HomeMy WebLinkAbout4.i. Payment #1, O'Leary's Hills 5th Addition, City Project #232E r CITY OF ROSEMOUNT EXECUTIVE SUNbiARY FOR ACTION CITY COUNCIL MEETING DATE: December 15, 1992 AGENDA ITEK: Payment #1, O'Leary's Hills 5th AGENDA SECTION: Add`Utl & Str'Impr. City Project #232- Consent PREPARED BY: Bud Osmundson City Engineer/Assistant AGENDA ffEM # L; Public Works Director ATTACEM1ENTS: Payment Voucher #1 APP VED Y: This item requests the first payment to Arcon Construction Co. in the amount of $124,632.11 for City Project #232, O'Leary's Hills 5th Addition. Work completed and represented in this amount as of November 18,1992 is 24% of contracted work. The work has been inspected and is in compliance with contract documents. The curb and gutter, bituminous, water and storm drain connections at Chippendale, and the storm drain connection to the Wachter Pond Outlet will be completed in the spring of 1993. Attached is a copy of the pay voucher for your information. Staff recommends approval of this first payment request. RECOKMENDED ACTION: MOTION TO APPROVE PAYMENT #1 TO ARCON CONSTRUCTION CO. IN THE AMOUNT OF $124,632.11 FOR O'LEARY'S HILLS 5TH ADDITION UTILITY AND STREET IMPROVEMENTS, CITY PROJECT #232. COUNCIL ACTION: 4 CITY OF ROSEMOUNT APPLICATION FOR PAYMENT NO. 1 CITY PROJECT NO: 232 SEH FILE NO: 92410.01 PROJECT: O'Leary's Hills 5th Addition - Utility & Street Construction CONTRACTOR: Arcon Construction Co. CONTRACT DATE: November 4,1992 903 East Forest Avenue November 30,1992 APPLICATION DATE: Mora, MN 55051 FOR PERIOD ENDING: November 18,1992 Total Contract Amount $_537,666-26 Total Amount Earned $ 131,191.70 Material Suitably Stored on Site, $ Not Incorporated into Work - Contract Change Order No Percent CompletE Contract Change Order No. Percent CompletE $ - Contract Change Order Nc. Percent Complete $ GROSS "AMOUNT DUE .......................................... 131,191.70 LESS 5% RETAINAGE ................................. ............ $ 6,559.59 $ 12--:_ 11 AMOUNT DUE TO DATE LESS PREVIOUS APPLICATIONS ............................ AMOUNT DUE THIS APPLICATION ...................... $ 124,632.11 APPROVED: Bud Osmundson, City Engineer/ Assistant Director of Public Works -i D SHORT ELLIOTT 1N�. APPLICATIONFORPAYMENT - - - _ 0 1992 (UNIT PRICE•CONTRACT) NO. 1 -ST. PA- U )WNER: ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 232 ----------------------------------- ENGINEER'S PROJECT NO. 92410 --------------- ,OCATION: O'LEARY'S HILLS 5TH ADDITION :ONTRACTOR ARCON CONSTRUCTION CO., INC. CONTRACT DATE ll/,4Z-2 2. ----- ------------- ----- ----- ------------------------ 903 EAST FOREST AVE. CONTRACT AMOUNT $537,666.26 MORA, MN 55051 ------------------------------- :ONTR. FOR O'LEARY'S HILLS 5TH ADDITION - UTILITY &STREET CONSTRUCTION -------------------------------------------------------------------- .PPLIC.DATE If 1'3 ............. 'ERIOD END. 1t 1a�q� --- ----------------- 1222.101 CRUSHED ROCK PIPE FOUNDATION TON 50 X222.103 GRANULAR PIPE FOUNDATION TON 1222.107 REPLACEMENT BACKFILL TON 273.112 X273.113 8"PVC SEWER,10'-15' DEEP L.F. 8"PVC SEWER,15'-20' DEEP L.F. 50 100 371 371 949 949 'AGE 1 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 8.00 ' 5.00 5.00 15.08 5,594.68 15.38 14,595.62 APPLICATION FOR PAYMENT ----------------------- CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL ------------------------------------------------------------------------------ .CHEDULE A - SANITARY SEWER ------------------------------------ 1207.403 REMOVE SANITARY SEWER L.F. 60 6.00 )207.410 REMOVE MH DROP. SECTION L.F. 5.3 5.3 50.00 265.00 1222.101 CRUSHED ROCK PIPE FOUNDATION TON 50 X222.103 GRANULAR PIPE FOUNDATION TON 1222.107 REPLACEMENT BACKFILL TON 273.112 X273.113 8"PVC SEWER,10'-15' DEEP L.F. 8"PVC SEWER,15'-20' DEEP L.F. 50 100 371 371 949 949 'AGE 1 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 8.00 ' 5.00 5.00 15.08 5,594.68 15.38 14,595.62 210 210 30.27 )273.213 10"PVC SWR,15'-20' DEEP L.F. )273.214 10"PVC SWR,20'-25' DEEP L.F. )273.215_ 10"PVC SWR,25'-30' DEEP L.F. )273.225 10"DIP SWR,25'-30' DEEP L.F. )273.501 MANHOLE, 10' DEEP EACH )273.511 EXCESS MANHOLE DEPTH L.F. )273.611 8" X 4" PVC WYE EACH )273.612 10" X 4" PVC WYE EACH )273.011 4" PVC SERVICE PIPE L.F. )273.015 4" PVC RISER PIPE L.F. )273.531 CONNECT TO EXISTING MH EACH :CHEDULE-B - WATERMAIN 5.74 ------------------------------------ )259.001 AGG. BASE RESTORATION IN. -S. )259.011 BIT. SURFACE RESTORATION IN. -S. )266.106 6" DIP W.M., CL. 52 L.F. )266.108 8" DIP W.M., CL. 52 L.F. )266.211 6" GATE VALVE AND BOX EACH )266.212 8" GATE VALVE AND BOX EACH )266.181 DIP FITTINGS LB• )266.311 HYDRANT EACH )266.322 SALVAGED HYDRANT EACH )266.411 1" COPPER SERVICE PIPE L.F. )266.421 1" CORPORATION STOP EACH )266.431 1" CURB STOP AND BOX EACH )266.511 16" X 8" PRESSURE TAP W/8" GATE VALVE AND BOX EACH )266.611 INSULATION BD.FT. )266.531 CONNECT TO INPLACE WM EACH 210 210 30.27 6,356.70 187 187 30..27 5,660.49------ 38 38 30.27 1,150.26 84 84 37.37 3,139.08-- 7 3 1170.00 ^8,190.00 64 53 55.60 2,946.80 31 31 37.00 1,147.00 4 4 72.00 288.-00 1350 5.74 319 5.74 1 1 360.00 360.00 297 149 1450 1, 440 902 719 9 9 3 3 1600 4 4 1 1 1620 35 35 1 256 128 2 2 'AGE 2 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 0.80 6.30 11.31 16,286.40 . 13.46 9,677.74 283.00 2,547-00 378.00 1,134.00 1.71 1130.00 4,520.00 240.00 240.00 7.04 35.00 67.50 1300.00 1.00 128.00 120.00 240.00 ;CHEDULE C - STREETS )150.510 MOBILIZATION L.S. )157.201 TRAFFIC CONTROL L.S. )207.401 REMOVE CONC C & G L.F. )213.005 - ROCK CONST. ENTRANCE EACH )222.601 COMMON EXCAVATION (LV) C.Y. )222.621 GRANULAR BORROW (LV) C.Y. )222.701 TEST ROLLING R.S. )222.801 SUBGRADE PREPARATION R.S. )223.803 AGG. BASE PLACED, CL. 5 C.Y. )251.108 TYPE 41 WEARING COURSE MIXTURE TON )251.110 TYPE 31 BASE COURSE MIXTURE TON )252.201 CONC. CURB AND GUTTER L.F. )253.001 4" CONCRETE WALK S.F. )253.002 6" CONCRETE WALK S.F. )254.702 )259.001 )259.011 )260.701 )260.703 )284.703 )284.702 )293.001 )293.002 :293.005 )293.011 BIT. MAT. FOR TACK COAT GAL. AGG. BASE RESTORATION IN. -S. BIT. SURFACE RESTORATION IN. -S. ADJUST FRAME & RING 4.00 CASTING EACH ADJUST VALVE BOX EACH PERMANENT BARRICADES L.F. STREET NAME SIGN EACH SEEDING ACRE SEED, MIXTURE 600 LB. SODDING, TYPE LAWN S.Y. MULCH MATERIAL, TYPE I TON 1 •.50 8700 . oo 4,350.00 1 1500.00 40 4.00 3 300.00 1000 1.50 1000 3.50 21 10.00 21 100.00 1212 13.50 580 580 4440 .1770 120 410 222 111 15 7 32 3 1.2 88 1735 2.3 'AGE 3 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 19.80 18.80 5.75 1.55 1.90 1.00 0.80 6.30 150.00 100.00 24.40 225.00 280.00 2.25 1.28 105.00 293.019 DISC ANCHORING ACRE 1.2 293.023 WOOD FIBER BLANKETS, 213.003 SILT FENCE, PREASSEMBLED L.F. -TYPE HV S.Y. 200 293.032 COM. FERTILIZER, C.Y. 1259.001 AGG. BASE RESTORATION 'ANALYSIS 12-12-12 LB. 120 611.223 2" NONMETALLIC CONDUIT L.F. 240 CHEDULE D - STORM SEWER PHASE I: O LEARY'S HILLS 5TH ADDITION 153.501. TEMPORARY FENCING L.F. 213.001 BALE CHECK EACH 213.003 SILT FENCE, PREASSEMBLED L.F. 227.507 GROUTED RIPRAP CL. III C.Y. 227.511 GRANULAR FILTER C.Y. 1259.001 AGG. BASE RESTORATION IN. -S. )259.011 BIT. SURFACE RESTORATION IN. -S. ►272.001 12" RCP CB LEAD, CL. IV L.F. )272.002 15" RCP CB LEAD CL. III L.F. )272.013 18 -RCP STORM SWR, CL III L.F. )272.015 21"RCP STORM SWR, CL III L.F. )272.016 24"RCP STORM SWR, CL III L.F. )272.017 27"RCP STORM SWR, CL III L.F. )272.018 27"RCP STORM SWR, CL IV L.F. )272.019 27"RCP STORM SWR, CL V L.F. 1272.037 27" RCP APRON 360.00 W/TRASH GUARD EACH 1272.041 MANHOLE, TYPE B L.F. 272.042 MANHOLE, TYPE C Z.F. 272.043 MANHOLE, TYPE D L.F. 272.045 MANHOLE, TYPE F L.F. 272.051 CATCH BASIN, TYPE X L.F. 600 133 30 300 7 4 164 82 259 119 218 20.89 130 31 637 637 526 317 19,810.70 85 37.09 1 1 18.4 22.2 17.2 18.9 18.9 16 43.6 ,AGE 4 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 48.00 1.28 0.23 6.00 3.50 465.50 5.00 2.00 90.00 20.00 0.80 5.30 22.54 23.04 20.89 22.74 24.29 31.10 19,810.70 37.09 11.757.53 53.20 740.00 740.00 153.00 168.00 2,889.60 176.00 3,326.44 360.00 146.60 272.052 CATCH BASIN, TYPE Y L.F. 272.053 CATCH BASIN, TYPE C-1 L.F. 272.061 MH CASTING, TYPE R-1642 EACH 292.602 CATCH BASIN CASTING, TYPE R -3067V EACH 292.071 CONNECT TO INPLACE STORM SEWER EACH 293.005 SODDING, TYPE LAWN S.Y. 293.032 COM. FERTILIZER, ANALYSIS 12-12-12 LB. CHEDULE E - STORM SEWER PHASE II: 'LEARY'S HILLS FUTURE ADDITIONS ----------------------------------- 153.501 TEMPORARY FENCING L.F. 207.402 REMOVE STORM SEWER L.F. 207.409 REMOVE STORM SWR STRUC. EACH 211.502 CLEARING TREE 211.507 GRUBBING TREE 222.101 CRUSHED ROCK PIPE FOUNDATION TON 222.103 GRANULAR PIPE FOUNDATION TON 222.107 REPLACEMENT BACKFILL TON 259.001 AGG. BASE RESTORATION IN. -S. 259.011 BIT. SURFACE RESTORATION IN. -S. 272.014 18"RCP STORM SWR, CL IV L.F. 272.018 27"RCP STORM SWR, CL IV L.F. 272.019 27"RCP STORM SWR, CL V L.F. 272.020 36"RCP STORM SWR, CL IV L.F. 272.021 36"RCP STORM SWR, CL V L.F. 272.022 48"RCP STORM SWR, CL IV L.F. 272.042 MANHOLE, TYPE C L.F. 14.8 152.00 18.2 18.2 186.00 3,385.20 8 252.00 16 290.00 1 2050 42 500 430 2 3 3 50 50 100 3335 1668 10 693 238 309 486 425 73.9 AGE 5 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 360.00 1.28 0.23 3.50 4.00 200.00 100.00 50.00 8.00 5.00 5.00 0.80 6.30 24.95 30.82 41.29 48.84 61.70 79.65 146.00 )272.043 MANHOLE, TYPE D L.F. )272.044 •MANHOLE, TYPE E L.F. )272.055;. CATCH BASIN, TYPE -J L.F. )272.061 MH CASTING, TYPE R-1642 EACH )272.062 CATCH BASIN CASTING, TYPE R -3067V EACH )272.072 CONNECT TO INPLACE MH EACH )293.001 SEEDING ACRE )293.002 SEED, MIXTURE 600 LB. )293.004 SEED, MIXTURE 1100 LB. )293.005 SODDING, TYPE LAWN S.Y. )293.011 MULCH MATERIAL, TYPE I TON )293.019 DISC ANCHORING ACRE )293.023 WOOD FIBER BLANKETS, TYPE HV S.Y. )293.032 COM. FERTILIZER, ANALYSIS 12-12-12 LB. ;CHEDULE F - STORM SEWER PHASE III: ;OUTH ROSE PARK ADDITION ------------------------------------ )207.402 REMOVE STORM SEWER L.F. )213.003 SILT FENCE, PREASSEMBLED L.F. )222.101 CRUSHED ROCK PIPE FOUNDATION TON )222.103 GRANULAR PIPE FOUNDATION TON )222.107 REPLACEMENT BACKFILL TON 1227.507 GROUTED RIPRAP CL. III C.Y. )227.511 GRANULAR FILTER C.Y. 1272.012 15"RCP.STORM SWR, CL IV L.F. 1272.014 18"RCP STORM SWR, CL IV L.F. 92.5 41.6 19 12 1 1 2.5 11 189 2111 5 2.5 200 294 65 700 50 50 3590 6 3 385 154 'AGE 6 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 181.20 295.00 86.00 252.00 290.00 360.00 280.00 2.25 0.38 1.28 105.00 48.00 1.28 0.23 6.00 1.50 8.00 5.00 2.50 90.00 20.00 20.60 22.10 272.033 18" RCP APRON W/TRASH GUARD EACH 1 272.041 MANHOLE, TYPE B L.F. 37.1 272.061_,.`.MH CASTING, TYPE R-1642 EACH 3 272.071. CONNECT TO INPLACE STORM SEWER EACH 1 293.001 SEEDING ACRE 2.1 293.003 SEED, MIXTURE 800 LB. 170 293.011 MULCH MATERIAL, TYPE 1' TON 4.2 293.019 DISC ANCHORING ACRE 2.1 293.023 WOOD FIBER BLANKETS, TYPE HV S.Y. 8500 293.032 COM. FERTILIZER, ANA. ANALYSIS 12-12-12 LB. 212 AGE 7 OF 8 SHORT-ELLIOTT-HENDRICKSON, INC. 570.00 100.40 252.00 360.00 280.00 1.65 105.00 48.00 1.28 0.23 APPLICATION FOR PAYMENT - Continued Total Contract Amount $ 5 3 7, _6 6 6.2 6 Total Amount Earned $ 131,191.70 Material Suitably Stored on Site, Not Incorporated into Work $ Contract Change Order No. Percent Complete $ Contract Change Order No. Percent Complete $ Contract Change Order No. Percent Complete $ GROSS AMOUNT DUE .........................$ 131,191.70 LESS ✓ % RETAINAGE ..................$ -6, 4 4 o•W 4'jgy sf AMOUNT DUE TO DATE $ 50-73- L94t, 4W. fl LESS PREVIOUS APPLICATION ..........$ AMOUNT DUE THIS APPLICATION.....$'�'�>632.�1 CONTRACTOR'S AFFIDAVIT The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress pay- ments received from the Owner on account of work performed under the contract referred to above have been applied by the undersigned to discharge in full all obligations of the undersigned incurred in connection with work covered by prior Applications for Payment under said contract, and (2) all materi- als and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment are /free and clear of all liens, claims, security interests and encumbrances. Dated /Arcon Construction Co., Inc. (C t ctor) (Name and Title) COUNTY OF Kanabec ) SS STATE OF Minnesota ) Before me on this 25th day of November 1992 personally appeared Michael Denker known to me, who being duly sworn, did depose and say that he is the secretary/Treasurer of the Contractor above mentioned; that he (Office) executed the above Application for Payment and Affidavit on behalf of said Contractor; and that all of the statements contained therein are true, correct and complete. :'r�':'4RMlMl:+:"t/;'1i1:".1" tt"lJU:��A•AA�1Md�x M Commission Expire.. =w�a Y P April 9 ,,_ 1 4 Q "c) i, t. Cc ? s__ �:� G:.. brit 9, 19.°5 (Notary Pu The undersigned has checled the Cori tf6ftw ication for Payment shown above. A part of this Application is the Contractor's Affidavit stating that all previous payments to him under this Contract have been applied by him to discharge in full all of his obligations in connection with the work covered by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. Date _ 1 a. Page 8 of 8 RT L 7HENDRIGKSON, INC, P. By �,y , E.