HomeMy WebLinkAbout4.g. Payment #2, Valley Oak Pond Outlet, Phase I, City Project #197 ► .
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY fOR ACTION
,CITY COUNCfL MEETING DATE: October 5, 1993
AGENDA ITEM: Payment #2, Valley Oak Pond Outlet, AGENDA SECTION:
Phase I, City Project #197 Consent
PREPARED BY: Bud Osmundson AGENDA NO.
City Engineer/Assistant Public Works birector �� ��
ATTACHMENTS: Payment Voucher #2 APP VED Y:
This item requests the second payment to Busse Construction, Inc. in the amount of
536,910.49 for constructian on City Praject #197, Valley Oak Pond Outlet, Phase L
Work completed and represented in this amount as of September 17, 1993 is 62% of the
contracted work.
At this time the grading in Ponds #2 & 3 is complete. The contractor is held up
completing the grading in Pond #1 due to the constant rain. The pipe work is now
complete. The project is still behind due to rain/bad weather.
Attached is a copy of the Payment Voucher for your information. Staff recommends
approval of this second payment request.
RECOMMENDED ACTION: MOTION TO APPROVE THf PAYMENT #2 TO BUSSE
CONSTRUCTION, INC. IN THE AMQUNT OF $36,910.49 FOR VALLEY OAK POND OUTLET,
PHASE 1, CITY PROJECT #197.
COUNCIL ACTION:
4
CTTY OF ROSEMOUNT
APPLICATION FOR PAYMENT
NO. 2
�
CITY PROJECT NO: 197 SEH FILE NO: 89245.03
PROJECT: Valle� Oak Pond Outlet - Phase I
CONTRACTOR: Busse Construction, Inc. CONTI2ACT DAT'E: 7/14/93
13001 Belle PlaineTrail APPLICATION DATE: 9/17/93
Belle Plaine MN 56011 FOR PERIOD ENDING: 9/'16/93
Total Contract Amount $211.800.91 Total Amount Earned $140,392.31
Material Suitably Stored on Site,
Not Incorporated into Work $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $
GROSS AMOUNT DUE . . . . . . . . . . . . . . . . . . . . $140,392.31
LESS 5% RETAINAGE . . . . . . . . . . . . . . . . . . . . $ 7,019.62
AMOUNT DUE TO DATE . . . . . . . . . . . . . . . . . . $133,372.69
LESS PREVIOUS APPLICATIONS . . . . . . . . . . . . . $ 96 462.20
AMOUNT DUE THIS APPLICATION . . . . . . . . . . $ 36,910.49
APPROVED:
�-------
Bud Osmundson,
City Engineer / Assistant Director of Public Works
. t
APPLICATION FOR PAYMENT
(UNIT PRICE CONTRAC'17
NO. �
----------------
VJNER: CITY OF ROSEMOUNT OWNER'S PROJECT NO. 197
--------------------------------------------------- -
ENG. PROJECT NO. 89245.03
OCATION: ROSEMOUNT, MINNESOTA
ONTRACTOR BUSSE CONSTRUCTION, INC. CONTRACT DATE -7�� /
----------------------------------------- ------------- / _,_9 3
13001 BELLE PLAINE TRAIL CONTRACT AMOUNT $211,800.91
BELLE PLAIN, MN 56011
'ONTR. FOR VALLEY OAK POND OUTLET- PHASE I
---------------------------------------------------------------------------------------------------------------------------
.PFLIC.DATE ------ ! /�� )1 3
-- -�--- ---1- ---------------------------
'ERII.�D END. --------����-�1.�---------
APPLICATION FOR PAYMENT
CONTRACT QUANTITY UNIT
I'EM NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL
---------------------------------------------------------------------------------------------------------------------------------------�-J-,-l'---Y
021.501 Mobilization L.S. 1 , � 7000.00 � 9
153.501 Temporary Fencing L.F. 2555 �Z.� 3.35 G'
�563.601. Traffic Control L.S. 1 950.�0
'_051.501 Haul Road L.F. 1.50 10.00
.573.501 Bale Check Each 100 6.00
243G CDFs) 5359.2�+
573.503 Silt Fence, Preassembled L.F. 3890 ._ 220 _
�213.005 Rock Conswction Entrance Each 1 350.00
o<vFs) o
259.601 Crushed Rock Pipe Foundation Ton 70 __�__ 14.00 ��"`
p C9fs� � O
�259.603 Granular Pipe Foundation Ton 7U _�. 10.50 _�"
'AGE 1 OF 4 SHORT-ELLIOTT-HENDRICKSON, ING
d {
O CDFS� d
.59.607 Replacement Backfill Ton 14U _..�� 10.50 _�_�=� "'
�11.501 Random riprap, Cl. III C.Y. 6 �D 42.00 _���'
�11.507 Grouted Riprap C.Y. 50 �� 84.00 —�=,
�11.511 Granuiar Filter C.Y. 27 � 13.00 _1'1�j, -
�90.501 Agg. Base Restoration In-SY 1200 1.00
�90.505 Bit. Surface Restaration In-SY 600 5.00
�90.509 Concrete C &G Restoration L.F. 60 23.00
��s) 7og.-t S
258.415 15" RCP Storm Sewer, Ct. III L.F. 24 _J����_ 31.50 _J���
t4L �s� 4 599•�
?58.524 24" RCP�torm Sewer, Cl. III L.F. 149 .�� 31.50 .� �,,�:_'�G
3qp (9Fs) 18,837.00
258.430 30" RCP Storm Sewer, Cl. N L.F. 396 � '� 48.3Q ,����G
258.515 15" RCP Apron w/Trash Guazd Each 2 �_ 604.00 f a-f�,�
258.524 2�" RCP Apron w/Trash Guazd Each 1 _� 860.00 __�_`
258.530 30" RCP Apron wft'rash Guard Each 2 0°� 1075.00 � ��. �
258:801 Manhole, Type B L.F. 3.4 __.��� 123.00 �8.�
�258.821 MH Casting, Type R-1642 Each � 1 � 378.OQ ��„�
258.901 Connect to Inplace Storm Sewer Each 2 oC 420.00 � ��
258.903 Connect to Inplace Catch Basin Each 1 / 7$7.00 �_
772.501 Common Pond Excavation C.Y. 45136 ����,� 2.06 ��3�0,1�
_772.516 Pond Liner Excavation C.Y. 7189 "���� 2.45 ���C7
772.520 Pond Liner Borrow (LVl C.Y. 3115 3.50 _
772.525 Topsoil Borrow (LV) C.Y. 50 9.(?0
'772.540 Pond Dewatering L.S. 1 75Q.00
'.575.501 Seeding Acre 5 3 153.00 _��•_'
:575.502 Seed, Mixed Ht/Mesic Mix. Lb. 75 .�Q 26.�0 � 3L��. -
'S75.505 Sodding,Type A S.Y. 5199 _s����U 1.55 �lZ('�
�575.511 Mulch Material, Type 1 Ton 10 �_ 145.00 �Q1_'_
575.519 Disc Anchoring Acre 5 _� 37.00 �.�`
'AGE 2 OF 4 SHORT-ELLIOTT-HENDRICKSON, INC.
j75.�32 Comm. Fert, Analysis 12-12-12 Lb. 5(?0 �3L'U 0.35 �
'_95.501 Transplant Tree Tree 4 192.00
?95.502 Transpiant Shrub Shrub 8 66•00
?95.503 Colorado Spruce, 6' B & B Tree 2 220.00
?95.504 Marshall Seedless Ash,
2" Cal. B & B Tree 2 253.00
?95.505 Black Willow, 2" Cal. B & B Tree 2 253.00
295.506 Northwood Maple, 2" Cal. B & B Tree 2 253.00
295.507 Deciduous Shrub -
Alpine Current Shrub 5 31.00
295.508 Deciduous Shrub- Potentilla Shnib 5 31.00
295.509 Deciduous Shrub-Dwarf
Korean Lilac Shrub 5 31.00
295.510 Deciduous Shrub- Purple Leaf
Sand Cherry Shrub 5 31.00
295.511 Deciduous Shrub-
Red/Pink Rose Shrub 5 31.00
�295.512 Perennial Flower- Iris/Lily Flower 1(? 19.00
'AGE 3 OF 4 SHORT-ELLIOTT-HENDRICKSON, INC.
ru i �_i�iii .v�� � vi. � �����i_i.� �,v�i.,i�ii�c �/
, t . � . . . � ! �� �U.�. S i' � �,✓FcS�
ta? �cncract Amount $ 211 , 800 . 91 Total Arnount Earned $ �,'�[o�o
te�ial Suitably Stored on Site, Not Incoporated into Work $
ntract Change Order No. Percent_Complete $
ntract Change Order No. Percent Complete $
ntract Change Order �do. Percent Complete $
I Y��3�i�. 3F ��)
GROSS AMOUNT DUE. . . . . . . . . . . . . . . � .�1-�
� �D����,o�s)
LESS � RETAINAGE. . . . . .. . . $
�33,3 7a.e t��.��
. AMQUNT DUE TO DATE. . . . . . . . . . . . . $ f
LESS PREVIOUS APPLICATIONS. . .. . $ ��,� o�, o�D v
36,�9�/o,YS �a�s)
AMOUNT DUE THIS APPLICATION. .. . $ �GL.�,s��o�
�NTRACTOR'S AFFIDAVIT
�e undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress.
�yments received from the Owner on account of work performed under the contract referred to
�ove have been applied by the undersigned to discharge in full all obligations of the under-
igned incurred in connection with work covered by prior Applications for Payment under said
�ntract, and (2) all
iterial and equipment incorporated in said Project or otherwise listed in or covered by this
�plication for Payment are free and clear of all liens, claims, security interests and
icumbrances.
�ted y�/7 , 19 �. Busse Construction Inc.
Contractor
By
(Name and Titl
)UNTY OF �COTT � - ) SS
1'ATE OF �`��'�- )
�fore me on this 17th day of sept , 19 93 personally appeared
Gene Moskop kt10W11 to me, who being duly sworn, did depose
�d say that he is the President of the Contractor above mentioned;
Office
�at he executed the above Application for Pa�y� and Affidavi on behalf of said Contractor;
nd that all of the statements��g�,�ai�w�e�d��'��in �re true, cor ec and complete.
t ���pue�.���� i �
y Commission Expires: � _, t�n �
, �3{� ��,�.
� �p�m� .e No ary Publ i c
����••—~�+r•• .
�e undersigned has checke�""t'fie�Gontractor's Application for Payment shown above. A part of
�is Application is the Contractor's Affidavit stating that all previous payments to him
�der tMis Contract have been applied by him to discharge in full all of his obligations in
�nnection with the work covered by all prior Applications for Payment.
� accordance with the Contract, the undersigned approves payment to the Contractor of the
nount Due.
SHOR LIOTT RI SON, INC.
3te � � �o- 43 Qy � '
�^e 4 of 4