Loading...
HomeMy WebLinkAbout5.d. Fire Station Referendum Project UpdateCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: SEPTEMBER 1, 1992 AGENDA ITEM: FIRE STATION REFERENDUM AGENDA SECTION: PROJECT UPDATE OLD BUSINESS PREPARED BY: STEPHAN JILK, CITY ADMINISTRATOR AGENDAI=M # 50 ATTACHMENTS: COST ESTIMATES APPROVED BY: Ll The Fire Station staff committee, the Fire Station Citizen Committee and the Fire Apparatus Committee have been meeting to review cost estimates, site plans and equipment specifications to establish design and cost estimates for the referendum in November. Cost estimates for the completion of the construction of the station and remodeling of the existing station and the purchase of the new aerial truck are now available. The cost estimates were presented to the Citizens Committee on Thursday evening and these estimates are attached for your consideration. The Citizens Committee took three separate actions on Thursday evening; 1) To recommend to the City Council that the Ballot for the referendum include one question and that question include the cost for the complete package of the cost of the new station, the remodeling of the current station and the purchase of the new aerial truck. 2) that the committee conduct a survey of the residents of the two apartment complexes immediately adjoining the site to the west and the east to get their input on how to improve upon the chosen sight if the station is located there. The Committee voiced some concern about the fact that there are so many children in the immediate area and the use of fencing, landscaping, berming may be suggested to provide a more suitable final site. 3) that the architect research other cities to see if fire stations in similar locations have experienced any problems with pedestrian or vehicular movements. The Committee would like this additional information in preparation of educational and promotional material for the referendum. RECOMMENDED ACTION: None at this time. Item will be placed back on the September 15, 1992 agenda for final approval. COUNCIL ACTION: CITY OF ROSEMOUNT I t E ST- I m A T E SPACE NEEDS ASSESSMENT BUDGET 1990 A. PROPOSED NEW FIRE STATION • BUILDING CONSTRUCTION 0 $85.001S.F. $1,928,140 (PHASE I - 5 APPARATUS SAYS) $625,000 " EXPANSION TO MAIN STATION @ $85.001S.F. (PHASE III - 2 APPARATUS DAYS) $45,000 " SITE DEVELOPMENT $60,000 FURNISHINGS AND EQUIPMENT $203,300 " CONTINGENCY $152,500 PROFESSIONAL FEES $60,000 * LAND COSTS $3,073,840 SUBTOTAL FOR EVERY YEAR BEYOND 1991 $187,200 INFLATION FACTOR @ 3% PER YEAR $29,180 FOR EVERY YEAR BEYOND 1981 $3,261,140 SUBTOTAL B. FIRE STATION APPARATUS NOT INCLUDED me- P:\rm31bt8-dk1 $25,000 C. REMODEL EXISTING FACILITIES ' PUBLIC WORKS BUILDING " FIRE STATION BUILDING NONE " FURNISHINGS AND EQUIPMENT $2,500 CONTINGENCY @ 10% NTY STAFF) • PROFESSIONAL FEES $27,$00 SUBTOTAL 81,680 INFLATION FACTOR; @ 3% PER YEAR FOR EVERY YEAR BEYOND 1991 $29,180 SUBTOTAL $3,290,320 .TOTAL me- P:\rm31bt8-dk1 1992, EST1mATE CITY OF ROSEMOUNT PROPOSED NEW FIRE STATION AND PUBLIC WORKS REMODELING REFERENDUM BUDGET 1992 -Jwwmmm� A. PROPOSED NEW FIRE STATION • BUILDING CONSTRUCTION @ $83.82/S.F. (6 APPARATUS BAYS) $2,146,770 $278,050 • SITE DEVELOPMENT $65,000 • FURNISHINGS AND EQUIPMENT $260,000 " CONTINGENCY @ 10% $175,000 • PROFESSIONAL FEES $90,000 " LAND COSTS $3,004,820 SUBTOTAL $650,000 B, FIRE STATION APPARATUS _ $650,000 SUBTOTAL C. REMODEL EXISTING FACILITIES $60,530 • PUBLIC WORKS BUILDING • FIRE STATION BUILDING FOR PUBLIC WORKS USE • FURNISHINGS AND EQUIPMENT $7,500 • CONTINGENCY @ 15% $10,000 PROFESSIONAL FEES SUBTOTAL $68,030 TOTAL $3,722,850 file: rmMt 8-dk1