resurfacing Project No.: PIN 94-710
Department Requesting: Pubiic Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 33,74s
1 1/2 miles of resurfacing: E ui ment
— Dodd Road Other 3 409
— 132nd Street from Highway 3 to 120th Street Other
Total Pro'ect Costs 37 158
Revenue Sources
Year of Aequest: 1994 1. Assessments
2. General Lev 37 158
Type of Project: Road Resurfacing 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 37158
•
� •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - 143rd Street West ProjeCt No.: PIN 94-711
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 8 800 I
Land '
Project Description (use back for additional information): Construction 34,300
Street reconstruction on 143rd St. from Highway 3 to west end of 143rd St E ui ment
528 L.F. curb &gutter and street surfacing. Other — Finance 9% 4 400
Other — Le al/Admin 3% 1 500
Total Pro'ect Costs 49 000
Revenue Sources
Year' of Request: 1994 1. Assessments 40,000
' 2. General Lev 9 000
Type of Project: StreetAeconstruction 3. General Operating Budget
4. Geheral CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park 1m rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Desirable 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1994) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
- 21. Other Enter rise
22. Other Enter rise
Tota)Revenue Sources 49 000
•
r �
CITY OF ROSEMOUNT '
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
PI'ojeCt Name: Street Reconstruction — Cameo Avenue PtojeCt No.: PIN 94-712
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 14 900
Land
Project Description (use back for additional information): Construction 58,100
Street reconstruction on Cameo Avenue from 145th St. to Lower 147th St. E ui ment
898 L.F. curb &gutter and street surfacing. Other — Finance 9% 7 500
Other — Le al/Admin 3% 2 500
Total Pro'ect Costs 83 000
Revenue Sources
Year of Request: 1994 1. Assessments 61,000
2. General Lev 22 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud e#
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.j: 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili ClPfunds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
TotatAevenue Sources 83 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - 145th Street West Project No.: PIN 94-713
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 105 500
Land
Project Description (use back for additional information): Construction 585,900
Street reconstruction on 145th St. from Cameo Ave. to Chippendale Ave. E ui ment
2,746 L.F. curb &gutter and street surfacing. Other — Finance 9% 52 700
Other — Le al/Admin 3% 17 600
Total Pro'ect Costs 761 700
Revenue Sources
Year of Request 1994 1. Assessments 105,000
2. Generaf Lev 451 700
Type of Project: Street Reconstruction 3. General Operating Budget
4. General GIP Funds
5. MSA Funds 205,000
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? Yes 9. Other General
Years 1993 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1994) 18. Storm Water O eratin Bud et
19. Utili CtP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 761 700
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Sheiter- N7 Project No.: PIN 95-610
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 30,OOo
Construction of shelter in new park — N7 E ui ment
Other
Other
Totai Pro'ect Costs 30 000
Revenue Sources
Year of RequeSt: 1995 1. Assessments
2. General Lev
Type of Project: Park Development 3. Generai Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds 30,000
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.j: 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. OtherEnter rise
22. Other Enter rise
Total Revenue Sources 30 000
• •
i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Howard MowerReplacement Project No.: PIN 95-611
Department Requesting: Parks &Recreation Project Costs �'
Plannin /Desi n/En ineerin '
Land
Project Description (use back for additional information): Construction
Replace Howard mower(15') purchased several years ago as E ui ment 30 000
part of the regular equipment roiation program. Other
Other
Total Pro'ect Costs 30 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 30 000
Type of Project: Equipment 3. General Operating Budget
4. General CtP Funds
5. MSA funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
Rotate to maintain trade—in value as well as to keep good equipment 20. Other Enter rise
operating and on—line 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
•
� �
CITY OF ROSEMOUNT ��
CAPITAL IMPROVEMENTS PROGRAM �'
PROJECT WORKSHEET
Project Name: Land - Winds Park Project No.: PIN 95-612
Department Requesting: Parks &Aecreation Project Costs
Plannin /Desi n/En ineerin
Land 36 000
Project Description (use back for additional info�mation): Construction
Add 3.0 acres of land for when area south of park is developed. E ui ment
Should be acquired through park dedication. Other
Other -
Total Pro'ect Costs 36 000
Revenue Sources
Year of Request: 1995 t. Assessments
2. Generai Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds 36,000
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 36 000
• �
i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Playground Equipment at New Park (N-7) Project No.: PIN 95-613
Department Requesting: Parks &Recreation Project Costs I
Plannin /Desi n/En ineerin
Land
Project Description (useback for additional information): Construction
Add playground equipment to new park west of Biscayne and 145th Street E ui ment 40 000
Other
Other
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 40 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Authoriry
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Yea�s NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter- Schwarz Park Project No.: PIN 95-614
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 60,000
Construction of shelter in northwest corner — next to Kelly Property. E ui ment
Coordinate with improvements of Carroli Woods and dedication of Kelly Property. Other
Other
Total Pro'ect Costs :60 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. Generai Lev
Type of Project: Park Development 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park im rovement Funds 60,000
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15, Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impaet on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993{For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter r'�se
22. Other Enter rise
Total Revenue Sources 60�00
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land - Schwarz Park Project No.: PIN 95-615
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land 90 000
Project Description (use back for additional information): Construction
Acquire land west of Schwarz Park for play area/active use. E ui ment
Coordinate with Carroll Woods acquisition. Other
Other
Total Pro'ect Costs 90 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park im rovement Funds 45,000
8. Other General 45,000
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes f 1. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 90 000
•
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land - Birger Pond Project No.: PIN 95-616
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land 180 000
Project Description (use back for additionai information): Construction
Acquire land around pond above 904 feet for park use. E ui ment
Less land needed if 883 feet(normal high water mark) is used. Other
Coordinate with Utility Department for joint use. Other
Total Pro'ect Costs 180 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority -
7. Park Im rovement Funds 180,000
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Originai Year of Request — 1993 �For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. OtherEnter rise
22. Other Enter rise
Total Revenue Sources 180 000
•
• �
CITY OF Rl3SEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land - Hart Properry Project No.: PIN 95-617
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land 336 000
Project Description (use back for additionai information): Construction
Acquisition of land south of 120th Street owned by Mrs. Hart through a donation E ui ment
(life estate) as conservancy land. Other
Other
Total Pro'ect Costs 336 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. Generai Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Po�t Authority
. 7. Park Im rovement Funds
8. Other General 336,Od0
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. �ther General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. OtherEnter rise
Total Revenue Sources 336 000
•
i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land - Erickson Community Square Project No.: PIN 95-618
Department Requesting: Parks&Recreation Pcoject Costs
Plannin /Desi n/En ineerin
Land 350 000
Project Description (use back for additional information): Construction
Potential acquisition of lumber yard property. E ui ment
Coordinate with Port Authority and other departments. Other
Other
Total Pro'ect Costs 350 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev
Type of Project: Land Acquisition 3. Generai Operating Budget
4. General CIP Funds
5. MSA Funds
Rroject Justification: 6. Port Authoriry
7. Park tm rovement Funds 350,000
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Othe�General
Ex ansion of Existin Pr ram Yes 11. Othe�General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful�ife of Pro:ect 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information ji.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 350 000
• ,
r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land - University Property Project No.: PIN 95-619
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 1,000,000
Coordinate land acquisition with University for use as athletic complex. E ui ment
Land should be obtained to insure future availability. Other
Other
Total Pro'ect Costs 1 000 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev
Type of Project: Land Acquisition 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds 1,000 000
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanita Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other tnformation (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 199� 18. Storm Water O eratin Bud et
19. Utili CtP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 OQO 000
•
� �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Projeet Name: Bike Trail Through Camfield Park Project No.: PIN 96-601
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 6,000
8 foot wide bike trail connecting Canada Avenue to Highway 3 E ui ment
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 199s 1. Assessments
2. Genera) Lev 6 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. PortAuthority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other Generai
Re lacement - Unit Na NA 13. Water Core
Useful L'rfe of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses� staffing, etc.): 17. Sewer Operating Budget
Originai Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
ProjeCt Name: Phase I Vegatation- Carroll Woods Projeet No.: PIN 96-602
Department Requesting: Parks 8�Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Work on prairie restoration — includes seed and labor. E ui ment
Other 10 000
Other
Total Pro'ect Costs 10 000
Aevenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
P�ior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect Permanent 14. Sanita Sewer Core
Priority Necessary 15. Starm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Phase I1A Vegatation - Carroll Woods Project No.; PIN 96-603
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Buckthorn irradication, use herbicide and cutting methods. E ui ment
Piant savannah type plants. Continue prairie area development. Other 10 000
Other
Total Pro'ect Costs 10 000
Revenue Sources
Yea�of Request: 1996 1. Assessrnents
2. General Lev 10 000
Type of Project: Park Development 3. General Operating Budget
4. General C1P Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect Permanent 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1992 (For 1995) t8. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
� � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Parking Lot - Twin Puddles Project Nb.: PIN 96-604
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction �o,000
Pave and put curb &gutter in parking lot of Twin Puddles Park E ui ment
Other
Other
Total Pro:ect Costs 10 000
Revenue Sources
Year of Request 1996 1. Assessments
2. General Lev 10 000
Type of Project: Construction 3. Generai Operating Budgef
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
S. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Coordinate run off from cars and allow for easy parking and 20. Other Enter rise
identified parking stalls for cars. 21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 10 000
•
• �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Piayground Equipment - Biscayne Park Project No.: PIN 96-605
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Add on to playground equipment at Biscayne Park as development by CMC takes place E ui ment 15 000
Other
Other
Totai Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 15 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justificatian: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect 14. Sanita Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request - 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
� Total Revenue Sources 15 000
• • i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS RROC,RAM
PROJECT WORKSHEET
Project Name: Pond Restoration — Connemara Park Project No.: PIN 96-606
Department Requesting: Parks &Recreation Projeet Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 15,000
Fi�i in holding pond and work with Utility Department to E ui ment
redesign use of ponding drainage area Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 15 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other Generai
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19, Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Tennis Couris &Basketball Couris — Jaycee Park Project No.: PIN 96-607
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 30,000
Build courts in south end of Jaycee Park E ui ment
Other
Other �
Total Pro'ect Costs 30 000
Revenue Sources
Year of Request; 1996 1. Assessments
2. General Lev 30 000
Type of Project: Construction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other Generai
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful L'rfe of Pro'ect 14. Sanitar Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information {i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
OriginalYear of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Ente rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Playground Equipment- Shannon Park Project No.: PIN 96-608
Departtnent Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Playground equipment for around shelter area — for use by families E ui ment 40 000
on area away from school site Other
Other
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 40 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovernent Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Yeats NA 10. Other General
Ex ansion of Existin Pr ram Yes t i. Other General
New Pr ram/Unit NA 12. Other General
Re lacement— Unit No. NA 13. Water Core
Useful L'rfe of Pro'ect 14. Sanita Sewer Core
Priority 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21.Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
• • !
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Ornamental Pond - Erickson Community Square Project No.: PIN 96-609
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 65,000
Construct ponds around south end of shelter — includes 2 fountains. E ui ment
Other
Other
Total Pro'ect Costs 65 000
Revenue Sources
Year of Request 1996 1. Assessments
2. General Lev 65 000
Type of Project: Park Development 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Usefui Life of Pro ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 65 000
• ! i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Deck — Erickson Community Square Project No.: PIN 96-610
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 70,000
Construct deck area (brick)adjacent to shelter structures. E ui ment
Other
Other
Total Pro'ect Costs 70 000
Revenue Sources
Year of Request: 1 s96 t. Assessments
2. General Lev 70 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
P�ior Pro'ect Re uests? No 9. Dther General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacemenf— Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e, estimated impact on revenues� expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 70 000
• •
.
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Park Shelter— Shannon Park Project No.: PIN 96-611
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 110,000
Construct shelter to serve as winter warming house and summer picnic area. E ui ment
Similar to Jaycee Park Other
�ther
Total Pro'ect Costs 110 000
Revenue Sources
Year of Request: 1996 1. Assessments -
2. General Lev 110 000 �i,
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justificatiom 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generat
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water 0 e�ati Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 110 000
•
• •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Land — Shannon Park Project No.: PIN 96-612
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land 120 000
Project Description (use back for additional information): Construction
Acquisition of 10 acres north of present site. E ui ment
Other
Other
Tota) Pro'ect Costs 120 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev
Type of Project: Land Acquisition 3. General-0perating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: s. Port Aumority
7. Park Im rovement Funds 120,000
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. SeweK Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 120 0�
• � •
CITY OF ROSEMOUNT I
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Ornamental Sculpture - Erickson Community Square Project No.: PIN 97-601
Department Requesting: Parks &Recreation Project Costs
Plannin 1Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 5,000
Add sculpture depicting project on south of building near ponds. E ui ment
Other
Other
Total Pro'ect Costs 5 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 5 000
Type of Project: Park Development 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovementfunds
8. Dther General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993(For 199� 18. Storm Water 0 eratin Bud et �
19. Utilit CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 5 000
• • i
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Pond Observation Blind - Carroll/Schwarz Project No.: PIN 97-602
Department Requesting: Parks &Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 8,000
Construct blind near pond to view wildlife. E ui ment
Carroll Woods — shore of Schwarz Pond. Other
Other
Total Pro'ect Costs 8 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 8 000
Type of Project: Park Development 3. General Operating Budget
4. Generai CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget
Original Year of Request — 1993 (For t997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 8 000
• i •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Environmental Education Dock - CarrolUSchwarz Project No:: PIN 97-603
Department Requesting: Parks&Recreation Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 8,000 ,
Construct environmental education dock at pond site to be used for observing habitat and E ui ment
taking water sampies. Other
Other
Total Pro'ect Costs 8 000
Revenue Sources
Year of Request: 1997 1. Assessments
2. General LeV 8 000
Type of Project: Parkbevelopment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Urrit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 {For 199� t8. Storm Water O eratin Bud et
� 19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 8 000
• r •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Lift Cart Project No.: PIN 95-701
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Lift Cart E ui ment 4 500
Other
Other
Total Pro'ect Costs 4 500
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 4 500
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13, Water Core
Useful Life of Pro ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 {For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 4 500
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
Project Name: Vehicle Hoist Project No.: PIN 95-702
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Vehicle hoist to lift light duty equipment. E ui ment 5 000
Other
Other
Total Pro'ect Costs 5 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 5 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rouement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generat
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro ect 10 Years 14. Sanitar Sewer Core
Prioriry Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise �
Total Revenue Sources 5 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Paint Gun Project No.: PIN 95-703
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Replace air sprayer with airless paint gun. E ui ment 6 000
Other
Other
Total Pro'ect Costs 6 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 6 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
State will be banning oil—based paints in 1995. 7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit No 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 10 Y�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating eudget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
Replacement units for outdated equipment. 20. Other Enter rise
Examples of equipment include hoses, fans, portable generators and ladders. 2t. Other Enter rise
22. Other Enter rise
Total Revenue Sources 6 000
• # i
CITY OF ROSEMOUNT ,
CAPITAL IMPAOVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Lawn Mower Project No.: PIN 95-704
Department Requesting: Public Works/Utilities Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
72"front—rnounted deck mower to cut grass areas on all well, tower&lift station sites. E ui men# 15 000
Other
Other
Total Pro'ect Costs 15 000
Revenue Sources
Year of Request: 19s5 1. Assessments
2. General Lev
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion ofExistin Pr ram No 11. OtherGeneral
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 7 Years — If limited to Utili use. 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Inforrnation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995j 18. Storm Water O eratin Bud et
19. Utili CIP Funds 15 000
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 15 000
• � r
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Loader Project No.: PIN 95-705
Department Requesting; Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Front end loader with plow and wing replacing '74 John Deere E ui ment 115 000
Other
Other
Total Pro'ect Cos#s 115 000
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 115 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. 204 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 115 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Curb &Gutter Replacement Project No.: PIN 95-706
Department Requesting: Pubiic Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 12,360
1,000 feet of bituminous curbing. E ui ment
1,000 feet of concrete curbing and removaL Other
Other
Total Pro'ect Costs 12 360
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 12 360
Type of Project: Curb &Gutter 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park tm rovement Funds
8. Other Generaf
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. WaterCore
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18, Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 360
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Sidewaik Replacement Project No.: PIN 95-70T
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 2s,174
1,500 feet of concrete sidewaik replacement and removal. E ui ment
500 feet of bituminous sidewalk or bike paths and removaL Other
Other
To#al Pro'ect Costs 29 174
Revenue Sources
Yea�of Request: 1995 1. Assessments
2. General Lev 29 174
Type of Project: Sidewalk 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 29174
r�
• • l
.
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Gravel Road Resurfacing Project No.: PIN 95-708
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 33,749
1 1l2 miles of resurfacing: E ui ment
— Upper 135th — Danville — 136th Other 3 409
— 124th — Blanca — 125th Other
— 128th — Bolivia Total Pro'ect Costs 37 158
Revenue Sources
Year of Request: 1995 1. Assessments
2. General Lev 37 158
Type of Project: Road Resurfacing 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 37158
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Cameo Avenue Project No.: PIN 95-709
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 14 900
Land
Project Description (use back for additional information): Construction 58,100
Street reconstruction on Cameo Avenue from 143rd St. to 145th St. E ui ment
898 L.F. curb &gutter and street surfacing. Other — Finance 9% 7 500
Other —1e al/Admin 3% 2 500
Total Pro'ect Costs 83 000
Revenue Sources
Year of Request: 1995 1. Assessments 63,000
2. Genera) Lev 20 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CiP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex' ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Y�rs 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 83 000
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Camero Avenue Project No.: PIN 95-710
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 18 000
Land
Project Description (use back for additional information): Construction 70,000
Street reconstruction on Camero Avenue from Cambrian Ave. to South Terminus. E ui ment
2,640 L.F. curb &gutter and street surfacing. Other — Finance 9% 9 000
Other — Le al/Admin 3% 3 000
Total Pro'ect Costs 100 000
Revenue Sources
Yea� of ReqUest: 1995 1. Assessments 59,000
2. General Lev 41 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Othsr General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 100 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROCRAM
PROJECT WORKSHEET
PI'oject Name: Street Reconstruction - Lower 147th Street West Project No.: PIN 95-711
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 21 200
Land
Project Description (use back for additional information): Construction 82,700
Street reconstruction on Lower 147th Street from Highway 3 to Canada Avenue. E ui ment
1,267 L.F. curb &gutter and street surfacing. Other — Finance 9% 10 600
Other — Le al/Admin 3% 3 500
Total Pro'ect Costs 118 000
Revenue Sources
Year of Request: 1995 1. Assessments 88,000
2. Generai �ev 30 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993(For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 118 000
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Cambrian Avenue Project No.: PIN 95-712
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 23 800
Land
Project Description (use back for additional information): Construction s2,3oo
Street reconstruction on Cambrian Avenue from Lower 147th Street to Highway 3. E ui ment
L.F. curb &gutter and street surfacing. Other — Finance 9% 11 900
Other — Le al/Admin 3% 4 000
Total Pro'ect Costs 132 000
Revenue Sources
Year of Request: T995 1. Assessments 86,000
2. General Lev 46 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. OtherGeneral
New Pro ramlUnit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years i4. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) t8. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 132 000
• • .
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Praject Name: Street Reconstruction - 160th Street Project No.: PIN 95-713
Departrnent Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 59 600
Land
Project Description (use back for additionai information): Construction 331,000
Street reconstruction on 160th Street from Highway 3 to Highway 52. E ui ment
26,400 L.F. curb &gutter and street surfacing. Other — Finance 9% 29 800
Other — Le al/Admin 3°k 9 900
Total Pro'ect Costs 430 300
Revenue Sources
Year of Request: 1995 1. Assessments 220,000
2. General Lev 210 300
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Pork Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Desirab�e 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 430 300
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - 160th Street Project No.: PIN 95-714
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 170 000
Land
Project Description (use back for additional information): Construction 945,000
Street reconstruction on 160th Street from Apple Valley to Highway 3. E ui ment
5,280 L.F. curb&gutter and street surfacing. Other — Finance 9% 85 000
Other — Le al/Admin 3% 28 400
Totai Pro'ect Costs 1 228 400
Revenue Sources
Yeaf of ReqUest: 1995 1. Assessments 152,000
2. General Lev 1 076 400
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993{For 1995) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 228 400
• • !
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Skid Steer Loader Project No.: PIN 96-701
Department Requesting: Pubiic Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
New Bob Cat skid steer loader replacing 229 Bob Cat. E ui ment 25 000
Other
Other
Total Pro'ect Costs 25 000
Revenue Sources
Year of Request. 1996 1. Assessments
2 General Lev 25 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. 229 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 25 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PIN 96-702
Department Requesting: Pubiic Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
1 ton dump truck, plow and wing/sander replacing 242 dump truck. E ui ment 30 000
Other
Other
Total Pro'ect Costs 30 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 30 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. PortAuthoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other Generaf
Re lacement — Unit Na 242 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Starm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues� expenses, staffing, etc.): �7. Sewer Operating Budget
Original Year of Request — 1993(For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 30 000
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PIN 9s-7o3
Department Requesting: Public works Project Costs
Piannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Single axie dump truck replacing 208 plow/wing/sander. E ui ment 1�0 000
Other
Other
Totai Pro'ect Costs 100 000
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 100 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. PortAuthority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other Generai
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na 208 13. Water Core
Usefui Life of Pro'ect 5Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing� etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
� 22. Other Enter rise
Total Revenue Sources 100 000
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Curb�Gutter Replacement Project No.: PIN 96-704
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 12,s54
1000 feet of bituminous curbing. E ui ment
1000 feet of concrete curbing and removaL Other
Other
Total Pro'ect Costs 12 854
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 12 854
Type of Project: Curb&Gutter 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other Generat
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etC.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 12 854
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEfT
Project Name: Sidewalk Replacement Project No.: PIN 96-705
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 30,050
1,500 feet of concrete sidewaik replacement and removaL E ui ment
500 feet of bituminous sidewalk or bike paths and removaL Other
Other
Total Pro'ect Costs 30 050
Revenue Sources
Year of Request: 1996 1. Assessments
2. General Lev 30 050
Type of Project: Sidewalk 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park lm rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
OtherJnformation (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating eudget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Tota�Revenue Sources 30 050
• ! �
CtTY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Gravel Road Resurfacing Project No.: PIN 96-706
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 65,344
3 miles of resurfacing: E ui ment
- Biscayne Avenue Other 6,600
Other
Total Pro'ect Costs 71 944
Revenue Sources
Year of Request: 1996 1. Assessments
2. Generai Lev 71 944
Type of Project: Road Resurfacing 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Butl et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 71 944
• r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Cimmarron Avenue Project No.: PIN 96-7d7
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 7 200
Land
Project Description (use back for additional information): Construction 28,000
Street reconstruction on Cimmarron Avenue from 145th St. to Dodd Blvd. E ui ment
1,200 L.F. curb &gutter and street surfacing. Other — Finance 9% 3 600
Other — Le al/Admin 3% 1 200
Total Pro'ect Costs 40 000
Revenue Sources
Year of Request: 1996 1. Assessments 37,000
2. General Lev 3 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
S. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 30 Y�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e, estimated impact on revenues, expenses, staffing, etc.): 17. Sewer�perating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 40 000
• r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction — Chippendale Avenue Project No.: PIN 96-708
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 67140
Land
Project Description (use back for additional information): Construction 373,000
Street xeconstruction on Chippendale Avenue from 151 st St. to 160th St E ui ment
4,750 L.F. curb&gutter and street surhacing. Other — Finance 9% 33 570
Other — Le al/Admin 3% 11 190
Total Pro'ect Costs 484 900
Revenue Sources
Year of Request: 1996 1. Assessments 281,000
2. General Lev 63 900
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 140,000
Project Justification: s. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 1 t. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Desirable 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estirnated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 484 900
• • i
GITY OF ROSEMOUNT
CAPtTAL IMPROVEMENTS PROGRAM
PRUJECT WORKSHEET
Project Name: Street Reconstruction - 145th Street West Project No.: PIN 96-709
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 141 120
Land
Project Description (use back for additional information): Construction 784,000
Street reconstruction on 145th Street from County Road 42 to Brazil Avenue. E ui ment
3,748 L.F. curb &gutter and street surfacing. Other — Finance 9% 70 560
Other — Le al/Admin 3% 23 520
Total Pro'ect Costs 1 019 200
Revenue Sources
Year of Request: 1996 1. Assessments 254,000
2. General Lev 300 200
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 465,000
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Prioriry Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 {For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 019 200
• • •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PRUJECT WORKSHEET
ProjeCt Name: Street Reconstruction - Biscayne Avenue Pfoject No.: PIN 96-710
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 171 000
Land
Project Description (use back for additional information): Construction 950,000
Street reconstruction on Biscayne Avenue from County Road 42 to County Road 38. E ui ment
L.F. curb &gutter and street surfacing. Other — Finance 9% 85 500
Other — Le al/Admin 3% 28 500
Total Pro'ect Costs 1 235 000
Revenue Sources
Year of Request: 1996 1. Assessments 420,000
2. General Lev 415 000
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 400,000
Project Justificatiorr. 6. Port Authority
7. Park 1m rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Urgent 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1996) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 235 000
• � •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Truck Project No.: PtN 97-701
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction
Fire Department Rotation E ui ment 18 000
1 ton pickup truck, 4x4 with plow replacing M100 4x4 1 ton truck. Other
Other
Totai Pro'ect Costs 18 000
Revenue Sources
Yea� of Request: 1997 1. Assessments
2. General Lev 18 000
Type of Project: Equipment 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram No 11. Other General
New Pr ram/Unit NA 12. Other General
Re (acement — Unit Na 100 13. Water Core
Useful Life of Pro'ect 5 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): t7. Sewer�perating Budget
Original Year of Request — 1993 {For 1997) 18. Storm Water 0 eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 18 000
• r �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Curb &Gutter Replacement Project No.: PIN 97-702
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 13,497
1000 feet of bituminous curbing. E ui ment
1000 feet of concrete curbing and removal. Other
Other
Total Pro'ect Costs 13 497
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 13 497
Type of Project: Curb &Gutter 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Yaars 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core '
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses� staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 13 497
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Sidewalk Repiacement Project No.: PIN 97-703
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 31,853
1,500 feet of concrete sidewalk replacement and removaL E ui ment
500 feet of bituminous sidewalk or bike paths and removal. Other
Other
Total Pro'ect Costs 31 853
Revenue Sources
Year of Request: 1997 1. Assessments
2. General Lev 31 853
Type of Project: Sidewalk 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA f 0. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Y�rs 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e, estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request— 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Ente rise
Totat Revenue Sources 31 853
r • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction — Akron Avenue Project No.: PIN 97-704
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 116 588
Land
Project Description (use back for additionai information): Construction 647,7�2
Street reconstruction on Akron Avenue from County Road 42 to Inver Grove Heights. E ui ment
13,200 L.F. curb&gutter and street surfacing. Other — Finance 9% 58 295
Other — Le al/Admin 3°� 19 430
Total Pro'ect Costs 842 025
Revenue Sources
Year of Request: 1997 1. Assessments 651,420
2. General Lev 19�605
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authority
7. Park Im rovement Funtls
8. Other General
Prior Pro'ect Re uests7 No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Deferrable 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1997� 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Tota)Revenue Sources 842 025
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Conemarra Trail Project No.: PIN 97-705
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 174 780
Land
Project Description (use back for additional information): Construction 971,000
Street reconstruction on Conemarra Trail from Shannon Parkway to Highway 3. E ui ment
10,560 L.F. curb &gutter and street surfacing. Other — Finance 9% 87 390
Other — Le al/Admin 3% 29130
Total Pro'ect Costs 1 262 300
Revenue Sources
Year of Request: 19s7 1. Assessments 396,000
2. General Lev 566 300
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 300,000
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget
Original Year of Request — 1993 (For 1997) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 1 262 300
• ! •
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Curb &Gutter Replacement Project No.: PIN 98-701
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additionai information): Construction 13,902
1000 feet of bituminous curbing. E ui ment
1000 feet of concrete curbing and removaL Other
Other
Total Pro'ect Costs 13 902
Revenue Sources
Year of Request: 1998 t. Assessments
2. General Lev 13 902
Type of Project: Curb&Gutter 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other Generai
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 10 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
�ther Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 13 902
• • �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Sidewalk Replacement Project No.: PIN 98-702
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin
Land
Project Description (use back for additional information): Construction 33,764
1,500 feet of concrete sidewalk replacement and removal. E ui ment
500 feet of bituminous sidewalk or bike paths and removaL Other
Other
Total Pro'ect Costs 33 764
Revenue Sources
Year of Request: 1998 1. Assessments
2. General Lev 33 764
Type of P�oject: Sidewalk 3. General Operating Budget
4. General CIP Funds
5. MSA Funds
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful Life of Pro'ect 10 Yaars 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Inforrnation (i.e. estimated impact on �evenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 33 764
• � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Dodd Boulevard Project No.: PIN 98-703
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 105 300
Land
Project Description (use back for additional information): Construction 585,900
Street reconstruction on Dodd Boulevard from Chippendale Avenue to Shannon Parkway. E ui ment
2,851 L.F. curb &gutter and street surfacing. Other — Finance 9%a 52 650
Other — Le al/Admin 3% 17 550
Total Pro'ect Costs 761 400
Revenue Sources
Year of ReqUest: 1998 1. Assessments 141,000
2. Genera) Lev 396 400
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 224,000
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. �ther General
New Pr ram/Unit NA 12. Other General
Re lacement - Unit No. NA 13. Water Core
Useful Life of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998} 18. Storm Water O eratin Bud e#
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 761 400
� � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Dodd Boulevard Project No.: PIN 98-704
Department Requesting: Public Works Project Costs
Plannin /Desi NEn ineerin 105 300
Land
Project Description (use back for additional information): Construction 585,soo
Street reconstruction on Dodd Boulevard from Shannon Parkway to Delft Avenue. E ui ment
2,798 L.F. curb&gutter and street surfacing. Other — Finance 9% 52 650
Other — Le al/Admin 3°k 17 550
Total Pro'ect Costs 761 400
Revenue Sources
Year of Request: 1998 1. Assessments 141,000
2. General Lev 396 400
Type of Project: Street Reconstruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 224,000
Project Justification: 6. Port Authority
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other General
Ex ansion of Existin Pr ram Yes 11. Other General
New Pr ram/Unit NA 12. Other General
Re lacement — Unit Na NA 13. Water Core
Useful �ife of Pro'ect 30 Years 14. Sanitar Sewer Core
Priority Necessary 15. Storm Sewer Core
16. Water O eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 17. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Enter rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 761 400
� � �
CITY OF ROSEMOUNT
CAPITAL IMPROVEMENTS PROGRAM
PROJECT WORKSHEET
Project Name: Street Reconstruction - Dodd Boulevard Project No.: PIN 98-705
Department Requesting: Public Works Project Costs
Plannin /Desi n/En ineerin 105 300
Land
Project Description (use back for additional information): Construction 585,900
Street reconstruction on Dodd Boulevard from 132nd Street to 120th Street. E ui ment
L.F. curb &gutter and street surfacing. Other — Finance 9°� 52 650
Other — Le al/Admin 3% 17 550
Total Pro'ect Costs 761 400
Revenue Sources
Year of Request: 1998 1. Assessments 141,000
2. General Lev 396 400
Type of Project: Street Recoristruction 3. General Operating Budget
4. General CIP Funds
5. MSA Funds 224,000
Project Justification: 6. Port Authoriry
7. Park Im rovement Funds
8. Other General
Prior Pro'ect Re uests? No 9. Other General
Years NA 10. Other Generai
Ex ansion of Existin Pr ram Yes 11. Other General
New Pro ram/Unit NA 12. Other General
Re lacement — Unit No. NA 13. Water Core
Useful Life of Pro'ect 3�Years 14. Sanita Sewer Core
Prioriry Desired 15. Storm Sewer Core
16. Water 0 eratin Bud et
Other Information (i.e. estimated impact on revenues, expenses, staffing, etc.): 1�. Sewer Operating Budget
Original Year of Request — 1993 (For 1998) 18. Storm Water O eratin Bud et
19. Utili CIP Funds
20. Other Ente rise
21. Other Enter rise
22. Other Enter rise
Total Revenue Sources 761 400