HomeMy WebLinkAbout9.i. Payment #3, 145th Street West Improvements, City Project #206CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DTE: September 15, 1992
AGENDA ITEMS ,Payment
#3, 145th Street West
AGENDA SECTION:
between Shannon Parkway,
City Project #206
Consent
PREPARED BY:
Public Works Director/Building
Ron Wasmund
Official
AGENDt-M
t C`�
ATTACHMENTS: Paymen
Voucher #3
AP OVEP BY:
v
This item requestg the third payment to McNamara Contracting, Inc. in
the amount of $84,967.21 under City Project #206, Contract No. 1991-
1, 145th Street R construction.
Work completed anl represented in this amount as ofAugust33, 1992 is
79% of contracted work.
The work has been inspected and is in compliance with contract
documents.
Attached is a cop of the pay voucher for your information. Staff
recommends approval of this third payment request.
RECOMMENDED ACTION:
MOTION TO APPROVE PAYMENT #3 TO.MCNAMARA. CONTRACTING
INC. IN THE _AMOUNT 0
$84,967.21 FOR 145TH STREET RECONSTRUCTION,
CITY PROJECT #206.
COUNCIL ACTION:
CONSTRUCTION PAY VOUCHER
Estimate Voucher Number: 3 Date: September 3, 1992
OSM Project Number: 4438.40 Period Ending:. August 31, 1992
Project: 145TH STREET WEST UTILITIES AND STREET IMPROVEMENTS
CITY OF ROSEMOUNT 206
Contractor: MC NAMARA CONTRACTING, INC.
14605 JOHNNY
APPLE VALLEY
CAKE RIDGE ROAD
MN 55124
Contract Date:
May 19, 1992 Work
Started:
Completion Date: September
4, 1992 Work
Completed:
Original Contract
amount
497,926.29
Total Additions
0.00
Total Deductions
0.00
Total Funds Encumb!lered
497,926.29
Total Work Certified
to Date
391,185.61
Less Retained Pero
Ientage
5.00%
19,559.28
Less Previous PaYmients
286,659.12
Total Payments Intal
This Voucher
371,626.33
Balance Carried Folrward
126,299.96
APPROVED FOR PAYMENT,
THIS VOUCHER
84,967.21
APPROVALS
ORR-SCHELEN-MAYERONI& ASSOCIATES, INC.
Pursuant to our field observation, as performed in accordance with our
contract, and basedlon our professional opinion, materials are
satisfactory and the work properly performed in accordance with the plans
and specifications and that the total work is:
79% completed as of,August 31, 1992.
We herby recommend payment of this voucher.
Signed:
ConstructionlObserver
Signed:
Project anager/Engineer
MC NAMARA CONTRACTING, INC.
This is to certify that to the best of my knowledge, information, and
belief, the quantities and values of work certified herein isa fair
approximate estimate for the period covered by this voucher.
Contractor:
Date:
CITY OF ROSEMOUNT
Checked By:
Date:
Signed By
Title
Approved for payment:
Authorized Representative
PAGE 1
Date:
V O U C H E R D E T A I L L I S T
Estimate Voucher Number: 3 Project: 145TH STREET WEST UTILITIES AND STREET IMPROVEMENTS
OSM Project Number: 4438.40 CITY OF ROSEMOUNT PROJ. NO.: 206
for
CITY OF ROSEMOUNT
SCHEDULE A - STREETS (M.S.A. 208-103-06)
Date: SEPTEMBER 3, 1992
Contract
Contract
Completed This Month
Total
To Date
Item
----
Spec No
--------
Description
------------------------------------
Quantity
---------
Units
----------
Unit Price
----- -------------------
Total Price
Quantity
----------------------
Total
Quantity
---------
Total Price
------------
1
DIV II
MOBILIZATION
1
LUMP SUM
10,000.00
10,000.00
0
0.00
1
10,000.00
2
DIV II
CLEAN-UP
1
LUMP SUM
10,000.00
10,000.00
0
0.00
0
0.00
3
0564.602
F & I STREET SIGNS (COMP. ASSEMBLY)
17
EACH
350.00
5,950.00
0
0.00
10
3,500.00
4
0564.602
F & I BARRICADES (TEMPORARY) TYPE
6
EACH
400.00
2,400.00
0
0.00
6
2,400.00
III
5
0564.602
PAVEMENT MESSAGE, WHITE TURN ARROWS
14
EACH
35.00
490.00
0
0.00
0
0.00
(PAINT)
6
0564.603
4" DOUBLE SOLID LINE, YELLOW (PAINT)
2240
LIN FT
0.30
672.00
0
0.00
0
0.00
7
0564.603
4" SOLID WHITE (PAINT)
372
LIN FT
0.40
148.80
0
0.00
0
0.00
8
2101.502
CLEARING
1
TREE
110.00
110.00
3
330.00
4
440.00
9
2101.507
GRUBBING
1
TREE
55.55
55.55
3
166.65
4
222.20
10
2104.501
REMOVE PIPE (ALL SIZES AND TYPES)
750
LIN FT
6.60
4,950.00
70
462.00
820
5,412.00
11
2104.501
REMOVE CURB & GUTTER (ALL TYPES)
460
LIN FT
3.00
1,380.00
472
1,416.00
472
1,416.00
12
2104.505
REMOVE BITUMINOUS PAVEMENT (ALL
11620
SQ YD
0.50
5,810.00
940
470.00
11940
5,970.00
DEPTHS)
13
2104.509
REMOVE MANHOLE OR CATCH BASIN
2
EACH
220.00
440.00
0
0.00
2
440.00
14
2104.513
SAWCUT BITUMINOUS (ALL DEPTHS)
390
LIN FT
1.35
526.50
120
162.00
320
432.00
15
2105.501
COMMON EXCAVATION
24000
CU YD
2.20
52,800.00
0
0.00
24000
52,800.00
16
2105.526
SELECT TOPSOIL BORROW (LV)
500
CU YD
5.50
2,750.00
0
0.00
0
0.00
17
2211.501
AGGREGATE BASE CLASS 5 ( 100%
7315
TON
6.25
45,718.75
5272
32,950.00
5272
32,950.00
18
2211.501
AGGREGATE BASE CLASS 5 (100% CRUSHED
600
TON
7.00
4,200.00
53
371.00
311
2,177.00
ROCK) TEMPORARY, ACCESS
19
2331.508
TYPE 41 WEARING COURSE MIXTURE
1500
TON
17.00
25,500.00
0
0.00
0
0.00
20
2331.514
TYPE 31 BASE COURSE MIXTURE
1650
TON
16.00
26,400.00
1429
22,864.00
1429
22,864.00
21
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
610
GALLON
1.20
732.00
48
57.60
48
57.60
22
DIV I
IRREGULAR WIDTH PAVING (DRIVEWAYS)
720
SQ YD
7.00
5,040.00
0
0.00
0
0.00
23
2504.000
ADJUST GATE VAVES
4
EACH
100.00
400.00
4
400.00
4
400.00
24
2506.511
RECONSTRUCT MANHOLES
10
LIN FT
165.00
1,650.00
0
0.00
7
1,155.00
25
2506.522
ADJUST FRAME & RING CASTING
5
EACH
150.00
750.00
3
450.00
3
450.00
26
2531.501
CONCRETE CURB AND GUTTER (ALL TYPES)
5500
LIN FT
4.84
26,620.00
5438
26,319.92
5438
26,319.92
27
2571.502
F & 11-1/2" B&B TREE ASH
6
TREE
160.00
960.00
0
0.00
0
0.00
28
2571.541
TRANSPLANT TREES -811 & SMALLER
4
TREE
90.00
360.00
0
0.00
0
0.00
2OF5
V O U C H E R D E T A I L L I S T
Estimate Voucher Number: 3 Project: 145TH STREET WEST UTILITIES AND STREET IMPROVEMENTS Date: SEPTEMBER 3, 1992
OSM Project Number: 4438.40 CITY OF ROSEMOUNT PROJ. NO.: 206
for
CITY OF ROSEMOUNT
SCHEDULE A - STREETS (M.S.A. 208-103-06)
TOTAL SCHEDULE A - STREETS (M.S.A. 208-103-06)
3 OF 5
-------------------- --------------------
S 284,509.60 $ 88,504.17
Total To Date
Quantity Total Price
--------- ------------
354 6,301.20
1 1,650.00
400 1,060.00
0 0.00
2500 3,375.00
0 0.00
0 0.00
--------------------
S 181,791.92
Contract
Contract
Completed This Month
Item
Spec No
Description
Quantity
Units
Unit Price
------------- -------------
Total Price
Quantity
--------- -------------
Total
----
29
--------
2621.500
------------------------------------
81' D.I.P., CLASS 52 FORCE
MAIN
---------
345
----------
LIN FT
17.80
6,141.00
0
0.00
(INCLUDING FITTINGS)
30
2621.500
FORCE MAIN RECONSTRUCTION
AND
1
LUMP SUM
1,650.00
1,650.00
0
0.00
APPURTENANT WORK L.S.B.I.
8-A
31
2573.502
EROSION CONTROL
500
LIN FT
2.65
1,325.00
150
397.50
32
DIV II
SEEDING (INCLUDING MULCH,
FERTILIZER
2.8
ACRE
1,500.00
4,200.00
0
0.00
AND TOPSOIL)
33
2575.505
SODDING, TYPE A LAWN & BOULEVARD
12800
SQ YD
1.35
17,280.00
1250
1,687.50
34
2575.523
FIBER BLANKETS, TYPE HIGH
VELOCITY
300
SQ YD
1.50
450.00
0
0.00
35
DIV II
81 WIDE BITUMINOUS TRAIL
(INCLUDING
18500
SQ FT
0.90
16,650.00
0
0.00
CLASS 5)
TOTAL SCHEDULE A - STREETS (M.S.A. 208-103-06)
3 OF 5
-------------------- --------------------
S 284,509.60 $ 88,504.17
Total To Date
Quantity Total Price
--------- ------------
354 6,301.20
1 1,650.00
400 1,060.00
0 0.00
2500 3,375.00
0 0.00
0 0.00
--------------------
S 181,791.92
4 OF 5
V
O U C H E R
D E T A I L
L I S T
Estimate
Voucher
Number: 3
Project:
145TH STREET
WEST UTILITIES AND STREET
IMPROVEMENTS
Date: SEPTEMBER
3, 1992
OSM Project
Number: 4438.40
CITY OF
ROSEMOUNT PROJ. NO.: 206
for
CITY OF
ROSEMOUNT
SCHEDULE
B - STORM DRAIN (M.S.A. 208-103-06)
Contract
Contract
Completed This
Month
Total
To Date
Item
Spec No
Description
Quantity
Units
-------------
Unit Price
-------------
Total Price
Quantity
----------------------
Total
Quantity
---------
Total Price
----
----
36
--------
2503.541
------------------------------------
12" RCP CB LEADS CL IV, DESIGN 3006
---------
431
----------
LIN FT
17.25
7,434.75
0
0.00
435
7,503.75
37
2503.541
15" RCP CS LEADS CL IV, DESIGN 3006
252
LIN FT
18.45
4,649.40
0
0.00
271
4,999.95
38
2503.541
15" RCP CLASS IV, DESIGN 3006
42
LIN FT
18.45
774.90
0
0.00
42
774.90
39
2503.541
18" RCP CL 111, DESIGN 3006
404
LIN FT
21.30
8,605.20
0
0.00
402
8,562.60
40
2503.541
27" RCP CL III, DESIGN 3006
40
LIN FT
34.50
1,380.00
0
0.00
54
1,863.00
41
2503.541
30" RCP CL I11, DESIGN 3006
105
LIN FT
38.83
4,077.15
0
0.00
126
4,892.58
42
2503.541
30" RCP CL IV, DESIGN 3006
730
LIN FT
46.10
33,653.00
0
0.00
733
33,791.30
43
2503.541
36" RCP CL II, DESIGN 3006
180
LIN FT
48.40
8,712.00
0
0.00
180
8,712.00
44
2503.541
36" RCP CL IV, DESIGN 3006
562
LIN FT
62.05
34,872.10
0
0.00
562
34,872.10
45
2503.541
36" RCP CL V, DESIGN 3006
65
LIN FT
89.95
5,846.75
0
0.00
65
5,846.75
46
2501.515
36" RCP F.E.S. W/TRASH GUARD
1
EACH
1,805.00
1,805.00
0
0.00
1
1,805.00
47
2506.508
STANDARD 4' DIA.MANHOLE (0-81)
2
EACH
915.00
1,830.00
0
0.00
2
1,830.00
48
2506.508
STANDARD 41 DIA C.B. MANHOLE (0'-81)
2
EACH
1,035.00
2,070.00
0
0.00
2
2,070.00
49
2506.508
STANDARD 51 DIA MANHOLE (0'-81)
9
EACH
1,550.00
13,950.00
0
0.00
9
13,950.00
50
STD SPEC
EXCESS 5' DIA MANHOLE DEPTH OVER 81
47
LIN FT
108.57
5,102.79
0
0.00
45
4,885.65
51
2506.509
CONSTRUCT CATCH BASIN TYPE A
11
EACH
627.00
6,897.00
0
0.00
10
6,270.00
52
2506.509
CONSTRUCT CATCH BASIN TYPE B
4
EACH
660.00
2,640.00
0
0.00
4
2,640.00
53
DIV II
REMOVE AND RELAY GROUTED RIP RAP W/
1
L.S
55.00
55.00
1
55.00
1
55.00
FABRIC LSBI 9-A
54
DIV II
BULKHEAD PIPE/MANHOLE
4
EACH
440.00
1,760.00
2
880.00
2
880.00
- _ -35-M
SPEC --GRANULAR
FOUNDATION-MAT-E-RtAt
200
TOM -- - - --
- - 8.8O-----1j-76O-OO------
- --o- _--------0-00------
--------------------
-299,-41 -----------
--------------------
2,634-81
TOTAL SCHEDULE
B - STORM DRAIN (M.S.A. 208-103-06)
--------------------
E 147,875.04
$
935.00
E 148,839.39
4 OF 5
V O U C H E R D E T A I L L I S T
Estimate Voucher Number: 3 Project: 145TH STREET WEST UTILITIES AND STREET IMPROVEMENTS Date: SEPTEMBER 3, 1992
OSM Project Number: 4438.40 CITY OF ROSEMOUNT PROJ. NO.: 206
for
CITY OF ROSEMOUNT
SCHEDULE C - WATERMAIN (CITY)
5OF5
Contract
Contract
Completed This Month
Total
To Date
Item Spec No
Description
Quantity
Units
Unit Price
-------------
Total Price
-------------
Quantity
--------- -------------
Total
Quantity
---------
Total Price
------------
---- --------
56 2611.503
------------------------------------
6" WATER MAIN -DUCT IRON CL 52
---------
85
----------
LIN FT
15.35
1,304.75
0
0.00
201
3,085.35
57 2611.503
12" WATER MAIN -DUCT IRON CL 50
1700
LIN FT
19.45
33,065.00
0
0.00
1685
32,773.25
58 2611.502
611 GATE VALVE AND BOX
5
EACH
311.00
1,555.00
0
0.00
7
2,177.00
59 2611.502
12" GATE VALVE AND BOX
2
EACH
792.00
1,584.00
0
0.00
3
2,376.00
60 2611.502
HYDRANTS
4
EACH
1,251.00
5,004.00
0
0.00
5
6,255.00
61 2611.502
HYDRANT EXTENSIONS
4
LIN FT
271.00
1,084.00
0
0.00
0
0.00
62 2611.520
FITTINGS
3400
LB.
0.90
3,060.00
0
0.00
3820
3,438.00
63 2611.502
1" CORPORATION COCKS
17
EACH
35.50
603.50
0
0.00
13
461.50
64 2611.502
1" CURB STOP & BOX
17
EACH
70.40
1,196.80
0
0.00
13
915.20
65 2611.503
1" COPPER SERVICE PIPE
600
LIN FT
10.50
6,300.00
0
0.00
670
7,035.00
66 2611.502
2" CORPORATION COCKS
1
EACH
234.50
234.50
0
0.00
0
0.00
67 2611.502
2" CURB STOP & BOX
1
EACH
177.10
177.10
0
0.00
0
0.00
68 2611.502
2" COPPER SERVICE PIPE
150
LIN FT
15.40
2,310.00
0
0.00
0
0.00
69 2611.500
F & I INSULATION, 4" THICK
4400
S.F.
1.35
5,940.00
0
0.00
100
135.00
70 2611.500
EXPLORATORY EXCAVATION
4
EACH
220.00
880.00
0
0.00
3
660.00
71 2611.500
CONNECT TO EXISTING WATERMAIN
;2
EACH
220.00
440.00
0
0.00
2
440.00
72 2611.500
CUT -IN 8" X 4" PVC WYE
1
EACH
275.00
275.00
0
0.00
1
275.00
73 2611.500
4" PVC SDR 26 SERVICE PIPE
30
LIN FT
17.60
528.00
0
--------------------
0.00
30
--------------------
528.00
TOTAL SCHEDULE C - WATERMAIN (CITY)
--------------------
S 65,541.65
S 0.00
S 60,554.30
-
- - --------------------
GRAND TOTAL
$ 497,926.29
$ 89,439.17
$ 391,185.61
5OF5