HomeMy WebLinkAbout3.c. Community Center Arena UpdateCITY OF ROSE24OUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: June 2, 1992
AGENDA ITEM: Community Center Arena Update
AGENDA SBCTIONs
Depart. Heads Reports
PREPARED BY: Stephan Jilk, City Administrator
AGENDA i • � "
ATTACHKENTS: Operating Budgets, Lakeville Info
AF
Consistent with the direction given by council at the last c ncil meeting
city staff and consultants have completed several tasks relative to the
financial consideration of the proposed multi-purpose arena.
We have reviewed other city/organizations' operating data for arenas with.
similarities to our proposed facility.
We have also drafted our own operating budget for the proposed facility.
Our financial consultant has reviewed this information, along with the
information provided by Mr. Pederson and his committee members.
We have also been provided with information from the City of Lakeville
which has been working with the Lakeville School District and a citizens
group on a similar concept.
Attach6d are documents outlining the draft budget and a copy of the
information drafted by the Lakeville group. Mr. O'Neill will provide the
debt service information to Council at the June 2, 1992 meeting.
The proposed budget established by staff, being myself, Dave Bechtold,
Lisa Jost and Rick Cook, reflects our best estimate at these operating
expenses and revenues. It also reflects a sizeable net income from
operations without consideration for debt service.
As debt service is included there would be'a sizeable deficit. We have
listed several alternatives for providing the necessary subsidy if it is
needed. These alternatives are not recommendations but legal alternatives.
It is interesting to note that the Lakeville projections are similar and
would also require a similar subsidy along with other financing methods.
RECOMMENDED ACTION: None Recommended. Discussion needs to be focused
on the desire to move ahead knowing the options
on how to create the necessary cash flow.
If the council moves ahead the next step would-
be to order the completion of plans for the arena.
COUNCIL ACTION:
Rosemount Arena
Income / Loss Statement
(Estimated)
Income From Operations
Ice Time Sales
$238,000.00
Ww". 43C'-'
Skate Sharpening
$3,000.00
(net)
High School Games
$10,000.00
(net)
Concessions
$20,000.00
(net)
Vending
$5,000.00
(net)
Pro Shop
$1,000.00
(net)
Advertising in Arena
$10,000.00
Tournaments
$6,000.00
(net) (3)
Dry Floor Events
$15,000.00
(net)(5)
Dry Floor Use Other
$6,000.00
Summer Ice
$5,000.00
(net)
Total Income
From Operations
$319,000.00
Operating & Maintenance Expenses
Wages & Benefits
Manager
$20,000.00
(1/2 facility manager)
Assistant Manager
$25,000.00
Others
$51,920.00
(3 part time )
Insurance
$10,000.00
Building R & M
$40,000.00
(note 1 below)
Equipment R & M
$21,860.00
(note 2 below)
Gas
Electric„
Telephone
Water
Rubbish
$65,000.00
(all utilities combined)
Total Operating & Maintenance
$233,780.00
General & Office Expense
Accounting/Payroll
Advertising/Publications
Duses and Subscriptions
Licenses
Office Supplies
Travel and Seminars
Misc.
$10,000.00 (all above gen and office expense)
Total Operating, Maint and General $243,780.00
Income / Loss From Operations
Other Income/Expenses
Expenses
Debt Service
Income
Transfers - Banquet Facility
Port Authority
Contributions
Building Dep
Income / Loss For Year
$75,220.00
$154,000.00
$15,000.00 (profits from operation}
$29,780.00 (excess increments)
$14,000.00 (capitol cost reduction)
$20,000.00 (50% bldg Depreciation)
—478,780.00
$0.00
Note 1) Building depreciation is based on $2,000,000. construction
cost and,a useful life of 50 years.
Note 2) Equipment depreciation is based on a value of $437,000. and
a useful life of 20 years.
Refrigeration Unit
Heat Reclaimer
Elevator
Skate Tile
Dashers
Bleachers
Zamboni
Edger
Goals
sound system
Total Equipment
Depreciation
Equipment To Depreciate
$200,000.00
$20,000.00
$80,000.00
$15,755.00
$65,570.00
$10,000.00
$34,040.00
$750.00
$1,095.00
$10,000.00
$437,210.00
$21,860.50
MEMORANDUM
munnum:.........S.SS..SS SSFFF..S.:..'....S...............•.«..... ...SS:•S.......•S
.F•S...
pm!
SSLLS:SSFM
.... SSg i:m mSS.S.E:: SESLSSLS
SSLES..SLE.
TO: Mayor and Council Members
FROM: Dennis Feller
DATE: January 10, 1992
SUBJ: Ice Arena
ICE SNA
BACKGROUND
The Ice Arena Task Force has met periodically over the last
couple of years with the intent of eventually constructing:a
facility. The Committee is composed of representatives from the
Lakeville Community Corporation (LCC), Lakeville Hockey
Association (LRA), Independent School District No. 194 and the
City of Lakeville. City representatives include Council members
Lynette Mulvihill and Pat Harvey; City Administrator, Robert
Erickson and Finance Director, Dennis Feller.
A Finance Subcommittee was created in early 1991 for the purpose
of preparing realistic and detailed construction, debt service
and operating budgets. Regular attendees include Dick Aslesen,
Juran and Moody; David Johnston, LHA; Dan Mehleis, Ind. School
Dist. 194; Jim Morrow, LCC and Dennis Feller, City of Lakeville.
Construction of the building would require the City of Lakeville
to approve the issuance of bonds through a lease purchase
financing mechanism. The facility would be subleased to and
operated by the LCC with the primary revenues coming from ice
rental fees generated by the LHA and ISD No. 194. The LCC would
pledge revenues to pay for operations and debt service. The LHA
would also pledge $70,000 of pull tab revenues to help augment
the debt service payments.
Construction is anticipated to start in 1994 with completion in
August of the same year.
SITE PLAN AND BUILDING D ,SIGN COMMI'T'TEE
Robert Erickson, City Administrator; Bob Klecker, Polk
Architects; and Steve Bourba, Krause Andersen have met on
numerous occasions over the past several months to discuss the
site plans and building design.
The ice arena would be located near the northeast corner of
Ipava and Highway 50. The school district has agreed to donate
the land to the city for $1.00 and grade the site in conjunction
With the athletic field construction project in 1992. The
school also has agreed to pay for all the water, sewer and
street special assessments associated with the project. A
cement floor is included in the budget contingent upon the
contribution from the City of Lakeville in the amount of
$92,525.
FINNUNG
The project proposes the issuance of $1,400,000 of bonds in
early 1992 to take advantage of unprecedented low interest
rates. The bonds would be parked until the facility is
authorized. None of the bond proceeds can be expended for
construction until the LCC and LHA raise $400,000 of
contributions and $140,000 in additional pull tab revenues from
LHA• If construction is not completed within three years, IRS
regulations require the bonds to be called. Net proceeds of
$1,213,998 from the bond issue will be available for
construction.
The success of the Operating Budget is contingent upon annual
receipt of the $70,000 from LHA pull tab revenues. Operating
revenues are based on current market rates for ice rentals and
26 weeks of ice operations.' Operating expenses were based on
information assembled by Dick Aslesen from eight ice arenas.
FUND RAISING
Mike Watters, President of Marquette Bank in Lakeville, has
enthusiastically accepted responsibility for chairing the LCC
Fund Raising Committee. The primary objective is to identify
and solicit contributions from three groups; Corporate, LHA
families and Community at Large. Mr. Watters will discuss his
game plan with the Council at Tuesday's meeting.
MEMORANDUM OF UNDERSTANDING
Construction and operation of an ice arena requires the support
and cooperation of the LHA, LCC, ISD 194 and the City of
Lakeville. Such an endeavor will result in contracts between
the four groups in order to insure project success. Over the
course of the next several weeks, John Kirby, Bond Attorney from
Dorsey Law Firm will prepare a Memorandum of Understanding which
details the responsibilities of the groups involved.
CONCEPT APPROVAL
The City Council is requested to provide a Concept Approval of
the ice arena project.
EXHIBITS
A. Site Study
B. Ground Floor Plan
C. Construction - Preliminary Estimates
D. Debt Issuance and Construction Budget
E. Amoritization Schedule
F. operating Budget
G. Proposed Long -Term Financing Agreement
01
E
3-6
7
8-9
10-15
16
A B
C
1
10/1/91
2
KRAUS-ANDERSON CONSTRUCTION -PRELIMINARY ESTIMATE
3
i A1{EV -j-F ICE ARENA, LAKEVILLE, MINNESOTA
4
5
SECTION ITEM
TOTAI.
6
1000 GENERAL FIELD CONDITIONS
7
BUILDING PERMIT ALLOWANCE
$10,041.00
8
SAC CHARGES ALLOWANCE
$8,450.00
9
WAC & SEWER HOOKUP ALLOWANCE
$19,890.00
10
SUPERINTENDENT
$49,200.00
11
TEMPORARYOFFICE
$1,400.00
12
TEMPORARYPHONES
$1,312.00
13
TEMPORARYHEAT
NOT INCLUDED
14
TEMPORARY TOILETS
$700.00
15
EQUIPMENT RENTAL, SAWS
$1,500.00
16
CLEAN-UP
$3,500.00-
17
DUMPSTER
$1,800.00
18
SOIL TESTS
$2,500.00-
19
LAY()UT
$1,218.00-
1,218.0020
20
SURVEY
$2,500.00-
21
BARRICADES & LIGHTS
$1,20&00-
1,200.0022
22
2200 EARTHWORK
NOT INCLUDED
23
DEWATERING
NOT INCLUDED
24
SAND CUSHION
NOT INCLUDED
25
2610 PAVING
$15,750.00
26
FENCE
$2,960.00
27
2800 LAWNS AND PLANTINGS ALLOWANCE
$16,900.00-
16,900.0028
28
3300 CONCRETE WORK
$107,600.00
29
RINK SLAB & INSULATION
$92,525.00
3 0
SITE CONCRETE
$25,643.00
31
4420 UNIT MASONRY& BRICK ON 50% OF BUILDING
$323,400:00
A 9
C
32
5100 STRUCTURAL STEEL:
33
BEHLEN ROOF
$360,304.00
34
BARJOIST AND ROOF DECK AT ENTRANCE
$10,395.00
35
MEZZANINE STEEL AND ANGLES
NOT INCLUDED
36
5500 MISCELLANEOUS METALS
$3,700.00
37
6100 ROUGH CARPENTRY
$5,640.00
3 8
6622 FINISH CARPENTRY & MILLWORK
$3,629.00
39
BENCHES
NOT INCLUDED
40
BENCH SUPPORTS
NOT INCLUDED
41
7111 WATERPROOFING
$3,200.00
42
7500 ROOFING
$12,600.00
43
7900 CAULKING AND SEALANTS
$1,800.00
44
8110 HOLLOW METAL & FINISH HARDWARE
$17,556.00
45
8360 OVERHEAD DOORS
$6,420.00
46,
8850 GLASS AND GLAZING
$21,745.00
47
9250 GYPSUM DRYWALL
NOT INCLUDED
48
9300 CERAMIC TILE WORK
$5,720.00
49
9500 ACOUSTICAL CEILING
$3,577.00
50
9650 RESILIENT FLOORING
NOT INCLUDED
51
9690 RUBBER FLOOR
52
LOBBY
$14,076.00
53
LOCKER ROOM
NOT INCLUDED
541
9900 PAINTING
$27,200.00
55
10100 CHALKBOARDS
NOT INCLUDED
56
10150 E UIPMENT:
57
SUBSOIL HEATING
$10,500.00
58
LABOR TO INSTALL SUBSOIL HEAT
$4,000.00
59
1" POLYETHELENE &c 160 H.P. REFRIGERATION SYSTEM
$112,000.00
60
LABOR TO INSTALL 1" TUBING
$12,000,00
61
DASHER BOARD & ACRYLIC GLASS
$78,000.00
6 2
ADD FOR TEMPERED GLASS
$4,000.00
A
8
c-
63
DESICCANT DEHUMIDIFIER
$25,000.00
64
LABOR TO INSTALL DEHUMIDIFIER
$3,620.00
65
DESIGN BUILD PLANS
$5,000.00
66
RESURFACING MACHINE
NOT INCLUDED
67
NETS, ICE EDGER, DROP NETTING
$8,000.00
68
1018 TOILET COMPARTMENTS
$2,271.00
69
1025 FIRE FIGHTING DEVICES
$820,00
70
1041 DIRECTORIES
NOT INCLUDED
71
1042 SCOREBOARDS & SIGNS
NOT INCLUDED
72
1080 TOILET ACCESSORIES
$4,000.00
73
1140 FOOD SERVICE EQUIPMENT
NOT INCLUDED
74
1270 SEATING
NOT INCLUDED
75
BLEACHERS
NOT INCLUDED
76
1500 MECHANICAL:
77
INFRA RED HEATERS
NUT INCLUDED
78
GAS PIPING
$4,000.00
79
PLUMBING
$25,525.00
80
EXCAVATION & BACKFILL
$2,200.00
81
ENGINEERING
$2,500.00
82
SMALL TOOLS & EQUIPMENT
$2,270.00
83
VENTILATION
$34,000.00
84
PIPE INSULATION
$1,200.00
85
OUTSIDE SEWER AND WATER ALLOWANCE
$34,000.06-
34,000.0086
861
FIRE PROTECTION
NOT INCLUDED
87
INCREASE FOR 1993 CONSTRUCTION
$9,115.00
88
1600 ELECTRICAL
$98,00.00
89
COMMUNICATION SYSTEM
NOT INCLUDED
90
TELEPHONE
NOT INCLUDED
91
9 2
93
�` J�'
$ Yr.i y""
ARCHITECTS - CIVIL AND STRUCTURAL ENGINEERING
�,,} kt; rgL'Ct.3,;�.
r v}.•; `$:L .h` `i .Y Y'+u ;i..
.-{ r
SUBTOTAL
$35,000.00
tit•�Q� a.7' t�j. ��. ,,.,:
y.}yY .^)C ht.�p
$1,737,572.00
0
A 6
C
94
INSURANCE AND TAX ON LABOR
IN LABOR ABOVE
95
SALES TAX -6%
$5,211.00
96
SPECIAL INSURANCE & BUILDERS RISK
$2,117.00
97
BOND
NOT INCLUDED
98
PROFIT AND OVERHEAD
$51,536.00
99
GENERAL LIABILITY INSURANCE
$8,831.00
100
101
SITE LIGHTING
??.•:• � : �\.'!?;e64�; }.. j. hvv'�•.•::'. t •Sh.%?•:K.Li;.'nl,••�.itr'{ti??ii?:`:%:r::yy:?:::}y
'i,'`.?,..�y`J.,`': .'�„y��•tar, ,•i`i si4�n{ i`nC•:4.Ly:, }+hp,�fi�f {,'.Y+.F T k
jn•,..?�.. .�:'�S`r•`YR':.if ���. �{. �.Y.•: .:{•fC�n.J..K:r+:i'.Oki•:iryrf•:\.fi�ti.�.•. %..C..1k>yH }{LS
TOTAL
NOT INCLUDED
y� Y. +$,.Q.Vprf. ��F
<Yi h �� �`^45j.?•'� ��m"¢3".}��"J}��..
.. NWv.'•iF�}FA}}'P'K�:h'{.•9i'Y:':�•.b4jv:K•4n�•"A•-�{j<'
$1,805,267.00
102
103
WE DO NOT INCLUDE THE FOLLOWING:
104
SITE LIGHTING
105
SIGN WIRING
106
SCOREBOARD
107
TELEPHONE WIRING
108
EARTHWORK
109
PARKING LOT
110
LOCKER ROOMS
111
MEZZANINE
112
DRESSING BENCHES
1 1 3
CABINETS
1114
LOCKER ROOM TOILETS
115
RESILIENT FLOORING
116
LOCKER ROOM RUBBER PAD
117
CHALKBOARDS
118
RESURFACING MACHINE
119
DIRECTORIES
120
FOOD SERVICE EQUIPMENT
121
SEATING
122
INFRA RED HEATERS OVER SEATING
123
SPRINKLER SYSTEM
124
CONSULTING ENGINEER FOR ICE MAKING SYSTEM
0
a
z
3-z
'Pop&Assvslnc: ',
Acvtets Eng,evs -Plan^ers �=
, 11, —AKEVILLE ICE ARENAw *1[M
z
3-z
'Pop&Assvslnc: ',
Acvtets Eng,evs -Plan^ers �=
, 11, —AKEVILLE ICE ARENAw *1[M
LAkX03
CITY OF LAKSVILLS
LAKBVILLS COHWMITY CORP.
LAKBVILL6 HMMY ASSOCIATIcN
DEBT ISSUANCE BUDGET
and
CONSTRUCTION SUM"
USES OF FUNDS
Undsrwritar's Financing Vee
DEBT
CONST.
42,000
L axwor' n Fee
BUt)Ci1dT
BUDXT
----w-•w--
TOTAL
SOURCES OF FUNDS
w---r-----
42,013
LCC & LHA Cash (7/91)
94,513
45,487
140,000
Lassa Financing On 2-1-92
•1,400,000
11400,000
Pull Tab Rwvwrn" (2-1-92 to 2-1-94)
1,213,990
140,000
140,000
City of Lakeville • Conereta Bicor
140,000
92,525
92,525
Net Proceed* From Lemma Financing
1,213,999
1,213,998
OTHER LCC/LM Funding By 2-1-94
400,000
400,000
TOTALsoURms
w---w-ww-.
1, 494, 513
----------
1,892r010
---------w
3,396,623
TOTAL USES
asslsassfa
aaza-s_oss
:aaassssss
USES OF FUNDS
Undsrwritar's Financing Vee
42,000
42,000
L axwor' n Fee
10,500
10,500
Various Insuence Coats
42,013
42,013
Subtotal
wwww- -wr-r
94,513
Capitalized Interest /1
46,002
46,002
Transfer To Construction 2-1-94 /2
1,213,990
1,213,999
Debt Service Reserve
140,000
140,000
Net Interest Expense /3
•37,010
37,010
Operating Reserve
50,000
50,000
Construction Cost
1,805,000
11805,000
TOTAL USES
1,494,513
1,892,Oi0
3,386,523
ssasaasaas
amaaa_aecs
sa assess
/i To Pay Interest Due On 8-1-94. Interest Paymenta Due 8-1-92, 2-1-93,
9-1-93, and 2-1-94 To Be Funded From Interest Rarned On The $1,400,000
Balance In The Debt Account. See Also Footnote 3.
/2 It Is Assumed That Construction Will Commence 2-1-94 And Be Fully
Complete On 8-1-94. A NET Debt Service Payment Of AbmA 965,000
Due On 2-1-98 Must Be Funded From Operations a Pull Tabs.
/3 Interest Expense For 24 Months, 2-1-94 thru 2-1-94 $184,010
In;Vest,$1,400,000 For 24 Months 0 5,250 - Interest Burned 147,000
NET INTEREST EXPENSE Mm
337,010
19-Dec-gi - Prepared By Juran 6 Moody, Inc. /
-
LAKEOl
$1,400,000 : pA]R AMOUNT
CITY OF LAKBVILLB, MINNESOTA
ICB 5PIM PROJECT LOAN
18 YEAR DRBT AMORTIZATION SCFwUjjt
20 YEAR LSABB LOAN
INTEREST RATES ILLUS'1'RATBD ARE AS C
RBFLBCTIVS OF MARKST �Di1�DI�S OF THIS QA1'R.
THE RATES AM S08JBCT TO Q1MB.
PYMT 2
YEAR DATE
---- ----------
08/01/92
02/01/93
08/01/93
02/01/94
08/01/94
1 02/01/95
08/01/95
2 02/ol/9S
09/01/96
3 02/01/97
08/01/97
4 02/01/98
08/01/98
s 02/01/99
08/01/99
6 02/01/2000
08/01/2000
7 02/01/2001
08/01/2001
8 02/01/2002
08/01/2002
9 02/01/2003
08/01/2003
10 02/01/2004
08/01/2004
1L 02/01/2006
08/01/2003
12 02/01/2006
08/01/2006
13 02/01/2007
08/01/2007
14 02/01/2008
08/01/2008
15 02/01/2009
08/01/2009
16 02/01/2010
08/01/2010
M.
COUPON
PRINCIPAL RATB
20,000
bolo
20,000
6.10
25,000
9.30
25,000
3.30
25,000
5.60
25,000
5.60
25,000
5.75
25,000
5.75
25,000
5.90
30,000
5.90
30,000
6.10
30,000
6.10
30,000
6.30
30,000
6.30
30,000
6.40
35,000
6.40
35,000
6.50
35,000
6.50
35,000
6.60
40,000
6.60
40,000
6.70
40,000
6.70
40,000
6.90
45,000
6.80
45,000
6.85
50,000
6.86
50,000
6.90
50,000
6.90
50,000
6.95
55,000
6.95
55,000
7.00
55,000
7.00
INTEREST
---- --------
46,002.30
46,002.60
46,002.50
46,002.50
46,002.50
46,002.50
45,492.80
44,982.50
44,320.00
43,657.50
42,957.50
42,257.50
41,538.75
40,920.00
40,092.50
39,197.50
38,282.60
37,367.50
36,422.50
35,477.50
34,517.60
33,397.50
3a,260.0o
31,122.50
29,967.50
28,647.50
27,307.!30
26,967.50
74,607.50
23,077.50
21,526.25
19,823.75
18,098.75
16,373.76
14,636.25
12,725.00
10,800.00
SgMI
ANNUAL
PAYMENT
r.►rrr..�..r-r-r
46,002.50
46,002.50
46,002.50
46,002.!50
46,002.60
66,002.60
65,492.50
69,982.50
69,320.00
68,657.50
67,957.50
67,257.50
66,538.75
65,820.00
70,082.50
69,197.50
68,282.50
67,367.50
66,422.50
65,477.50
69,517.50
68,397.50
67,260.00
66,122.50
69,967,50
68,647,50
67p307.80
65,967.60
69,607.50
68,077.$0
71,536.25
69,823.75
68,098.75
66,373.75
69,636.26
67„725.00
65,800.00
19 -Dec -91 - PREPARED BV JURAN & MOODy f INC.
CALBNOAR
YEAR
WTAL.
------------
46,002.50
92,005.00
92,005.Q0
131,495.00
139,302.50
.136,615.00
133,796.25
135,902.S0
137,480.00
133,790.00
134,995.00
135,667.50
136,090.00
1351959.00
135,675.00
134,613.75
137,922.50
136,010.00
133,525.00
� -8
LAKEpi CITY OF LAKEVILLE, MIMESOTA
ICE ARENA PROVECT LOAN
18 YEAR DEBT AMORTIZATION BULB
ZO YEAR LEASE LOAN
61,400,000 PAR AMUNT
INTEREST RATES ILLUSTRATED ARE REFLECTIVE OF MARXRT G1ONDIT0NS AS OF TNIB DATE.
THE RATER ARB SUBJECT TO OMM.
PYNT
Z
EST.
COUPON
BENI CALMAR
YEAR
....
DATE
..........
PRINCIPAL RATE
INTBRB$T
ANNUAL YSAR
PAYMENT
17
03/01/2011
.•-•.••-..... ..-----
60.000 7.10
----8,875.• .
TOTAL
............ --------
.. -- r----•
18
08/01/2011
08/01/2011
60,000 7.10
8.875.00
6,745.00
68,875.00
02/01/2012
08/01/2012
65,000 7.10
4,615.00
66,748.00 136,620.00
69,615.00
65,000 7.10
---- ----
2,307.60
67,307.50 136,922.60
TOTAL
1,400,000
-==aaaaxsas=x
•-•r-r�.�.rrr
1,276,280.00
.. r -r r -r ----r ----------•-
-,676,280.00 2,676,280.00
ataasst:as:este.
..
saacsassx:acmmm =ss:=assn: ss
02/01/92
02/01/97
a Dated Data
= Est. Closing
b1,a00,000 00
= � FINANCED
08/01/92
= 1st Int Data
94 013.
• 00
(42,000.00)
s Cash Frm LHA and LCC
Underwriter**
6.76990
= xvM INTEREST RATS
(10,500.00;
= Fes A 3,t
Leaeor•a Fee
(140, 000.00
= Reserve Ace t
6.99261
_
Nat Effect. Rate
(42,013.00)
(46,002.50)
= set. issuance 6xpane�ese /1
= 6 Months Cap. Intereft
13.4662
=Awe Lite (Yrs) 61,213,997.60
= Available For
140,000.00
Conetrwtion
r Reserve Acct Cash
46,002.60
------------
- Cap rnterest Cosh
$1,400,000.0o
= AMOUNT FiNANCBD
xaaaa=aaaaaa
$135,904 m AVERMM ANNUAL DEBT SRRVICL
(9,800) . Reserve Arch Interest # 7.0(
-----."-
6126,104 = NBT AVER ANWjAL KWIRT SSRVrCm
•smms=:a
/1 To Fund Cartificate Printing, Escrow
and Local Legal Agent Pees, and the fee of Bond Counsel
Couns6l for the preparation Of all transaction documents.
/Z It In assumed the $140,000 Reserve Amount will be invested in a U.S. Treasur
Notes to mature February'2000. Per the 12-19-91 "Wall street Journal", the
closing Yield 12-18-91 wee 7.074. It is •
the Lsa8Q will be 8 years from the date of pectedce.at the earliest Call date
jux
19-Dec-91 - PRSPARM BY JURAN & MOODY, I
I C E A R E N A
ESTIMATED OPERATING BUDGET
01/03/92 PAGE 1
1991-92
REVENUES
-------------
_-_______
Pull tabs
70,000
Ice Rental
155,788
Tournament admissions
3.000
Skate sharpening
2,500
Sales and concessions, net
10,000
'Advertising
10,000
Interest income
2,250
Total revenues
253,538
EXPENDITURES
------------
Personnel
59,210
Commodities
10,200
Utilities
37,624
Other contractual
20,400
Debt service
126,104
Total expenditures
253,538
Net income/(loss)
0
01/03/92 PAGE 1
I C E A R E N A
ESTIMATED OPERATING BUDGET
REVENUES
,GAMBLING OPERATIONS 70,000
ICE RENTAL.
Ice rental estimates based on an assumed 26 weeks of operation
as shown in figure 4 of Juran and Moody report of August 10, 1989
with a $1058 adjustment.
TOTAL ICE RENTALS 155,788
Tournament admissions
From 1989 budget
Skate sharpening
From 1989 budget
Sales and concessions
Advertising
From 1989 budget
Interest income
(cash reserves)
01/05/`2 PAGE 2
3,000
Units 5,000
Rate $0.54
2;500
Sales
25,000
60% Cost of good
15,000
10,000
Units
40
Rate
$250
10,000
Avg balance
50,000
Rate
4.5%
2,250
I C E A R E N A
ESTIMATED OPERATING BUDGET
EXPENDITURES
------------
Personnel
Salaries Full time
Salaries Part time
FICA
Hospitalization + Life Ins.
Unemployment insurance
Workmans Comp
Total personnel costs
Commodities
Small tools and equipment
Motor fuels/oils
Chemicals
Equipment parts
Supplies
Total commodities
Utilities
Electric
Gas
Water and sewer
Telephone
Total utilities
Other contractual
Consultant services
Printing and Publishing
Repairs - equipment
Repairs - building
Schools and conferences
Cleaning service/garbage removal
Rental expense
Insurance - Liab/prop
.Dues and subscriptions
Uniform/Clothing allowance
Total other charges
Debt service
Total expenditures
011/03/92 PAGE 3
32,500
17,010
3,788
1,800
894
.3,218
59,210
250
1,750
3,000
2,000
3,200
10,200
24,516
12,000
508
600
37,624
1,000
200
2,000
2,000
200
1,250
0
13,200
400
ISO
20,400
126,104
253,538
I C E A R E N A
ESTIMATED OPERATING BUDGET
EXPENDITURES
------------
The following budget was based on the assumption that
the LCC would be responsible for operating the facility.
Personnel
Salaries - Full time - Manager 32,500
based on ice arena manager survey
Salaries - Full time — assistant 0
32,500
Salaries - Part time
Weeks
Hours
Rate
Commodities
Small tools and equipment
Motor fuels/oils
Zamboni propane fuel
Chemicals
Freon for compressor, if needed
Equipment parts
various, including zamboni
30
95
6.00
17,010
250
250
1,750
1,750
3,000
3,000
2,000
2,000
Supplies
Cleaning supplies, first aid
trash liners, maint. materials etc 3,200
3,200
01 0 PAGE 4
I C E A R E N A
ESTIMATED OPERATING BUDGET
Electric
1989 est of $22,700
Add 8%
24,516
24,516
Gas.
1989 est of $11,200
12,000
12,000
Water and sewer
Number gallons - water
200.000
Cost
$154
Number gallons - sewer
200,000
Cost
$354
508
Telephone
One Centrix line at $50 per month
600
600
Consultant services
Attorney
0
Auditor
1,000
1,000
Printing and publishing
Tickets, news/want ads
200
•
200
Repairs - equipment
Zamboni repairs
Scoreboards
maintenance agreements
2,000
2,000
Repairs - building
HVAC system
Hockey board repairs
Garage doors
Etc
2,000
2,000
01/03/q2 PAGE 5
PHGE 6
I C E A R E N A
ESTIMATED OPERATING BUDGET
Schools acrid conferences
200
200
Cleaning service/garbage removal
Garbage pickup
1,250
1,250
Rental expense
Forklift to remove hockey boards
provided by volunteers
O
Insurance - Liab/prop
Property insurance
3,200
Liability
10,000
13,200
Dues and subscriptions
Minn 1 ce Managers Asso
ISIA Membership
ASCAP
Miscellaneous
400
400
Uniform/Clothing allowance
Employee ID jackets
150
150
PHGE 6