HomeMy WebLinkAbout11. Legislative Position StatementsCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: FEBRUARY 4, 1992
AGENDA ITEM: LEGISLATIVE POSITION STATEMENTS
AGENDA SECTION:
ADMINISTRATOR'S REPORT
PREPARED BY: STEPHAN JILK, CITY ADMINISTRATOR
AGENDI.j�
MAl q
Tj' �.
ATTACHMENTS: MEMO
APP VE BY _
y
On January 21st the City Council approved the support for several
legislative position satements. Some revisions have been made to these
because of other cities input.
Attached is a memo in this regard.
RECOMMENDED ACTION:
Motion to approve the revisions to the legislative position statements
for Dakota County cities as presented.
COUNCIL ACTION:
�.iy of Rosemount
PHONE (612) 4234411 2875 - 145th Street West, Rosemount, Minnesota
FAX (612) 4235203 Mailing Address:
P.O. Box 510, Rosemount, Minnesota 55068.0510
TO: Mayor McMenomy
Council Members Klassen, Staats, Willcox, Wippermann
FROM: Stephan Jilk, City Administrator
DATE: January 31, 1992
RE: Legislative Position Statements
Legislative Breakfast
MAYOR
Edward S. McMenomy
COUNCILMEMSERS
Sheila Klassen
James (Red) Steals
Harry Willcox
Dennis Wippermann
ADMINISTRATOR
Stephan Jilk
On January 21st the City Council passed a motion to support the legislative
position statements drafted by the Dakota County City/County
Administrators. On January 30th the City Administrators met to discuss any
changes proposed by the various city councils and the County Board during
their consideration of the position statements.
There were several changes I wish to bring to your attention so that if you
have concerns with them we can consider them before we present them to the
legislative delegation.
The following changes were considered and consensus was reached:
1) Drug Education and Enforcement The last paragraph relating to the
county's levy will be separated out as a separate recommendation.
2) Local Government Finance - In the background section thesecond
paragraph was revised to replace the words "has further diminished the
ability of" with "prevents".
In the recommendation section the Levy Limits section was discussed in
depth. The County is not supportive of removing levy limits because they
are concerned that if levy limits are removed the state will mandate
additional programs, now funded and managed by the state, to be funded and
managed by the county. Consensus was that if the cities and the county can
agree on some language which addresses this concern the levy limit section
will be left in. If a compromise can't be reached the levy limit section
will be removed.
3) Regional Airport Policy - In the recommendation section the #1
recommendation was revised by removing the last sentence.
In addition there will be an additional recommendation to indicate
that we should not allow any transportation dollars to be allocated
away from other needs to fund planning and/or construction of any
needed elements of the relocation of a new airport.
6vertylhtngs (Pouring ` J6 RosemounlY
`i ecvc�eA Wane.,
4 •
The revised draft of the position statements will not be available for a
few days and I wanted to get you this information for our meeting.
Legislative Breakfast - The planned breakfast at which we will present
these issues is planned for February 14th at 7:30 a.m. at the Rosemount
American Legion. At this time at least six of the legislators from Dakota
County have committed to attending. I would encourage all of you to attend
and exhibit support for the legislators consideration on these issues.
We will be contacting you individually to ask you if you plan on attending
so we can make reservations.
1/31/92
ANNOUNCEMENTS
- CITY COUNCIL
MEETING SCHEDULE
FEBRUARY - MARCH,
1992
Feb. 4
Tues.
6:00
p.m.
Port Authority
7:30
p.m.
Regular Council Meeting
Feb. 10
Mon.
6:30
p.m.
Utilities/Cable Commission
Feb. 11
Tues.
5:00
p.m.
Planning Commission
Feb. 14
Friday
7:00
a.m.
Legislative Breakfast
Feb. 17
Mon.
7:30
p.m.
Parks & Rec. Committee
Feb. 18
Tues.
6:00
p.m.
Port Authority
7:30
p.m.
Regular Council Meeting
Feb. 25
Tues.
5:00
p.m.
Planning Commission
March 2
Mon.
6:00
p.m.
Port Authority
7:30
p.m.
Regular Council Meeting
March 9
Mon.
6:30
p.m.
Utilities/Cable Commission
March 10
Tues.
5:00
p.m.
Planning Commission
March 16
Mon.
7:30
p.m.
Park & Rec. Committee
March 17
Tues.
6:00
p.m.
Port Authority
7:30
p.m.
Regular Council Meeting
City Council Meetings
Port Authority
1st & 3rd
Tuesday, at 7:30 p.m.
MVTA (MN Valley Tran. Auth.)
1st & 3rd
4th Wed.,
Tuesday, at 6:00 p.m.
Burnsville 7:00
Parks & Recreation Committee
Planning Commission
3rd Monday, at 7:00 p.m. P�m�
Utilities/Cable Commission
2nd & 4th
1st Monday
Tuesday, at 5:00 p.m.
after 1st Tues., 6:30
p.m.
r�
u
0
Preliminary Report
for
Utility and Street Construction
• in
West Ridge 4th Addition
City of Rosemount
Minnesota
City Project No. 223
SEH File No. 92229
• February 4, 1992
0
W
DFS
Encl T
iminary Report
For
A Street Construction
in
Ridge 4th Addition
mount, Minnesota
:y Project No. 223
r'ebruary
4I 1992
SEH File No: 92229
hereby certify that this report was prepared e er dor un esr
I Y
my direct supervision nder the la that s Of
the State of Minnesota.
sional En ee
Re
Date: Februa 4 1992. c � � No. 19699
Reviewed By:
C
Date: Februa 4 1992
CH/PPEWA FALLS
WISCON5/N
0
Part 2
General Background
2.1 Project Area
The project location is shown in Drawing No. 1. The project area is located in the
northwest quarter of the southwest quarter of Section 31 and lies immediately
north of West Ridge 3rd Addition and south of Wensman 3rd and 4th Additions.
The westerly boundary of the plat is located on the Apple Valley corporate limits.
2.2 Project Area
West Ridge 4th Addition consists of 32 single family residential lots, an outlot for
future construction of County Road 33 (Diamond Path), and rights-of-way for seg-
ments of Darling Path, 156th Street West, and Darjeeling Path. This is the fourth
phase of the Rosemount West PUD.
2.3 Adjacent Property
The project area is adjacent to West Ridge 3rd Addition and Wensman 3rd and 4th
Additions. Utility and street construction in West Ridge 3rd Addition was com-
pleted in 1990 under City Project No. 195, Contract No. 1989-2. Utility and street
construction in Wensman 3rd Addition was completed in 1989 under Project No.
510. Utility and street construction in Wensman 4th Addition was completed in
1990 under Project No. 512.
Outlot A, located on the west end of the plat, has been reserved for the future con-
struction of County Road No. 33 (Diamond Path), and will be dedicated to the City
for this purpose.
It is anticipated that a future phase of the West Ridge Development will be located
immediately to the east of the project area.
2.4 Site Conditions
The project area is currently used for agricultural purposes. In accordance with
City requirements, all street and site grading will be completed by the developer
in accordance with the master grading plan submitted in the approved PUD. The
required street grading includes core excavation of all plastic (non -suitable) mate-
rials within the roadway area and replacement with granular (suitable) materials.
Part 2 General Background Page 3
Part 3
Proposed Improvements
3.1 Sanitary Sewer
Proposed sanitary sewer facilities are shown in Drawing No. 2. These facilities
include the northerly extension of a 10 inch trunk sewer along Darling Path from
the inplace stub south of 156th Street to the inplace stub in Darjeeling Path; the con-
struction of an 8 inch sewer along 156th Street east of Darling Path; and the con-
struction of an 8 inch sewer along Darling Path east of Darjeeling Path.
The 10 inch connection along Darling Path will result in the abandonment of the
private lift station and forcemain currently serving Wensman 3rd, 4th and 5th
Additions. The developer of Wensman Additions will be responsible for removing
the temporary lift station and abandoning the 4 inch forcemain. The extra depth 10
inch trunk sewer will also allow for future development to the north of Wensman
5th Addition.
The 8 inch sewer on Darling Path east of Darjeeling Path and on 156th Street will
provide for future easterly extensions to serve a subsequent phase of the West
Ridge Development.
The proposed facilities also include the installation of 4 inch services 15 feet into
each lot from the proposed mains in the street. Service risers will be installed on
the extra depth 10 inch main.
3.2 Watermain
Proposed watermain facilities are shown in Drawing No. 3. These facilities include
the northerly extension of an 8 inch main along Darling Path from the inplace stub
south of 156th Street to the inplace stub in Darjeeling Path; the extension of an 8
inch main along 156th Street east of Darling Path; and the construction of a 6 inch
main along Darling Path east of Darjeeling Path.
Future extensions to, the east will be made from the mains along 156th Street and
Darling Path east of Darjeeling Path to serve a subsequent phase of the West Ridge
Development.
The proposed facilities will also include the extensions of 1 inch services 15 feet
into each lot from the proposed mains.
0 Part 3 Proposed Improvements Page 4
LJ
3.3 Drainage
Proposed drainage facilities within the project are shown in Drawing No. 4. These
facilities include the northerly extension of a 21 inch trunk storm sewer along Dar-
ling Path from the inplace stub south of 156th Street to the inplace stub near the
northeast corner of Outlot A; and the construction of a 15 inch main from the trunk
main in Darling Path into Block 3 to facilitate back yard drainage. Inlets are pro-
posed along Darling Path and at the intersection of Darling Path and 156th Street
West.
The proposed 21 inch storm sewer connection will provide an overflow from the
Wensman 4th Addition pond to the West Ridge pond located adjacent to Shannon
Parkway and 160th Street. This overflow is consistent with the City of Rosemount
Drainage Plan for the West Drainage Area.
It may be possible to eliminate back yard drainage facilities during the final design
stage if significant changes are made to the developer's proposed grading plan. If
these drainage facilities are installed, emergency overflow routes will be provided
to prevent back yard flooding.
3.4 Street Construction
The construction of standard City streets is proposed as shown in Drawing No. 5.
The proposed streets are 30 feet wide between curb faces and are located within 60
foot rights-of-way. The proposed street section consists of a 1-1 /2 inch bituminous
wearing course and 1-1/2 inch bituminous binder course placed over a 6 inch
aggregate base with design D418 (surmountable) concrete curb and gutter. This
pavement section assumes that a granular subgrade will be provided by the devel-
oper.
Rough grading, topsoiling and seeding of the boulevards will also be included in
the City's contract. However, the developer will be responsible for final restoration
of the boulevard areas as a part of the final lot development.
! The street facilities will also include the construction of 6 foot wide concrete side-
walks along the south side of 156th Street West, the east and south sides of Darling
Path, and the west side of Darjeeling Path.
Temporary bituminous cul-de-sacs will be constructed on the easterly ends of Dar-
ling Path and 156th Street West to facilitate emergency vehicle access.
Part 3 Proposed Improvements Page 5
0
6
IM
0
3.5 Lighting
The street lighting system within West Ridge 4th Addition will be provided by the
local electric utility (Dakota Electric Association) as a part of the extension of ser-
vice into the project area. Provisions for electric service and associated restoration
should be coordinated by the developer. Installation of the system should not
occur until the street construction is completed.
3.6 Easements
A 15 foot utility easement will be required along either side of the common lot line
between Lots 6 and 7 of Block 1, and Lots 1 and 13 of Block 3 for the installation of
proposed storm sewer facilities. A 15 foot utility easement will also be required
along the back line of Lot 7, Block 1 for the proposed trunk storm sewer.
Part 3 Proposed Improvements
Page 6
Part 4
Financing
4.1 Cost Estimates
Detailed cost estimates for all proposed improvements are included in the Appen-
dix of this report. These estimates are based on projected 1992 unit costs and
include allowances for contingencies (10%) and anticipated overhead costs (30%).
These estimates do not include any costs for street or site grading, or for easements
which will be required of the developer as a part of the Development Contract with
the City.
A summary of these costs is as follows:
Sanitary Sewer $113,000
Watermain 71,000
Storm Sewer 60,000
Street Construction 121,000
Total $365,000
4.2 Assessment Area
The following parcels of land are located within the project area and are subject to
assessments to recover the project costs.
! West Ridge 4th Addition
Block 1, Lots 1 through 11
Block 2, Lot 1
Block 3, Lots 1 through 13
Block 4, Lots 1 through 7
4.3 Cost Recovery
4.3.1 Core Facilities
A core facility cost has been defined as the difference in cost between the
actual improvement and a residential equivalent improvement. For trunk
sanitary sewer, the cost of the extra depth and pipe diameter of mains in
excess of 8 inches is considered to be a City core facility cost. For trunk storm
sewer, the cost of the extra depth and pipe diameter which is in excess of
that needed to serve the immediate site is considered to be a City core facil-
Part 4 Financing Page 7
0
i
0 Part 4 Financing
Page 8
ity cost. The above core costs are not assessable to the project area, but can
be recovered from the respective Core Facility Funds.
The sanitary sewer and storm sewer core cost calculations are included in
the Appendix of this report. With standard contingencies and overhead
allowances, the estimated core costs are as follows:
Sanitary Sewer Core Cost $48,000
Storm Sewer Core Cost 16,000
4.3.2 Assessments
After the core facility costs have been subtracted from the total estimated
cost of the project, the remaining assessable amount is $301,000.
Spreading this amount over the 32 lots in the project area, the total esti-
mated assessment rate for each lot is $9,400.
4.3.1 Summary
Assessments = $301,000
Sanitary Sewer Core Facility Costs = 48,000
Storm Sewer Core Facility Costs = 16,000
Total $365,000
0
i
0 Part 4 Financing
Page 8
0
•
0
0 Part 5 Project Schedule Page 9
Part 5
Project Schedule
The proposed schedule for this improvement is listed below. This schedule is based on the
provisions of Chapter 429 of the Minnesota Statutes,
and it assumes that all elements of
the improvement, including developer obligations are completed in a timely manner.
Receive Feasibility Report
February 4, 1992
Hold Public Hearing
February 18,1992
Approve Plans and Specifications
March 3,1992
Receive Bids/Award Contract
April 7,1992
Begin Construction
April, 1992
1
Complete Construction
Summer, 1992
Hold Assessment Hearing
Fall, 1992
First Payment Due with Taxes
May, 1993
•
0
•
0
0 Part 5 Project Schedule Page 9
0
ENGINEERS ■ ARCHITECTS ■ PLANNERS
February 4,1992
City of Rosemount
2875145th Street West
Rosemount, MN 55068
3535 VADNAIS CENTER DRIVE, ST PAUL, MINNESOTA 55110 612490-2000
RE: Rosemount, Minnesota
West Ridge 4th Addition
Utilities and Streets
City Project No. 223
SEH File No: 92229
Attn: Ron Wasmund, Director of Public Works
Gentlemen:
In accordance with your authorization we have prepared the attached preliminary report
for utility and street construction in West Ridge 4th Addition. This report discusses sani-
tary sewer, watermain, drainage and street improvements, and provides cost estimates
for each.
We find this improvement to be feasible and recommend that it be constructed in general
compliance with the provisions of this report.
We would be pleased to review this report with you in detail.
Sincerely,
Shor -Elliott-Hendrickson, Inc.
David F. Simons, P.E.
DFS/cih
Enclosure
SHORT ELLIOTT ST PAUL,
HENDRICKSON INC. MINNESOTA
CHI PPEWA FALLS,
WISCONSIN
0
CM
0
W
WA
10
r]
Executive Summary
City Project No. 223 provides for the construction of sanitary sewer, watermain, storm
sewer and street facilities in West Ridge 4th Addition. This development consists of 32
single family residential lots and is located in the southwest quarter of Section 31 between
West Ridge 3rd Addition and Wensman 4th Addition.
The project includes approximately 1,900 feet of sanitary sewer; 2,000 feet of watermain;
1,100 feet of storm sewer; and 2,000 feet of street construction. The total estimated project
cost is $365,000. Of the total, $301,000 will be recovered through assessments, $48,000 will
be obtained from the Sanitary Sewer Core Facility Fund, and the remaining $16,000 will
be recovered from the Storm Sewer Core Facility Fund. The project is scheduled for con-
struction during the 1992 construction season.
Executive Summary
Page 1
Is
10
Part 1
Introduction
1.1 Authorization
On January 7,1992, the City of Rosemount, upon petition by the developer, autho-
rized the preparation of a preliminary report for utilities and street construction in
West Ridge 4th Addition. This project has been designated as City Project No. 223.
1.2 Scope
The purpose of this report is to determine the engineering feasibility of this project
based upon a review of the data available, and to make recommendations and pro-
vide cost estimates for the construction of sanitary sewer, watermain, storm sewer
and street facilities in West Ridge 4th Addition.
1.3 Data Available
Information and materials used in the preparation of this report include:
1. Preliminary plat of West Ridge 4th Addition (January, 1992).
2. Grading and Drainage Plan for West Ridge 4th Addition (December, 1991).
3. PUD Concept Plan for Rosemount West (January, 1986).
4. Utility Study for Section 31 (December, 1978).
5. Comprehensive Sewer Plan Update (June 7,1991).
6. City of Rosemount Construction Record Drawings.
7. City of Rosemount Drainage Plan for the West Drainage Area (May, 1989).
Part 1 Introduction Page 2
i
J
Estimate of Cost
Sanitary Sewer
West Ridge 4th Addition
City Project No. 223
Rosemount, Minnesota
Unit
Total
0
Item No. Description Unit Qty.
Price
Price
1.
8" PVC, 10'-15' Deep L.F. 941
$13.00
$12,233.00
2.
10" DIP, 20'-25' Deep L.F. 953
35.00
33,355.00
3.
Standard Manhole, 8' Deep Each 7
900.00
6,300.00
!
4.
Excess Depth Standard Manhole L.F. 86
70.00
6,020.00
5.
Manhole Drop Section L.F. 27
125.00
3,375.00
6.
8" x 4" PVC Wye Each 21
35.00
735.00
7.
10" x 4" DIP Tee Each 15
200.00
3,000.00
8.
4" PVC Service L.F. 1,480
6.00
8,880.00
9.
4" DIP Riser L.F. 250
15.00
3,750.00
10.
Connect to Existing Sewer Each 2
300.00
600.00
11.
Salvaged Clean Out Each 1
350.00
350.00
12.
Disconnect Temp. Lift Station Each 1
300.00
300.00
Subtotal
$78,898.00
+10% Contingencies
8,102.00
Estimated Construction Cost
87,000.00
30% Overhead & Engineering
26,000.00
Total Estimated Cost
$113,000.00
i
J
• Estimate of Cost
Watermain
West Ridge 4th Addition
City Project No. 223
Rosemount, Minnesota
LM
•
0
Unit
Total
Item No. Description
Unit
Qty.
Price
Price
1.
6" DIP Watermain, Cl. 52
L.F.
240
$12.00
$2,880.00
2.
8" DIP Watermain, Cl. 52
L.F.
1,729
19.00
25,935.00
3.
6" R.S. GateValve & Box
Each
1
375.00
375.00
4.
8" R.S. Gate Valve & Box
Each
4
475.00
1,900.00
5.
Fittings Less than 10"
Lb.
900
1.50
1,350.00
6.
Fire Hydrant
Each
3
1,025.00
3,075.00
7.
Salvaged Fire Hydrant
Each
1
700.00
700.00
8.
1" Copper Service
L.F.
1,671
6.00
10,026.00
9.
1" Corporation
Each
36
30.00
1,080.00
10.
1" Curb Stop & Box
Each
36
65.00
2,340.00
11.
Connect to Existing Watermain
Each
2
200.00
400.00
12.
Insulation
Bd. Ft.
128
1.25
160.00
Subtotal
$50,221.00
+10% Contingencies
4,779.00
Estimated Construction Cost
55,000.00
30% Overhead & Engineering
16,000.00
Total Estimated Cost
$71,000.00
•
0
E7
Estimate of Cost
Storm Sewer
i West Ridge 4th Addition
City Project No. 223
Rosemount, Minnesota
s
Unit
Total
•
Item No. Description
Unit
Qty.
Price
Price
L
12" RCP, Cl. IV
L.F.
118
$17.00
2,006.00
2.
15" RCP, Cl. III
L.F.
225
19.00
4,275.00
3.
21" RCP, Cl. IV
L.F.
760
24.00
18,240.00
4.
Manhole, Type B
L.F.
76
125.00
9,500.00
5.
Catch Basin, Type X
L.F.
21
125.00
2,625.00
6.
Catch Basin, Type Y
L.F.
6
140.00
840.00
7.
R-1733 Manhole Casting
Each
5
150.00
750.00
8.
R-3067 Catch Basin Casting
Each
6
225.00
1,350.00
9.
R -2561A Catch Basin Casting
Each
2
225.00
450,00
10.
Connect to Existing Sewer
Each
2
300.00
600.00
11.
Straw Bales
Each
40
6.00
240.00
12.
Silt Fence
L.F.
300
3.00
900.00
Subtotal
$41,776.00
+10% Contingencies
4,224.00
Estimated Construction Cost
46,000.00
30% Overhead & Engineering
14,000.00
i
Total Estimated Cost
$60,000.00
i
•
Estimate of Cost
Street Construction
West Ridge 4th Addition
City Project No. 223
Rosemount, Minnesota
•
�1
U
Unit
Total
•
Item No. Description
Unit
Qty.
Price
Price
1.
Common Excavation
C.Y.
1,000
$1.75
$1,750.00
2.
Granular Borrow (LV)
C.Y.
1,000
3.00
3,000.00
3.
Subgrade Preparation
R.S.
20
100.00
2,000.00
4.
Test Rolling
R.S.
20
40.00
800.00
5.
Agg. Base Placed, C1.5
C.Y.
1,312
10.00
13,120.00
6.
Binder Course Mixture, Type 31
Ton
609
15.00
9,135.00
7.
Bituminous Material for Tack Coat
Gal.
340
1.35
459.00
8.
Wearing Course Mixture, Type 41
Ton
609
19.00
11,571.00
9.
Adjust Gate Valve Box
Each
4
100.00
400.00
10.
Adjust Frame & Ring Casting
Each
10
175.00
1,750.00
11.
4" Concrete Walk
S.F.
8,900
1.75
15,575.00
12.
Concrete Curb & Gutter, Des. D418
L.F.
3,390
5.50
18,645.00
13.
Salvaged Permanent Barricades
L.F.
32
25.00
800.00
14.
Salvaged Topsoil
C.Y.
600
2.50
1,500.00
15.
Topsoil Borrow
C.Y.
150
7.50
1,125.00
16.
Seeding
Acre
1.5
1,000.00
1,500.00
17.
Mulch w/Disk Anchoring
Acre
1.5
700.00
1,050.00
18.
Wood Fiber Blanket
S.Y.
200
2.50
500.00
Subtotal
$84,680.00
+10% Contingencies
8,320.00
Estimated Construction Cost
93,000.00
30% Overhead & Engineering
28.000.00
Total Estimated Cost
$121,000.00
•
�1
U
0
Core Cost Calculations
West Ridge 4th Addition
City Project No. 223
Rosemount, Minnesota
s
Unit Costs
The core costs are calculated using the differential unit costs of the core
facilities from the standard
residential facilities, and are based on the following estimated unit costs:
Unit
Description
Unit
Price
Sanitary Sewer
8" PVC, 10'-15' Deep
L.F.
$13.00
10" DIP, 20'-25' Deep
L.F.
35.00
Excess Depth Standard Manhole L.F.
70.00
Manhole Drop Section
L.F.
125.00
8" x 4" PVC Wye
Each
35.00
10" x 4" DIP Tee
Each
200.00
4" PVC Service
L.F.
6.00
4" DIP Riser
L.F.
15.00
---------------------------------------------------------------
---------------------------------------
-------------
Storm Sewer
15" RCP, Cl III
L.F.
19.00
18" RCP, Cl III
L.F.
21.00
21" RCP, C1 III
L.F.
23.00
21" RCP, C1 IV
L.F.
24.00
Manhole, Type B
L.F.
125.00
R1733 Manhole Casting
Each
150.00
0
0
Core Cost Calculations
West Ridge 4th Addition
0 City Project No. 223
Rosemount, Minnesota
s
i
•
•
Sanitary Sewer
Unit Total
Item No. Description Unit Qty. Price Price
1. 10" DIP 20'-25' vs 8" PVC 10'-15'
2. Excess Depth Standard Manhole
3. Manhole Drop Section
4. 10"x4"DIP Tee vs. 8"x4"PVC Wye
5. 4" PVC Service
6. 4" DIP Riser
Subtotal
+10% Contingencies
Estimated Construction Cost
30% Overhead & Engineering
Total Estimated Cost
L.F.
953
$22.00*
$20,966.00
L.F.
65
70.00
4,550.00
L.F.
27
125.00
3,375.00
Each
15
165.00*
2,475.00
L.F.
-175
6.00
-1,050.00
L.F.
250
15.00
3,750.00
21" RCP, Cl. IV vs. 18" RCP, Cl. III
L.F.
170
$34,066.00
510.00
4.
21" RCP, Cl. IV vs. 21" RCP, Cl. III
2,934.00
163
1.00*
163.00
37,000.00
Manhole, Type B
L.F.
38
11,000.00
4,750.00
6.
R 1733 Manhole Casting
$48,000.00
Storm Sewer
* Unit Price is a Differential
Unit
Total
Item No. Description
Unit
Qty.
Price
Price
1.
21" RCP, Cl. IV
L.F.
146
24.00
3,504.00
2.
21" RCP, Cl. IV vs. 15" RCP, Cl. III
L.F.
278
5.00*
1,390.00
3.
21" RCP, Cl. IV vs. 18" RCP, Cl. III
L.F.
170
3.00*
510.00
4.
21" RCP, Cl. IV vs. 21" RCP, Cl. III
L.F.
163
1.00*
163.00
5.
Manhole, Type B
L.F.
38
125.00
4,750.00
6.
R 1733 Manhole Casting
Each
1
150.00
150.00
Subtotal
$10,467.00
+10% Contingencies
1,533.00
Estimated Construction Cost
12,000.00
30% Overhead & Engineering
4,000.00
Total Estimated Cost
$16,000.00
* Unit Price is a Differential
;fir '
4t k %
FEASIBILITY REPORT
FOR
SHANNON HILLS THIRD ADDITION
UTILITIES AND STREET IMPROVEMENTS
CITY PROJECT NO. 225
ROSEMOUNT, MINNESOTA
OSM Project No. 4869.04
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that I am
a duly Registered Professional Engineer under the laws of the
State of Minnesota.
e. . 04'w'�
Henry C. Osmundson, P.E.
Date: February 4, 1992 Reg No. 19156
SHANNON HILLS THIRD ADDITION
UTILITIES AND STREET IMPROVEMENTS
CITY PROJECT NO. 225
ROSEMOUNT, MINNESOTA
TABLE OF CONTENTS
TITLE PAGE
CERTIFICATION
TABLE OF CONTENTS
LETTER OF TRANSMITTAL
PAGE NO,
EXECUTIVE SUMMARY
i
PART 1 - INTRODUCTION
1
1.1 Authorization
1
1.2 Scope
1
1.3 Data Available
1
PART 2 - GENERAL BACKGROUND
2
2.1 Location
2
2.2 Project Area
2
!
2.3 Existing Conditions
2
PART 3 - PROPOSED IMPROVEMENTS
3
3.1 Sanitary Sewer
3
3.2 Watermain
3
3.3 Storm Drain
3
3.4 Street Construction
3
3.5 Sidewalk
4
3.6 Street Lighting
4
3.7 Permits
4
3.8 Right -of -Way and Easements
4
Table of Contents - Continued
PART 4 - FINANCING
4.1
Cost Estimate
4.2
Assessment Area
4.3
Cost Recovery
PART 5 PROJECT SCHEDULE
DRAWING
No. 1
Project Location Map
'j No 2
Sanitary Sewer Construction
No. 3
Watermain Sewer Construction
No. 4
Storm Sewer Construction
No. 5
Street Construction
APPENDIX
Preliminary Cost Estimate
February 4, 1992
Honorable Mayor and Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: Utilities and Street Improvements
Shannon Hills Third Addition
City Project No. 225
Rosemount, Minnesota
OSM Project No. 4869.00
Dear Mayor and Council;
Enclosed is the Feasibility Report for the Shannon Hills Third Addition Utility and Street
Improvements, City Project No. 225. This report addresses the sanitary sewer, watermain,
storm drain and street necessary for the area.
We would be happy to discuss this report with you at your convenience. Please call if you
have any questions.
Respectfully,
ORR-SCHELEN-MAYERON
& ASSOCIATES, INC.
Bud Osmundson, P.E.
Associate
/cmw
0127hm&c
Enclosure
EXECU'!'[VE S.
City Project No. 225 provides for the installation of city utilites and streets in the Third
Phase of the Shannon Hills Planned Unit Development in western Rosemount. The project
includes the installation of sanitary sewer, watermaut, storm drain, and street lighting`
facilities plus the construction of the streets and a sidewalk within the Third Addition. The
grading of the area will be completed by the developer under a private contract. The
impetus for the project was a petition from the developer, Ground Development.
The project is feasible from an engineering standpoint. This Feasibility Report proposes the
construction of approximately 1,660 lineal feet of sanitary sewer, 1,750 feet of watermain,
1,490 feet of storm drain, and 1,750 feet of street construction to provide service to 26
residential lots. The total estimated project cost is $344,400. The funding for the project
will totally come from assessments to the benefitted property.
The project construction can be initiated in May, 1992 with construction substantially
complete in June, 1992.
1.0
1.1
1.2
1.3
RODUCTI4N
Authorization - On January 7, 1992, the Rosemount City Council authorized the
preparation of an Engineering Feasibility Report for Public Utilities and Street
Construction for the Shannon Hills Third Addition. This project has been
designated as City Project No. 225. The Developer submitted a petition for
these improvements, which constituted 1100% of the benefitted property.
Scope This project provides for the construction of utilities and streets in the
Shannon Hills Third Addition in western Rosemount. Sanitary sewer,
watermain, storm drain, street, sidewalk, and street light facilities will be
provided to the Third Addition. The Developer, Ground Development, is
responsible for the site grading in the Third Addition, which will be competed
prior to the construction of the utilities and street examined in this report.
Data Available - Information and materials used in the preparation of this
report include:
♦ City of Rosemount Record Plans.
♦ Comprehensive Water System Pian, October, 1988.
Comprehensive Storm Water Drainage Plan, West Drainage Area,
May, 1989
♦ Shannon Hills PUD Preliminalry Plat and Preliminary Grading Plan.
♦ Construction Plans from the Shannon Hills Second Addition, City
Project No. 216.
1
2.0 GENERAL BACKGROUND
2.1 Location - The project is located in the southwest quarter of the northeast
quarter of Section 30, adjacent to and west of the Carrollton Addition, and
adjacent to and north of Shannon Hills First and Second Additions. The project
location is shown on the Location Map, Drawing No. 1, at the end of this
report.
2.2 Project Area - The Shannon Hills Third Addition consists of 26 single-family
residential lots, plus dedicated street right-of-way and an outlot. The Shannon
Hills Planned Unit Development consists of 75 acres of single-family residential
lots. The Shannon Hills First and Second Additions are immediately south of
the Third Addition. The Second Addition was constructed in 1991 and provides
utility access for the Third Addition. The project area is currently zoned R-1.
2.3 Existing Conditions - The project area is currently used for agricultural
purposes.The terrain is primarily rolling grassland. The area generally slopes
and drains from the north to the southwest to a wooded ponding area.
2
3.0 PROPOSED IMPROVEMENTS
3.1 Sanitary Sewer - The proposed project will provide sanitary sewer service to the
Shannon Hills Third Addition, plus extensions to the future Shannon Hills
Additions to the north. The proposed 8" PVC gravity dines will generally flow
from the west to the east, then south to the existing extension provided in the
Shannon Hills Second Addition. Four inch services will be provided to the lots
within the Third Addition. The proposed sanitary sewer facilities are shown on
Drawing No. 2.
3.2 Watermain - The proposed watermain facilities are shown on Drawing No. 3.
The proposed project will provide water service to the 'Third Addition, plus
extensions to the future Shannon Hills Additions to the north. A 6 watermain
will be extended to the east on proposed 143rd Street West from an existing b"
hydrant lead located on Shannon Parkway. An 8" watermain will be extended
north from an existing extension in the Second Addition within Cobler Avenue.
A 6" watermain will also be provided on the proposed cul-de-sac, Crofton Court.
The proposed facilities include 1" services to each of the lots. Hydrants will be
spaced accordingly for a residential area.
3.3 Storm Drain - The proposed storm drain facilities are shown on Drawing No.
4. The proposed storm drain facilities will generally drain the proposed
subdivision from east to west to a detention pond near Shannon Parkway. The
proposed piping ranges in size from 12" to 24" diameter. An overland overflow
drainage swale is necessary between Lots 6 and 7, Block 2, at the low point on
143rd Street West, which shall be completed under the grading contract. The
outlet for the detention pond was constructed in the Shannon Hills First
Addition Project. In accordance with the City policy, all storm drain facilities
are sized to transport runoff from a 10 year storm event and all ponding areas
and outlet sewers are sized for a 100 year storm event.
3.4 Street Construction - The proposed str
proposed streets will be constructed to
street. The street section will consist of
3
:s are shown on Drawing No. 5. The
ty standards which call for a 3T wide
of bituminous courses and 6" of Class'
5 Aggregate Base, based on the soils information known at this time. The street
will be flanked by surmountable concrete curb and gutter. The street section
design and cost estimate are based on the assumption that an acceptable
subgrade is provided by the grading operation, for which the Developer is
responsible. A small amount of sodding and seeding blanket are provided in
this project for erosion control.
3.5 Sidewalk - An 5' wide concrete walk isproposed to be constructed within the
Shannon Hills Third Addition along the south side of 143rd Street and along the
east side of Cobbler Avenue for approximately 1,460 L.F. This trail will
ultimately connect Carrolls Woods Park with the Shannon Parkway Trail.
3.6 Street Lighting - The proposed lighting units are the Type "A" units which are
15 feet high poles ' with post top mounted fixtures. The feed points and
connector runs will also be installed. The local electric utility in this project
area is Northern States Power Company, which will install all of the electric
utilities for this project under a separate contract with the developer.
3.7 Permits - Permits will be required for this project from the Minnesota
Department of Health for watermain extensions and the Minnesota Pollution
Control Agency for sanitary sewer extensions. Approval of the sanitary sewer
plans is also required by the Metropolitan Waste Control Commission.
3.8 Right-of-Way and Easements The 60' right-of-way and all necessary easements
are anticipated to be dedicated by the Developer on the final plat. The majority
of the facilities are located within the'; right-of-way except the storm drain
facilities north and south of Crofton Court. These facilities will require 20' wide
easements centered on the common lot lines between Lots 5 and 6 of Block 1,
and Lots 9 and 10 of Block 2. In addition, a ponding and drainage utility
easement will be required in the rear yard areas of Lots 9 through 13 of Block
2.
FINANCING
4.1 Cost Estimate - A detailed Cost Estimates can be found in the Appendix. The
following estimates are based on 1991 construction costs and include a 10%
contingency factor and all related administrative costs. The administrative costs
are estimated at 30% and include leg al, engineering, interest, and other
administration. A summary of these costs are as follows:
4.2
A. Sanitary Sewer ...... ... ....... . $ 51,200
B. Sanitary Sewer Services • . .... 20,600
C. Watermain ................... .... 61,900
D. Water Services ... . .. ...... ..................... 199500
E. Storm Drain ................. ..... 80,000
F. Street ...................... ... ..... . ..... 86,400
G. Sidewalk ................ . . . 15,600
H. Street Lights ... ........ .. .. .. ..... .... 9.200
TOTAL PROJECT COST .............. , $.3A4AN
Assessment Area - The following parcels of sand are located within the
project and assessment area:
Shannon Hills Third Addition:
Block 1, Lots 1 through 9
Block 2, Lots 1 through 13
Block 3, Lots 1 through 4
Total of 26 Lots
4.3 Cost Recovery
4.3.1 Asse5sment -'The sanitary sewer, watermain, storm drain, street
light, sidewalk, and street construction proposed for the Shannon
Hills Third Addition is regarded as residential equivalent sizing
and therefore will be 100% assessable toward the benefitted lots
included in the Third Addition.
The total estimated project cost for the Third Addition is
$344,400, which, if spread over the 26 lots produces an estimated
5
5.4 PROJECT SCHEDULE
The proposed schedule for this improvement is as follows:
Receive Feasibility Report . ...... .. ........
February 4, 1992
Public Hearing/Order Plans & Spees ...........
February 18, 1992 -
Receive Plans and Spees .......... .. . .............
March 17, 1992
Bid Opening ...... ............ .... .. ...
April 24, 1992
Award Contract ........... .. ... . .... .....
.. May 5, 1992
Begin Construction ..... .... ...... ...............
May 15, 1992
Completion of Construction ... ... .. ................
July 1, 1992'
Assessment Hearing ..... ... . . .. . ......
.. Fall, 1992
First Payment with Real Estate Taxes ..... .. ...
.. May, 1993
7
c
i
a � �
r st
,at•t se
,Z
•
b
2 St
PROJECT
a r4
736 to St <> i D
D �
13irA. it � _ p ` •
1
A-
ct
r � •
�. • ' -
736.wt O� ri3alk® '
r'r c a„ '• 13
j
e > t/t•t ~– 40:2[•OYNT / at
C ►rq . ON �
iC.00a Or
a i tt � 16+A•i -
E I i 143r fT• W
C [ lt[
_ K so
��0 E
3 •• �otst�
p0. *481% 11 •
W
of
K
7
CiAM 42
0,c COUNT
t DA PLC'C.IeCL[
< 1 , it • 4 Ceti[[NT CIS CLC
C i i Ce•►(•r COVeT
�� • 4 wVq[•Y(.ui
t- t
e Cwt a[it0. W(.V(
154 a b C"V[LLC COV.t .0.,.
1 cl C 4M Ct U�. r[ COL—tP. w
cavw.erp
couwt <
t + t •.c. sro. .•T.
c——#1 T � Ca(stO•C [DV.?
sale .•. s
n c.oe [•. W(rut
r� it • •.r•s rDr wt.�[
Cf U I t ^ FY •tt♦ •r(wu(
eM I t4 •p.OW. •r[ .a.[
7tA 1571% G
r
to
•
t �OiA.t�Ot
f/••ta N
Drawn By Drawing Title Comm. No.
P.S.H. Orr
. LOCATION MAP 4869
0S%i=tes.1nc.n & SHANNON HILLS 3RD ADD.
Date- Sheet no.
Engineers a Arebitects . Planners s Surveyors CITY PROJECT NO.
1-2.92 2011 Last He•a.yha IGaa«s.iu.rH M413061:-3tt•saso C I TY OF ROSEMOUNT t
------
COBBLER AVENUE
W
W
CC
N
CR A�BEaRY
z
WAY J o
w
Z
CC
ro z a
o a
0
o
a_
Li
S•
Z
0
z
Z�
Y � to
N
1
SHANNON PARKWAY_
---------------------------------
Drown BY: Drowing Title Comm. No.
P.S.H. Orr
SANITARY SEWER CONSTRUCTION 4889
Mayeron & SHANNON HILLS 3RD ADD.
Dote: CAX Associates, Inc. Sheet no.
Engineers a Arcbitects a Planners • surveyors CITY PROJECT NO.
1-2-92 U21 rt
8eaa.pla A.aatta 0 11isD"pslis. YN 55413 . 41:-331.9660 CITY OF R OS E MOUN T 2
r
I+f n:
.
COBBLER
1a
AVENUE'
....�
--------- -
ttl
N
W
f�
h
N
CRAN$ERR`i
V) z
J O
WAYz
o
«�
o
o Q
z
M
z
Q z
m
Q
04
z
O
i—
Q
S
LA
LL-
cwt
A"
FUTURE STORM SEWER
0.
�.
Q
z
Q
10,
z
S
N
V)
.-
~SHANNON
-----------_—
'�
PARKWAY
-----------------------------------
Drawn By:
Drawing
Title
Comm. No.
P.S.H.
Orr
STORM
SEWER
CONSTRUCTION
4869
Date:
ltayeron &
Associates. Inc.
SHANNON
HILLS 3RD ADD.
Sheet no.
Engineers a Arcbitects a Planners • Surveyors
CITY PROJECT NO.
1-2-92
2021 U -t Hennepin Avenue a Minneapolis. JIM awls a 612.331.OM
CITY OF
ROSEMOUNT
4
COBBLER
AVENUE
60' R.O.W.
N
a LEGEND:
PROPOSED STREET -PAVING
(32' B --S)
cRANBERR�!
wi DESIGN D412 CONCRETE
C & G
PROPOSED CONCRETE WALK
W A�
to z
J O
M
4
Z p
.—
. Q
Z
Z
Z
2 N
O
_
o
S
32' STREET B -B
Li
^
o
r
�
to
z
o
Z
O
Z Q
z
"
SHANNONPARKWAY
Drown
Drawn By
Drawing Title
Comm. No.
P.S.H.
schelen
STREET CONSTRUCTION
4869
ltayeron &
Associates. Inc.Sheet
SHANNON HILLS 3RD ADD.
no.
Date:
Engineers • Arebitects • Planners a surveyors
CITY PROJECT NO.
5
-2-922
2021 fad H.ss.pin Avon** 0 Yfaoeepotie.UN 55413 41 412.331.OM
CITY OF ROSEMOUNT
PRELIMINARY COST ESTIMATE
SHANNON HILLS 3RD ADDITION
STREET AND UTILITY IMPROVEMENTS
ROSEMOUNT, MINNESOTA
CITY PROJECT NO. 225
OSM PROJECT NO. 4869.00
Item No. Item
o nce
Unit
uaatity
nit Mee
A. SANITARY SEWER
1 Connect to Existing 8" Cleanout
Each
1 $
250.00 $
250.00
2 8" PVC SDR 35 Sanitary Sewer
I.F.
1660
15.00
24,900.00
3 4' Diameter Manhole (0'-1(Y)
Each
8
1,000.00
8,000.00:
4 Excess Manhole Depth
LF.
5
100.00
500.00
5 8" PVC Cleanout
Each
1
100.00
100.00
6 8" x 4" PVC Sewer Wye
Each
26
50.00
1,3W.00
7 Rock Trench Stabilization
Ton
75
11.00
825.00
Total
$
35,875.00
+ 10% Contingencies
3,525.00
Estimated Total Construction Cosi
$
39,400.00
+30% Legal, Engineering, Administrative
11,800.00
and Financing
ESTIMATED TOTAL SANITARY SEWER PROJECT COST
$
51,200.00
B. SANITARY SEWER SERVICES
8 4" PVC SDR 35 Service Pipe
L.F.
1200
12.00 $
14,400.00
Total
$
14,400.00
+ 10% Contingencies
1,440.00
Estimated Total Construction Cost
$
15,840.00
+30% Legal, Engineering, Administrative
4,760.00
and Financing
ESTIMATED TOTAL SANITARY SEWER SERVICE PROJECT COST $
20,600.00
a PRELIMINARY COST ESTIMATE
SHANNON HILLS 3RD ADDITION
STREET AND UTILITY IMPROVEMENTS
ROSEMOUNT, MINNESOTA
CITY PROJECT NO. 225
' OSM PROJECT NO. 4869.00
Item No. Item
Unit
cant !j
Unit
Total Fn'ce
C. WATERMAIN
9 Connect to Existing Stub
Each
1 $
500.00
$
500.00'
10 6" DIP, Class 52 Watermain
LF.
1340
18.00.
24,120.00
11 8"DIP, Class 52 Watermain
LF.
360
20.00
7,200.00
12 6" Gate Valve and Box
Each
8
400.00
3,200.00
13 8" Gate Valve and Box
Each
1
500.00
500.00
14 Hydrant
Each
4
1,100.00
4,400.00
15 6" DIP Hydrant Lead
LF
50
25.00
1,250.00
16 Fittings
Lbs
1700
1.20
2,040.00
Total
$
43,210.00
+ 10% Contingencies
4,390.00'
Estimated Total Construction Cost
$
47,60ik00'
+301/o Legal, Engineering, Administrative
14,3W.00
and Financing
ESTIMATED TOTAL WATERMAIN PROJECT COST
$
61,900.00
D. WATERMAIN SERVICES
17 1" Corp. Cocks
Each
26 $
55.00
$
1,430.00
18 1" Curb Stop and Box
Each
26
100.00
2,600.00
19 1" Copper Service Pipe
LF
1200
8.00
9,600.00
' Total
$
13,630.00
+10% Contingencies
11360.00
Estimated Total Construction Cost
$
14,990.00
+30% Legal, Engineering, Administrative
4,510.00
and Financing
ESTIMATED TOTAL WATERMAIN SERVICES
$
19,500.00
PRELIMINARY COST ESTIMATE
SHANNON HILLS 3RD ADDITION
STREET AND UTILITY IMPROVEMENTS
ROSEMOUNT, MINNESOTA
CITY PROJECT NO. 225
OSM PROJECT NO. 4869.00
Item No.
Item
Unit
Quantity
Unit Price
-Total Price
E. STORM DRAIN
20
12" RCP, Class V, St. Sewer
LF.
115 $
21.00
$
2,415.00
21
15" RCP, Class V, St. Sewer
L.F.
390
22.00
81580.00
22
18" RCP, Class III, St. Sewer
L.F.
525
23.00
12,075.00
23
21" RCP, Class III, St. Sewer
L.F.
280
26.00
7,280.00
24
24" RCP, Class III, St. Sewer
L.F.
180
30.00
5,400.00
25
24" RCP, FES w/TG
Each
1
1,200.00
1,200-00
26
Catch Basin Type A
Each
7
800.00
5,600.00
27
Catch Basin Type B
Each
7
850.00
5,95000
28
5' Diameter Catch Basin/Manhole
Each
1
1,100.00
1,100.00
29
4' Diameter Manhole
Each
6
1,000.00
6,000.00
30
Grouted Rip Rap (incl. filter fabric)
CY.
5
60.00
300.00
Total
$
55,900.00
+ 10%d Contingencies
5,600.00
Estimated Total Construction Cost
$
61,500.00
+30% Legal, Engineering, Administrative
18,500.00
and Financing
ESTIMATED TOTAL STORM DRAIN
$
80,000.00
F. STREETS
31
Subgrade Preparation
R.S.
17.5 $
100.00'
$
1,750.00
32
Aggregate Base, Class 5
Ton
2500
5.00
12,500.00
33
Type 31- Bituminous Base Course
Ton
515
18.00
9,270.00
34
Type 41- Bituminous Wear Course
Ton
515
20.00
10,3(10.00
35
Bituminous Material for Tack Coat
Gal
290
1.20
348.00
36
Concrete Curb & Gutter D418
L.F.
3500
5.00
17,500.00
37
Seed w/Mulch & Fertilizer
Acre
0.5
1,500.00
750.00
38
Sodding
S.Y.
4000
2.00
81000.00
Total
$
60,418.00
+10% Contingencies
6,082.00
Estimated Total Construction Cost
$
66,500.00
+30% Legal, Engineering, Administrative
19,900.00
and Financing
ESTIMATED TOTAL STREET PROJECT COST
$ 86,400.00
PRELIMINARY COST ESTIMATE
SHANNON HILLS 3RD ADDITION'
STREET AND UTILITY IMPROVEMENTS
ROSEMOUNT, MINNESOTA
CITY PROJECT NO. 225
OSM PROJECT NO. 4869.00
Total Pn'ce
Item No. Item Unit uantitq
Unit SnMe
G. SIDEWALK
39 4" Concrete Walk S.F 7300 $
1.50 $
10,950.00
'
Total
$
10,950.00
+ 10% Contingencies
1050.00
Estimated Total Construction Cost
$
12,000.00
+30% Legal, Engineering, Administrative
3,600- 00
and Financing
$
15,600.00
ESTIMATED TOTAL SIDEWALK PROJECT COST
'
H. STREET LIGHTS
40 Street Lights - Type A, wired complete Each 4 $
1,900.00 $
7,600.00
in place
Total
$
7,600.00
+ 101016 Contingencies
760.00
Estimated Total Construction Cost
$
81360.00
+30% Legal, Engineering, Administrative
840.00
and Financing
ESTIMATED TOTAL STREET LIGHT PROJECT COST
$
9,200.00
PROJECT COST
A. Sanitary Sewer
$
51,200.00
'
B. Sanitary Sewer Services
$
20,600.00
C. Watermain
$
61,900.00
D. Watermain Services
$
19,500.00
'
E. Storm Drain
$
80,000.00
F. Streets
$
86,400.00
G. Sidewalk
$
15,600.00
H. Street Lights
$
9,200.00
TOTAL PROJECT
$
344,400.00
NATURAL GAS SERVICE AREA
,
rn-
, ' i • '
w
, I
R15Nxi
w
It
`• >i { � -� j _ ��,�I� �- � it y � .. ',
" I ;
PN f
I IA (o)
' a
7.�5
i
44
MT
T-11
i. `. .__^_____: _♦ i , .__— - - - -__ -- - - -—_ itiil'. qi r _ _. ,Esq _�_� I,
A .
UNIVER _.. , MINNESQTA i -- -
+. , �1 s ? { r 3�:� ve il. •+ AGRICULTURAL
ROSEMOUNT -
---
,
7 d y
r r r
EXPERIAAENT
•' 3 s � � RE ARCH
MINNEQ CQ
- �rENTER -.
j
�-. -• � STATION � ii � � �f ; !f��)�I�,llr� � ') _- I � •
. _ _. ,. s i ,. •.. �� �: �� it
Lf)
W N
3 Ld 01
3 $ti WQ`
W N a'
cu
Q 0
Q
zZ A W
Q
W �N
_ W
q A F- to
� W Q
O W F-
�Lo F-4
u NW P--1 Q
H
N
W
3
H
s A W
W W
L7 Z
Q Z
f �
i P s { F1
C3
CY
. v f W
L. C3
p .y:
cy-
oy
u..:.......:...........................
V) ..; f-IR
UJI LA
00
CL W
...... 3
{,
■
T..... dza ,ot
o�
LA a- d 1 Q :
f M O
7!
S >pqV
......... o M j_Y ^.s
.-,
tU J
MU t IJ
-;;
...,...� p ..� qq
y.3... ,.,.,,..,w .. .,.._�:....,,,, .. ..,.;..... W
C) >
rte'. aco
F
L-3 Q I J
V
pq or
Ci
Q
,. r
Ln
1.3
N
N_
9v
# T£,
. .. .,,.. Q �. .. .:.,.. w...
W
Q
Y
X
F-
Nt
LO
M
w
<
cl
(]NJ
N
cu
o,
PP
z
►z
-i
Ld
ZO
............ ........................................
................
qN
CD
.... . . ..............
•
i
LO
Nt
LO
M
w
z
(]NJ
N
cu
o,
z
►z
-i
ZO
cu
qN
ED
W
W
1:3
C:l
ji <
ry♦PL4
Ow
D
LO
P4
Lai
A
Z
ww0
Ll-
p
0 Z
<
z
LZ
Li
F-
CL 0
CM Lj
_j
J
c
Ww
x
w
LLI <
L:) >
LU)
Ja-
P4
t .. . ...... ...... ...
P__4
... .................................
.
LLJ
... . .... .....
. .........
C3
(40)
Ld
Z
z
x
.Qf
z
2
3'N'n
r
M
oc
kD
4->
Ul
In
co
0)
1
%D
LO
Nt
w
z
ZO
u
ED
a- 13:
C:l
ry♦PL4
Ow
D
LO
(t.
D
A
>
—A
LA
t .. . ...... ...... ...
... .................................
.
.................
...........
... . .... .....
. .........
F—
C3
W
Z
Z
H
z
f
Li......
t y
irup
...
......
fJ,,Ln
LO °D
t...... N
.
'0 -T. u )@@ lVLO
�...,
-> . w _ .....: � a
Ps. f;
C3 s a
r ,
................................................. `V a M 0 €`r f
pq
Q1 cu 1...
LO
t,...�' w......
p4 .1 ...:.: y
LO f=
<. .i
LO�.. m
d'
C)
b' N
1141
c -Y)
lf)
ceW
a
W
V of
A�
3
m
LLJ
N
� y
aM
Z
E
AC3
A
¢ W
w
pt
W
A
O
Z
►Z- W
z
N
= v,
z
o
�
X
�
W
W
OL
W
QQ
a
p U
-,
1=4
H
:.
3
Q
F—
C3
W
Z
Z
H
z
f
Li......
t y
irup
...
......
fJ,,Ln
LO °D
t...... N
.
'0 -T. u )@@ lVLO
�...,
-> . w _ .....: � a
Ps. f;
C3 s a
r ,
................................................. `V a M 0 €`r f
pq
Q1 cu 1...
LO
t,...�' w......
p4 .1 ...:.: y
LO f=
<. .i
LO�.. m
d'
C)
b' N
1141
c -Y)
O V
/rV\ W
3
Z
A
W
1 i onto �
..........\
N
c
��-)od�:.
z
4�--9
►-,
x
N
t
`.......................................................
Lo
A
rr
�
\Y
L)
<
M
-----------
W
z
cr.,
9Ncu
A
2
Z
W�
W LO
V
Z
noe�� r j
Z
J
Q
�
3
0 A
_
y
A
Z
WLi
33
Li
_
Q
LL.Z
H
N
A
QL'
W
�"
W
�' �
N
W
1--1 M
F'Y
►Z-+
Z �
0
A
O
J
W
au°�
U
z
. ^
W
t-,
W
�y
J
00 P
:D
Q�
A
1
A U
W
W
W..
q
O V
/rV\ W
3
Z
A
W
1 i onto �
..........\
N
c
��-)od�:.
z
4�--9
►-,
x
t
`.......................................................
O
w
rr
�
\Y
L)
<
M
-----------
W
z
O V
/rV\ W
3
Z
A
W
1 i onto �
N
c
Q
H
►-,
x
t
O
w
\Y
W
A
Z
W LO
Z
noe�� r j
J
Q
�
3
0 A
_
Z
33
{
x
Z
W
C4
1--1 M
F'Y
Q
. ^
W
1
�
q
co
W
In
171
CD
U
•d-
10
xt
.:.,, .
�y
go
/L
La 01�
;r
p
°
�L�g
f(U
(� �y
LIJ
Lo N
_..._..
__...-_.. .......
�
M
La
q
LO
,....,
t")
€yj..:3