HomeMy WebLinkAbout5.b. Armory / Community Center ProjectCITY OF ROSEKOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: SEPTEMBER 1, 1992 AGENDA ITEM: ARMORY / COMMUNITY CENTER PROJECT AGENDA SECTION: OLD BUSINESS PREPARED BY: STEPHAN JILK, CITY ADMINISTRATOR AGENDI TEM # 5 B ATTACHMENTS: MEMO, FINANCING INFORMATION APPROVED BY: As development of the Armory and Community Center project continues further consideration of the components of the project has occurred and details of the necessary financing and the "fundability' is becoming more clear. The Armory Committee has met twice since the bids for the project have been received to discuss the various bid items and their costs. On Monday, August 24th, the Committee spent time in selecting those bid items they feel should be included and those they felt could be excluded in an effort to reduce the cost of the facility. Through this effort they were able to reduce the combined cost of the Armory and the Community Center by some $90,700.. Through this cost cutting the Armory and Community Center becomes affordable using the two Armory levies and the approved referendum amount. Extensive discussion on the cost of the Arena was also held and information was presented by Ron Pederson on behalf of the group supporting the development of the Arena to consider further cost reductions for the construction of the Arena. The Armory Committee then reached consensus to recommend to the Rosemount Port Authority and the City Council to proceed with the construction of the Armory and Community Center project using available levies and the approved referendum financing and to proceed with the construction of the Arena using financing available through the operating income from the project. Further detail on bid items proposed to be included and the financing options can be found on the attached memo. RECOMMENDED ACTION: Motion to direct staff and city consultants to prepare financial and contractual documents on the Armory/Community Center Project for consideration by the Port Authority and City Council on September 15th, 1992. COUNCIL ACTION: It eity of (Rosemount PHONE (612) 423.4411 2875 - 145th Street West, Rosemount, Minnesota FAX (612) 423-5203 Mailing Address: P.O. Box 510, Rosemount, Minnesota 55068-0510 TO: Mayor McMenomy Councilmembers Klassen, Staats, Willcox Port Authority Commissioners IL -- FROM: Stephan JIlk, City Administrato DATE: August 28, 1992 RE: Armory and Community Center Project ppe MAYOR Edward B. McMenomy COUNCILMEMBERS Sheila Klassen James (Red) Steals Harry Willcox Dennis Wippermann ADMINISTRATOR Stephan Jilk Several items of updated information of note on the Armory/Community Center Project are provided here. 1) Armory Committee Report/Recommendation - The Armory Committee met on Monday, August 24th, 1992 to discuss the affordability of the project. A separate report of that meeting is attached. The results of that meeting were that the committee reduced the cost of the Armory and Community Center by some'$90,700. The Committee also provided a recommendation to the Port Authority and City Council to proceed with the construction of the Armory, Community Center and Arena utilizing available levies and income from operations of the facilities. 2) After additional meetings with the ICE ARENA SUPPORT GROUP, and detailed discussion with Dan O'Neill of Springsted, Inc. further financial information was drafted. The revised financial analysis of the arena financing and cash flow information is very positive in the sense that it shows that the project can "cash flow" with very little or no subsidy if.less than full depreciation is taken. Data sheets . outlining how these new numbers relate is provided. I will not go into any detail on this information here, but will do so on Tuesday evening. The main reasons this is possible are: a) The contractor, PCL, has indicated that if they are awarded the contract to construct the facility they will commit to having the arena available for use by Thanksgiving of 1993, a whole ice season ahead of the previous schedule used. l6verylhings (Poming (Up gosemounlY N Armory/Center Update August 28,1992 b) in previous calculations depreciation costs were being escalated along with income which caused an inaccurate loss figure and a higher expenditure number. c) principal payments have now been scheduled with lower payments in the early years of the schedule, delaying larger payments until later years when accumulated reserves can assist in making them. It is extremely important to note that this new, and I must say, very positive position represented suggests that the project could be built and financed with the operational income providing sufficient cash to fund operations and debt service. But, we must also understand that all assumptions on income and expenditures must come true and any significant change in either could cause a loss. I am not trying to suggest that the project should not move ahead. Just the opposite. I feel that with the new information and changes indicated the Arena project should definitely move ahead. I simply want to make sure that you clearly understand that you are proceeding "with your eyes open" on the assumptions made. 3) Overall Financing - In order to utilize all available funds for the completion of the project(s) certain actions will needed to be taken. That is, if the city utilizes the two "armory levies", the approved referendum amount, and revenue from the arena operation, we will need to "package" the deal in a different than normal manner. A memo from Mr. Dan O'Neill will be available on Tuesday evening for discussion. I would provide the conceptual idea of how this will come together here for your consideration. There will be basically three bond issues: a) the debt that the Minnesota State Armory Building Commission issues for the Armory and to which the City will make a debt payment for the City's share of the Armory. b) a separate issue for the approved referendum amount of the Community Center Project which the City pays using a new levy. 2 Armory/Center Update August 28, 1992 c) a separate issue, sold by the Port Authority, to finance the remaining portion of the Community Center, the Arena and the acquisition and relocation costs for the Highway 3 businesses. The revenue for the repayment of this issue will come from three sources. One will be the remaining levy available from the two armory levies and made to the Port Authority in the form of a lease payment. The second would be the revenue from the operation of the Arena and also made in the form of a lease payment. The third would be excess increments from the tax increment development district to pay for the relocation of the businesses on Highway 3. Utilizing these options the complete package can now be financed. 4) One additional item of concern. I was advised today that Knutson Construction Company, the original low bidder, is contesting the fact that their bid was thrown out. The bid was disqualified because the bidder did not include in their bid proof of their compliance to minority hiring. The legal people at MSABC are reviewing this and are keeping us advised but at this time it is their recommendation that we continue to complete all documents considering PCL the successful bidder. If Knutson would be successful in getting the bid the City's cost could go up appreciably. 3 Subject: Armory Committee Meeting of August 24, 1992 Time: 6:30 p.m., 8-24-92 Location: City Hall Council Chamber Purpose: To discuss Armory/Community Center Project and Financing of the project. Present: Armory Committee - Greg Clausen, George Boomer, Ray Knutson, Lee Knutson, Del Lorentzson, Ron Carlson National Guard - Terry Palmer, Craig Webber Architect - Steve Belmont, Art Dickey City Council - Dennis Wippermann, Harry Willcox City Staff - Dave Bechtold, Steve Jilk RAHA - Ron Pederson Steve Belmont reviewed each separate Bid Item, #1 - #39. Steve Jilk reviewed prepared data on the cost of each component, i.e. Armory, Community Center, Park and Recreation Add -On and Arena; and the financing options for them. Ron Pederson presented information on the arena and ideas on potential cost savings and volunteer assistance to reduce costs. The group then worked on reducing costs to reach a fundable level with present levies and approved referendum amounts. Bid Items 14b, 17, 18, 20, 29, 31, 32 and 35a were considered for cuts. Bid Items 14b - $20,000, 20 - $15,000, 29 - $44,500 and 35a - $6,000 were cut. Item 31 - was found to be in error as a added cost of $2,600 and was actually a deduct of $2,600, so by leaving it would allow for a $5,200 savings. These items amounted to a - $90,700 potential savings. It was decided that if funds are available that the City should attempt to negotiate the reinstatement of items prioritized as #29, 14b and 20. The committee then reached consensus that a recommendation should be provided to the City Council to proceed with the construction of the Armory and Community Center, Parks and Recreation and gym upgrades using all approved and existing funding sources to finance them as a package and to consider the construction of the Arena using a funding package which includes revenue from operations, contributions and necessary subsidies. "g 888888888888 S C>iI 8 oi5- Ln � 8 A n n W O S S S'S S S S O O O O O 1!7 S O O N M �� 8 888 8 8888 8 8 8 8 to r r = M M �� 8 88 S88 888888888 8'•- 8 88 8 N �; N c o o vi o vi o 0 o QQ vi c vi o r r r r r r r r +• Li Yx9 O S p S pOo O o Oo O S S ,/p S'f 8 S gS S8 OO O O S S O to .N-. N N� N h If'] n�� fV O ✓] N om^ \ ri n O h fv`+. NO r r �. r w M r r` ^•. r M b 8 S8 88p8 8OO.p88008p88888p �� pS 8 �g 8 11 O N 8 g S g 12 O �� rl - 1Ci] VO'1 vO•/ / 11'l V2 h h IA N N N N G O O N W r W r J G GIzM CL r G V pp CC.. p p p pp pp pp p p p D .••• G O O O O O O O G G O g g g g 0 0 0 0 0$$ 0 0 0 0 0 0 0$ S S G O G G O 0 0 0^ g G g O S O O O G O O m a O 8 O O O S O O O Go p Opp Epp O8 pp S 8 pp p pp pp p p pp p p p •�ppp p O G O G O O g g C tom. O O O G G g g? O G G. L G O G . G G G G G d O n M ^• Y'1 O :^1 -0 O e-0 -• M O O O G N C• �• l � L� r -� M tv M� �� �. M e't O-0' N M� M H r N � r O � M n r r r 6 U r b _ N N � pp_ N C zU D t� v d G= O C J L1 r A I N A r tn ,,pp � C e C m-0 C �y `~ Vl N v@ V 7 C d J J T J_ N b O E A O O, $ J V m + •� b Of d 88 W tL IL CA Cb $ S $ OJ ^ Y W V1 •+ ,Dp N Yy Xy b N L, b 0C/ N J J �C d A U Li i O NI L y y N J J �d'1 •+ S O .T. 6 U ►b•• W m 6 to .b. mob•• _ C a b v l;, m _ c s �0�l CC o s o V O C O O b T J N A b C T ..r A A A A A d 6 Q 6 L 0 6 d L W U U LL. A b Zt b A C T C b V O C N b L� C C C C V •� C r L ✓ A ` L b w C� O V tt Y � L _ b b b 61 b C r CC m b t A7 C CC T O C N Of ..L.. b r A A Of N N C m L C y .-w y (`. t`, LL 4 kL i r r r 0✓ O 5 8 {/1 C y p. ry A N 0J u G C 6 Q¢ V w L1 �+ b •.C. A r L) tJ •"• (p. of ¢ "'� L r D •_ 0' 3 Ic O .•• O Obi A of C V n u N �' W T. !• b Y¢ V Li�- •..- L yV c =� `o T i L� v� W� �... c 5 5 5 5 �s � b> s L •V^ � '" c A v �n a'n yL,� LL m oQ�'+ J J U Cl A Y bei w b Cl b b C@.J 5 b C Y b C C b A m 'O • A C A A D>u O 0 zA=inma?l l7SJSui: W d¢cz¢z¢¢ 4.0=4 .L- -�rc¢ m4AuzRvi= O rW. A m .•• + ` A• �l 'O •. . lN!a In V3 ON n ► h 1� m P ____ y� t4i N N N N N N. N N n n n n n n n n n n l NATIONAL GUARD ARMORY, ROSEMOUNT, MN. DESCRIPTION OF BID ITEMS BID ITEM 1: Armory Building. The complete construction of the National Guard Armory Building, including all General, Mechanical, and Electrical work in connection with the construction of Project. This will hT include any of the work called for by Bid item 2 through Bid item 38. 1) Note that costs shall be based on a nominal ceiling height of the Assembly Hall, Room B120, of 20 ft. 6 in. and East/West dimension of approximately 92'-8° clear inside. 2) Costs shall be based on finishes as indicated on Room Finish Schedule. Alternate finishes are to be bid under separate bid items. 3) Utility costs shall be based on extension of lines and services to a point S ft. 0 in. outside the building perimeter and within. (Costs for connection to services at the Property Line and extension to 5 ft. 0 it -.outside building will be supplied in Bid item 7.) BID ITEM 2: inti' Ori Detection n Slvsr am r 7s , l Da 1 . Installation only of the rough -in materials for the JSIIDS. Materials (except wiring and conduit) shall be furnished by Owner. Equipment will be furnished and installed by Owner. Boxes will be furnished by Owner, installed by Contractor. 1) Light fixtures, switches, receptacles, conduit, rough -in boxes (applicable), wiring, dehumidifier, etc., not specifically a part of the JSIIDS, or as specifically indicated, shall be included in Bid item 1, (furnished and installed by the Contractor). 2) The Owner will order and purchase the JSIIDS, remove the 'technical' equipment and supply Contractor with rough -in boxes for installation. Conduit, wiring, phone line, and connectors specifically for the JSIIDS shall be furnished and installed by the Contractor. At the completion of the Project, the Owner will install the 'technical' equipment. STATEMENT OF WORK 00600 - 2 STATEMENT OF WORK SW.01 DESCRIPTION OF WORK Work To Be Done: The work consists of furnishing all plant, labor, materials and equipment and performing all work in strict accordance with these specifica- tions, schedules and drawings forming parts thereof for: a. PROJECT TITLE: National Guard Armory, Rosemount, Minnesota b. LOCATION OF PROJECT: The above work is to be accomplished at: ADDRESS: State Highway 3 at Dodd Road Rosemount, Minnesota SW.02 PRINCIPAL FEATURES The work to be performed includes the following principal features. It is to be understood. that the general description of these features does not in any way limit or diminish the responsibility of the Contractor to accomalish the complete work under the contract in accordance with the provisions of SW.01 above. a. 2 -Story National Guard Armory Building. b. Masonry bearing walls with steel joists and deck. c. Insulated masonry cavity wall construction at all exterior walls. d. General, Mechanical and Electrical work to be included in one General Contract. e. Community Center and additional sitework by Alternate Bid. f. (See also, attached DESCRIPTION OF BID ITEMS.) SW.03 PRE-BID ON-SITE INSPECTIONS a. It is the Contractor's responsibility that he inspect the sites, ascer- taining for himself the work to be performed and the conditions under which it will be accomplished. Failure to do so will in no way relieve the successful bidder (Contractor) of the responsibility of accomplishing the work as described in these specifications and drawings for the agreed upon contract price. b. Arrangements for site inspections shall be coordinated with Arthur Dickey Architects, Inc. The pre-bid inspections will be conducted between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday. A minimum advance notice of 24 hours is required. SW. 04 Refer all questions relative to the work to: Arthur Dickey Architects, Inc. 4930 France Avenue South Minneapolis, Minnesota 55410 (612) 920-3993 STATEMENT OF WORK 8909.64 00600 - 1 NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid Items BID ITEM 3: Site Prenarations. All work in connection with the preparation of the project site (within the limits of the Property Lines) to the subgrade elevations rewired for the construction of facilities to the elevations specified on the Plans, including clearing, grubbing, excavation and embankment earthwork, drainage channels/system, and final grading/compaction of site soils to subgrade levels. The bid will = include excavation and backfilling recuired for ioundat-on walls and footings nor the finish shaping and proof rolling of the subgrade under pavements and floor slab construction. 1) Subgrade elevation '_s to be within 2 in. of finish grades as indicated on the Drawings. 2) Site preparation should only be recuired for those areas indicated or disturbed by the construction. 3) Note that 'Engineered fill, is recuired for some portions of the site as indicated. BID iTal 4: Grad na and SeedinCr. ,,!!.work In connection with grading and seeding of unpaved areas disturbed by construction, including placement of top soil from existing stock piles on the prepared subgrade, finisz grading the topsoil, and the sowing oz grass seed together with fertilizing, watering, cutting and general maintenance operations required to establish a healthy stand of grass. This bid will Q include sodding, sprigging, mulching, plants, planting, nor the grading and preparation of the subgrade. BID ITEM 5: Planting. All work in connection with the furnishing and planting of new trees, shrubs, bushes and vines at locations specified, including fertilizing, mulching, staking, erection of temporary barriers to prevent damage, watering and general maintenance operations required to establish healthy .growth after transplant. BID ITEM 6: Access Roads and Parking Pavement. All work in connection with the furnishing, placing and compaction of base and surface courses of pavements for access roads and parking areas, including the finish shaping and proof rolling of the prepared subgrade. This bid will NOT include the construction of the prepared subgrade, drainage structures, nor other items STATEMENT OF WORK nnann - I NATIONAL GUARD ARMORY, ROSEMOUNT, MN, Description of Bid items designated as site preparation work. The costs for each type parking area and the pavement designated access road are to be indicated separately as listed. The costs associated with 'rdditional Off-street Parking, shall be indicated in Bid item 16 and s�Sj included in this Bid Item. The subtotal l SLDtOia pr_Ce Si:a11 be for al the work of Bid Item o. BiD iTEM %. jet'iliyonnecti n All C O r _ Work in CCP^+`c:iOn w.th i_ installing furnis:-: ng'?d a: water, gas end sanizar-,r sewer serVice 1 -Jr. --s from themains to a poi. - -- . - �.. 1. s � e � Our ,. , _ t: -:e .ru_1ciP.ff line and trenchinc f0 `"ec` u -4 f d-- b a1 el a -cmc and telephone ca e i � _ b S, ::C uC_..y backf i l i i Pc - r and cOT,pac,.l0n 0_ earth after Cables ::ave been installed by local utility companies. . Thi S b4 d wi l l Aj •T include the Construction of any main lines for water, gas or sanitary sewer systems no: any work for the installation of any primary electric lines and ..r-=nsfox-niers. The cost for each type of utility work is to be indicated separately as listed. _-� IT`S a : � _ =en i nC7 All work connection with the iurni $'-i.na �Iyn and erection of outdoor chain link fencing comolece with all posts, fabric, barbed wire barrier, gates and accessories in place and ready for service. BID iTEM 9: Security Lighting. All work in connection with the furnishing and installation of the exterior Dole - mounted lighting system, including trenching and backfilling, cable and accessory item to a 5 ft. point outside the building line; complete and ready for service. This bid will OT include work inside the building (5 ft. line) nor any building -mounted exterior lighting fixtures. BID ITF-M 10: Concre*P walks. All work in connection with the construction of concrete walks, including the finish shaping and proof rolling of the prepared subgrade. This bid item will NoT_ include the construction of the prepared subgrade, drainage structures, nor other items designated as site preparation work. This bid item will not include concrete walks associated with the Community Center, which shall be included in Bid Item lo'. 1) Cost shall include subgrade preparation, formwork, accessories, materials, labor, finishing, etc. NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid Items BID IT'M 11: Flacroole. All work in connection with the furnishing and installation of the flagpole, including rope, foundation and all accessories; complete and ready for service. BID ITEM 12: =nla-up AssemblY Hall, Raises Roof an d Add C1 eros zo, v windows. x.11 work, including Mechanical and Electrical, but not including air conditioning, re = sired to increase the long dimension of Assembly .all (Room No. B120) from 92'-0" to 112'-0• (20 feet) (See Drawing No. k -o'), increase the heicht of the roof structure from 20'-6" to 26—o'" clear heicht to u-:dersldA of structural beams (See Detail 7/,1.18), and add Clerestory window `(See Drawing 4/.,1.2'-,) as sped fi ed in Section 08410. BID ITS 13: Park and Recreation p` -i P soace. All work, including _M_echanical and Electrical, required to add space and comolete the Park and Recreation Department Offices (Rooms Nos. B114, 3115, 8116, B117, 3118, and B119 at' the lower level.) See Drawing Sheet No. A6. BID ITEM 14a: Rosemount Community Center. A_il work, including Mechanical and Electrical, required to add space and complete the Rosemount Community Center. (Rooms Nos. H2O1 through H2O9, EXPANDED Room No. H210, EXPANDED Room No. H211, and Rooms Nos. x:212 through H219.) See Drawing Sheet No. All and all corresponding sections, elevations, details, schedules, and Mechanical and Electrical Drawings. BID ITEM 14b: amazed C M U at Audiori,m provide glazed C.M.U. color 'B' in lieu of brick type C where indicated on Drawing Sheets Nos. A-11 and A-29. BID ITEM 15a: Rosemount Arena. All work, including Mechanical and Electrical, required to add space and complete the Rosemount Arena. See Drawing Sheets Nos. P.31 through A33 and all corresponding sections, elevations, details, schedules, sitework, landscaping, and Mechanical and Electrical Drawings. Include Mechanical and Electrical rough -ins for future toilets at Room Nos. 1126 and I207. STATEMENT OF WORK 00600 - 5 NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid Items BID ITEM 15D: RosemounT Arena • 1 pam �OCm O; 1 `S Snn rcr > .._ u S 1•'11 work, including Mechanical and -lectrical, recur=d to add: Team Rooms Nos. 7107, 7108 T100, and 110• Toilets Nos. 1126, I129, -206, and 07 ^�.- T I2 Showers Nos. 7-27 and _128 • _ ' Figure Skaters Rooms Nos. _ 12 4 and 1-1-24-1; and Concessions Room No. 1204. See Drawing No. '32 and Corresponding Mechan4 cal and Electrical Drawi.nas EID IT`S 15C: FQ em tint Arpra 71= -,rat -or. 1 l Work, in-c-luding MeC-^-a^ i cal and Blect= _cal required - c � - � - t0 GCC .VCraL' � '_C 1 cVatOr. See Spec? t- Cat'_C?•: Sects c_'? 111,2 0 and nd comes-oond:.nQ Mec.'?anti-cal and Electrical Drawings and Specifications. ,zoi stw v ;S -ad a - c ua in Bid .Iter 15a. BID :mom 15d: Eoaemcu-'t Arena 31 cnc^ltar G C nrcnn? r'� -tom Snttrn C✓slaT.. --1'1 Arena requJLred to add bI eac^e"S where S:?O'v�?: on D rawi naS NOS. A31 through :33 , and all work, including, Electrical, required to add Scoreboard and Sound Svstem. See Specification Section 12750-=R`\A EL' C"ES, and Electrical SDeci'icacic s coi?cern4n^ Scoreboard and Sound system. -y 3ID -TEM 15e: ROcnTOun- ='" "= Al tArrt^ro Tra VSi crn 1 -1 .work, n-cludi g Mechanical and Electrical, to provide reciprocating refrigeration system With steel Dine floor in lieu of hermetic multiple compressor system with plastic pipe floor as indicated in Mechanical Specifications and Drawings and in Division 13 Specifications. BiD IT�.'y1 16: �OTPm nj ty n�cr i tawny !t nd p V martt All Work required to provide bituminous paving, concrete walks, flagpoles, seeding, sod, and planting for the Community Center. See Drawing Sheets Nos. A2, G1, and Ll. BID ITEM 17: Assembly Hall Athletic Ern,;pment. All work required to provide and install two rectangular glass basketball backstops; four fan shaped metal basketball backstops; three sets of volleyball standards, floor inserts and nets; one dividing curtain; and twelve wall pads. See Drawing Sheet A28 and Specification Section 1150 ATHLETIC EQUIPI�NT . NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid items BID ITEM 18: Assembly Hall Athletic Surface All work recn:ired to provide and install athletic floor and floor markings. (See Drawing Sheet No. A28. ) This item applies only to the enlarged Assembly hall. (See Bid Item 12.) BID TTS 1-9ssemb y Hall LCOuSt? Cal Treatment. All wort{ recuired to Drovide acoustical panels on t_^.e kssembiv :all walls. See Drawing Sheet No. A.28. BID IT -M. 20: . i -,r, -,.i shod concrete Block in -.sse7bl V -Hall. All work recuired to Drovidescored burnished concrete block full height of exposed walls in lieu of epot:v painted and painted scored regular concrete block in Room No. 3120. BiD IT=`! 21. C1 aze Dar` i ": on at L-6bb;y All work re -.u4 ----d to Drovide Glazed Lites in lieu of Dainted scored concrete block between Stair. A and the Assembly ::all and between a portion of corridor G225 and the -.sse.*abiv :all. See hollow metal frame Type D on Sheet No.. c21.. 3=D I'I'^M 22. Trorhy CaCes All work required to provide two Trophy cases in Lobby. (Room No. 3202.) See Detail 2/A9. BID ITEM 23: Skvliahts in Armory. All work, including structural, mechanical, and electrical, required to provide and install a structural skylight in Room -7202 and two unit skylights in Rooms Nos. 1201 and E205, including finished drywall ceiling openings and structural framing, in lieu of roofing, roof insulation, steel deck, bar joists and suspended ceiling. See details on Drawing Sheet No. Al2, and Specification Sections 07700 and 07850, and Structural, Mechanical and Electrical Drawings and Specifications. BiD ITEM 24: Locker Room Benches. All work required to provide and install Locker Room Benches in Rooms Nos. B109 and B113. See Drawing Sheet A6 and specification Section 10990. BID ITEM 25: Recessed PaDQr Towel Dispensers. All work required to provide and install recessed paper towel dispensers in Rooms B1007, B111, C105, C1060 E229, E230, G222, a a G224, in lieu of surface mounted paper towel dispensers. See Specification Section 10800 Toilet & Bath Accessories. SiA7i FE 0600 ORS NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid items BiD IT=M 26. udin-Visual Bc*uinment A11 work required to provide and;nstall Audio -Visual "Equipment 11Sted under Specification Section 11950. BID IT=?M 27: Burni cn-d COn.C='e` 31 O .lt in Lower T.c,;c1 Lcbhv. r 1 i work requ=red to provide and install scored bllrni shed concrete block full height in Roos i No. : 1`01 n 1 i C,� C.L. painted scored regular concrete block. - BID I' ±'! 28: rn Ic' ori C nC, o:A 31 o { in r work required to provide and install scored burnis e^_ concre_e block in Room No. B101 a-, at J- wails, =��1 1 l e i . - -S.t Oexposed wal 1 , in 1-eu o_- painter Score'', concrete block. ✓=D =?vf 2 ace � t in U _ C{ ^nprT,:,;cl T %7y anG', V^c`i^t to :_11 work required to provide and install -face :rick On the wails of Rooms Nos F201 and F202 f4'-06"ro4'-06" above floor, to ceiling, in lieu o= painted, scored, cors_--- block. (Face brick from floor to 4 ' -6" a'Zove fl oor is _::eluded in Bid _tem l Base Bid.) B 7 -,' 30 : Gema„- C Tile Floor ; n T'rar Levelcl pbh•J r.nri ticc•, ^t�� � '.11 work required to provide and install Porcelain Ceramic Tile on the floors in Rooms Nos. F201 and F202, in lieu of Vinv1 Composition Tile. BID i=4 31 Maul e Floor- ani'+ Base at n ';tor;un/classroom �raae All work required to provide and install maple flooring and base in Room No. F205 in lieu of carpet floor and base. Provide maple treads and risers at the steps from Auditorium/Classroom to the Stage in lieu or carpet. See Specification Section 09550. BID ITEM 32: Corian window `oois. All work required to provide and install Corian window stools at all Aluminum clad wood windows except those in Room Nos. E213, E214, 7'215, and 7'216. See Detail 21/A21. BID ITEC! 33: 12 Burner Rancre. All work required to provide -and install a 12 burner -as range/oven in lieu of a four burner gas range/ en, and gas griddle/oven in Food Preparation Room No. B125. See Section 11900 - FOCD SERVICE EQUIP=. STATEMENT OF WORK 00600 - 8 NATIONAL GUARD ARMORY, ROSEMOUNT, MN. Description of Bid Items BID ITEM 34: landscaped TS!ard r Drive Lar.- ' . .A_ll work recruired to provide and install concrete cubs and landscaping, in I I lieu of bituminous paving, at the island in the main entry drive lane. See Drawing Sheets Nos. A2, G1, and L1. BID TT—" -:'M. 35a: iod. All work required to provide and install 80,000 sq. ft. of sod in lieu of seeding in areas indicated on Zne Landscape Plan. See Drawing Sheet No. L1. BID IT=IM 35b. 5; to -r„Yi car i on All work r ecl_red to and provide install site irrigation in areas indicated on the I_rigation Plan. See •Specification Section 02810. BID ITEM 36: VO'y Counters in -men's Roams . .111 work .equired to provide and install laminated plastic countertop and lavatories in lieu of wall mounted lavatories, and all work required to provide Tull mirrors in lieu of _n^.dividual framed mirrors, in Men Is Rooms Nos. B107, -229, and G222. See Details 11/h7 and 12/97. BiD ITEM 37: A i r Condit i oni nc in t_*hp AS em ) i V HE!!r.11 work required to provide and install chilled water coils in the air handling units that serve the Assembly hall. Room No. 3120. See Division 15 - Mechanical -and Division 16 - Electrical. B -D IT ---'M 38: Bronze Placrue. All work required to provide and install a bronze plaque in the F_7-morv. See Specification Section 10425 -SIGNS. Definition: Including means including, but not limited to. STATEMENT OF WORK 00600 - 9 08/28/92 14:33 FAX 612 223 3002 SPRINGSTED INC. CITY OF ROSEMOUNT ARMORY CENTER COMPLEX - SUMMARY August 2T, 1992 Ia 002/006 08/28/92 11:33 FAX 612 223 3002 SPRINGSTED INC. CITY OF ROSEMOUNT ARMORY CENTER COMPLEX Use of Funds (Estimated) Armory Community Center Business Relocation Ice Arena Total Construction Costs Capitalized Interest Underwriters Discount Other Cost of Issuance Total Project Costs (Estimated) $1,150,000 1,619,000 400,000 2,127,000 $5,296,000 205,000 52,000 52.000 $5,605,000 0003/006 08/28%82 11:33 FU 612 223 3002 SPRINGSTED INC. CITY OF ROSEMOUNT ARM019Y CENTER COMPLEX Sources of Funds (Estimated) Debt Contract - State of Minnesota G.O. Bonds - City of Rosemount G.O. Bonds - Port of Rosemount Investment Earnings Cash $1,150,000 1,065,000 3,080,000 130,000 180.000 Total Sources of Funds $6,605,000 [a 0041/006 08/28/92 14:34 FAX 612 223 3002 SPRINGSTED INC. Q005/006 CITY OF ROSEMOUNT ARMORY CENTER COMPLEX Source of Revenue (Estimated) Armory Levy - Special Legislation - Special Levy Debt Levy - G.O. Bonds City Debt Levy - G.O. Bonds Port Ice Arena income - G.O. Bonds Port $ 95,000 30,000 87,600 80,000 180,000 081128/92 14:34 F_�IX 612 223 3002 SPRINGSTED INC. 0061006 M CITY OF ROSEMOUNT ARMORY CENTER COMPLEX Ice Time Rates Base Case Est. Est. Rate Hours Income Peak $115 1,176 $135,240 Off -Peak 94 721 67,774 District #196 94 650 _ 61,100 Total Ice Rental Income $264,114 Alternative #1 Esta Est. Rate Hours Income Peak $120 1,176 $141,120 Off -Peak 100 721 72,100 District #196 100 650 65,000 Total Ice Rental Income $278,220 City of Rosemount, Minnesota 3% Escalation for all yrs, No Other Income $2,100,000 Bond Issue Ice Arena Pro-Forma Operating Year Income Escalation 1993 1994 1995 1996 1997 1998 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 3.00% $22,010 $254,114 $272,037 $280,199 $288,604 $297,263 Services 3.00% 3.00% 6,750_ 81,0_00 - 83,430 85,933 88,511 91,166 Total Operating income $28,780 $345,114 $355,467 $366,131 $377,115 4 $388,429 Other Income: Banquet Facility 0 0 0 0 0 0 Excess Tax increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 0 00 0 0 Total Other Income $0 $0 $0 - �$0- $0 $0 Total income $28,760 $845,114 $355,467 $3+66,131 __ q 7115 $388,429 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00.% 8,077 96,920 99,828 102,822 105,907 109,084 Insurance 3.009'° 3.00% 833 10,000 10,300 10,609 10,927 11,255 utilities 3.000/0 3.00% 5,417 65,000 66,950 68,959 71,027 73,158 Gen & Admin 3.00% 3.00% 833 10,000 10,300_ ---$187,378 10,609 10,927 11,255 Total Operating Expense $15,160 $181,920 $192,999 $198,789 $204,753 Depreciation: Cost life Building 1,947,000 50 6,490 38,940 38,940 38,940 38,940 38,940 Equipment 437,000 20 3,842 21,850 21,850 21,850 21,850 21,850 Total Depreciation $10,132 $60,790 $60,790 $60,790 $60,790 $60,790 Total Operating Expense & Depre $25,292 $242,710 $248,168 $253,789 $259,579 $265,543 Net Income Before Debt Service $3,468 $102,404 $107,300 $112,343 $117,536 $122,886 Debt Service $0 $103,830 $123,830 $123,830 $123,830 $133,830 Net Income $3,468 f$ 426 ($11,487 ($6,294) {$10,944) Cumulative Depreciation $10,132 $70,922 $131,712 $192,502 $253,292 $314,082 Cumulative ProfitiLoss $3,468 $2,042 ($14,488) ($25,976) ($32,269) ($43,213) City of Rosemount, Minnesota 0 3% Escalation for all yrs, No Other Income $2,100,000 Bond Issue Ice Arena Pro -Forma 0 Excess Tax Increment (Through 1999) Operating Year 0 0 0 Income Escalation 1999 2000 2001 2002 2003 2084 Yr 95-04 Yr 05+ 0 Building Depreciation 0.00% 0 - 0 0 0 Operating Income: 0 Tota3 Other Income $0 $0 _ -$0 $0 Ice Time 3.00% 3.00% $306,181 $315,366 $324,827 $334,572 $344,609 $354,947 Services 3.00% 3.000/0 93,901 _ 96,718 99,620 102,608 105,687108,857 _ Total Operating Income $400,082 $412,084 $424,447 $437,180 $450,295 $463,604 Cather Income: Banquet Facility 0 0 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 - 0 0 0 0 0 Tota3 Other Income $0 $0 _ -$0 $0 $0 $0 Total Income $400,082 $412,084 $424,447 $437,180 $450,295 $463,804 Expenses Escalation Yr 95-04 Yr05+ Operating Expense: Personnel 3.00% 3.00% 112,357 115,728 119,199 122,775 126,459 130,252 Insurance 3.00% 3.DO% 11,593 11,941 12,299 12,668 13,048 13,439 Utilities 3.00% 3.00% 75,353 77,613 79,942 82,340 84,610 87,355 Gen & Admin 3.00% 3.00% 11,593 11,941 12,299 12,668 13,048 13,439 Total ('operating Expense $210,895 $217,222 $223,739 $230,451 --$237,364 $244,485 Depreciation: Cost Life Building 1,947,000 50 38,940 38,940 38,940 38,940 38,940 38,940 Equipment 437,000 20 21,850 21,850 21,850 21,850 21,850 21,850 Total Depreciation $60,790 $60,790 $60,790 $60,790 $60,790 $60,790 Total Operating Expense & Depre $271,685 $278012 $284,529 _$291,241 $298,154 $305,275 Net Income Before Debt Service $128,397 $134,072 $139,918 $145,939 $152,141 $158,529 Debt Service $133,380 $137,900 $147,150 $150,863 $164,288 $166,880 Net Income ($4,983) t$3,828� $7 2321 -$4 923 _($123146) x$8,351 Cumulative Depreciation $374,872 $435,662 $496,452 $557,242 $618,032 $678,822 Cumulative Profit/Loss ($48,196) ($52,024) ($59,256) ($64,180) ($76,326) ($84,677) City of Rosemount, Minnesota 3% Escalation for ail yrs, No Other Income $2,100,000 Bond Issue Ice Arena Pro -Forma Operating Year Income Escalation 2005 2006 2007 2008 2009 2010 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.009'0 3.00% $365,596 $376,563 $387,860 $399,496 $411,481 $423,825 Services 3.00% 3.00% 112,123 115,487 118,951 _ 122,520 126,195 129,981 Total Operating Income $477,718 $492,050 $506,812$522,016 $537,676 $553,807 Other Income: Banquet Facility 0 a 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 0 0 0 _ 0 0 Total Other Income $0 $0 $0 $0 $0 $0 Total Income $477,718 $492,050 $506,8 2 _ $522,416 $537,676 $553,807 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.001yo 134,160 138,185 142,330 146,600 150,998 155,528 Insurance 3.000/0 3.00% 13,842 14,258 14,685 15,126 15,580 16,047 Utilities 3.009`0 3.00% 89,975 92,674 95,455 98,318 101,268 104,346 Gen & Admin 3.00% 3.00% 13,842 14,258 14,685 15,126 15,580 16,047 Total Operating Expense $251,820 $259,374 $267,156 $275,170 _ $283,425 $291,928 Depreciation: Cost Life Building 1,947,000 50 38,940 38,940 38,940 38,940 38,940 38,940 Equipment 437,000 20 21,850 21,850 21,850 21,650 21,850 21,850 Total Depreciation $60,790 $60,790 $60,790 $60,790 $60,790 $60,790 Total Operating Expense & Depre $312,610 $320,164 $327,946 $335,960 $344,215 $352,718 Net Income Before Debt Service $165,109 $171,886 $178,866 $186,056 $193,461 $201,088 Debt Service $174,155 $180,825 $186,870 $197,270 $201,713 $210,518 Net Income ($9,046) ($8,939) ($8,004) _____ ($11 1,214) �$8 252$9,429! Cumulative Depreciation $739,612 $800,402 $861,192 $921,982 $982,772 $1,043,562 Cumulative ProfiV oss ($93,723) ($102,662) ($110,667) ($121,881) ($130,133) ($139,562) City of Rosemount, Minnesota Ice Arena Pro- Forma Income Escalation 2011 Yr 95-04 Yr fly+ Yr 05+ Operating Income: Operating Expense: Ice Time 3.00% 3.00% $436,540 Services 3.00% 3.00% 133,881 Total Operating Income $570,421 Other Income: 16,528 Banquet Facility 0 Excess Tax Increment (Through 1999) 0 Cost Reduction Contribution 0 Building Depreciation 0.0096 0 Total Other Income $0 Total Income $570,421 Expenses Escalation Operating Year Yr 95-04 Yr 05+ Operating Expense: 2013 2014 Personnel 3.00% 3.00% 160,194 Insurance 3.00% 3.00% 16,528 Utilities 3.00% 3.00% 107,435 Gen & Admin 3.0cr/o 3.00% 16,528 Total Operating Expense $605,159 $300,686 Depreciation: Cost Life 0 Building 1,947,000 50 38,940 Equipment 437,000 20 21,850 Total Depreciation 0 $60,790 Total Operating Expense & Depre $381,476 Net Income Before Debt Service $208,945 Debt Service $218,438 Net Income ($9,493) Cumulative Depreciation $1,104,352 3% Escalation for all yrs, No Other income $2,100,000 Bond Issue 165,000 17,024 110,658 17,024 $309,707 38,940 21,850 $60,790 $370,437 $217,037 $225,405 ($8,368) $1,165,142 169,850 17,535 113,978 17,535 $318,998 38,940 18,208 $67,148 $376146 $229,013 $241,480 $1246 $1,222,290 Cumulative Profit/Loss ($149,054) ($157,422) ($169,889) 175,048 18,061 117,397 18,061 $328,568 38,940 0- $38,940 $367,508 $255,807 $265,980 _ ..L$1Q, L73 $1,261,230 ($180,063) 180,300 18,603 120,919 '18,603 38,940 0 $38,940 $377,365 $264,649 $273,380 -- ($8,731). $1,300,170 ($188,794) 185,709 19,161 124,547 19,161 $348,578 •a• $387,518 $273,757 $269,465 $4,292 $1,339,110 ($184,502) Operating Year 2012 2013 2014 2015 2016 $449,636 $463,125 $477,019 $491,330 $506,070 137,897 142,034 146,295 150,684 155,204 $587,533 $605,159 $623,314 $642,014 $661,274 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 - $0 - $0 $0 $587,533 $605,159 $623,314 $642,014 $651,274 165,000 17,024 110,658 17,024 $309,707 38,940 21,850 $60,790 $370,437 $217,037 $225,405 ($8,368) $1,165,142 169,850 17,535 113,978 17,535 $318,998 38,940 18,208 $67,148 $376146 $229,013 $241,480 $1246 $1,222,290 Cumulative Profit/Loss ($149,054) ($157,422) ($169,889) 175,048 18,061 117,397 18,061 $328,568 38,940 0- $38,940 $367,508 $255,807 $265,980 _ ..L$1Q, L73 $1,261,230 ($180,063) 180,300 18,603 120,919 '18,603 38,940 0 $38,940 $377,365 $264,649 $273,380 -- ($8,731). $1,300,170 ($188,794) 185,709 19,161 124,547 19,161 $348,578 •a• $387,518 $273,757 $269,465 $4,292 $1,339,110 ($184,502) City of Rosemount, Minnesota Ice Arena Pro -Forma Income Escalation 2017 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 3.00% $521,252 Services 3.00% 3.00% 159,861 Total Operating Income $681,112 Other Income: Banquet Facility 0 Excess Tax Increment (Through 1999) 0 Cost Reduction Contribution 0 Building Depreciation 0.00% 0 Total Other Income $0 Total Income $681,112 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 191,280 Insurance 3.00% 3.00% 19,736 Utilities 3.00% 3.00% 128,283 Gen & Admin 3.00% 3.00% 19,736 Total Operating Expense $359,035 Depreciation: Cost Life Building 1,947,000 50 38,940 Equipment 437,000 20 0 Total Depreciation $38,940 Total Operating Expense $ Depre $397,9751 Net Income Before Debt Service $283,137 Debt Service $259,945 Net Income $23,192 Cumulative Depreciation $1,378,050 Cumulative Profit/Loss ($161,310) 3% Escalation for all yrs, No Other Income $2,100,000 Bond issue Operating Year 2018 $536,889 164,656 $701,546 0 0 0 0 $701,546 197,016 20,328 132,132 20,328 $408,746 $292,800 EEO $292,800 $1,416,990 $131,490 2019 $552,996 169,596 $722,592 0 0 0 0 $0 $722,592 202,929 20,938 136,096 20,936 38,940 0 $38,940 $419,M $342,752 $302,75.2 $1,455,930 $434,242 City of Rosemount, Minnesota 3% Escalation through 2004, No Other Income $2,100,000 Bond Issue Ice Arena Pro -Forma Operating Year Income Escalation 1993 1994 1995 1996 1997 1998 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 0.00% $22,010 $264,114 $272,037 $280,199 $288,604 $297,263 Services 3.0036 0.00°% 6,750 81,000 83,430 85,933 88,511 91,166 Total Operating Income $28,760 $345,114 $355,467 $356,131 $377,115 $388,429 Other Income: Banquet facility 0 0 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.000 0 0 0 0 D 0 Total Other Income $0 $0 $0 $0 $0 $0 Total Income $28,760 $345,114 $355,467 $366131$377,115 $388,429 Expenses Escalation Yr95-04 Yr05+ Operating Expense: Personnel 3.00°/6 3.009'0 8,077 96,920 99,828 102,822 105,907 109,084 Insurance 3.00% 3.00% 833 10,000 10,300 10,609 10,927 11,255 utilities 3.00% 3.00% 5,417 65,000 66,950 68,959 71,027 73,158 Gen & Admin 3.00% 3.00% 833 10,000 10,300 10,609 10,927 11,255 Total Operating Expense $15,160 $181,920 $187,378 $192,999 $198,789 $204,753 Depreciation: Cost fife Building 1,947,000 50 6,490 38,940 38,940 38,940 38,940 38,940 Equipment 437,000 20 3,642 21,850 21,850 21,850 21,85D 21,850 Total Depreciation $10,132 $60,790 $60,790 $60,790 $60,790 $60,790 Total Operating Expense & Depre $251292 $242,710 $248,168 $2.531789 $259,579 $265,543 _ Net Income Before Debt Service $3,468 $102,4104 $107,300 $112,343 $117,536 $122,886 Debt Service $0 $103,830 $123,830 $123,830 $123,830 $133,830 Net Income $3,468 _($1,426)$16 530 $11,447) $6 294 ($10,944) Cumulative Depreciation $10,132 $70,922 $131,712 $192,502 $253,292 $314,082 Cumulative Profit/Loss $3,468 $2,042 ($14,488) ($25,976) ($32,269) ($43,213) City of Rosemount, Minnesota Ice Arena Pro -Forma 3% Escalation through 2004, No Other Income $2,100,000 Bond Issue Operating Year Income Escalation 1999 2000 2001 2002 2003 2004 Yr 95-04 Yr 05+ 0 0 0 0 0 0 Operating Income: 0 0 0 0 0 0 Ice Time 3.00% 0.00°!0 $306,181 $315,366 $324,827 $334,572 $344,809 $354,947 Services 3.00% 0.009'0 93,901 96,718 ---- 99,620 102,608 105,687 108,857 Total Operating Income $400,082 $412,084 $424,447 $437,180 -------- $450,295 $463,804 Banquet Facility 0 0 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 0 0 0 0 0 Total tither Income $0 - $0 - $0 $0 -- $0 $0 Total Income $440 082 -_-_-� $412,084 $424,447$437,184 $450,295 $463,804 Expenses Escalation Yr 95-04 Yr 1}5+ Operating Expense: Personnel 3.00% 3.00% 112,357 115,728 119,199 122,775 126,459 130,252 Insurance 3.00% 3.00% 11,593 11,941 12,299 12,666 13,048 13,439 Utilities 3.00% 3.000/a 75,353 77,613 79,942 82,340 84,810 87,355 Gen &Admin 3.00% 3.00% 11,593 11,941 12,299 12,668 13,048 13,439 Total Operating Expense $210,695 $217,222 $223,739 $230,451 $237,364 $244,485 Depreciation: Cost Life Building 1,947,000 50 38,940 38,940 38,940 38,940 38,940 38,940 Equipment 437,000 20 21,850 21,850 21,850 21,850 21,850 21,854 Total Depreciation $60,790 $60,790 $60,790 $60,790 $60,790 $60,790 Total Operaling Expense & Depre $271,685 $278,012 $284,529 $291,241 $298,154 $305,275 Net Income Before Debt Service $128,397 $134,072 $139,918 $145,939 $152,141 $158,529 Debt Service $133,380 $137,900 $147,150 $150,863 $164,288 $166,880 Net Income ($4,983) ($3 828 ($7,232)($4,923) ($1g, 1461 $B,3511 Cumulative Depreciation $374,872 $435,662 $496,452 $557,242 $518,032 $678,822 Cumulative Profit/Loss ($48,196) ($52,024) ($59,256) ($64,180) ($76,326) ($84,677) City of Rosemount, Minnesota Life 3% Escalation through 2004, No Other Income $2,100,000 Bond Issue Ice Arena Pro -Forma 0 0 Operating Year 0 0 0 Income Escalation 2005 2006 2007 2008 2009 2010 Yr95-04 Yr 051 - 0 0 0 Building Depreciation 0.00%- 0 Operating Income: 0 0 0 0 Total Other Income Ice Time 3.00% 0.00% $354,947 $354,947 $354,947 $354,947 $354,947 $354,947 Services 3.00% 0.00% 108,857 108,857 108,857 108,857_ 108,857 108,857 Total Operating Income 1 $463,804 $463,804 $463,804 $463,804 $463,804 $463,804 Other Income: Banquet Facility Life 0 0 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution Net Income Before Debt Service 0 0 0 0 0 0 Building Depreciation 0.00%- 0 0 0 0 0 0 Total Other Income $0 $Q $0 $0 $0 $0 Total Income $463,804 $463,804 4463,804 $463,804_ $463,804 $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 134,160 138,185 142,330 146,600 150,998 155,528 Insurance 3.00% 3.00% 13,842 14,258 14,685 15,126 15,580 16,047 Utilities 3.00% 3.00% 89,975 92,674 95,455 98,318 101,268 104,306 Gen & Admin 3.00% 3.00% 13,642 14,258 14,685 15,126 15'sw 16,047 Total Operating Expense $251,820 $259,374 $267,156 _ $275,170 $283,425 $291,928 Depreciation: Cost Life Building 1,947,000 50 38,940 38,940 Equipment 437,000 20 21,854 21,850 Tota.] Depreciation $60,790 $60,790 Total Operating Expense & Depre $312,610 $320,164 Net Income Before Debt Service $151,195 $143,640 Debt Service $174,155 $180,825 Net Income ($22,960) ($37,1851 Cumulative Depreciation $739,612 $800,402 Cumulative Profit/Loss ($107,637) ($144,822) 38,940 21,850 $60,790 $327,946 $135,859 $186,870 -----x$51,01. $861,192 ($195,834) 38,940 21,850 $60,790 -- $127,844 $197,270 ($69,426) $921,982 ($265,260) 38,940 21,850 $60,790 $344215 $119,589 $201,713 --($82:124) $982,772 ($347,383) 38,940 21,850 $60,790 $352,718 $111,086 $210,518 ($99,431) $1,043,562 ($446,814) City of Rosemount, Minnesota Ice Arena Pro -Forma Income Escalation 2011 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 0.00% $354,947 Services 3.00% 0.00°/0 _ 108,857 Total Operating Income $463,804 Other Income: 3% Escalation through 2004, No Other Income Operating Year 2012 2013 2014 $354,947 108,857 $463,804 $354,947 108,857 $463,804 $354,947 108,857 $463,804 $2,100,000 Bond Issue 2015 $354,947 108,857 $463,804 2016 $354,947 108,857 $463,804 Banquet Facility 0 0 0 0 0 0 Excess Tax Increment (Through 1999) 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 `____ 0 0 fl 0 0 Total Other Income $0 $0 $0 $0 $0 $0 Total income $463,804 $463,804_ $463,804 $463,804 $463,804 $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 160,194 165,000 169,950 175,048 180,300 185,709 Insurance 3.00% 3.00% 16,528 17,024 17,535 18,061 18,603 19,161 Utilities 3.00% 3.00% 107,435 110,658 113,978 117,397 120,919 124,547 Gen & Admin 3.00% 3.00% 16,520 17,024 17,535 18,061 18,6013 14,161 Total Operating Expense $300,686 $309,707 $318,998 $328,568 $338,425 $348,578 Depreciation: Cost Life Building 1,947,000 50 38,940 38,940 38,940 38,940 38,940 38,940 Equipment 437,404 20 21,850 21,850 18,208 0 0 0 Total Depreciation $60,790 $60,790 $57,148 $38,940 $38,940 $38,940 Total Operating Expense & Depre $361,476 $370,497 $376,146 $367 508 $377,3fi5 $387,518 Net Income Before Debt Service $102,328 $93,308 $87,658 $96,297 $86,440 $76,287 Debt Service $218,438 $225,405 _$241,460 $2+65,980 $273,380 $269,465 _ Net tncome ($116,1091 ($132,097) _!$153,822) ($169,683) ($186,940)_ x$193 178 - Cumulative Depreciation $1,104,352 $1,165,142 .$1,222.290 $1,261,230 $1,300,170 $1,339,110 Cumulative Profit/Loss ($562,924) ($695,021) ($848,843) ($1,018,526) ($1,205,457) ($1,398,645) City of Rosemount, Minnesota Ice Arena Pro -Forma Income Escalation 2017 Yr 95-04 Yr05+ $463,804 Operating Income: 0 0 Ice Time 3.00% 0.00% $ 4,947 Services 3.00% 0.00% 108,857 Total Operating Income $0 $463,804 Other Income: Banquet Facility 0 Excess Tax Increment (Through 1999) 0 Cost Reduction Contribution 0 Building Depreciation 0.00 0 Total Other Income - - $0 Total Income $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00'0 3.00% 191,280 Insurance 3.00% 3.00% 19,736 Utilities 3.00% 3.00% 128,283 Gen & Admin 3.00% 3.W% t9,736 Total Operating Expense $359,035 Depreciation: Cost Life Building 1,947,000 50 38,940 Equipment 437,000 20 0 Total Depreciation $38,940 Total Operating Expense $ Depre $397,975 Net Income Before Debt Service $65,829 Debt Service $259,945 Net Income ($194,11 P) Cumulative Depreciation $1,378,050 Cumulative Profit/Loss ($1,592,760) 3% Escalation through 2004, No Other Income Operating Year 2018 2019 $354,947 $354,947 108,85_7 108,857 $463,804 $463,804 0 0 0 0 0 0 0 0 _ $0 $0 $463,804 $463804 197,018 202,929 20,328 20,938 132,132 136,096 20,321 20.,933 $369,806 $380,900 38,940 38,940 0 0 $38,940 $38,940 $408,746 $419,840 $55,058 $43,964 $0 $0 $65,058 $43964 $1,416,990 $1,455,930 ($1,537,702) ($1,493,737) $2,100,000 Bond Issue City of Rosemount, Minnesota lee Arena Pro -Forma Cap. Interest (7) 103,192 20,000 Net Debt Payabfe (8) 0 103,830 123,830 123,830 123,830 133,830 133,380 137,900 147,150 150,863 164,288 166,880 174,155 180,825 186,870 197,270 201,713 210,518 218,438 225,405 241,480 265,980 273,380 269,465 259,945 0 Totals: 2,100,000 2,438,244 4,538,244 123,192 41415,053 Total Levy Mat Interest Principal & Year Year Principal Rate Interest Interest (1) (2) (3) (4) (5) (6) 1991 1993 0 3.10% 103,192 103,192 1992 1994 0 3.50% 123,830 123,830 1993 1995 0 3.70% 123,830 123,830 1994 1996 0 3.90% 123.830 123,830 1995 1997 0 4.20% 123,830 123,B30 1996 1998 10,000 4.50% 123,830 133,830 1997 1999 10,000 4.80% 123,380 133,380 1998 2000 15,000 5.00% 122,900 137,900 1999 2001 25,000 5.15% 122,150 147,150 2000 2002 30,000 5.2510/0 120,863 150,663 2001 2003 45,000 5.350/6 119,288 164,288 2002 2004 50,000 5.45% 116,880 166,880 2003 2005 60,000 5.55% 114,155 174,155 2004 2006 70,000 5.6596 110,82.5 180,825 2005 2007 80,000 5.75% 106,670 186,870 2006 2008 95,000 5.85% 102,270 197,270 2007 2009 105,000 5.90% 96,713 201,713 2008 2010 120,000 5.90% 90,518 210,518 2009 2011 135,000 5.95% 83,438 218,438 2010 2012 150,000 5.95% 75,405 225,405 2011 2013 175,000 6.00% 66,480 241,480 2012 2014 210,000 6.00% 55,980 265,980 2013 2015 230,000 6,050/, 43,380 273,380 2014 2016 240,000 6.050/6 29,465 269,465 2015 2017 245,000 6.10% 14,945 259,945 2016 2018 0 6.10% 0 0 Cap. Interest (7) 103,192 20,000 Net Debt Payabfe (8) 0 103,830 123,830 123,830 123,830 133,830 133,380 137,900 147,150 150,863 164,288 166,880 174,155 180,825 186,870 197,270 201,713 210,518 218,438 225,405 241,480 265,980 273,380 269,465 259,945 0 Totals: 2,100,000 2,438,244 4,538,244 123,192 41415,053 City of Rosemount, Minnesota Ice Arena Pro -Forma Income Escalation 1993 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 3.0096 $22,010 Services 3.00% 3.00% 6,750 Total Operating Income $28,760 3% Escalation all years, No Cather Income Operating Year 1994 1995 1996 $264,114 $272,037 $280,199 81,000 63,430 85,933 $345,114 _ $365,467 $366,131 $2,310,000 Bond Issue , 1997 $2.88,604 88,511 $377,115 1998 $297,263 91,166 $388,429 Other Income: 0 0 0 0 0 0 Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 0 Cost Reduction Contribution 20 0 0 0 0 0 Building Depreciation 0.00% 0 � $0 - $0 - $0 $0 $0 Total Other Income Total income $28,766 $345,114 $355,467 $366,131 _ $377,115 $358,429 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 8,077 Insurance 3.00° 3.00% 833 Uflittles 3.00% 3.00% 5,417 Gen & Admin 3.00% 3.00% 833 Total Operating Expense $15,160 Depreciation: Cost We Building 2,044,000 50 6,813 Equipment 520,000 20 4,333 Total Depreciation $11,147 Total Operating Expense & Depre Net Income Before Debt Service $2,453 Debt Service $0 Net Income $2,453 Cumulative Depreciation $11,147 Cumulative Profit/Loss $2,453 $181,920 40,^88 0 $248,600 $96,314 $134,765 _($38 ,�§Jl- $78,027 ($35,998) 99,828 10,300 66,950 10,300 $187,378 $254,258 $101,210 102,822 10,609 68,959, 10,609 $192,999 $259,879 $106,253 $134,765 $134,765 `x$33 L55 A$28,512) $144,907 $211,787 ($69,553) ($98,066) 105,907 10,927 71,027 10,927 $198,789 40,880 26,000 $66,880 $265,669 $111,446 A,J r • yrnc -- _L9-� $278,667 ($141,384) 109,084 11,255 73,158 11,255 $204,753 $271,£33 $116,796 $153,925 ($37,129 $345,547 ($178,513) City of Rosemount, Minnesota Ice Arena Pro- Forma Income Escalation Yr 95-04 Yr 05+ Operating Income: 3% Escalation all years, No Other Income Operating Year Ice Time 3.0096 3.009`0 $306,181 Services 3.00% 3.00% 93,901 Total Operating Income $400,082 $315,366 96,718 $412,084 2001 $324,827 _ 99,620 $424,447 ��' $334,572 102,608 $437,160 $2,310,000 Bond Issue 2003 $344,609 105,667 $450,295 2004 $354,947 108,857 $463,804 Other Income: 0 0 0 0 0 0 Banquet Facility 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 Cost Reduction Contribution 0 4 0 0 0 Building Depreciation 0.00% 0 $0 0 - $0 -- $0 $0 $0 Total Other Income Total Income $400,082 $412,084 _$424 447 $437,180 $463,804_ __$_50,295 Expenses Escalation Yr95-04 Yr05+ Operating Expense: Personnel 3.0096 3.00% 112,357 115,728 1(9,199 122,775 126,459 13,048 130,252 13,439 Insurance 3.00% 3.00% 3.00% 3.00% 11,593 75,353 11,941 77,613 12,299 79,942 12,668 82,340 84,810 87,355 Utilities Gen & Admin 3.00% 3.00% 11,593 11,941 12,299 $223,739 12,668 13,048 $237,364 13,439 $244,485 $230,451 $217,222 Total Operating Expense $210,895 Depreciation: Cost Life Building 2,044,000 50 40,880 40,880 40,880 40,880 44,880 26,000 40,880 26,000 Equipment 520,000 20 26,000 26,000 26,000 26,000 $66,880 _ $66,880 $66,880 $66,860 $66,880 $66,880 Total Depreciation Total Operating Expense &Depre $277,776 _$284,102 $290,619 $297,331_ $3044,244 $311,365 Net income Before Debt Service $122,307 $127,982 $133,828 $139,849 $146,051 $152,439 Debt Service $163,025 $171,585 $174,585 $177,268 $179,643 $186,700 {$40 718 ($43,603 x$40,757) _ �7,418� x$33,551 {$34,261) Net Income Cumulative Depreciation $412,427 $479,307 $546,187 $613,067 $679,947 $746,827 Cumulative ProfrtJLoss ($219,231) ($262,834) ($303,591) ($341,010) ($374,601) ($408,862) 4 , City of Rosemount, Minnesota 3% Escalation all years, No Other Income $2,310,000 Bond Issue , Ice Arena Pro -Forma Operating Year Income Escalation 2005 2006 2007 2008 2009 2010 Yr 95-04 Yr05+ Operating Income: Ice Time 3.00% 3.00% $365,596 $376,563 $387,860 $399,49fi $411, 481 $423,825 Services 3.000/ 3.00% 112,123 $477,718 115,487 $492,050 118,951 122,520 $522,016 _ 126,195 129,981 $553,807 $537,676 $506,812 Total Operating Income Other Income: 0 0 0 0 0 0 Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 Building Depreciation 0.00% 0 0 $0 0 $0 $0 $0 $0 Total Other Income $0 Total Income $477,718 $482,0 $x,812 $522,016 $537,676 _$5531 807 _ Expenses Escalation Yr95-04 Yr05+ Operating Expense: Personnel 3.00% 3.00% 134,160 138,185 142,334 146,600 150,998 155,528 Insurance 3.00% 3.00% 3.00% 13,842 69,975 14,258 92,6674 14,685 95,455 15,126 98,318 15,580 101,268 16,047 104,306 Utilities 3.00% Gen & Admin 3.00% 3.00% 13,842 14,258 14,685 $267,156 15,126 15,580 16,047 $291,928 $283,425 $275,170 $259,374 Total Operating Expense $251,820 Depreciation; Cost Ufe Building 2,044,000 50 40,880 40,880 40,880 44,880 40,880 40,880 Equipment 520,000 20 26,000 26,000 26,000 $66,880 26,000 26,000 26,000 $66,880 $66,880 $66,880 $66,880 $66,880 Total Depreciation Total Operating Expense & Depre _ $318,700 $326,254 $334,036 _ $342,050 $358,808 __$350,305 Net Income Before Debt Service $159,019 $165,796 $172,776 $179,966 $187,371 $194,998 Debt Service $193,158 $203,995 $203,910 $208,448 $212,305 $210,520 Net Income _ ($34,139) {$38,1991 --VIAP-41 34 _x$24,934 ` 15,522) `_428,482} Cumulative Depreciation $813,707 $680,587 $947,467 $1,014,347 $1,081,227 $1,148,107 Cumulative Profit/Loss ($443,001) ($481,200) ($512,334) ($540,816) ($565,750) ($581,272) City of Rosemount, Minnesota 3% Escalation all years, No Other Income $2,310,000 Bond Issue Ice Arena Pro- Forma Operating Year Income Escalation 2011 2012 2013 2014 2015 2016 Yr 95-04 Yr 05+ Operating income: Ice Time 3.00'/u 3.00% $436,544 $449,636 $463,125 $477,019 $491,330 $506,070 Services 3.00% 3.00% 133,881 137,897 14_2,034 146,295 150,684 155,204 Total Operating Income $570,421 $587,533 $605,159 $623,314 $642,014 $661,274 Other Income: 0 0 0 0 0 0 Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 Building Depreciation 0.00% 0 $0 0 $0 0 $0 $0 $0 $0 Total Other Income Total Income $570,421 _$587,_533 __$6o5 6231314 $642..014 $661,274 Expenses Escalation Yr95-04 Yr O5+ Operating Expense: Personnel 3.00% 3.00% 160,194 165,000 169,950 175,048 180,300 185,709 Insurance 3.00% 3.00% 3.00% 3.00% 16,528 107,435 17,024 110,658 17,535 113,978 18,061 117,397 18,603 120,919 19,161 124,547 Utilities Gen & Admin 3.00% 3.00% 16,528 17,024 17,535 18,061 18,603 19,161 Total Operating Expense $300,686 $309,707 $318,998 $328,568 $338,425 $348,578 Depreciation: Cost Life Building 2,044,000 50 40,880 40,880 40,880 40,880 40,880 40,880 Equipment 520,000 20 26,000 25,000 21,667 8 0 0 $40,880 $40,880 $40,880 $62,547 $66,880 $66,880 Total Depreciation Total Operating Expense & Depre $367,566 $376,587 $381,544 $369,448 _ $379,305 $389,458 _ Net Income Before Debt Service $202,855 $210,947 $223,615 $253,867 $262,709 $271,817 Debt Service $223,440 $235,110 $235,590 $250,390 $263,690 $270,380 Net Income _L$20,585} x$24,1631 -$( 11,MI _ $3 477 l x$981 $1,437 Cumulative Depreciation $1,214,987 $1,281,867 $1,344,413 $1,385,293 $1,426,173 $1,467,053 Cumulative Profit/Loss {$£01,857} ($626,020) ($537,995) ($634,518) ($635,500) ($634,063) City of Rosemount, Minnesota Ice Arena Pro -Forma Income Escalation 2017 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 3.00% $521,252 Services 3.00% 3.00% 159,861 Total Operating Income $661,112 Other Income: 3% Escalation all years, No Other Income $2,310,000 Bond Issue Operating Year Banquet Facility 0 Excess Tax Increment 0 Cost Reduction Contribution 0 Building pepreclation 0,00% 0 Total Other Income $0 Total Income 2018 $536,889 164,656 $701,546 0 0 0 0 $0 $681,112 $701,646 2019 $552,996 169,596 $722,592 0 0 0 0 $722,592 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 191,280 197,018 202,929 Insurance 300% 3.00% 19,736 20,328 20,938 Utilities 3.00% 3.00% 128,283 132,132 136,0% Gen & Admin 3.00% 3.00% 19,736 20,328 20,938 Total Operating Expense $359,035 $369,806 $360,900 Depreciation: Cast Life Building 2,044,000 50 40,880 40,860 40,880 Equipment 520,040 20 Total Depreciation 0 0 0 $40,880 $40,880 $40,880 Total Operating Expense & Depre $399,915 $410,686 $421,780 - Net Income Before Debt Service $281,197 $290,860 $300,812 Debt Service $275,860 $0 $0 Net Income $5,337 $290,860 $300,812 Cumulative Depreciation $1,507,933 $1,548,813 $1,589,693 Cumulative Prolt/Loss ($628,725) ($337,866) ($37,054) R 1 City of Rosemount, Minnesota 0 3% Esc thru 04, No Other Income 0 $2,310,000 Bond Issue Ice Arena Pro -Forma Excess Tax Increment 0 Operating Year 0 0 0 Income Escalat€on 1993 1994 1995 1996 1997 1998 Yr 95-04 Yr 05+ Building Depreciation 0.003 0 0 0 0 0 Operating Income: Total Other Income T $0 $0 $0 $0 $0 Ice Time 3.00% 0.00% $22,010 $264,114 $272,037 $280,199 $288,604 $297,263 Services 3.00% 0.00% 6,750 81,000 83,430 85,933 88,511 91,166 Total Operating Income $28,760 $345,114 $355,467 $366,131 $377,115 $388,429 Other Income: Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.003 0 0 0 0 0 0 Total Other Income T $0 $0 $0 $0 $0 $0 Total Income �`$28L760 $345,114 _$355,467 $3661131 __$377 115 _ $388,429 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 8,077 96,920 99,828 102,822 105,907 109,084 Insurance 3.00% 3.00% 633 10,000 10,300 10,609 10,927 11,255 Utilities 3.00% 3.00% 5,417 65,000 66,950 68,959 71,027 73,158 Gen & Admin 3.00% 3.00% 833 10,000 10,300 10,609 10,927 11,255 Total Operating Expense $15,160 $181,920 $187,378 $192,999 $198,789 $204,753 Depreciation: Cost € ife Building 2,044,000 50 6,813 40,880 40,880 40,880 40,880 40,880 Equipment 520,000 20 4,333 26,000 26,000 26,000 26,000 26,000 Total Depreciation $11,147 $66,880 $66,880 $66,880 $66,880 $66,880 Total Operating Expense & Depre $26,307 $248,800 $254,258 _ $259,879 $265,669 $271,633 Net Income Before Debt Service $2,453 $96,314 $101,210 $106,253 $111,446 $116,796 Debt Service $0 $134,765 $134,765 $134,765 $154,765 $153,925 Net Income $2,453 - ($38,451 ($33,555) _ _x$28,5121 ($43,319) ($37,129) Cumulative Depreciation $11,147 $78,027 $144,907 $211,787 $278,667 $345,547 Cumulative Profit./Loss $2,453 ($35,998) ($69,553) ($98,066) ($141,384) ($178,513) City of Rosemount, Minnesota 3% Esc thru 04, No Other Income $2,310,000 Bond Issue Ice Arena Pro -Forma Operating Year Income Escalation 1999 2000 2001 2002 2003 2004 Yr 95-04 Yr05+ Operating Income: ice Time 3.00°% 0.0096 $306,181 $315,366 $324,827 $334,572 $344,609 $354,947 Services 3.00% 0.00% 93,901 96,718 99,620 102,808 #05,687 108,857 Total Operating Income $400,082 $412,084 $424,447 _ $437,184 - $450,295 $463,804 i Other Income: Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.04°x'6 0 0 0 v 0 0 0 Total Other Income $0 -$0 $0 $0 $0 $0 Total Income $400,082 $412,084. $424,447 $437,180 $450,295 $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 112,357 115;728 119,199 122,775 126,459 130,252 Insurance 3.00% 3.00% 11,593 11,941 12,299 12,668 13,048 13,439 Utilities 3.00°% 3.00% 75,353 77,613 79,942 82,340 84,810 87,355 Gen & Admin 3.00% 3.00% 11,593 11,941 12,299 12,668 13,048 13,439 Total Operating Expense $210,895 $217,222 $223,739 $230,451 $237,364 $244,485 Depreciation: Cost Life Building 2,044,000 50 40,880 40,880 40,880 40,880 40,880 40,880 Equipment 520,000 20 26,000 26,000 2+6,000 26,000 26,000 26,000 Total Depreciation $66,880 $66,880 $66,880 $66,880 $66,880 $66,880 Total Operating Expense & Depre $277,775 $284,102 $290,619 $297,331 $304,244 $311,365 Net Income Before Debt Service $122,307 $127,982 $133,828 $139,849 $146,051 $152,439 Debt Service $163,025 $171,585 $174,585 $177,268 $179,643 $186,700 Net Income ($40,718) Y($43,603) x$44 7 7y ($37,418) ($33,591) ($34,261) Cumulative Depreciation $412,427 $479,307 $546,187 $613,067 $679,947 $746,827 Cumulaiive Profit/Loss ($219,231) ($262,834) ($303,591) {$341,010} ($374,601) ($408,862) City of Rosemount, Minnesota 3% Esc thru 04, No Other Income $2,310,000 Bond Issue Ice Arena Pro -Forma Operating Year Income Escalation 2005 2006 2007 2008 2009 2010 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 0.00°16 $354,947 $354,947 $354,947 $354,947 $364,947 $354,947 Services 3.00% 0.00% 108,857 108,857 108,857 108,857 108,857 108,857 Total Operating Income $463,804 $463,804 $463,804 $463,804 $463,804 $463,804 Other Income: Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 0 0 0 Building Depreciation 0.00% 0 00 0 0 0 Total Other Income $0 _ $0 _ $0 $0 $0 $0 Tota! Income $453,804 X463,804 $463,804 _ $463,804 _$463,804 $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 134,160 138,185 142,330 146,600 150,998 155,528 Insurance 3.00% 3.00% 13,842 14,258 14,685 15,126 15,580 16,047 Utilities 3.00% 3.00°la 89,975 92,674 95,455 98,318 101,268 104,306 Gen & Admin 3.00% 3.00% 13,842 14,258 14,685 15,126 15_,580 16,047 Total Operating Expense $251,820 $259,374 $267,156 $275,170 $283,425 $291,928 Depreciation: Cost Life Building 2,044,000 50 40,880 40,880 40,880 40,880 40,880 40,880 Equipment 520,000 20 26,000 26,000 26,000 26,000 26,000 26,000 Total Depreciation $66,880 $66,880 $66,880 $66,880 $6£,880 $66,880 Total Operating Expense & Depre $318,700 $326,254 $334,036 __$342 050 $3.50,305 $358,808 Net Income Before Debt Service $145,105 $137,550 $129,769 $121,754 $113,499 $104,996 Debt Service $193,158 $203,995 $203,910 $208,448 $212,305 $210,520 Net Income ($48,053) C4$ ,. ($74,141)_ CW 693 ($98,8116} _ ${ 105 524 Cumulative Depreciation $813,707 $880,587 $947,467 $1,014,347 $1,081,227 $1,148,107 Cumuia#iveProfit/Loss ($45+6,915) ($523,360) ($597,501) ($684,195) ($783,001) ($888,524) City of Rosemount, Minnesota Ice Arena Pro -Forma 3% Esc thru 04, No Other Income Operating Year $2,310,000 Bond Issue Income Escalation 2011 2012 2013 2014 2015 2016 Yr 95-04 Yr 05+ Operating Income: Ice Time 3.00% 0.00% $354,947 $354,947 $354,947 $354,947 $354,947 $354,947 Services 3,0096 0.00% _ 108,857 108,857_ 108,857 108,857 108,857 108,857 Total Operating Income i $463,804 $463,804 $463,804 $463,804 $463,804 $463,804 ! Other Income: Banquet Facility 0 0 0 0 0 0 Excess Tax Increment 0 0 0 0 0 0 Cost Reduction Contribution 0 0 0 D 0 0 Building Depreciation 0.00%0 0 0_ 0 0 0 0 Total Other Income -_-�$0 $0 _ $0 $0 -- $0 $0 Total Income $463,804 $463,804 $ 53,804 $463,804 $463,804 $463,804 Expenses Escalation Yr 95-04 Yr 05+ Operating Expense: Personnel 3.00% 3.00% 160,194 165,000 159,950 175,048 180,300 185,709 Insurance 3.00% 3.00% 16,528 17,024 17,535 18,061 18,603 19,161 Utilities 3.00% 3,00% 107,435 110,658 113,978 117,397 120,919 124,547 Gen & Admin 3.00% 3.00% 16,528 17,024 17,535 18,061 18,603 18,161 Total Operating Expense $300,686 $309,707 $318,998 $328,568 $338,425 $348,578 Depreciation: Cost Life Building 2,044,000 50 40,880 40,880 40,880 40,880 40,880 40,880 Equipment 520,000 20 26,000 26,000 21,667 0 0 0 Total Depreciation $66,880 $66,880 $62,547 $40,880 $40,880 $40,860 Total Operating Expense & Depre $367,566 $376,587 $3811544 $369,448 $379,305 $389,456 Net Income Before Debt Service $96,238 $87,218 $82,260 $94,357 $84,500 $74,347 Debt Service $223,440 $235,110 $235,590 $250,390 $263,690 $270,380 Net Income ($127,202) ($147,892) _ $153,330 ($156,033) ($179,190) _t$196,033) Cumulative Depreciation $1,214,987 $1,281,867 $1,344,413 $1,385,293 $1,426,173 $1,467,053 Cumulative Profit/Loss ($1,015,726) ($1,163,618) ($1,316,949) ($1,472,982) ($1,652,172) ($1,848,206) 0 City of Rosemount, Minnesota 3% Esc thru 04, No Other Income $2,310,000 Bond Issue • Ice Arena Pro -Forma Operating Year Income Escalation 2017 Yr 95-04 Yr 05+ Insurance Operating Income: 3.00% 19,736 Ice Time 3.00% 0.00% $354,947 Services 3.00% 0.00% 108,857 Totaf Operating Income 19,736 $463,804 Other Income: $359,035 Depreciation: Banquet Facility Ilfe 0 Excess Tax Increment 2,044,000 0 Cost Reduction Contribution Equipment 0 Building Depreciation 0.0011/0 0 Total Other Income $40,880 $0 Total Income Expenses Escalation , Yr 95-04 Yr 05+ Operating Expense: FAL $354,947 108,857 $463,804 0 0 0 _ 0 $0 $463,804 $463,804 Personnel 3.00% 3.00% 191,280 Insurance 3.00% 3.00% 19,736 Utilities 3.00% 3.00% 128,283 Gen & Admin 3.00% 3.00% 19,736 Total Operating Expense $359,035 Depreciation: Cost Ilfe Building 2,044,000 50 40,880 Equipment 520,000 20 0 Total Depreciation $40,880 Total Operating Expense & Depre $399,915 Net Income Before Debt Service $63,889 Debt Service $275,860 Net Income $211 9711 Cumulative Depreciation $1,507,933 Cumulative Profit/Loss ($2,060,176) 197,018 20,328 132,132 20,328 $53,118 $0 $53,118 $1,548,813 ($2,007,058) 2019 $354,947 108,857 � $463,804 0 0 0 0 $463,504 ;yc:r err m,e $421,780 $42,024 $0- _$12.024_ $1,589,693 ($1,9$5,033) City of Hosemount, Minnesota Ice Arena Pro -Forma Total Net Levy Mat Interest Principal & Cap. Debt Year Year Principal Rate Interest Interest Interest Payable (i) (2) (3) (4) (5) (6) (7) (8) 1991 1993 0 3.10% 112,304 112,304 112,304 0 1992 1994 0 3.506 134,765 134,765 134,765 1993 1995 0 3.70% 134,765 134,765 134,765 1994 1996 0 3.900/0 134,765 134,765 134,765 1995 1997 20,000 4.20% 134,765 154,765 154,765 1996 1998 20,000 4.50% 133,925 153,925 153,925 1997 1999 30,000 4.80% 133,025 163,025 163,025 1998 2000 40,000 5.00% 131,585 171,585 171,585 1999 2001 45,000 5.15% 129,585 174,585 174,585 2000 2002 50,000 5.25% 127,268 177,269 17-7,268 2001 2003 55,000. 5.35% 124,M 179,643 179,643 2002 2004 65,000 5.45$6 121,700 186,700 166,700 2003 2005 75,000 5.55% 118,158 193,158 193,158 2004 2006 90,000 5.65% 113,995 203,995 203,995 2005 2007 95,000 5.75% 108,910 203,910 203,910 2006 2008 105,000 5.85% 103,448 208,448 208,448 2007 2009 115,000 5.90% 97,305 212,305 212,305 2008 2010 120,000 5.90% 90,520 210,520 210,520 2009 2011 140,000 5.95% 83,440 223,440 223,440 2010 2012 160,000 5.95% 75,110 235,110 235,110 2011 2013 170,000 6.00% 65,590 235,590 235,590 2012 2014 195,000 6.00% 55,390 250,390 250,390 2013 2015 220,000 6.05% 43,690 263,690 263,690 2014 2016 240,000 6.05% 30,380 270,380 270,380 2015 2017 260,000 5.10% 15,860 275,860 275,860 2016 2018 ^_ 0 6.10% 0 0 0 _ Totals: 2,310,000 2,554,889 4,664,869 112,304 4,752,585