HomeMy WebLinkAbout4.j. Armory / Community Center Construction Change Orders � CITY OF ROSEMOUNT EXECUTIVE SUb�1ARY FOR ACTION CITY COUNCIL MEETING DATE:October 19, 1993 AGENDA ITEM: Armory and Community Center AGENDA SECTION: Construction Change orders Consent PREPARED BY: Stephan Jilk AGENDA NO. I EM # ATTACffi�N'TS: Change order listing AP BY: Addi�ional change orders for the construction of the Armory a d Community Center are being requested for approval. These change orders have been reviewed by the architecht, the National Guard project manager and city staff. All change orders listed are being recommended for approval. As noted on the attached summary sheet we are now at a total change order cost for the City of Rosemount, without the stormwater pond costs, of some $23, 032.90. Of the original contract cost for the city cornponents this figure amounts to 6/lOths of one percent. The total change orders cost for city, state and federal government is at 1.5 %. Though there have been a significant number of change orders I am extremely pleased that we have been able to keep the amount to such a low percentage of the original : contract. RECO�TDED ACTION:Motion to approve change orders #69, 75, $8, 110, 118, 124; 128, 130, 132, 134, 151,170 and 171 for the construction of the Armory and Community Center project for a city share only of $24, 886.92 COtTNCIL ACTION: � Date:October 19, 1993 Subject:Armory/Community Center Construction Change Orders Change Descriptian Total Cost City Only Order Share # 69 Change Metal Frame size $83 . 00 $83 .00 on Door Opening 75 Ceiling Height Change in Fitness Room $349 .00 NC 88 Relocate floor drain in arena NC NC 110 Add Tubular Frame and steel lintels at arena exits $2089 .00 $2089 .00 118 Remove door in arena ($171. 00) {$171.00) 124 Sound system enhancements $2090. 00 $1627.00 128 Add doors at auditorium $3468.00 $1250.42 130 Arena Scoreboard, scoring control system wiring $4965.00 $4965.OD 131 Arena Concession Room Rough in $4930. 00 $4930.00 132 Arena viewing area window size change in framing $3644. p0 $3644.00 134 Add condensation pumps to electrical system $2907. 00 $1453 .50 151 Add Removable' Fence Section at Military parking lot $313 .00 - - - - 170 Add required grease traps to both kitchens $4746. 00 $2373 .00' 171 Add different culvert at entrance to highway $2643 .00 $2643 .00 Total This Request $32, 056.00 $24, 886.92 To Date Total $243,197.00 $108, 199 .90 To Date Total W/0 Stormwater Pond $158, 030.00 $23, 032 .90 Percent of Original Contract 1.5� .6s