Loading...
HomeMy WebLinkAbout5.b. Receive Feasibility Report / Set Public Heating Shannon Hills 4th Addition Street & Utility Improvements, City Project #234CITY OF ROSEMOUNT EXECUTIVE SUbQRY FOR ACTION CITY COUNCIL MEETING DATE: July 7, 1992 AGENDA ITEM:Receive Feasibility/Set Public Hrg AGENDA SECTION: Shannon Hills 4th Addition Str & Utl Im #234 New Business - PREPARED BY: Buck. OsmundsonAGENDA ! I ! �11 A � � B City Engineer/Assistant Public Works Director ATTACMdENTS: Memo, Resolutions, Mailing List O Ys Public Hearing Notice, Feasibility Report i sf�.G-dt At the June 16, 1992 regular Council meeting Council received a petition and ordered a feasibility study for Shannon Hills 4th Addition Street & Utility Improvements, City Project #234. OSM Consulting Engineer firm has supplied the City with the necessary feasibility report. The project is feasible. Brian Bourassa' will -present and 'explain the feasibility report. Upon acceptance of the feasibility report, Stuff recommends setting a public hearing for the project for July 21, 1992 starting at 8:00 p.m. or as soon thereafter as possible. 3 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1992 - A RESOLUTION RECEIVING THE FEASIBILITY REPORT SHANNON HILLS 4TH ADDITION STREET & UTILITY IMPROVIIMENTS CITY PROJECT #234 WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota, construct certain improvements, to -wit: City Project #234, Shannon Hills 4th Addition Street & Utility Improvements, in the City as described in and in accordance with the feasibility report prepared by Orr-Schelen-Mayeron & Associates, Inc., Consulting Engineers; and WHEREAS, the City Council has been advised by the Consulting Engineers that said utility and street improvements, City Project #234, is feasible, and should best be made as proposed, and the Consulting Engineers' report to this effect has heretofore been received by Council, and filed with the City Clerk on July 7, 1992; and NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility report for City Project #234 and places it on file. ADOPTED this 7th day of July, 1992. ATTEST: Susan M. Walsh, City Clerk Motion by: Vote in favor: Vote against: 0 E. B. McMenomy, Mayor Seconded by: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1992 - A RESOLUTION CALLING FOR A PUBLIC HEARING SHANNON HILLS 4TH ADDITION STREET & UTILITY IMPROVEMENTS CITY PROJECT #234 WHEREAS, the City Council received the feasibility report and found the project feasible for Shannon Hills 4th Addition Street & Utility Improvements, City Project #234, on the 7th day of July, 1992; and WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public hearing on such improvements following mailed notice and two publications thereof in the official newspaper stating time and place of the hearing, the general nature of the improvement, the estimated costs thereof, and the area proposed to be assessed, in accordance with the law; and NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Rosemount, Minnesota, as follows: 1. A public hearing will be held at the time and place set forth in the Notice of Hearing attached hereto as Exhibit A to consider said proposed improvements. 2. The nature of the improvements, the estimated cost of each major portion thereof, and the areas proposed to be assessed therefor are described in the form of Notice of Hearing hereto attached. 3. The notice of said public hearing shall be in substantially the form contained in the notice hereto attached. 4. The City Clerk is hereby authorized and directed to cause notice of said hearing to be given two publications in the official newspaper. Said publications shall be one week apart, and at least three days shall elapse between the last publication and the hearing. Not less than ten days before the hearing the Clerk shall mail notice of the hearing to the owner of each parcel of land within the area proposed to be assessed as described in the notice. For the purpose of giving such mailed notice, owners shall be those shown to be such on the records of the County Auditor or, if the tax statements in the County are mailed by the County Treasurer, on the records of the County Treasurer. As to properties not listed on the records of the County Auditor or the County Treasurer, the Clerk shall ascertain such ownership by any practicable means and give mailed notice to such owners. ADOPTED this 7th day of July, 1992. ATTEST: Susan M. Walsh, City Clerk Motion by: Voted in favor: Voted against: Seconded by: E E. B. McMenomy, Mayor CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA PUBLIC NOTICE NOTICE OF PUBLIC HEARING ON IMPROVEMENTS SHANNON HILLS 4TH ADDITION STREET & UTILITY IMPROVEMENTS CITY PROJECT NO. 234 TO WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN, that the City Council of the City of Rosemount, Minnesota will meet at 8:00 o'clock p.m. or as soon thereafter as possible, Tuesday, July 21, 1992, in the Council Chambers of the City Hall, 2875 145th Street West, to consider the following improvements: Project #234 Shannon Hills 4th Addition Street & Utility Improvements The nature of improvements shall include the construction of curb and gutter, street surfacing, sanitary sewer, sanitary sewer services, watermain and water services, storm drain, sidewalk, street lights and restoration. The total estimated cost of said improvements is $241,700. The total assessment cost of said improvement is $241,700. The area proposed to be assessed for the foregoing improvements will generally be: Shannon Hills Fourth Addition: Block 1, Lots 1 through 14 Block 2, Lots 1 through 14 Block 3, Lots 1 through 12 Total of 30 Lots Such person(s) as desires to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral opinion will be considered. Dated this 7th day of July, 1992. BY ORDER OF THE CITY COUNCIL. Susan M. Walsh City Clerk City of Rosemount Dakota County, Minnesota MAILING LIST SHANNON HILLS 4TH ADDITION STREET & UTILITY IMPROVEMENTS CITY PROJECT NO. 234 PUBLIC HEARING: JULY 21, 1992 8:00 P.M. Ground Development Shannon Hills Fourth Addition 1550 Utica Ave S., Suite 485 Block 1, Lots 1 through 14 Mpls., Mn 55416 Block 2, Lots 1 through 14 Block 3, Lots 1 through 12 FEASIBILITY REPORT FOR SHANNON HILLS FOURTH ADDITION UTILITY AND STREET IMPROVEMENTS CITY PROJECT NO. 234 ROSEMOUNT, MINNESOTA OSM Project No. 4942.00 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Brian J. Bourassa, P.E. Date: June 25, 1992 Reg No. 21816 SHANNON HILLS FOURTH ADDITION UTILITY AND STREET IMPROVEMENTS CITY PROJECT NO. 234 ROSEMOUNT, MINNESOTA TABLE OF CONTENTS TITLE PAGE CERTIFICATION TABLE OF CONTENTS LETTER OF TRANSMITTAL PAGE NO, EXECUTIVE SUMMARY i PART 1 - INTRODUCTION 1 1.1 Authorization 1 1.2 Scope 1 1.3 Data Available 1 PART 2 - GENERAL BACKGROUND 2 2.1 Location 2 2.2 Project Area 2 2.3 Existing Conditions 2 PART 3 PROPOSED IMPROVEMENTS 3 3.1 Sanitary Sewer 3 3.2 Watermain 3 3.3 Storm Drain 3 3.4 Street Construction 3 3.5 Street Lighting 4 3.6 Permits 4 3.7 Right -of -Way and Easements 4 Table of Contents - Continued PART 4 FINANCING 5 4.1 Cost Estimate 5 4.2 Assessment Area 5 4.3 Cost Recovery 6 PART 5 - PROJECT SCHEDULE DRAWINGS No. 1 Project Location Map No. 2 Sanitary Sewer Construction No. 3 Watermain Construction No. 4 Storm Sewer Construction No. 5 Street Construction APPENDIX Preliminary Cost Estimate 7 Orr Schelen �CDMSA Mayeron & Associates, Inc. 2021 East Hennepin Avenue Minneapolis, MN 55413 June 25 1992 612-331-8660 FAX 331-3806 Engineers Architects Planners Honorable Mayor and Council surveyors City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: Shannon Hills Fourth Addition Utility and Street Improvements City Project No. 234 Rosemount, Minnesota OSM Project No. 4942.00 Dear Mayor and Council: Enclosed is the Feasibility Report for the Shannon Hills Fourth Addition Utility and Street Improvements, City Project No. 234. This report addresses the sanitary sewer, watermain, storm drain and street necessary for the area. We would be happy to discuss this report with you at your convenience. Please call me at 378-6380, if you have any questions. Sincerely, ORR-SCHELEN-MAYERON & ASSOCIATES, INC. PZ�L" ?6�t64AAJeL, Brian J. Bourassa, P.E. Project Manager dad Enclosure cc: Bud Osmundson, City of Rosemount Fyual opporlunav Emplover 1 IEXECUTIVE SUMMARY City Project No. 234 provides for the installation of city utilites and streets in the Fourth Phase of the Shannon Hills Planned Unit Development in western Rosemount. The project includes the installation of sanitary sewer, watermain, storm drain, and street lighting facilities plus the construction of the streets. The grading of the area will be completed by �f the developer under a private contract. The impetus for the project was a petition from the developer, Ground Development. The project is feasible from an engineering standpoint. This Feasibility Report proposes the construction of approximately 1,340 lineal feet of sanitary sewer, 1,460 feet of watermain, 370 feet of storm drain, and 1,460 feet of street construction to provide service to 30 residential lots. The total estimated project cost is $241,700. The funding for the project will come entirely from assessments to the benefitted property. The project construction can be initiated in September, 1992 with construction substantially complete in November, 1992. 1.0 INTRODUCTION 1.1 Authorization - On June 16, 1992, the Rosemount City Council authorized the preparation of an Engineering Feasibility Report for Public Utilities and Street Construction for the Shannon Hills Fourth Addition. This project has been designated as City Project No. 234. The Developer submitted a petition for these improvements, which constituted 100% of the benefitted property. 1.2 Scope - This project provides for the construction of utilities and streets in the Shannon Hills Fourth Addition in western Rosemount. Sanitary sewer, watermain, storm drain, street, and street light facilities will be provided to the Fourth Addition. The Developer, Ground Development, is responsible for the site grading in the Fourth Addition, which will be completed prior to the construction of the utilities and street examined in this report. 1.3 Data Available - Information and materials used in the preparation of this report include: ♦ City of Rosemount Record Plans. ♦ Comprehensive Water System Plan, October, 1988. ♦ Comprehensive Storm Water Drainage Plan, West Drainage Area, May, 1989 ♦ Shannon Hills PUD Preliminary Plat and Preliminary Grading Plan. ♦ Construction Plans from the Shannon Hills Third Addition, City Project No. 225. 1 t 2.0 GENERAL BACKGROUND 2.1 Location - The project is located in the southwest quarter of the northeast quarter of Section 30, adjacent to and west of the Carrollton Addition, and north of Shannon Hills Third Addition. The project location is shown on the Location Map, Drawing No. 1, at the end of this report. 2.2 Project Area - The Shannon Hills Fourth Addition consists of 30 single-family residential lots, plus dedicated street right-of-way and an outlot. The Shannon Hills Planned Unit Development consists of 75 acres of single-family residential lots. The Shannon Hills Fourth Addition is immediately north of the Third IAddition. The project area is currently zoned R-1. 2.3 Existing Conditions - The project area is currently used for agricultural purposes. The terrain is primarily rolling grassland. The area generally slopes and drains from the north to the south to Shannon Hills Third Addition. 7 1 3.0 PROPOSED IMPROVEMENTS 3.1 Sanitary Sewer - The proposed project will provide sanitary sewer service to the Shannon Hills Fourth Addition. The proposed 8" PVC gravity lines will generally flow from the northwest to the southeast, then south to the existing extension provided in the Shannon Hills Third Addition. Four inch services will be provided to the lots within the Fourth Addition with the exception of one lot which has been previously serviced by the Third Addition. The proposed a sanitary sewer facilities are shown on Drawing No. 2. 3.2 Watermain - The proposed watermain facilities are shown on Drawing No. 3. The proposed project will provide water service to the Fourth Addition, plus extensions to the future Shannon Hills Additions to the north. A 6" watermain will be extended from 143rd Street West and will connect to the existing 16" line along Shannon Parkway. A 6" watermain will also be extended to serve the proposed lots on Crocus Way and to provide for future additions to the north. The proposed facilities include 1" services to each of the lots. Hydrants will be installed throughout the project to provide adequate fire protection for the residential area. 3.3 Storm Drain - The proposed storm drain facilities are shown on Drawing No. 4. The storm drain facilities will generally drain the proposed subdivision from north to south and into the Shannon Hills Third Addition drainage system. The proposed piping ranges in size from 12" to 18" diameter. In accordance with the City policy, all storm drain facilities are sized to transport runoff from a 10 year storm event. 3.4 Street Construction - The proposed streets are shown on Drawing No. 5. The streets will be constructed to City standards which call for a 32' wide street. The street section will consist of 3" of bituminous courses and 6" of Class 5 Aggregate Base, based on the soils information known at this time. The street will be flanked by surmountable concrete curb and gutter. The street section design and cost estimate are based on the assumption that an acceptable subgrade is provided by the grading operation, for which the Developer is responsible. A small amount of sodding and seeding blanket are provided in this project for erosion control. 3.5 Street Lighting - The proposed lighting units are the Type "A' units which are 15 feet high poles with post top mounted fixtures. The feed points and connector runs will also be installed. The local electric utility in this project area is Northern States Power Company, which will install all of the electric utilities for this project under a separate contract with the developer. 3.6 Permits - Permits will be required for this project from the Minnesota Department of Health for watermain extensions and the Minnesota Pollution Control Agency for sanitary sewer extensions. Approval of the sanitary sewer plans is also required by the Metropolitan Waste Control Commission. 3.7 Right -of -Way and Easements - The 60' right-of-way and all necessary easements are anticipated to be dedicated by the Developer on the final plat. The majority of the facilities are located within the right-of-way except the storm drain facilities north of Crofton Court. These facilities will require 20'- wide easements centered on the common lot lines between Lots 2 and 3 of Block 3. 4 1 4.0 FINANCING 4.1 Cost Estimate - A detailed Cost Estimate can be found in the Appendix. The following estimates are based on 1992 construction costs and include a 10% contingency factor and related administrative costs. The administrative costs are estimated at 30% and include legal, engineering, interest, and other 0 administration. A summary of these costs are as follows: 4.2 Assessment Area - The following parcels of land are located within the project and assessment area: Shannon Hills Fourth Addition: Block 1, Lots 1 through 14 Block 2, Lots 1 through 4 Block 3, Lots 1 through 12 Total of 30 Lots 5 A. Sanitary Sewer ..................................... $ 45,900 B. Sanitary Sewer Services ............................... 25,100 C. Watermain........................................ 52,000 D. Water Services ..................................... 21,900 E. Storm Drain ....................................... 24,200 G. Sidewalk .......................................... 68,000 H. Street Lights ....................................... 4.600 T ECT COST TOTAL PROJECT ....... $241700 ........................ 4.2 Assessment Area - The following parcels of land are located within the project and assessment area: Shannon Hills Fourth Addition: Block 1, Lots 1 through 14 Block 2, Lots 1 through 4 Block 3, Lots 1 through 12 Total of 30 Lots 5 4.3 Cost Recovery 4.3.1 Assessment - The sanitary sewer, watermain, storm drain, street lights, and street construction proposed for the Shannon Hills Fourth Addition is regarded as residential equivalent sizing and therefore will be 100% assessable toward the benefitted lots included in the Fourth Addition. The total estimated project cost for the Fourth Addition is $241,700, which, if spread over the 30 lots produces an estimated assessment rate of $8,057 per lot. 4.3.2 Pending Assessments -There are no pending assessments against the project area at this time. 5.0 PROJECT SCHEDULE The proposed schedule for this improvement is as follows: Receive Feasibility Report/Set Public Hearing ................. July 7, 1992 Hold Public Hearing/Order Plans and Spec's ................ July 21, 1992 Accept Plans and Spec's/Order Ad for Bid .................. August 4, 1992 Bid Opening ....................................... August 28, 1 1992 Receive Bids/Award Contract ....................... September 15, 1992 Begin Construction ................................ September, 1992 Substantial Completion of Construction ................... November, 1992 Final Wear Course Installation ............................ June 1, 1993 Assessment Hearing ...................................... Fall, 1993 First Payment with Real Estate Taxes ........................ May, 1994 7 eOJm m X < J 4 I251A � o ST. v_ o Cr ¢ OR St�� �� C E 4 w m p3c� to V"Oo DOVERo r = 117111 C7. V. ° Cl l7etn ST 118th- sr. < C W w O t �N'VAN MAi i i Y DANBU�r m a 33 0 ° 1+ WAY 3 129t sr. �S1° 730tIt f �z ARO A rill* firs/ ST. W132n LA o 24711 oa 132nd ST. Cr RtOV R71V z h PROJECT "F DOMINICA WAY o AREA ¢ WOOD (I ft. w <p WAY DU tU1N UPPER o� ` rr CIA. 33 '35111 ST 136th STV. j filth ST. V. Oma tR a°� vt3j''1ST"v. DANVI(7� ; ROSEMOUNT e CONNEMARA TR. 000 Cr. I3bn C �� c • list" i� q 1990 POP. 8622 13 ?0 od-e S f . V .000 . a P TR. DUBLIN 9 DR. ti3 �< i ,< C0 ErN A M O MOND ` DR ` < WAY k �► Q Trai/et, ZM�*NE " Court < ` 74 Pn z < ET OAPTI'10U Up mss. 1 1st f1 70 I97nd ST V i a St - W DEARS y C v ' WN ROWD/ANON m DAVEnPUP jD�rN < S 4i PAIN CT. < x Q r.� 163rd S! 1r..� r dr�q�,N < < DULCUyE.9 p,P 33 o H t o YAY a UPPER 1t3r0 Sr. MAY �.p� l� I f 4-/ r - w ¢ 143RD SZ A- q < e `'11 o V. th ST. V .� �� + W x� TB. I4S/ ST. w ti i �I461 ST. < v y O W y N< W W< V y m > 77. ` w = ; 166th W LOWER /4714 ST. < YN i "ATNo r Z i o < m o < p < DO �, ST. 147t? < Sr. 73. ` o o ,_„ _ i DAM9r< °HT1 St ¢ 14J/h 51. UPPER 1471 <5f. aF!; 74 o < `'� < fc 1 �; P'1a ��� �l. it*th o 0 0 7� f = UPPER /48th ST. 76 L v V low( V W r�` a CT. COVER *I 14r/ h J3.J4N url► sr a UPPER � W J 6 > o� m e Q firth Cf 33 : �¢ + i 1<rinsT. W ' UPPER 147/"57. firth T )ser ST i� 0 ~ OJ 75 " w IS0/11 w / a O� > rsfst tf o` 71 tr Cz u t3 5Jrylst sr. : o < a j� 7113N R/IV 1•d Sr.o < 1 a r52nd = CARRo TIt, 81. CHRYSLER AVE. dBt' OEN furs. 55 Ix 82" CMORLEY AVE. °J ORC DRE SDS' �. ANVr�0 1S4THTQ " I`- 154/11 o O ' 83. UPPER 19TH CT. Y E o 84. CMEVELLE CT. ~ s C fSSI� n ST VT" V. Sr. V 155111 ST v. 85. CHARLESTON AVE. i C AVC w [O4 u e/A N 86. i49TM ST. w < ORNfIL/R. CT I56 th S, w "RN f EE TR Ch PA Drawn By: 6 Drawing Title Comm. No. r P.S.H. Orr LOCATION MAP 4942 Mayeron & SHANNON HILLS 4TH ADD. Date NO. 234 Associates, Inc. Sheet no. y Engineers •Architects • Planners • Surveyors CITY PROJECT 1 6-22- 92 2021 EAst Hennepin Avenue 0 1tln0eepOlis-MR 55413.612.331.6660 CITY OF ROSEMOUNT \ - / I SHANNON HILLS 3RD. ADDITION 143RD ST. W. EX. 8" P.V.C. Drawn By: Drawing Title Comm. No. P.S.H. Schelen SANITARY SEWER CONSTRUCTIONMayero 4942 n & Associates. Inc. SHANNON HILLS LLS 4TH ADD. DoteM)k Sheet no. Engineers • Architects • Planners a Surveyors CITY PROJECT NO. 234 6-22-92 2021 Eesl Hennepin Avenue • 1linaeapolis. YH !6413 0 612.331 -NO CITY OF ROSEMOUNT 2 Drawn By: Drawing Title Comm. No. P.S.H. Orr WATERMA I N CONSTRUCTION 4942 Mayeron & Associates, Inc. Engineers a Architects • Planners • Surveyors SHANNON HILLS 4TH ADD. CITY PROJECT NO -234 Date:(B)t Sheet no. 6-22-92 2021 bad N.onepla Avenue • Minneapolis. MN 55413 0 612-331.OW CITY OF ROSEMOUNT 3 Drawn By: Drawing Title P.S.H. Orr STORM SEWER CONSTRUCTION Mnyeron & SHANNON HILLS 4TH ADD. Dote Associates. Inc. Engineers o Arcbitects • Planners • Surveyors CITY PROJECT N 0. 2 3 4 6-22-92 2021 rAet Hennepin A•eaue 6 Nitneap0118.NN 55413 8 612•331•eaao CITY OF ROSEMOUNT Comm. No. 4942 Sheet no. 4 ' LEGEND: PROPOSED STREET PAVING (32' B -B) W/ DESIGN 5418 CONCRETE C 6 G 143RD ST. W. Drawing Title STREET CONSTRUCTION SHANNON HILLS 4TH ADD. CITY PROJECT N0.234 CITY OF ROSEMOUNT Comm. No. 4942 Sheet no. 5 32' STREET B -B ' TEMPORARY GRAVEL-._ CUL DE SAC ' O� c N - 9S 1 I I Q I - 2 — 13 1 ' � i l �RaNOERR� 1 1 3 t = tz t a it t � t SHANNON HILLS 3RD. ADDITION r Drown By ' P.S.H. Orr Mayeron & (B)cAssociates, Dote Inc. Engineers a Architects a Planners a Surveyors ' 6-22-92 2021 Et Heaaepio Avenue 0 Yinneepotis. YH 53413 0 alt-331.SW 143RD ST. W. Drawing Title STREET CONSTRUCTION SHANNON HILLS 4TH ADD. CITY PROJECT N0.234 CITY OF ROSEMOUNT Comm. No. 4942 Sheet no. 5 u PRELIMINARY COST ESTIMATE SHANNON HILLS 4TH ADDITION STREET AND UTILITY IMPROVEMENTS ROSEMOUNT, MINNESOTA CITY PROJECT NO. 234 OSM PROJECT NO. 4942.00 Item No. Item nrt uantity Unit Price Total Price A. SANITARY SEWER 1 Connect to Existing 8" Stub Each 1 $ 250.00 $ 250.00 ' 2 8" PVC SDR 35 Sanitary Sewer 3 4' Diameter Manhole (0'-10') L.F. Each 1340 10 15.00 1,000.00 20,100.00 10,000.00 4 Excess Manhole Depth L.F. 9 100.00 900.00 5 Rock Trench Stabilization Ton 75 11.00 825.00 Total $ 32,075.00 +10% Contingencies 3,208.00 Estimated Total Construction Cost $ 35,283.00 +30% Legal, Engineering, Administrative 10,617.00 and Financing ' ESTIMATED TOTAL SANITARY SEWER PROJECT COST $ 45,900.00 B. SANITARY SEWER SERVICES 6 4" PVC SDR 35 Service Pipe 7 8"x 4" PVC Sewer Wye L.F. Each 1340 29 12.00 $ 50.00 16,080.00 1,450.00 Total $ 17,530.00 + 10% Contingencies 1,753.00 Estimated Total Construction Cost $ 19,283.00 +30% Legal, Engineering, Administrative 5,817.00 ' and Financing ESTIMATED TOTAL SANITARY SEWER SERVICE PROJECT COST $ 25,100.00 u PRELIMINARY COST ESTIMATE SHANNON HILLS 4TH ADDITION STREET AND UTILITY IMPROVEMENTS ROSEMOUNT, MINNESOTA CITY PROJECT NO. 234 OSM PROJECT NO. 4942.00 Item No. Item Unit Quantity Unit Price Total Price C. WATERMAIN 8 Connect to Existing Stub Each 2 $ 500.00 $ 1,000.00 9 6" DIP, Class 52 Watermain L.F. 1456 18.00 26,208.00 10 6" Gate Valve and Box Each 7 400.00 2,800.00 11 Hydrant Each 3 1,100.00 3,300.00 12 6" DIP Hydrant Lead L.F. 50 25.00 1,250.00 13 Fittings Lbs 1500 1.20 1,800.00 Total $ 36,358.00 + 10% Contingencies 3,636.00 Estimated Total Construction Cost $ 39,994.00 +30% Legal, Engineering, Administrative 12,006.00 and Financing ESTIMATED TOTAL WATERMAIN PROJECT COST $ 52,000.00 D. WATERMAIN SERVICES 14 1" Corp. Cocks Each 29 $ 55.00 $ 1,595.00 15 1" Curb Stop and Box Each 29 100.00 2,900.00 16 1" Copper Service Pipe L.F. 1350 8.00 10,800.00 Total $ 15,295.00 + 10% Contingencies 1,530.00 Estimated Total Construction Cost $ 16,825.00 +30% Legal, Engineering, Administrative 5,075.00 and Financing ESTIMATED TOTAL WATERMAIN SERVICES $ 21,900.00 f. PRELIMINARY COST ESTIMATE SHANNON HILLS 4TH ADDITION STREET AND UTILITY IMPROVEMENTS ROSEMOUNT, MINNESOTA CITY PROJECT NO. 234 OSM PROJECT NO. 4942,00 Item No. Item Unit Quanhty mt Price Total Price ' E. STORM DRAIN 17 12" RCP, Class V, St. Sewer L.F. 30 $ 21.00 $ 630.00 ' 18 18" RCP, Class 3, St. Sewer 19 Connect to existing stub L.F. Each 338 1 22.00 250.00 7,436.00 250.00 20 Catch Basin Type A Each 1 800.00 800.00 21 4' Diameter Catch Basin/Manhole Each 6 1,000.00 6,000.00 ' 22 4' Diameter Manhole (0'-10') Each 1 1,000.00 1,000.00 23 4' Diameter Excess Depth L.F. 8 100.00 800.00 Total $ 16,916.00 + 10% Contingencies 1,692.00 Estimated Total Construction Cost $ 18,608.00 ' +30% Legal, Engineering, Administrative 5,592.00 and Financing ESTIMATED TOTAL STORM DRAIN $ 24,200.00 F. STREETS 24 Subgrade Preparation R.S. 14 $ 100.00 $ 1,400.00 25 Aggregate Base, Class 5 Ton 1800 5.00 9,000.00 26 Type 31- Bituminous Base Course Ton 400 18.00 7,200.00 ' 27 Type 41- Bituminous Wear Course Ton 415 20.00 8,300.00 28 Bituminous Material for Tack Coat Gal 250 1.20 300.00 29 Concrete Curb & Gutter S418 L.F. 2880 5.00 14,400.00 30 Seed w/Mulch & Fertilizer Acre 0.1 1,500.00 150.00 ' 31 Sodding S.Y. 3400 2.00 6,800.00 Total $ 47,550.00 ' +10% Contingencies 4,755.00 Estimated Total Construction Cost $ 52,305.00 ' +30% Legal, Engineering, Administrative 15,695.00 and Financing ESTIMATED TOTAL STREET PROJECT COST $ 68,000.00 f. PRELIMINARY COST ESTIMATE SHANNON HILLS 4TH ADDITION STREET AND UTILITY IMPROVEMENTS ROSEMOUNT, MINNESOTA CITY PROJECT NO. 234 OSM PROJECT NO. 4942.00 tem No. Item Unit Ouantitv Unit Price Total Price G. STREET LIGHTS 32 Street Lights - Type A, wired complete Each 2 $ 1,900.00 $ 3,800.00 in place Total $ 3,800.00 +10% Contingencies 380.00 Estimated Total Construction Cost $ 4,180.00 +10% Legal, Engineering, Administrative 420.00 and Financing ESTIMATED TOTAL STREET LIGHT PROJECT COST $ 4,600.00 PROJECT COST A. Sanitary Sewer $ 45,900.00 B. Sanitary Sewer Services $ 25,100.00 C. Watermain $ 52,000.00 D. Watermain Services $ 21,900.00 E. Storm Drain $ 24,200.00 - F. Streets $ 68,000.00 G. Street Lights $ 4,600.00 TOTAL PROJECT $ 241,700.00