HomeMy WebLinkAbout5.a. 145th Street Reconstruction. City Project #235 CITY OF ROSEMOUNT
EXECUTIVE SULrIl+�lARY FOR ACTIOI� '
CITY COUNCIL Nl�ETING bATEe April 6, 1993
AGENDA 2TEM: 145th Street Reconstruction AGENDA SECTION:
City Project #235 Old Business
PREPARED BY: Bud Osmundson AGEND�� � �y
City Engineer/Assistant Public Works Director � H
ATTACHI�2ENTS: OSM Letter & Estimates APP OVE BY:
Resolution, Public Notice, Mailing List
This item is back on the agenda to consider revising City Project No.
235 to include the reconstruction of 145th Street West from Shannon
Parkway to Chili Avenue and include the realignment of th� Chili-
Chippendale Avenue intersection. Attached is an estimate of eosts and
funding sources for this segment of the project. Follawing is a
tentative schedule for the revised project:
April 6, 1993 • Order a New Public Hearing
April 20, 1993 Hold Public Hearing, Order Plans & Spec' s
May 18, 1993 Approve Plans & Spec' s, Order Ad for Bid
July 6, 1993 Award Contract
July 19, 1993 Begin Construction
September, 1993 Complete Substantial Construction
The project should include the Chili-Chippendale Avenues intersection
from the Dodd Boulevard-Chippendale Avenue realignment northerly to
144th Street. The reconstruction of Chi1i Avenue north of 144th
� Street is open for discussion. The land acquisition necessary far the
realignment could affect the construction and could delay canstruction
by a month.
The total cost of the project is estimated at $457, 000 including all
of the Chili Avenue reconstruction. Funding would include Municipal
State Aid Funding of $322, 000 with the remaining funding as shown on
the Funding Overview Spreadsheets. Land acquisition costs are
estimated to be approximately $30,000 to $40, 000 . The assessments are
primarily to multiple housing properties on the south side of 145th
Street, plus whatever properties are included on Chili Avenue,
Brian Bourassa, P.E., OSM Engineering and Staff will provide an
overview and be available for any questions.
Staff recommends approval of the new revised project.
RECONII+�IENDED ACTION: MOTION TO ADOPT A RESOLUTION CALLING FOR A PUBLIC
HEARING ON 145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO
CHILI-CHIPPENDALE AVENUE, THE REALIGNMENT OF CHILI-CHIPPENDALE
INTERSECTION AND CHILI AVENUE FROM 145TH STREET TO THE NORTH TERMINUS,
CITY PROJECT #235 ,
COUNCIL ACTION:
5
. . _ CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1993 -
A RESOLUTION CALUNG FOR A PUBLIC HEARING
145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY TO
CHILI-CNIPPENDALE AVENUE, THE'REALIGNMENT OF
CHILI-CHIPPENDALE INTERSECTION AND �
CHILI AVENUE FROM 145TH STREET TO
NQRTH TERMINUS
CITY PROJECT #235
WHEREAS, the City Councii received the feasibility report and found the project feasible for
145th Street Improvements from Shannon Parkway to Chili-Ghippendaie Avenue and the
realignment of Chili-Chippendale Intersection, City Project#235, on the 19th day of January,
1993; and
WHEREAS, the statute provided that no such improvements shall be made until the Councit
has held a public hearing on such improvements following mailed notice and two publications
. thereof in the official newspaper stating time and place of the hearing, the general nature of
---- the improvement, the estimated costs thereof, and the area proposed to be assessed, in
accordance with the la�ov; and
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Rosemount,
Minnesota, as follows:
1 . A public hearing will be held at the time and ptace set forth in the Notice of
Hearing attached hereto as Exhibit A to consider said proposed improvements.
2. The nature of the improvements, the estimated cost of each major portion thereof,
and the areas proposed to be assessed therefor are describe�l in the form of Notice of
Hearing hereto attached.
3. The notice of said public hearing shall be in substantially the #orm contained in the
notice hereto attached.
4. The City Clerk is hereby authorized and directed to cause notice of said hearing
to be given two publications in the official newspaper. Said publications shall be one week
apart, and at least three days shall elapse between the last publication and the hearing. Not
less than ten days bef�re the hearing the Clerk shall mail notice of the hearing to the owner
of each parcel of land within the area proposed to be assessed as described in the notice.
For the purpose of giving such mailed notice, owners shall be those shown to be such on
the records of the County Auditor or, if the tax statements in the County are mailed by the
County Treasurer, on the records of the County Treasurer. As to properties not listed on the
Resolution 1993 -
records of the County Auditor or the County Treasurer, the Cierk shafl ascertain such
ownership by any practicable means and give mailed notice to such owners.
ADOPTED this 6th day of April, 1993.
E. B. McMenomy, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
2
" � ; EXHIBIT uAn.
i� o osemoun�
� �
PHONE (612)4234411 2875•145th Strset West,Roeemount,Mfnnssoia MAYOR
. FAX (612)4235203 Maiiinp Addroas: Edward 8.MdYlenomy
P.O.Box 510,Rosemount,Mirmesota 55068-0510 COUNCIIMEMBERS
� Sheiia Klaassn
James(Re�Staats
CITY OF ROSEMOUNT "�"�'"''"`°"
Dennis wppermann
DAKOTA COUNTY, MINNESOTA noMiNisrRaTOR
. Stephan JiUc
PUBUC NOTICE
NOTICE OF PUBLIG HEARING ON IMPROVEMENTS
145TH STREET IMPROVEMENTS FROM SHANNON PARKWAY
TO CHILI-CHIPPENDALE AVENUE, THE R�AUGNENT Of
THE CHILI-CHIPPENDAtE INTERSECTION AND
CHILI AVENUE FROM 145TH STREET TO
NORTH TERMINUS
CITY PROJECT N0. 235 �
TO WHOM IT MAY CONCERN:
NOTICE IS HE�iEBY GIVEN, that the City Courecil of the City of Rosemount, Minnesota will meet
at 8:00 o'ciock p.m. or as soon thereafter as possible, Tuesday, Aprii 20, 1993, in the Councii
Chambers of the City Hall, 2875 145th Street West, to consider the following improvements:
Project #235 - 145th Street Improvements from Shannon Parkway to
Chili-Chippendale Avenue, the Realignment of the Chili-Chippendale
. Intersection and Chili Avenue from 145th Street to North Terminus
The nature of improvements shall include the construction of curb and gutter, street surfacing,
sanitary sewer, sanitary sewer services, watermain and water services, storm drain, sidewalk,
street lights, private utilities and r�storation.
The total estimated cost of said improvements is 5457,400.
The area proposed to be assessed for the foregoing improvements will generally be:
Outiot A, Carrollton Addition; Lots 15 & 16, Block 1, Motz Addition; Lot 10, Block 2, Motz
Addition; Lot 10, Block 1, Motz 2nd Addition; Lot 10, Block 2, Motz 2nd Addition; Lot 10, Block
1, Motz 3rd Addition; Lot 10, Block 2, Motz 3rd Addition; Lots 1 & 2, Block 1, Rahn's 4th
Addition; Also included are the following parcels all within Sections 29 and 30, Township 115
North, Range 19 West, with the Parcel Identificatian Numbers as follows:
34-03010-(012-80; 016-80; 010-91; 014,88; 010-90; 010-85; 010-20).
�verc���tng's �omivcg `(/C� �JLosemounl��
< . ,
� : � � > �_..,
-� �- �. .� , � � � � '`.
Public Notice-City Project 235
Page 2 '
Such person(s) as desires to be heard with reference to the proposed improvements will be heard
at this meeting. Written or oral opinion will be considered.
Dated this 6th day of April, 1993
BY ORDER OF THE CITY COUNCIL.
�
._ _ _ Susan M._.Walsh
City Clerk
�� � _. � � .__� � __. �. _-_ _ . _w._ ..._ ____.__ __. � �Gity-of_Rosemou�st �
Dakota County, Minnesota
� ..,
MAILING LIST .
� � �� . : �_
; � . ` ` PUBLIC HEARING NOTICE :
CITY PROJECT 235
145TH STREET IMPROVEMENTS FROM
SHANNON PARKWAY TO CHFLI-CHIPPENDALE AVENUE, THE REAUGNMENT
OF CHILI-CHIPPENDALE INTERSECTION AND CHILI AVENUE FROM
145TH STREET TO THE THE N(JRTH TERMtNUS
APR1L 20, 1993 @ 8:00 P.M.
Marguerite A. Tste Millard Robert F & Joyce A Shimota R o s e m o u n t Go rn m u n i t y
3405 144th St W . 10703 Prescott Ct Housing
Rosemount, MN 55068 Burnsville, MN 55337-1032 3810 145th St. W.
Rosemount, MN 5506$
Richard C. & Hulda Skille Vernon R. Kelley Regina R. Rahn Riegert
3400 Upper 143rd St W 7930 Pleasant Ave S 3450 145th St W
Rosemount, MN 55068 Minneapolis, MN 55420 Rosemount, MN 55068
- - .
- - Patrick F & Mary R Finnegan
Robert & Cavonne Feuerstein Box 16-- - . - -
3405 Upper 143rd St W Rosemount, MN 55068
Rosemount, MN 55068
- Carl & Ruth Rechtzigal
William Jr. & Marilyn Carlon Box 294
3400 143rd St W Rosemount, MN 55068
Rosemount, MN 55068
Donal & Mary Carroll
Charles F. & Jean F. Todd 2440 Southview Ct
3405 143rd St W Hastings, MN 55033
Rosemount, MN 55068
Mary E Hynes
3405 145th St W
Tom Thumb Food Markets Rosemount, MN 55068
110 17th St E
Hastings, MN 55033
Kenneth & Margaret Gist
3400 144th St W
Rosemount, MN 55068
Richard L. & Emmet Carroll
4485 Oak Chase Lane
Eagan, MN 551 23-1 81 4
. O�
Schelen .
lvlayeron&
. March 25, 1993 as�°`�ates,u►c. :
- 300 Park Place Center
_ ' S775 Wayzata Boulevard
Minneapolis,MN 554i6-1228
612-595-5775
1-800-753-5775
FAX 595-5774
Mr. $ud Osmundson �c�'i,�nit c s
City Of RosemOUIIt planners
surveyors
2875 145th Street West
Rosemount, MN 55068-0514
Re; 145th Street West Improvements
City of Rosemount
City Project No. 235
OSM Project No. 4438.60
Dear Mr. Osmundson:
As you requested, we have reviewed the option of reconstructing the portion of 145th
Street West between Shannon Parkway and Chile Avenue, the Chippendale/Chile
Avenue intersection (includ.ing the Dodd Road realignment) and Chile Avenue from
- . 144th Street to-the Independent School District No. 196-S�uth Boundary. Detailed cost
: estimates are attached to this letter and a summary of the project costs is listed as
fallows;
z45th Street West fthese costs incl�•__: the ChippendalejChile Avenue and the
Dodd�toad Realignmentsl -
A. Sanitary Sewer $ 1,400.00
B. Sanitary Sewer Services 3,700.00
C. Watermain 18,500.00
D. Watermain Services 0.00
E. Storm Drain 74,700.00
F. Streets 297,900.00
G. Sidewalk/Trail 8,400.00
H. Street Lighting 4.000.00
Estimated Project Cost (A-H) $408,600.00
Chile Avenue Reconstruction
, I. Storm Drain $15,440.00
J. Streets 25,OOO.QO
K. Sidewalk/Trail 8.400.00
Estimated Project Cost (I-K) 48 0.,(?0
Estimated Total Project Cost (A-K} $457,400.00
Ecua:0o�ortur,tt:•°-nplo:�er
, Mr. Bud Osmundson
City of Rosemount
Rosemount, MN
March 25, 1993
Page 2
As �'vas with the original 145th Street West Improvements (City Project No. 235) this
project could be funded from assessments, Street Core Funds (including Mn�DOT State
Aid Funds), Storm Sewer Core Funds, Watermain Core Funds and Sanitar�, Sewer Core
Funds. Attached to this letter are the General Fundi.ng Overviews and prelirni.nary
Assessment Rolls for the revised 145th Street West Improvement Project. The
assessment amaunts 'ted were calculated using the City of Rosemount
Assessment/Improvement Policy.
"` The followi.ng are items that should be considered if the City decides to separate the
145th Street West Improvement Project into two phases (Phase 1 - between Shan.non
Parkway and Chile Avenue and Phase 2 - between Chile Avenue and Cameo Avenue).
. _ --- _ _
� _ __
If the 14Sth-�treet W��t-�pu�vement Pra,}eet is only constructed between Shannon
- Pai'kway and Chile Avenue, then a stockp�e area will neezi to_:be acquired by the City
-- --for storage-of th� excess gra.�rular material genera�ed during construction. 'i�is material
- �� nronosed to be used during the 145th Street West Improvement Project between Chile
��:�i� and Cameo Avenue.
If you have any questions regarding the above information or if you need any additional
information, please contact me at 595-5694.
Sincerely,
ORR-SCHELEN-MAYERON
& ASSOCIATES, INC.
���� ��u�!�--
�rian J. Bourassa, P.E.
Attachments
/�
. . . ,, g.,... � .
ESTIMATED G$NERAL FUNDING OVERVIEW
145TH STREET RECONSTRUCTION FROM SHANNON PA.RKWAY TO CHILE AVENUE PLUS THE CHIPPENDALE- CHILE
AVENUE AND THE DODD ROAD REALIGNMENTS
ITEM ESTIMATED ASSESSMENT STORM WATERMAIN SANITARY STREET TOTAL
� COST SEWER CORE CORE FUND SEWER CORE FUND REVENUES
FUND CORE FUND **
Sanitary Sewer $1,400 $302.00 $0 $0 51,09$.00 $0 $1,400
Sanitary Sewer $3,700 $719.00 � $0 $0 $2,981.00 $0 $3,700
Services
Watermain $18,500 $0 $0 $18,500.00 $0 $0 $18,500
Water Services $0 $0 $0 $0 $0 $0 $0
Storm Drain $74,700 $0 $0 $0 $0 $74,700' '' $74,700
Street $297,900 $63,340.00 $0 $0 �0 �234,560.00 �297,900
Street/Lighting $4,000 $0 $0 $0 $0 $4,000 ' $4,000
Sidewalks/Trails $8,400 $0 $0 $0 $0 �8,400 �8,400 `
Overhead $0 $0 $0 $0 $0 �0 $0
Utilities
TOTAIS - $408,600.00 $64,361.00 $0.00 $18,500.00 $4,079.00 � �321,660.Q0 �40$,600.00
* Street Core Fund includes Mn/DOT State Aid Funds
. I� .,i.. � . .
. . . . - � . . • ��d . �
�
7�
. . . . . . ,._, i� . s
�
� . . . � � . . .. �,ir���.:� .
. . . . i t., :•�� . .
ESTIMATED GEI�ERAL, FtJNDING OVERVIEW **
CHILE AVENUE RECONSTRUCTI�N FROM 144TH STREET TO ISD NO. 196 SOUTH '
BOUNDARY
ES'I°IMATED REVENUES
ITEM ESTIMATED ASSESSMENT : STORM STREET TOTAL
COST SEWER CORE CORE FUND REVENUES
; FUND
Storm Drain $15,400.00 * i $0 $15,40Q.00 * $0 �15,400.00 "
Street $25,000.00 $22;696.87 $0 $2303.13 $25,000.00
Sidewalk/Trail $8,400.00 $0 $0 $8,400.00 58,400.00
TOTAIS $48,800.00 $22,69G.87 $15,400.00 $10,703.13 �48,800.00
* Final Design will determine whether or not this is requireci
** This Funding Overview is the same as was given in the original reasibility Report