HomeMy WebLinkAbout5.e. Highway 3 Improvement Update, City Project #239t f
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: October 6, 1992
AGENDA ITEM: Highway 3
Improvement Update
AGENDA SECTION:
City Project
239
Old Business
PREPARED BY: Bud
City Engineer/Assistant
Dsmundson
Public Works Director
AGENDA ITEM
5 E
ATTACHMENTS: OSM Letter,
Memo
APPROVED BY:
Attached is a memo 'regarding
Staffs recommendations for the Highway 3
Improvements. The memo
also refers to projected costs, lighting, and
different alternatives
within the project.
RECOMMENDED ACTION: Informational
Only
COUNCIL ACTION:
10
TO: MAYOR Mcl
COUNCIL M
FROM: CITY ENGINEER
DATE: OCTOBER 2, 1992
RE: HIGHWAY 31
KLASSEN
STAATS
WILLCOX
WIPPERMANN
UNDSON
ENT UPDATE
After receiving the feasibility eport for City Project #239, the Armory Trunk Highway 3
Improvements, Council directed Staff to investigate an urban roadway alternative for Trunk
Highway 3. The firm of OSM completed that investigation and cost estimate which is attached.
Council also directed Staff to investigate the lighting system for that improvement. That lighting
system estimate is also attached.
Alternative "C" as it is referred to, would involve a total reconstruction of Highway 3 from 143rd
Street to north of Connemara Trail. The proposed section as shown in the attachment would be
a 64' wide urban section. The outer two lanes, which are shown as right turn lanes or shoulder,
could be used as thru lanes in the future. This is a very similar section to what Dakota County uses
on all its major roads. The cost estimate for this alternative is approximately $1,000,000. The
previous Alternative "A" improv ment was estimated at approximately $309,000. Of that total,
MNDOT would fund approxim tely $190,000 through a Cooperative Agreement. With the
proposed Alternative "C" cost ei timate of a $1,000,000; it is the initial reaction of MNDOT that
they would still only provide approximately $190,000 of funding.
The lighting system, which is described on the attachment, would include approximately 30 lights
staggered at 150' intervals. Lic hts would be located directly behind the curb with a breakaway
base. The cost estimate for the ighting is approximately $140,000. These lights would be similar
to the larger downtown globe Lype lights. It is anticipated that this lighting system could be
installed on the rural section previously recommended.
Staff recommends that Cour
Improvements in the Armory a
improvements.
Council had also asked that we
the remainder of Highway 3 thn
alternatives for the design, but
downtown area. One problem i;
Street in this area. Widening
businesses and homeowners alc
will be present at the meeting
improving it. It recommended
the Downtown Scoping Commis
to the Council at a future m
recommendations.
proceed with the recommended Alternative "A" Highway 3
We also recommend that the lighting system be included in the
investigate with MNDOT the possibility of including in the project
iugh the downtown area to Project No. 239. There are numerous
all of them would include widening of the roadway through the
that there is only 66' of right-of-way from 143rd Street to 147th
of the roadway would involve major costs to the City and to
ng this segment of roadway. Mr. Ron Bray from OSM and myself
o further discuss this segment of Highway 3 and possibilities of
that the City Council recommend that the City Engineer work with
tee and continue the Highway 3 investigation. We can come back
Deting with more information and the "Scoping" committee's
October 1, 1992
Honorable Mayor and i
City of Rosemount
2875 145th Street West
Rosemount, Minnesota
Re: Alternative C and Li
Cost Estimates for
Trunk Highway 3 (T
For the Armory Site
Rosemount, Minns(
City Project No. 239
OSM Project No. 48
Dear Mayor and Council:
Orr
Schelen
Mayeron &
O�S)t Associates, Inc.
ting System
3)
5.20
300 Park Place Center
5775 Wayzata Boulevard
Minneapolis, MN 55416-1228
612-595-5775
1-800-753-5775
FAX 595-5773
Engineers
Architects
Planners
Surveyors
Transmitted herewith are cst estimates for the above mentioned project. As requested
by the Council each estima a is discussed in more detail below:
TH 3 Alternative C:
This alternative includes the total reconstruction of TH 3 from 143rd Street to
north of Connemara Trail, approximately 4000 feet. The typical roadway section
would be a 64' wide urban section with curb and gutter. It would include 3 - 12'
lanes (2 thru lanes and 1 continuous left turn lane) and 2 - 14' shoulders/right
turn lanes. The attached figure illustrated the typical section for Alternative C.
TH 3 Lighting System:
The lighting system
intervals (300 feet o
the curb with a brea
the pole to allow fol
ncludes approximately 30 lights staggered at 150 foot
L each side). The light pole would be located directly behind
away base. The estimated cost assumes a higher price for
a decorative/ornamental pole.
Equal Opportunity Employer
We hope this information is sufficient for your review. We would be glad to discuss this
report with all interested pa ties at your convenience.
Please call me at 595-5666 if you have any questions.
Sincerely,
ORR-SCHELEN-MAYER
& ASSOCIATES, INC.
Ronald B. Bray, P.E.
Manager, Transportation I
dad
enclosure
cc: Mr. Bud Osmundsonl - City Engineer
Z
O
F—
U
W
N
Z
Q
m
Cr
W
N
O
1L
O
1r
1L
J
F-
N J
F -
Z
O
U
W
Z
Q
N J
S
F -
Drawing Title
TYPICAL SECTIONS
ALTERNATIVE C
T.H. 3
ROSEMOUNT, MN
Comm. No.
4845.20
Figure No.
3-
D_
Drawn BY:
L.A.M. Orr
Schelen
C%S)ASsociat
Mayeron
Dote'
&
s, Inc.
10/01/921 Engineers ■ Architects ■ Planners ■
3urveyors
5775 Wayzata Boulevard ■ St. Loius Park 55416
■ 612-331-8660
J
F-
N J
F -
Z
O
U
W
Z
Q
N J
S
F -
Drawing Title
TYPICAL SECTIONS
ALTERNATIVE C
T.H. 3
ROSEMOUNT, MN
Comm. No.
4845.20
Figure No.
T.H. 3 ROADWAY IMPROVEMEN'
143RD STREET TO NORTH OF C
`ROSEMOUNT, MN
OSM COMM. NO. 4845-20
TH 3 LIGHTING SYSTEM
ITEM
SPEC.
NO.
NO.
DI
1
2545.515
LIGHT BASE
2
2545.523
3" NMC
3
2545.531
1/C # 10
4
2545.531
1/C#6
5
0545.602
LUMINAIRE 2
6
0545.602
LIGHTING SE
7
0545.602
LIGHTING SE
ROAD
WATT HPS
'ICE FOUNDATION
ICE EQUIPMENT
UNIT
UNIT COST
EA 1100.00
LF 5.00
LF 0.35
LF 0.60
EA 300.00
EA 1100.00
EA 900.00
SUBTOTAL
+10% CONTINGENCIES
SUBTOTAL
+30% ADMINISTRATION
TOTAL ESTIMATED COST
Page 1
QUANTITY
8000
24000
8000
30
1
1
TOTAL
COST
$33,00 o
$40,000.00
$8,400.00
$4,800.00
$9,000.00
$1,100.00
$900.00
$97,200.00
$9,720.00
$106,920.00
$33,080.00
$140,000.00
T.H. 3 ROADWAY IMPROVEM
143RD STREET TO NORTH OF DODD ROAD
ROSEMOUNT, MN
OSM COMM. NO. 4845.20
ALTERNATIVE C - CONTINUOUS LEFT TURN LANE -URBAN SECTION
1
2104.501
REMOVE MET/
2
2104.505
REMOVE BITU
3
2104.505
REMOVE CON
4
2105.501
COMMON EXC
5
2105.507
SUBGRADE E.
6
2112.501
SUBGRADE PI
7
2211.501
AGGREGATE
8
2211.501
AGGREGATE
9
2331.514
TYPE 31 BASE
10
2341.514
TYPE 41 WEAI
11
2331.521
IRREGULAR V
12
2357.502
BITUMINOUS
13
2501.515
15" CMP PIPE
14
2503.541
15" CMP PIPE
15
2503.541
18" RC SEWEI
16
2506.508
CONSTRUCT
17
2531.501
CONCRETE C
18.
2575.505
SODDING
_ CULVERT
LF
5.00
270
$1,350.00
OINOUS PAVEMENT
SY
1.50
19555
$29,332.50
;RETE PAVEMENT
SY
3.60
6000
$21,600.00
OVATION
CY
2.00
33186
$66,372.00
.CAVATION
CY
2.50
11112
$27,780.00
,EP.
RS
150.00
40
$6,000.00
SASE CLASS 3
TON
3.80
17920
$68,096.00
SASE CLASS 5
TON
5.30
13440
$71,232.00
COURSE
TON
20.00
7823
$156,460.00
1 COURSE
TON
22.00
2347
$51,634.00
IDTH PAVING
SY
9.00
1322
$11,898.00
IATERIAL FOR TACK
GAL
1.00
1425
$1,425.00
kPRON
EA
62.00
8
$496.00
LF
12.80
300
$3,840.00
PIPE
LF
25.00
4000
$100,000.00
;ATCH BASIN
EA
800100
12
$9,600.00
)RB AND GUTTER
LF
6.50
8000
$52,000.00
SY
2.00
17778
$35,556.00
SUBTOTAL
+10% CONTINGENCIES
SUBTOTAL
+30% ADMINISTRATION
TOTAL ESTIMATED COST
Page 1
$714,671.50
$71,467.15
$786,138.65
$235,861.35
$1,022,000.00
CITY OF ROSEMOUNT
XECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DA E:October 6, 1992
AGENDA ITEM: Closed Session AGENDA SECTION:"
McDonaugh/Sunrise Builders
This is a recommendation for the City Council to adjourn to
executive/slosed sessionfor the purpose of discussing pending litigation
on the McMdonaugh/Sunrise Builders matter.
RECOMMENDED ACTION,:Mo
'ion to adjourn to executive/closed session to
discuss
pending litigation involving the McDonaugh/
Litigation
Executive Sesion
PREPARED BY:Stephan Jilk
AGENDA NO.
ATTACHMENTS: None
BY
M,ozZ
AGENDA ITEM: Closed Session AGENDA SECTION:"
McDonaugh/Sunrise Builders
This is a recommendation for the City Council to adjourn to
executive/slosed sessionfor the purpose of discussing pending litigation
on the McMdonaugh/Sunrise Builders matter.
RECOMMENDED ACTION,:Mo
'ion to adjourn to executive/closed session to
discuss
pending litigation involving the McDonaugh/
Sunrise
Builders matter
COUNCIL ACTION: