HomeMy WebLinkAbout5.a. 145th Street Reconstruction. City Project #235 CITY OF ROSEMOUNT EXECUTIVE SULrIl+�lARY FOR ACTIOI� ' CITY COUNCIL Nl�ETING bATEe April 6, 1993 AGENDA 2TEM: 145th Street Reconstruction AGENDA SECTION: City Project #235 Old Business PREPARED BY: Bud Osmundson AGEND�� � �y City Engineer/Assistant Public Works Director � H ATTACHI�2ENTS: OSM Letter & Estimates APP OVE BY: Resolution, Public Notice, Mailing List This item is back on the agenda to consider revising City Project No. 235 to include the reconstruction of 145th Street West from Shannon Parkway to Chili Avenue and include the realignment of th� Chili- Chippendale Avenue intersection. Attached is an estimate of eosts and funding sources for this segment of the project. Follawing is a tentative schedule for the revised project: April 6, 1993 • Order a New Public Hearing April 20, 1993 Hold Public Hearing, Order Plans & Spec' s May 18, 1993 Approve Plans & Spec' s, Order Ad for Bid July 6, 1993 Award Contract July 19, 1993 Begin Construction September, 1993 Complete Substantial Construction The project should include the Chili-Chippendale Avenues intersection from the Dodd Boulevard-Chippendale Avenue realignment northerly to 144th Street. The reconstruction of Chi1i Avenue north of 144th � Street is open for discussion. The land acquisition necessary far the realignment could affect the construction and could delay canstruction by a month. The total cost of the project is estimated at $457, 000 including all of the Chili Avenue reconstruction. Funding would include Municipal State Aid Funding of $322, 000 with the remaining funding as shown on the Funding Overview Spreadsheets. Land acquisition costs are estimated to be approximately $30,000 to $40, 000 . The assessments are primarily to multiple housing properties on the south side of 145th Street, plus whatever properties are included on Chili Avenue, Brian Bourassa, P.E., OSM Engineering and Staff will provide an overview and be available for any questions. Staff recommends approval of the new revised project. RECONII+�IENDED ACTION: MOTION TO ADOPT A RESOLUTION CALLING FOR A PUBLIC HEARING ON 145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO CHILI-CHIPPENDALE AVENUE, THE REALIGNMENT OF CHILI-CHIPPENDALE INTERSECTION AND CHILI AVENUE FROM 145TH STREET TO THE NORTH TERMINUS, CITY PROJECT #235 , COUNCIL ACTION: 5 . . _ CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1993 - A RESOLUTION CALUNG FOR A PUBLIC HEARING 145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO CHILI-CNIPPENDALE AVENUE, THE'REALIGNMENT OF CHILI-CHIPPENDALE INTERSECTION AND � CHILI AVENUE FROM 145TH STREET TO NQRTH TERMINUS CITY PROJECT #235 WHEREAS, the City Councii received the feasibility report and found the project feasible for 145th Street Improvements from Shannon Parkway to Chili-Ghippendaie Avenue and the realignment of Chili-Chippendale Intersection, City Project#235, on the 19th day of January, 1993; and WHEREAS, the statute provided that no such improvements shall be made until the Councit has held a public hearing on such improvements following mailed notice and two publications . thereof in the official newspaper stating time and place of the hearing, the general nature of ---- the improvement, the estimated costs thereof, and the area proposed to be assessed, in accordance with the la�ov; and NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Rosemount, Minnesota, as follows: 1 . A public hearing will be held at the time and ptace set forth in the Notice of Hearing attached hereto as Exhibit A to consider said proposed improvements. 2. The nature of the improvements, the estimated cost of each major portion thereof, and the areas proposed to be assessed therefor are describe�l in the form of Notice of Hearing hereto attached. 3. The notice of said public hearing shall be in substantially the #orm contained in the notice hereto attached. 4. The City Clerk is hereby authorized and directed to cause notice of said hearing to be given two publications in the official newspaper. Said publications shall be one week apart, and at least three days shall elapse between the last publication and the hearing. Not less than ten days bef�re the hearing the Clerk shall mail notice of the hearing to the owner of each parcel of land within the area proposed to be assessed as described in the notice. For the purpose of giving such mailed notice, owners shall be those shown to be such on the records of the County Auditor or, if the tax statements in the County are mailed by the County Treasurer, on the records of the County Treasurer. As to properties not listed on the Resolution 1993 - records of the County Auditor or the County Treasurer, the Cierk shafl ascertain such ownership by any practicable means and give mailed notice to such owners. ADOPTED this 6th day of April, 1993. E. B. McMenomy, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor: Voted against: 2 " � ; EXHIBIT uAn. i� o osemoun� � � PHONE (612)4234411 2875•145th Strset West,Roeemount,Mfnnssoia MAYOR . FAX (612)4235203 Maiiinp Addroas: Edward 8.MdYlenomy P.O.Box 510,Rosemount,Mirmesota 55068-0510 COUNCIIMEMBERS � Sheiia Klaassn James(Re�Staats CITY OF ROSEMOUNT "�"�'"''"`°" Dennis wppermann DAKOTA COUNTY, MINNESOTA noMiNisrRaTOR . Stephan JiUc PUBUC NOTICE NOTICE OF PUBLIG HEARING ON IMPROVEMENTS 145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO CHILI-CHIPPENDALE AVENUE, THE R�AUGNENT Of THE CHILI-CHIPPENDAtE INTERSECTION AND CHILI AVENUE FROM 145TH STREET TO NORTH TERMINUS CITY PROJECT N0. 235 � TO WHOM IT MAY CONCERN: NOTICE IS HE�iEBY GIVEN, that the City Courecil of the City of Rosemount, Minnesota will meet at 8:00 o'ciock p.m. or as soon thereafter as possible, Tuesday, Aprii 20, 1993, in the Councii Chambers of the City Hall, 2875 145th Street West, to consider the following improvements: Project #235 - 145th Street Improvements from Shannon Parkway to Chili-Chippendale Avenue, the Realignment of the Chili-Chippendale . Intersection and Chili Avenue from 145th Street to North Terminus The nature of improvements shall include the construction of curb and gutter, street surfacing, sanitary sewer, sanitary sewer services, watermain and water services, storm drain, sidewalk, street lights, private utilities and r�storation. The total estimated cost of said improvements is 5457,400. The area proposed to be assessed for the foregoing improvements will generally be: Outiot A, Carrollton Addition; Lots 15 & 16, Block 1, Motz Addition; Lot 10, Block 2, Motz Addition; Lot 10, Block 1, Motz 2nd Addition; Lot 10, Block 2, Motz 2nd Addition; Lot 10, Block 1, Motz 3rd Addition; Lot 10, Block 2, Motz 3rd Addition; Lots 1 & 2, Block 1, Rahn's 4th Addition; Also included are the following parcels all within Sections 29 and 30, Township 115 North, Range 19 West, with the Parcel Identificatian Numbers as follows: 34-03010-(012-80; 016-80; 010-91; 014,88; 010-90; 010-85; 010-20). �verc���tng's �omivcg `(/C� �JLosemounl�� < . , � : � � > �_.., -� �- �. .� , � � � � '`. Public Notice-City Project 235 Page 2 ' Such person(s) as desires to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral opinion will be considered. Dated this 6th day of April, 1993 BY ORDER OF THE CITY COUNCIL. � ._ _ _ Susan M._.Walsh City Clerk �� � _. � � .__� � __. �. _-_ _ . _w._ ..._ ____.__ __. � �Gity-of_Rosemou�st � Dakota County, Minnesota � .., MAILING LIST . � � �� . : �_ ; � . ` ` PUBLIC HEARING NOTICE : CITY PROJECT 235 145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO CHFLI-CHIPPENDALE AVENUE, THE REAUGNMENT OF CHILI-CHIPPENDALE INTERSECTION AND CHILI AVENUE FROM 145TH STREET TO THE THE N(JRTH TERMtNUS APR1L 20, 1993 @ 8:00 P.M. Marguerite A. Tste Millard Robert F & Joyce A Shimota R o s e m o u n t Go rn m u n i t y 3405 144th St W . 10703 Prescott Ct Housing Rosemount, MN 55068 Burnsville, MN 55337-1032 3810 145th St. W. Rosemount, MN 5506$ Richard C. & Hulda Skille Vernon R. Kelley Regina R. Rahn Riegert 3400 Upper 143rd St W 7930 Pleasant Ave S 3450 145th St W Rosemount, MN 55068 Minneapolis, MN 55420 Rosemount, MN 55068 - - . - - Patrick F & Mary R Finnegan Robert & Cavonne Feuerstein Box 16-- - . - - 3405 Upper 143rd St W Rosemount, MN 55068 Rosemount, MN 55068 - Carl & Ruth Rechtzigal William Jr. & Marilyn Carlon Box 294 3400 143rd St W Rosemount, MN 55068 Rosemount, MN 55068 Donal & Mary Carroll Charles F. & Jean F. Todd 2440 Southview Ct 3405 143rd St W Hastings, MN 55033 Rosemount, MN 55068 Mary E Hynes 3405 145th St W Tom Thumb Food Markets Rosemount, MN 55068 110 17th St E Hastings, MN 55033 Kenneth & Margaret Gist 3400 144th St W Rosemount, MN 55068 Richard L. & Emmet Carroll 4485 Oak Chase Lane Eagan, MN 551 23-1 81 4 . O� Schelen . lvlayeron& . March 25, 1993 as�°`�ates,u►c. : - 300 Park Place Center _ ' S775 Wayzata Boulevard Minneapolis,MN 554i6-1228 612-595-5775 1-800-753-5775 FAX 595-5774 Mr. $ud Osmundson �c�'i,�nit c s City Of RosemOUIIt planners surveyors 2875 145th Street West Rosemount, MN 55068-0514 Re; 145th Street West Improvements City of Rosemount City Project No. 235 OSM Project No. 4438.60 Dear Mr. Osmundson: As you requested, we have reviewed the option of reconstructing the portion of 145th Street West between Shannon Parkway and Chile Avenue, the Chippendale/Chile Avenue intersection (includ.ing the Dodd Road realignment) and Chile Avenue from - . 144th Street to-the Independent School District No. 196-S�uth Boundary. Detailed cost : estimates are attached to this letter and a summary of the project costs is listed as fallows; z45th Street West fthese costs incl�•__: the ChippendalejChile Avenue and the Dodd�toad Realignmentsl - A. Sanitary Sewer $ 1,400.00 B. Sanitary Sewer Services 3,700.00 C. Watermain 18,500.00 D. Watermain Services 0.00 E. Storm Drain 74,700.00 F. Streets 297,900.00 G. Sidewalk/Trail 8,400.00 H. Street Lighting 4.000.00 Estimated Project Cost (A-H) $408,600.00 Chile Avenue Reconstruction , I. Storm Drain $15,440.00 J. Streets 25,OOO.QO K. Sidewalk/Trail 8.400.00 Estimated Project Cost (I-K) 48 0.,(?0 Estimated Total Project Cost (A-K} $457,400.00 Ecua:0o�ortur,tt:•°-nplo:�er , Mr. Bud Osmundson City of Rosemount Rosemount, MN March 25, 1993 Page 2 As �'vas with the original 145th Street West Improvements (City Project No. 235) this project could be funded from assessments, Street Core Funds (including Mn�DOT State Aid Funds), Storm Sewer Core Funds, Watermain Core Funds and Sanitar�, Sewer Core Funds. Attached to this letter are the General Fundi.ng Overviews and prelirni.nary Assessment Rolls for the revised 145th Street West Improvement Project. The assessment amaunts 'ted were calculated using the City of Rosemount Assessment/Improvement Policy. "` The followi.ng are items that should be considered if the City decides to separate the 145th Street West Improvement Project into two phases (Phase 1 - between Shan.non Parkway and Chile Avenue and Phase 2 - between Chile Avenue and Cameo Avenue). . _ --- _ _ � _ __ If the 14Sth-�treet W��t-�pu�vement Pra,}eet is only constructed between Shannon - Pai'kway and Chile Avenue, then a stockp�e area will neezi to_:be acquired by the City -- --for storage-of th� excess gra.�rular material genera�ed during construction. 'i�is material - �� nronosed to be used during the 145th Street West Improvement Project between Chile ��:�i� and Cameo Avenue. If you have any questions regarding the above information or if you need any additional information, please contact me at 595-5694. Sincerely, ORR-SCHELEN-MAYERON & ASSOCIATES, INC. ���� ��u�!�-- �rian J. Bourassa, P.E. Attachments /� . . . ,, g.,... � . ESTIMATED G$NERAL FUNDING OVERVIEW 145TH STREET RECONSTRUCTION FROM SHANNON PA.RKWAY TO CHILE AVENUE PLUS THE CHIPPENDALE- CHILE AVENUE AND THE DODD ROAD REALIGNMENTS ITEM ESTIMATED ASSESSMENT STORM WATERMAIN SANITARY STREET TOTAL � COST SEWER CORE CORE FUND SEWER CORE FUND REVENUES FUND CORE FUND ** Sanitary Sewer $1,400 $302.00 $0 $0 51,09$.00 $0 $1,400 Sanitary Sewer $3,700 $719.00 � $0 $0 $2,981.00 $0 $3,700 Services Watermain $18,500 $0 $0 $18,500.00 $0 $0 $18,500 Water Services $0 $0 $0 $0 $0 $0 $0 Storm Drain $74,700 $0 $0 $0 $0 $74,700' '' $74,700 Street $297,900 $63,340.00 $0 $0 �0 �234,560.00 �297,900 Street/Lighting $4,000 $0 $0 $0 $0 $4,000 ' $4,000 Sidewalks/Trails $8,400 $0 $0 $0 $0 �8,400 �8,400 ` Overhead $0 $0 $0 $0 $0 �0 $0 Utilities TOTAIS - $408,600.00 $64,361.00 $0.00 $18,500.00 $4,079.00 � �321,660.Q0 �40$,600.00 * Street Core Fund includes Mn/DOT State Aid Funds . I� .,i.. � . . . . . . - � . . • ��d . � � 7� . . . . . . ,._, i� . s � � . . . � � . . .. �,ir���.:� . . . . . i t., :•�� . . ESTIMATED GEI�ERAL, FtJNDING OVERVIEW ** CHILE AVENUE RECONSTRUCTI�N FROM 144TH STREET TO ISD NO. 196 SOUTH ' BOUNDARY ES'I°IMATED REVENUES ITEM ESTIMATED ASSESSMENT : STORM STREET TOTAL COST SEWER CORE CORE FUND REVENUES ; FUND Storm Drain $15,400.00 * i $0 $15,40Q.00 * $0 �15,400.00 " Street $25,000.00 $22;696.87 $0 $2303.13 $25,000.00 Sidewalk/Trail $8,400.00 $0 $0 $8,400.00 58,400.00 TOTAIS $48,800.00 $22,69G.87 $15,400.00 $10,703.13 �48,800.00 * Final Design will determine whether or not this is requireci ** This Funding Overview is the same as was given in the original reasibility Report