CITY OF ROSEMOUNT
EXECUTIVE SUb�1ARY FOR ACTION
CITY COUNCIL MEETING DATE:October 19, 1993
AGENDA ITEM: Armory and Community Center AGENDA SECTION:
Construction Change orders Consent
PREPARED BY: Stephan Jilk AGENDA NO.
I EM #
ATTACffi�N'TS: Change order listing AP BY:
Addi�ional change orders for the construction of the Armory a d Community
Center are being requested for approval.
These change orders have been reviewed by the architecht, the National
Guard project manager and city staff. All change orders listed are being
recommended for approval.
As noted on the attached summary sheet we are now at a total change order
cost for the City of Rosemount, without the stormwater pond costs, of some
$23, 032.90. Of the original contract cost for the city cornponents this
figure amounts to 6/lOths of one percent. The total change orders cost
for city, state and federal government is at 1.5 %. Though there have been
a significant number of change orders I am extremely pleased that we have
been able to keep the amount to such a low percentage of the original :
contract.
RECO�TDED ACTION:Motion to approve change orders #69, 75, $8, 110, 118,
124; 128, 130, 132, 134, 151,170 and 171 for the construction of the Armory
and Community Center project for a city share only of $24, 886.92
COtTNCIL ACTION:
�
Date:October 19, 1993
Subject:Armory/Community Center Construction Change Orders
Change Descriptian Total Cost City Only
Order Share
#
69 Change Metal Frame size $83 . 00 $83 .00
on Door Opening
75 Ceiling Height Change in
Fitness Room $349 .00 NC
88 Relocate floor drain
in arena NC NC
110 Add Tubular Frame and
steel lintels at arena exits $2089 .00 $2089 .00
118 Remove door in arena ($171. 00) {$171.00)
124 Sound system enhancements $2090. 00 $1627.00
128 Add doors at auditorium $3468.00 $1250.42
130 Arena Scoreboard, scoring
control system wiring $4965.00 $4965.OD
131 Arena Concession Room Rough in $4930. 00 $4930.00
132 Arena viewing area window size
change in framing $3644. p0 $3644.00
134 Add condensation pumps to
electrical system $2907. 00 $1453 .50
151 Add Removable' Fence Section
at Military parking lot $313 .00 - - - -
170 Add required grease traps
to both kitchens $4746. 00 $2373 .00'
171 Add different culvert at
entrance to highway $2643 .00 $2643 .00
Total This Request $32, 056.00 $24, 886.92
To Date Total $243,197.00 $108, 199 .90
To Date Total W/0
Stormwater Pond $158, 030.00 $23, 032 .90
Percent of Original
Contract 1.5� .6s