Loading...
HomeMy WebLinkAbout4.l. Receive Bids / Award Contract, Shannon Hills 5th Addition, City Project #243 v � ����� � CITY OF RC15�+lOIINT EXECUTIVE SUbII�iARY FOR ACTION CITY COUNCIL MEETING DATE: August 17, 1993 A�ENDA ITEMzReceiv� Bids/Award Contract AGENDA SECTION: Shannon Hills 5th Addition, City Project #243 Consent PREPARED BY: Bud Osmundson AGEND� City Engineer/Assistant Public Works Director �� ATTACffiKENTS: Bid Tab, Resolution APP VED ' Y: On Friday, August 6, 1993 bids for the referenced proje were received and read aloud publicly. Seven bids were received and are listed for your review on �he attached bid tabulation. Bids ranged from $192, 161.55 to $277,266.14 . The low bid received is from S.J. Louis Gonstruction Co. , Inc. , Box 1373, St. Cloud, Minnesota 56302 in the amount of $192, 161.55 . The engineers estimate was $264, 200 based on 1992 and 1993 constructian costs. The firm of OSM & Associates, engineer far the project, and Staff reeommend the award of Project No. 243, to S. J. Louis` Construction Co. , Inc. , Box 1373 , St. Cloud, Minnesota 56302 in the amount of $192, 161.55 . RECOMMENDED ACTION: MOTION TO ADOPT A RES4LUTION RECEIVING BIDS AND AWARDING CONTRACT FOR SHANNON HILLS 5TH ADDTTION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #243 . COtTNCIL ACTION: 3 ! . CITY C3F ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1993 - A RESOLUTION RECEIVING BIDS AND AWARD{NG CONTRACT FOR SHANNON HILLS 5TH ADQITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT 243 BE IT RESOLVED, by the City Cauncil of the City of Rosemount, Minnesota, as fotlows: 1 . Ail bids on construction of Shannon Hills 5th Addition Street and Utility Improvements are fiereby received and tabulated. 2. The bid of S. J. Louis Construction Co., Inc., in the amount of S 192,161 .55 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and sha11 be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except fihat the deposit of all successful bidder and the next two lowest bidders shail be retained until a contract has been executed. ADOPTED this 17th day of August, 1993. E. B. McMenomy, Mayor . ATTEST: Susan M. Walsh, City Clerk Motion bY� Seconded by: Voted in favor: Votedagainst: . , t On Schelen Mayeron& Associates,inc. 300 Park Piace Center 5775 Wayzata Boulevard Minxteapolis,MN 55416-1228 August 6, 1993 6iz-s9s-s�7s 1-800-753-5775 FA?C 595-5774 Engineers Architects Planners Mayor and City Couneil su�eyo�s City of Rosemount - 2875 - 14Sth Street West Rasemount, MN 55068 Re: Shannon Hills Fifth Addition Utilities and Street Improvements City Project No. 243 City of Rosemount, Minnesota OSM Project No. 5096.Q0 Dear Mayor and City Council: Bids were received far the above-referenced project at 10:00 A.M., August 6, 1993 and were opened and read aloud. A total of 7 respansible bids were received. S. J. Louis Construction, Inc.,P.O. Box 1373, St. Cloud, Minnesota S63Q2 submitted the lawest bid in the amount of $192,161.55. 'The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $264,200.00. We recommend award of the Contract to S. J. Louis Construction, Inc. in the amount of $192,161.55. Tfie Bid Tabulation and Bid Extension are enclosed Sincerely, ORR-SCHELEN-MAYERON & ASSOCIATES, INC. ���'��'.- . �C�2-C�Q��_ Brian J. Bourassa, P.E. Project Manager Enclosures c: Bud Osmundson - City of Rosemount /� J:\5096.00\CIVIL\LbTTERS\AWARD.LTR Equal Opportuniry Employer BID TABULATIQN FOR SHANN4N HILIS FTFTH ADDITION UTILITTES AND STREET iMPROVEMENTS CITY PROJECT NQ. 243 FOR THE CITY OF ROSEMOUNT, IvIINNESOTA BIDS OPENED: AUGUST 6, 1993 ORR-SCHELEN-MAYERON 10:00 A.M. & ASSOCIATES, II�C. >�CQNTRACTOR `BID SECURITY TOTAL BID S. J. LOUIS CONSTRUCTION, INC. SC10 BID BOND *$192,161..55 NODLAND CONSTRUCTI4N CO. 5% BID BOND *$204,263.30 ARCON CONSTRUC'I'IUN C�. 5% BID BOND $208,319.46 VOLK SEWER & WATER 5% BID BOND $209,271,34 RICHARD KNUTSON, INC. S% BID BOND $213,614.35 RYAN CONTRACTTNG, INC. 5�10 BID BOND $248,979.00 KENKO, INC. 5% BID BOND $277,266.14 ENGINEER'S ESTIMATE � $264,200.00 I HEREBY CERTIFY THAT THIS � IS A TRUE AND CORRECT TABULATION OF THE BIDS AS _ REeETVED ON: DATE: August 6, 1993 BY; --�'�� Bud Osmundson, P.E. Gity Engineer Brian J. ourassa, P.E. OSM Project No. 5096.00 *Denotes Corrected Figure J:\5095.00\SPECIBIDTAB