Loading...
HomeMy WebLinkAbout5.l. Receive Petition / Order Feasibility Report - West Ridge 4th Additionr CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: JANUARY 7, 1992 AGENDA ITEM: Receive Petition/Order Feas. AGENDA SECTION: Report & Plans/Specs-West Ridge 4th Proj #223 Consent PREPARED BY: Ron Wasmund AGENDtTftlit Director of Public Works/Building Official5L ATTACHMENTS: Petition, Maps, Memo & AP14OVEp B . Resolution � J The City is in receipt of a petition for public improvements from Rosemount Development Corp. for the installation of utilities and streets within the West Ridge 4th Addition. This is a 100% assessableproject. Staff is asking council to receive the petition and order the feasibility report. S.E.H. will be the consulting engineer to prepare the report. RECOMMENDED ACTION: Motion to adopt a resolution receiving petition and ordering the feasibility report for West Ridge 4th Addition street and utility improvements, City Project #223. COUNCIL ACTION: MEMORANDUM TO: Mayor McMenomy Council Members: Klassen Statts Willcox Wippermann FROM: Ron Wasmund, Director of Public Works/Building Official DATE: January 3, 1992 RE: West Ridge 4th Addition The City has received a petition from Rosemount Development Corporation to do the public improvements of street, utilities, street lights and walkways for West Ridge 4th Addition. The petition which is attached is asking for the City to order the feasibility study for these improvements. Since this project is 100% assessable to Rosemount Development Corporation there is no financial risk to the City in ordering the preparation of the feasibility report. Payment is guaranteed by signature of the owner on the petition. The attached map shows the location of the 4th Addition in relationship to the other additions in West Ridge. There are currently no issues from Staff on this proposal. I would recommend approval of Rosemount Development Corporations request. Proj 4 CITY OF ROSEMOUNT PETITION FOR LOCAL IMPROVEMENTS (100% Petition) To the City Council of Rosemount, Minnesota: We, the undersigned, being the owners of all the real property legally described as follows: ,Ida Ch e 0 OJ► West ri41' f A����'r0V\ hereby petition the city council to undertake without a public hearing under Minnesota Statutes, Section 429.031, the following improvements to such property and agree to pay for all costs for the preparation of the feasibility report for these improvements in the event the improvements are not ordered in: Sanitary Sewer I,-- Walkways Watermain V Streets 1/ Storm Sewer ✓ Curb & Gutter Streetlights Other and to pay the entire assessable costs thereof against our property encompassing or abutting said improvements based on benefits received without regard to cash valuation. Signature of Owner(s)* Address Date 1. 2. 46 014411- 4. We also agree to guaranty payment for the preparation of plans and specifications for the above petitioned improveme=nts in order that the plans and specifications may be prepared simultaneously with the feasibility report. For City Use Date Rec d:Only z0 By: GG/ To Council: * Property owned in joint tenancy should be signed by each owner. 10/88 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1991 - A RESOLUTION RECEIVING PETITION AND ORDERING THE FEASIBILITY REPORT FOR WEST RIDGE 4TH ADDITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT # 223 WHEREAS, the City Council of the City of Rosemount has received a petition from the developer and property owners of the proposed West Ridge 4th Addition Street and Utility Improvements, City Project #223. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Rosemount as follows: (1) the aforesaid petition represents 100% of the owners of the affected property; (2) the property owner requests in the petition that the improvements be constructed and that the entire cost for their share less the City's share of the cost of the improvement be assessed against the property; (3) the aforesaid petition is approved and placed on file; and (4) the City's Consulting Engineer, S.E.H. is directed to have the necessary feasibility report prepared for West Ridge 4th Addition Street and Utility Improvements, City Project #223. ADOPTED this 7th day of January, 1992. E.B. McMenomy, Mayor ATTEST: Susan M. Walsh, City Clerk Motion by: Seconded by: Voted in favor• Voted against• 4d C7 JMli• ?"-w J—w O AN7/I. 11v7 W A//.7 o 4d C7 JMli• ?"-w J—w O AN7/I. 11v7 W A//.7 i Description of Plat: That part of the Southwest Quarter of Section 31, Township 115, Range 19, I Dakota County, Minnesota lying north of the plat of WEST RIDGE THIRD ADDITION, according to the recorded plat thereof, and west, north, and south of the following described line: Commencing at the northwest corner of said Southwest Quarter; thence South 89 degrees 48 minutes 49 seconds East (assumed bearing) along the north line thereof 747.96 feet to the point of beginning of the line to be described; thence South 0 degrees 11 minutes 11 seconds West 140.00 feet; Thence South 89 degrees 48 minutes 49 seconds East 41.30 feet; thence South 0 degrees 48 minutes 49 seconds West 390.00 feet; thence North 89 degrees 48 minutes 49 seconds West 23.90 feet; thence South 0 degrees 11 minutes 11 seconds West 135.09 feet to the north line of said WEST RIDGE THIRD ADDITION and said line there terminating.